August 2004 Monthly Operating Report for Seabrook Station
ML042600342
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 09/09/2004
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-04054
Download: ML042600342 (2)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 SEP 9 2004 Docket No. 50-443 SBK-L-04054 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station August 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-08. This shutdown experience relating to Seabrook Station Unit 1 and is submitted in accordance with the requirements Specification 6.8.1.5.

report addresses the operating and for the month of August, 2004 of Seabrook Station Technical Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:

S. J. Collins, NRC Region I Administrator S. P. Wall, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector an FPL Group company

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50443 Seabrook I September01; 2004 Peter Nardone (603) 773-7074 August 2004

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,148.00 1,155.30

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs' This Month Yr-to-Date 744.00 5,855.00 744.00 5,855.00 0.00 0.00 862,383.41 6,784,323.99 Cumulative 108,684.80 105,769.29 0.00 119,238.655.21 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.33% based on the MDC value of 1155.3 Net MWe.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1