IR 05000373/1981025

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-373/81-25 & 50-374/81-13 on 810616-17, 0714-15 & 23-24.No Noncompliance Noted.Major Areas Inspected:Reporting Quality Nonconformance During Const & Test Per Ceco Procedure QP15-1
ML20031F952
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/08/1981
From: Baker K, Sutphin R, Wescott H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20031F938 List:
References
50-373-81-25, 50-374-81-13, NUDOCS 8110200587
Download: ML20031F952 (13)


Text

.

.

.

!-

.

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-373/81-25; 50-374/81-13

Docket No. 50-373; 50-374 License No. CPPR-99; CPPR-100 Licensee-Commonwealth Edison Company P. O. Box 767 Chicago, IL 60690 Facility Name: La Salle County Station, Unit 1 Inspection At: La Salle Site, Marseilles, Illinois Inspection Conducted: June 16-17, July 14-15, 23-24, 1981

!

Inspectors:

T. N. Sutphin jo[f'/f/

P I @ f. Y e d

'

e H. M. Wescott

/r f/

<

Approved By:

. Baker, Chief

/C

/

.

Management Programs Section

'

(-

Inspection Summary Inspection on June 16-17, July 14-15, 23-24, 1981 (Report No. 50-373/81-25; 50-374/81-13)

Areas Inspected: Review of control of procured material and equipment -

receiving and inspection per CECO Quality Procedure Q.P. No. 7-1; reporting quality nonconformances during construction and test per CECO Procedure Q.P. No. 15-1; and interim release of components; followup of 10 CFR 50.55(e)

reports. The inspection involved a total of 53 inspector-houn on site by two h3C inspectors.

Results: No items of noncompliance or deviations were identified.

i F1102OO587 811009 PDR ADOCK 05000373 i o..

PDR

.

__

.

.

.

'

DETAILS 1.

Persons Contacted Commonwealth Edison Company

  • R. A. Braun, Q. A. Supervisor
  • L. J. Burke, Site Project Superintendent
  • J. W. Gieseker, Staff Assistant Project Superintendent
  • S. P. Johnson, Construction Supervisor
  • L. H. Lauderbach, Q.A. Supervisor G. F. Marcus, Director of Q.A., Eng. & Construction E. R. Netzel, Q.A. Engineer T. E. Quaka, Q.A. Superintendent
  • W. E. Reidy, Q.A. Engineer
  • D.

L. Shamblin, Stafi Asst. Project Manager's Office

  • D. J. Skoza, PCD Engineer
  • D. A. Spencer, Q.A. Engineer E. E. Spitzner, Start Up Coordinator B. Steprenson, Project Manager

,

i

  • R. D. Vine, Q.A. Engineer l
  • R. E. Waninski, Q.A. Engineer

Foley Construction

  • D. Heider, Q.C. Supervisor

'

Morrison Construction Company

.

  • D. Kanakares, Q.C. Inspector
  • M. Wherry, Q.C. Supervisor
  • Denotes those present at the exit interview July 24, 1981.

2.

Licensee Action on Previous Inspection Findings (Closed)

10 CFR 50.55(e) Report, dated November 26, 1980 (Nos. 373/80-04 and 374/80-04), Subject: Suppression Pool Water Volume. The inspector reviewed Commonwealth Edison's thirty (30)

'

day report to RIII dated December 24, 1981, and the final report to RIII dated May 6, 1981, stating that the final Safety Analysis Report was amended (Amendment 54) to reflect the as-built situation.

A re-analysis was performed by General Electric and confirmatory -

re-analysis was performed by Sargent and Lundy showing that a ten percent reduction in suppression pool water volume did not show a marked difference in pool temperature response.. Review of CE's letter to USNRC Licensing Branch dated June 29, 1981 established that Revision 9 to the LaSalle County Station Desi.en Assessment Report included an update of Chapter 6.0 addressimg suppression pool water temperature response.

.

-2-J

, ---


,-is3,ve.,

e.

,-

-,-.-w-..

--,--.emm w<

,-

c-m,,

,w,

.,

w+,,-r,-

,-er

,..,+-~~y y,---ry

,.

,,-y-~

,<x-wwg,.-r y-

,. -. - -,, - - - --

- __

_

-

-

_____

l l

.

,

This item is considered closed and in accordance with Commonwealth Edison's final report to RIII.

