yV FPL'Energy FPL Energy Seabrook Station Seabrook Station P.O. Box 300 Seabrook, NHl 03874 (603) 773-7000 FEB 10 205 Docket No. 50-443 SBK-L-05039 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Sabfr6bk Statioh January 2005 Monthlj Operating Report Enclosed please find Monthly Operating Report 05-01. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of Januaiy 2005 and is submitted in accordance with the yequirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Mark E.'Warner Site Vice President cc:

S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Proj'ct Directorate I-2 G.T. Dentel, NRC Senioi Resident Inspector

V OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-443 Seabrook I February 11, 2005 Peter Nardone...

(603) 773-7074 January 2005

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 1,148.00 1,155.30
3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5. Reserve Shutdown Hours
6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 862,283.17 Yr-to-Date Cumulative 744.00 112,357.80 744.00 109,442.29 0.00 0.00 862,283.17 123,493,579.94 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.32% based on the MDC value of 1155.3 Net MWe.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C Refueling D Regulatory Restriction E

Operator Training & License Examination F Administration G Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)