| Start date | Site | Title |
---|
ML24304A960 | 5 November 2024 | Mcguire Catawba McGuire | Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations |
ML24306A219 | 1 November 2024 | Wolf Creek | Results of the Steam Generator Tube Inservice Inspection During the 26th Refueling Outage to Reflect TSTF-577 Reporting Requirements |
L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements | 26 September 2024 | Monticello | Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements |
ML24269A024 | 25 September 2024 | 99902078 05200050 | LLC, Submittal of Presentation Materials Entitled Sdaa Review Presentation on RPV Connections, PM-174304, Revision 0 |
RA-24-0193, Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) | 28 August 2024 | Mcguire Catawba McGuire | Supplement to Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) |
ML24267A162 | 26 August 2024 | | Region II Hatch 50.69 Training (Public Version) |
ML24219A237 | 23 August 2024 | Surry | Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, |
05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage | 22 August 2024 | Cook | Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage |
ML24219A049 | 15 August 2024 | | Enclosure 2 - NRC Documents (Interpretive Rules Category) |
IR 05000272/2024002 | 30 July 2024 | Salem | Integrated Inspection Report 05000272/2024002 and 05000311/2024002 |