(Closed)

10 CFR 50.55(e) Report, dated November 12, 1980 (Nos. 373/80-06 and 374/80-06), Subject: Electrical Termination Lug Design. The inspector reviewed the following:

(1) Letter from CE to RIII dated December 15, 1980, Subject: Response to IE Inspection Report No. 50-373/80-43, w/ enclosure.

(2) Letter from RIII to CE, dated January 9, 1981, in response to Item 1 above.

(3) Final report from CE to RIII, dated January 19, 1981, stating that all defective lugs had been replaced.

(4) Review of GE's Field Deviation Disposition Request No. HAl-540 dated September 15, 1978, stating that greater than 200 nr.mber of runs of No. 14 AWG wire terminated with No. 10 or No. 12 ring lugs.

It was noted that travellers were not used to document the lug replacement program; however, FDDR No. HAl-540 indicates disposition completed.

The inspector considers this item closed and in conformance with Item 3 above.

(Closed)

10 CFR 50.55(e) Report, dated March 24, 1981, (Nos. 373/81-03 f

and 374/81-03), Subject: LPRM Connector Deficiency - Type 901-200.

The inspector reviewed S & L letter to CECO (SGE-390) dated April 1,

[

1981, with enclosures which identified the deficiency ar.d specified corrective action. The inspector considers this item closed and in conformance with CECO's final report to RIII dated April 29, 1981.

3.

Control of Procured Material and Equipment a.

The inspector conducted a review of the control of procured material and equipment - receiving and inspection records - and the requirements of CECO Quality Assurance Manual, Quality Pro-cedure Q.P. No. 7-1.

This review was initiated in the receiving area by a review of the receiving log and included the selection of examples of the receipt of safety related items for further detailed analysis. The following items were selected, as identi-fied by their MRR number from Form QP7-1.1, " Material and Equip-ment Receiving and Inspection Report CECO Engineering and Construction", for the initial review:

-3-

. _ _ _ _.

.

.

.

Notes, Etc.,

List MRR Date Spec.

Description Hold Tag No.

No.

Status ** No.

Shipped Ref.

of Item (H.T. #)***

  • 1 C

2 & 10 1/29/74 J-2500 RHR Ht. Exchan-H.T. #1058 gers, & Flange Relief Valves

  • 2 C

100 8/30/74 J-2534 Reactor Pedestal Code 1 Base Inner Ring

  • 3 C

346 1/15/75 J-2500 Core Spray Line Code 1

  • 4 C

1236 12/19/75 J-2500 Shell for RHR H.T. #1304 Pump

  • 5 C

1244 12/18/75 J-2500 RHR Pump H.T. #1305

  • 6 C

1471 1/26/76 J-2966 1/C #4 AWG Wire See Hold Tag 1/C #10 AWG Wire 7 C 1576 2/20/76 J-2966 Conductors H.T. #2117 thru 2136 8 C 3402 2/16/77 J-2938 4" 150# & 18" Non Safety 150# Valves Related III 9 C 3417 2/18/77 J-2961 Prefab Pipe Non Safety Related III 10 C 3432 2/14/77 J-2500 Presrure 3 - Safety Transmitter Related

  • 11 C

3445 2/19/77 J-2500 Jet Pump H.T. #3751 Penetration Seal NRC #145 12 C 4801 1/9/78 J-2943 Solenoid Valves Code 3 ***

  • 13 C 4808 12/22/77 J-2950 Y2 Globe & Stop Hold Check Valves 14 C 4837 1/31/78 J-2585 Fan Code 1 15 C 4847 1/23/78 J-2909 Discharge and Code 3 Vac.Bkr. Valves 16 C 4861 2/7/78 P.O.#

Pipe Elbow Sect. III 205959 17 C 4866 2/6/78 J-2908 D.G. Fuel Trans-Code 3 fer Pumps

  • 18 C 4892 2/15/78 J-2584 Isolation Code 1 h.T.

