IE Insp Rept 50-373/81-35 on 810928-29.No Noncompliance Noted.Major Areas Inspected:Completed Preoperational Sys Demonstrations & Tests,Open Insp Items,Radiation Protection Procedures & IE Circular 81-07
ML20032A381
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 10/15/1981
From: Greger L, Miller D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20032A376 List:
References
50-373-81-35, IEC-81-07, IEC-81-7, NUDOCS 8110290471
Download: ML20032A381 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

_ _ _ _ _ - - _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - _ _ _ _ _

_ _ ____ ___ ___ _ _ __ _ _ _ __

__,

-

..

,

'U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCU SIT.

REGION III'

Report No. 50-373/81-35-Docket No. 50-373-License-No.~CPPR-99

. Licensee: ; Commonwealth Edison Company Post Office Box 767

hicago, IL 60690 Facility Name: LaSalle County Nuclear Station,' Unit 1

,

-

Inspection At: LaSalle Site, Seneca, IL Inspection Conducted: September 28 and 29,.1981 Inspector:

D. E.

iller

/8 - / 6 -O/ '

Nb Approved By:

L. R. Greger, Chief

/O - /f - 8/

Facilities Radiation Protectioru Section Inspection Summary Inspection on September 28 and 29, 1981 (Report No. 50-373/81-35)_

Areas Inspected: Routine, u announced inspection of completed preoperational systems demonstrations and tests, radiation protection procedures, open in-spection items, and IE Circulars. The inspection involved 18' inspector-hours onsite by one NRC inspector.

Results: No items of noncompliance or deviations were identified.

h 0 h O 00 x

t______________________________=_____________________________________________

_ _.

W

-

.

DETAILS 1.

Persons Contacted

  • R. Holyoak, Station Superintendent R. Bishop, Assistant Superintendent, Admini.trative and Support Services
  • C. Schroeder, Technical Staff Supervisor
  • F. Lawless, Rad / Chem Supervisor
  • P. Manning, QC Supervisor
  • E. Stevak, Quality Assurance J. Lewis, Health Physics Coordinator J. Williams, Radwaste Coordinator - Operations G. Watts, AIR Coordinator
  • S. Shepley, Resident Inspector, NRC The inspector also contacted several technicians and engineering aFsistants during the inspection.

.

  • 0enotes those present at the exit meeting.

2.

General This inspection, which began at 8:00 a.m. on September 25, 1981, was conducted to examine complcted preoperational systems demonstrations and tests, radiation protection procedures, open inspection items, and IE Circulars.

3.

Raciation Protection Procedures:

The inspector reviesei the following new or recently revised radiation protection procedures. They appear tr,be compatible with regulatory requirements and FSAR commitments:

LRP 1130-1 Revision 3 Radiological Signs and Labels LRP 1150-4 Revision 0 Area Radiation Monitor Check Sources LRP 1250-6 Revision 1 Quarterly On-Site TLD Surveillance LRP 1270-6 Revision 0 Operation and Use of the Shepherd Model 89 Shielded Calibrator LRP 1290-2 Revision 0 Radiation Evaluation Program (REP) SYFA Entry LRP 1360-6 Revision 2 Air Sampling of Suspected Radioactive Airborne Areas LRP 1370-1 Revision 0 Calibration of Air Sampling Equipment LRP 1430-1 Revision 3 Unconditional Releases LRP 1610-2 Revision 2 Radioactive Sources 4.

Unresolved and Open Items The following matters were noted by the inspector during previous inspections. Corrective actions were reviewed during this inspection.

-2-

'

L

-.

.

-

. -. -

e.

e a.

Area Radiation Monitoring Syntem Three area radiation monitors need to be relocated to perform their intended function. Facility change requests have 'veen written and 1pproved, and relocation is in progress.

(373/81-04-01)

b.

Radwaste Operating Procedures Radwaste operating procedures need major revision. The inspector reviewed the recently revised procedures. No significant prob-lems were noted.

(373/81-11-03)

5.

IE Circular No. 81-07

The licensee's actions in res;onse to IE Circular No. 81-07, " Control of Radioactively Contaminated Material," were reviewed.

The licensee revised Procedures LRP 1130-1 and Lpr 1430-1 to include acceptable contamination survey instrument sensitivities. No problems were noted.

(373/81-04-02).

6.

Preoperational Tests and Systems Demonstrations The following systems test and demonstration packages have been completed and reviewed by the licensee. The inspector reviewed the completed packages. Outstanding deficiencies, which include purchase and installation of higher capacity pumps in the liquid radwaste test, and various indicating light alterations, appear to be adequately addressed by facility change requests. No significant problems were noted.

PT-AR-101 Area Radiation Monitoring System SD-WE-101C Liquid Radwaste Laundry Drain Reprocessing SD-WX-101 Solid Radwaste 7.

Exit Meeting The inspector met with licensee representatives (denoted in Section 1)

at the conclusion of the inspection on September 29, 1981. Discussed were the scope and findings of the inspection.

i-3-L_