Ma'y 17, 1990
%..PDIII-2r/f(("JZwolinski NRC & Local PDRs locket Nos. 50-254 and 50-265
.CMoore L01shan-DDudley OGC
^
Mr. Thomas J. Kovach EJordan ACRS (10)
Nuclear Licensing Manager Plant File Commonwealth Edison Company-Suite,300 OPUS West III 1400 OPUS Place Downers Grove,' Illinois 60515
Dear Mr. Kovach:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR TRIP RELIABILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS. 54017 AND 54018).
Generic Letter 83-28. Item 4.5.3..' required confirmation from all licensees and applicants that en-line functional testing of the reactor trip system, including independent tuting of the diverse trip feature, was being performed.
By letters dated August 23, 1985, and May 1, 1990, you submitted responses to Generic Letter 83-28. Item 4.5.3.
Therein you indicated your endorsement of the BWR Owner': Groups Reports NEDC 30844 and NEDC 30851P, as being applicable to Quad Cities. The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the BWR Owners Group's report. We conclude that the existing intervals for on-line functional testing at Quad Cities are consistent with achieving high reactor trip system availability.
The enclosed safety evaluation and contractor's report (EGG-NTA 8341) provide the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28 Item 4.5.3 to be complete.
This completes all staff activities related to TAC Nos. 54017 and 54018.
Sincerely.
Original signed by Leonard H. 01shan, Project Manager Project Directorate III-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
ggg32gggg pg,ggg54 l
See next page P
PDC 0FFICIAL RECORD COPY Document Name:
5401 I
- LA DIII-2:PM PD111' :
)PD e
L01shan:ta djey DDy/ f>/90 g
g i
4
/90 5 /N/90 g
tp
o
,.y
/pwouq'ci (t
UN11EDSTATEs P.'
NUCLE AR REGULATORY COMMISSION h
. /: o W ASHINGTON, D, C. 20bb6 n
%...../
May 17, 1990 i
Docket Nos. 50 254 I
and 50-265 Mr. Thomas J. Kovach Nuclear Licensing Manager Commonweelth Edison Company-Suite 300 i
OPUS West III 1400 OPUS Place Downers Grove, Illinois 60515 5
Dear Mr. Kovach:
SUBJECT:
SIJETY EVALVATION FOR GENERIC LETTER 83 28, ITEM 4.5.3, REACTOR TRIP RELitCILITY - ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TACNOS.54017AND54018) required confirmation from all licenstes i
Generic Letter 83-28, Item 4.5.3.Ional testing of the reactor trip system, and applicants that on-line funcL including independent testing of the diverse trip feature, was being perforned, By letters dated August 23, 1985, and May 1,1990, you submitted responses to i
Generic Letter 83-28, Item 4.E.3.
Therein you indicated your endorsement of the BWR Owner's Groups Reports NEDC 30844 and NEDC 30851P, as being applicable to Quad Cities. The NRC staff, with the assistance of our contractor, Idaho Nationel Engineering Laboratory, has reviewed your responses and the BWR Oviners Group's report. We conclude that the existing intervals for on-line functional testing at Quad Cities are consistent with achieving high reactor-trip system availability.
'Theenclosedsafetyevaluationandcontractor'sreport(EGGNTA8341) provide-l the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, item 4.5.3 to be complete.
This completes all staff activities related to TAC Noc. 54017 and 54018.
Sincerely, ffAk
/Y leonard N. 01shan, Project Manager Project Directorate 111-2 j
Division of Reactor Projects - III,
-)
lY, Y and Special Projects Office of Nuclear Reactor Regulation J
Enclosure:
As stated i
cc w/ enclosure:
See next page 4
-s c
n
Mr. ' Thomas J. Kovach Quad Cities Nuclear Pcwer Station
.Comitorwealth Edison Company Units 1 and 2 cci Mr. Stephen E. Shelton Vice President Iowa-Illinois Gas and Electric Company P. O. Box 4350 Davenport, Iowa 52808 Michael 1. Miller, Esq.
Sidley and Austin One First National Plaza Chicago, Illinois 60690 Mr. Richard Bax Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 Resident inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, Illinois 61201 lilinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator, Region 111 U. S. Nuclear Regulatory Comit,ission 799 Roosevelt Road, Bldg. f4 Glen Ellyn, Illinois 60137 Robert Neumann Office of Public Counsel State of Illinois Center 100 W. Randolph Suite 11-300 Chicago, Illinois 60601 i
)