Dampers

  1. 4410-4413 19 C 6057 1/8/79 J-2938 Globe Valves Code 3 H.T.
  1. 4628-29 20 C 6076 1/15/79 J-2937 Control ValvesSection III 21 C 6099 1/19/79 J-2940 Butterfly Valve Section III
  • 22 C 6119 1/25/79 J-2500 N2 Nozzle Section III Safe Ends
  • 23 B 6125 1/28/79 J-2967 Instrument Cable Code 1 24 B 7231 1/17/80 J-2918 Hanger Items Code 1 25 B 7237 1/18/30 J-2941 Relief Valves Code 3 26 C 7247 1/16/80 J-2500 Term. Boxes H.T. #4830 Htrs. - D.G.

l 27 B 7254 1/14/80 CECO P. Bevel Washers Code 1 0. 501363

'

  • 28 C 7257 1/28/80 J-2918 Hanger Items Code 1 H.T.
  1. 4832-33 l

!

l-4-

. -

.

.

.

-

I

.

!

Notes, Etc.,

List MRR Date Spec.

Description Hold Tag No.

No.

Status ** No.

Shipped Ref.

of Item (H.T. #)***

29 B 7312 2/20/80 J-2918 Hanger Items H.T. #4882-84 30 C 7376 3/3/80 J-2938 Globe Valves Code 3 H.T.

  1. 4893-4896
  • 31 C 7420 4/1/80 J-2990 Embedment Plates Code 1 H.T.
  1. 4913-4923 32 B 7451 4/2/80 P.O. #

Battery &

Code 1 H.T.

,

'

197419 Charger

  1. 4757-59

33 B 7474 4/8/80 J-2544 Misc. Electric Code 1 Reject Tags 1155, 1156 i

l 34 B 8423 1/19/81 J-2961 Studs W/ Nuts Code 3 35 C 8425 1/21/81 J-2500 Temperature Ele-Code 1

.-

ments

.

  • 36 (Ship 8430 1/23/81 J-2543 Misc. Electric H.T. #6362 l

Short)

!

37 C 8435 1/26/81 J-2966 Electrical Cable Code 1 8446 2/4/81 J-2543 Misc. Electric Code 2

-

H.T. #6363 39 B 8489 2/17/81 J-2990 Mech. (Grease)

Code 1 Parts H.T. #6361

.

  • 40 B 8504 2/20/81 J-2552 Penetration Code 1 Tool Kit H.T. #6451

'

41 B 8518 2/27/81 J-2938 Rep 1. Yokes

-

42 B 8519 3/2/81 J-2938 Rep 1. Motors Code 1 Limatorque 8535 3/12/81 J-2560 See Packing List Code 1

-

  • 44 A 8667 5/5/81 J-2944 RHR Service Code 3 Water Pump - Spare H.T. #6691
  • 45 8690 5/18/81 J-2990 S.S. Pipe Code 1

-

H.T. #6710-12 46 B 8698 5/1/81 J-2938 Replacement Yoke Code 3 H.T. #6705-8

,

  • MRR selected for further detailed review.
    • The " status" is - the receipt quality status classification (A, B, or C)

I

'

per CECO Quality Procedure Q.P. No. 7-1 Section 3.1 in effect as of the date of _this inspection.

'

Classification A = Hold Status

,

Classification B = Interim Release Classification C = Acceptable

[

      • The code classification per MRR Form Q.P. 7-1.1 is:

i

'

Code Class. 1 - Safety Related Non-ASME Sec. III Code Class. 2 - Non-Safety Related-Code Class. 3 - ASME Sec. III l

!

-5-

_.,.. -. _

., _ _.. _. _ _ _ _,. _,. _ _ _ -. _.. _. _. _, -. _ _,.., _

_ _. -. _., _ _ - _. _. _., _.

t l

'

.

.

.

'

During the initial review the inspector checked the Code Class (1, 2, 3) and the Classification Status (A, B, C) as designated for the 46 MRR's reviewed.

.

Of particular interest was the Status "B" classification. This

'

classification is defined as follows in Section 3.1.2 of the CECO Quality Procedure Q.P. No. 7-1:

"3 1 2 Interim Release - (Classification B)

..

Equipment, components, or materials in an undamaged condition which lack. a required quality documentation may be given interim release on the CECO material receiving report by site QA for installation (not on " Hold") provided the following is received at the site:

a.

For safety-related, non-ASME Section III Code items, an accept-able Certificate of Conformance and, as applicable, either an ASME Code Data Report, Certified Material Test Report or a Material Manufacturer's Certificate of Compliance. Where pro-curement requirements are identical to the ASME Code. require-ments, only the applicable Code document listed above is required to permit interim release of purchased material or items by Quality Assurance for installation.

,

The requirements for Certificate of Conformance, ASME Code Data Forms and/or Certified Material Test Reports shall be as speci-fied in the procurement documents. Follow-up is required to obtain necessary documentation and close out of the CECO material receiving report (Form QP 7-1.1)."

i The inspector did not find any problems in the coding and classi-fications during this initial review activity.

b.

Detailed Analysis of Selected MRR - Safety Related Items - As Designated * in a.

(above)

'

(1) HRR Number: 2 (Unit #1)

>

Item: 2 RHR Heat Exchangers Shipper: Struthers Wells Corp.

Date Shipped:

12/16/73 CECO P. O. #124620; G.E. P. O. #205-AA668 Specification: J-2500 Code Class 1 Receiving / Inspection Report 12/20/73 Hold Tags No. 1051, 1052; Document Deficiency QA Checklist Reed 11/9/73 by G. E. Power Equipment Div.

Accepted by CECO 4/3/74 Hold Tags Released 4/4/74 by Field Engineer Hold Tags Released 4/5/74 by Q. A. Supervisor Final Records Transmitted 5/24/76 by S & L Q.C.

Final Records Received 5/25/76 CECO Final Records Received - Site 5/26/76 Final Records Reviewed 7/14/76 Q.A. Engineer Final Records Acceptance 7/14/76 Q.A.

-6-

,,. - -

an

.,,.n v,

,.e

,e

---.n-

,.,, ~

,.a.,.,

-.

--r,,

.-

,,a-

,

,,,,g..

,

...,m.,m

.

.

.

(2) MRR Number:

2 (Unit #2)

Item:

2 RHR Heat Exchangers Shipper:

Struthers Wells Corp.

Date S' ipped:

12/16/73 CECO P. O. #124620; G.E. P. O. #205-AA668 Specification J-2500 Code Class 1 Receiving / Inspection Report 12/20/73 Hold Tags No. 1053, 1054; Document Deficiency Q.A. Check List Reed. 11/9/73 by G.E. Power Equip. Div.

Accepted by CECO 4/3/74 Hold Tags Released 4/4/74 by Field Engineer Hold Tags Released 4/5/74 by Q.A. Supervisor Final Records Transmitted 4/12/76 by S & L Q.C Final Records Received 4/13/76 CECO Final Records Received 4/14/76 Site Q.A.

Final Records Reviewed 7/14/76 Q.A. Engineer Final Records Acceptance 7/14/76 Q.A.

(3) MRR Number:

10 (Units 1 & 2)

Item:

4 Flange Relief Valves Shipper:

Struthers Wells Corporation Date Shipped:

1/29/74, Spec. J-2500 CECO P. O. #124620; G. E. P. O. #205-AA668 Receiving / Inspection Report 2/11/74 Hold Tag No. 1058; Document Deficiency Hold Tag Released by Field Engineer 4/4/74 and by Q.A.

Supervisor 4/5/74 due to receipt of Q.A. check lists, for MRR #2 & #10.

Final Records Acceptance 7/14/76 Q.A.

(4) MRR #100 (Unit #1)

Item: Reactor Pedestal Base Inner Ring Shipper:

(CBI) Chicago Bridge & Iron Date Shipped: 8/30/74 CECO P. O. #160496 Specification: J-2534 Code Class 1 Receiving / Inspection Report 9/4/74 Interim Release 6/10/76 by Q. A. Supervisor Final Records Reviewed 9/26/80 Q.A.

Final Records Acceptance 9/29/80 Q.A. Superintendent Note:

CBI. Material Heat Number Sheet (Contract 73-6336 No. 5 1 of 1) signed off by CBI shop 8/26/74 and CBI Q.A. 8/29/74 was used for acceptance initially. However, one number entry on the sheet was in error.

74107 for Pc 6-18 should have been 47107. This was identified as an error by CECO 4/10/74 and cleared 9/26/80. This item was source inspected 8/29/74. However, the report of the inspection had an error in the spec. number referenced.

2434.17 should have been 2534.17. This item upon receipt was assigned to lay down Area #3. Records do not show that it was released from laydown area #3; however, inspection records show that this item was fit up checked-7-

.

.

.

when installed, and final records have been reviewed and accepted.

(5) MRR #346 (Unit #2)

Item: Core Spray Line Shipper: Murdock Inc.

Date Shipped:

1/15/75 CECO P. O. #124620; G.E. P. O. #205-AE-600 Specification: J-2500; Code Class 1 Receiving / Inspection Report 1/22/75 Hold Tags No. 2028, 2029; Document Deficiency.

Required documentation (certification) dated 1/14/75 received and accepted by field engineer 2/3/75.

Hold tags signed off - released for use 2/3/75 by Field Engineering and Q.A.

Final records reviewed 3/31/79 Final records acceptance 4/13/79 Q./. Supt.

(6) MRR #1236 Item: Shell for RHR Pump Shipper:

Ingersoll-Rand Date Shipped:

12/19/75 CECO P. O. #124620; G.E. P. O. #205-AC-755 Specification: J-2500; Code Class 1 Receiving / Inspection Report 12/24/75 Hold Tag No. 1304, for cert. of conformance Certificate dated 12/19/75 was attached to MRR 1244 S & L Documentation approval letter dated 10/6/76 with quality record package rec'd from S & L.

Hold Tag No. 1304 was signed off 1/31/77 by Field Engineering. The hold resolution date was esta-blished as 10/6/76. Accepted by Q.A. on 1/31/77 after approval by Q. A. Engineering on 1/26/77.

(7) MRR #1244 Item: RHR Pump Shipper:

Ingersoll-Rand Date Shipped:

12/18/75 CECO P. O. #124620; G.E. P.O. #205-AC-J55 Specification: J-2500; Code Class 1 Receiving / Inspection Report 12/29/75 Hold Tag No. 1205 Certificate dated 12/19/75 was attached to S & L document package 10/6/76, which is tLe resolu-tion date.

Released from use 1/31/77 by Field Engineer and accepted by Q.A. on the same date, 1/31/77.

(8) HRR #1471 Item:

11 reels of #14 AWG and #10 AWG wire Shipper: The Okonite Co.

Date Shipped:

1/26/76 CECO P. O. #181696-8-

.

.

.

.

Specification: J-2966; Code Class 1 Receiving / Inspection report 2/5/76 Hold tags issued: Nos. 2069, 2070, 2071, 2074, 2075, 2076, 2077, 2078, 2079, 2080, 2081 - certificates of compliance missing.

Documentation received 3/17/76 and released for use by Field Engineering. Accepted by Q. A. Supervisor 3/18/76.

Pull cards were prepared.1/4/76 and 3/17/76. However, uo entries were made on t.he cards before 7/27/78.

(9) MRR #3445 Item: 2 sets, Jet Pump Penetration Seal Shipper:

G.E. San Jose, CA Date Shipped: 2/19/77 CECO P. O. 124620 Specification: J-2500; Code Class 1 Receiving / Inspection Report:

2/23/77 Hold Tag No. 3751, 2/24/77, issued for dimension problem NRC #145, 2/24/77 - addressed the thin wall question. A G.E. Co. letter of 3/8/77, received 3/10/77, indicated (by calculation) that the minimum wall required was 0.295 inches. Measured wall w,- 0.298 inches which was therefore an acceptable condition. The NRC inspector checked the G.E. Co. calculation for verification and found that the G.E. calculation result of 0.295 inches was in error. The correct result following the logic and data provided by G.E. Co. in their letter is 0.2905 inches minimum wall thickness required. This was reported to the licensee. However, since the actual calculated minimum wall thickness was more conservative than the previously reported thickness by G.E. Co., no further action was required by the NRC inspector. The NRC 145 was signed off 4/19/77. Certificate of conform-ance and copy of ASME data report was reviewed and accepted 4/19/77.

Interim release approved 4/19/77.

Q.A. hold release date was 4/19/77, Field Engineering.

Complete data package submitted by S & L 12/16/80 and reviewed 12/31/80. Final data package approved 5/4/81, Q.A.

(10) MRR #4808 (Units 1 & 2)

Items:

1/2" globe valves cd 3/4" stop check valves.

Shipper: Anderson Greenwoo- & Co.

Date Shipped:

12/22/77 CECO P. O. #167402 Specification:

J-2950; Code Class 3 Receiving / Inspection Report 1/10/78 Hold tags 4286 & 4287 were issued on stop check valves for document deficiency.

Inquiry established that ASME Code Form NPV-1 had been completed 12/28/77. An interim release was approved 1/16/78 by Q.A.

The document de-

-9-

.

d.

.

ficiency hold was signed off 1/24/78. Documentation for globe valves was reviewed and accepted by A & L 3/6/78, received 3/13/78. Documentation for Stop Check Valves (including EPV-1 12/28/77 form) was reviewed and accepted by S & L 3/17/78, transmitted to CECO by S & L 3/17/73,

. received 3/21/78 by site construction and by site Q.A.

3/27/78. The final record acceptance by Q.A. was on 7/27/78.

(11) MRR #4892 (Units 1 & 2)

Items: 4 Isolation Dampers Shipper: Techno Corp., Erie, PA Date Shipped: 2/15/78 CECO P. O. #194880 Specification: J-2584; Code Cless 1 Receiving / Inspection Report 2/21/78 Hold Tags Nos. 4410, 4411, 4412, 4413 - CMTR - for document deficiency were. issued.4/28/78. However, documentation was reviewed and accepted by W & L on 3/14/78 and submitted to CECO 3/15/78. Hold tags were closed out by voiding as data had been received but not immediately associated with the shipment.

Final data package accepted by.Q.A. 5/7/81.

(12) MRR #6119 (Unit 1)

Items:.6 ea. N Nozzle Safe Ends

Shipper: Associated Piping & Engineering Corp.,

Compton, CA Date Shipped:

1/25/79 CECO P. O. #124620 Specification: J-2500; Code Class 3 Receiving / Inspection Report 2/2/79 Original-N-2 data reports dated 1/24/79 had an incorrect name for the parts. The data reports were reviewed by G.E. 1/24/79 and G.E. product quality certification was issued 1/24/79 with.

copies of the N-2 data. The N-2 forms were corrected 3/15/79 to show the correct part name, i.e.

" Reducing Type Safe End"..The MRR was accepted by station construction 2/15/79 and by Q.A. on 2/23/79. Final data report review by S & L was completed 6/7/80 and final' acceptance by Q.A. was completed 6/16/80.

. (13) MRR #6125 Items:

26 reels of instrument cable Shipper: The Rockbestos Co., New Haven, CT-Date Shipped:

1/30/79 CECO P. O. #181714 Specification: J-2967; Code Class 1 Receiving / Inspection Report: 2/2/79 Licensee expects that approximately 15% of this

- 10 -

_ _ _ - _ _ _ _ - - _ - _ _ _ _ _ _ - - _ - - _ - - - -

.

a

.

.

cable would be used in safety related applica-tions. A Certificate of Conformance is required and provided for in the purchase order specifica-tion and was assured via telephone communication with supplier 1/29/79. No certificates of con-formance were supplied with the shipment. No hold tags were issued pending followup on 1/29/79 telephone communication. On 4/5/79 additional contact with Rockbestos assured that material was in conformance. On 4/10/79 an interim release was granted by Field Engineering and Q.A., and request to Rockbestos was documented. One reel of wire appears to have been released 5/4/79 for use based on the interim release granted 4/10/79.

On 2/29/80 another letter was sent to Rockbestos regarding the certificates of conformance. No reply received to date, and no certificates received. However, telephone assurances continue.

The status of the Certificate of Conformance for this shipa.ent of instrument cable is still officially known by licensee. This is considered an unresolved item by the NRC inspector (373/81-25-01; 374/81-13-01).

(14) 19U1 #7257 (Units 1 & 2)

Item: Misc. Hanger Random Material Shipper:

ITT Grinnell Corp., Chicago, IL Date Shipped:

1/28/80 CECO P. O. #155567 Specification: J-2918; Code Class 1 Receiving / Inspection Report 1/28/80 Hold tags were issued on two items for document deficiency (4832, 4833). A letter of certifica-tion dated 10/8/79 was received 10/17/79 at the Station Construction Field Office.

Interim release was approved 1/30/80 by construction and on 2/8/80 by Q.A.

The document review performed by S & L of the document package 4/9/81 was marked " Audited".

The document package was reviewed by Q.A. on 5/2/81 and accepted by Q.A. on 5/4/81. The NRC inspector requested an interpretation of the use of the term

" Audited" as used by S & L on their review of this data package. The other usual review normally re-sulted in a " Reviewed and Accepted" status by S & L.

This is an unresolved item.

(373/81-25-02; 374/81-13-02)

(15) MRR $7420 (Unit #1)

Item: Embedment Plate (s)

Shipper: CB&I Date Shipped: 4/1/80 CECO P. O. #222719 Specification: J-2990; Code Class 1 Receiving / Inspection Report 4/1/80

- 11 -

-

.

-

- -

- -

-

-.

- -

- -

.

- - -

-

-

.

.

s

.

Hold Tags #4913 - 4923 issued 4/1/80 due to status of review of welding procedure. All hold tags were signed off and released upon final review and approval of welding procedure on 4/30/80. An interim release was granted by construction and accepted by Q.A. on 4/1/80 to store and bolt embedments in place pending approval of welding procedure. Standard CBI certifi-cations received with shipment and accepted 4/1/80.

Final record material certifications and test reports were transmitted 10/8/80 by S & L and received by CECO 10/14/80. Final review was completed 1/21/81.

(16) HRR #8430 Item: Misc. Electric (one item safety related)

Shipper: Gould Brown Boveri (G.E.)

Date Shipped:

1/23/81 CECO P. O. #167530 Specification: J-2543; one item, Code Class 1 Receiving / Inspection Report:

1/29/81. A hold tag was issued for one item, Tag #6362.

It was later discovered that this one item was a " ship short" item from a previous shipment received on MRR #1242.

CECO QAL #4609 provides for receiving ship short items on the original MRR. Hold Tag 6362 was closed 7/9/81.

Interim acceptance was approved 7/9/81. No documentation was required other than that furnished previously on original shipment. Final Q.A. acceptance signed off on 7/9/81.

(17) MRR #8504 Item: Penetration Tool Kits Shipper: Amphenol, Chatsworth, CA Date Shipped:

2/20/81 CECO P. O. #172806 Specification J-2552; Code Class 1 Receiving / Inspection Report 2/27/81 Inspection Completed 3/5/81 Hold tag issued 3/9/81 (#6451) for document deficiency Released hold 3/16/81 based on receipt of certificate of conformance dated 3/9/81.

Interim release signed off by Q.A. 3/16/81. Final review signed off 7/10/81.

(18) MRR #8690 Item: Stainless Steel Pipe; 8", 6", 3-1/2" Shipper: CB & I Date Shipped: 5/13/81 CECO P. O. #222719

,

Specification: J-2990; Code Class 1

'

Hold Tags 6710, 11, 12, 13 were issued 5/28/81, due to missing documentation and end caps. Notifications were made 5/26/81 to CB & I.

Remaining on ho]d at present.

- 12 -

- -

-

-

- - - -

-

-

-

- - -

-

-

-

-

-

-

- -

-

-

-

-

-

- -

.

'

.

.

e e

(19) 1001 #8667 Item: Spare RER Service Water Pump & Motor Shipper: Crane Co., Salem, OH Date Shipped: Not in record CECO P. O. #172790 Specification: J-2944; Code Class 3 Receiving / Inspection Report 5/5/81 Hold Tag #6691 issued 5/6/81 for a document defi-ciency. The S & L review of radiographs is pending.

Remaining on hold at present.

c.

Observations by the Inspector on the Results of the Review The inspector's detailed review of the selected 19 items, out of the original 46 items, indicated that they had been received and processed essentially in accord with the pertinent issue and provisions of the CECO Quality Procedure Q.P. No. 7-1.

Two items, #4 and #9, were found to have had minor problems in their processing after receipt. However, no significant deficienuies developed from these problems. Two items, #13 and #14, irdicate that additional information may be required to establish isn accept-able final status, and to respond to questicas raised by the NRC inspector.

The detailed review tavered eleven (11) specification categories of procurement and is considered to be an adequate representative sample of the procurement activity to demonstrate satisfactory compliance with their program requirements for receiving and inspection, control of procured material and equipment, reporting quality nonconformances, and interim release of components.

4.

Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, items of non-compliance, or deviations. Unresolved items disclosed during the inspection are discussed in Paragraphs 3.b(13) and 3.b(14).

5.

Exit Interview The inspector met with licensee representatives (denoted under Persons Contacted) at the conclusion of the inspection on July 24, 1981. The inspector summarized the scope and findings of the inspection. The licensee acknowledged the information.

- 13 -