|
---|
Category:Legal-Affidavit
MONTHYEARL-2023-034, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2023-02-24024 February 2023 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML18151A1442018-05-31031 May 2018 Hearing File Update ML15149A2832015-05-26026 May 2015 PWROG-15042-P, Revision 0, Appendix a, NextEra Energy, Seabrook, Unit 1, Summary Report for the Cold Work Assessment (Non-Proprietary). Application for Withholding Proprietary Information from Disclosure and Affidavit ML15072A0372015-03-0909 March 2015 Enclosures 1 and 2 - Response to Request for Additional Information for License Amendment Request 14-04 Revised Reactor Coolant System Pressure - Temperature Limits Applicable for 55 Effective Full Power Years and Affidavit SBK-L-12176, Response to Request for Additional Information Regarding Relief Request for Service Water Piping2012-09-0707 September 2012 Response to Request for Additional Information Regarding Relief Request for Service Water Piping SBK-L-12054, Response to Request for Additional Information Regarding License Amendment Request 10-02, Application for Change to the Technical Specifications for the Containment Enclosure Emergency Air Cleanup System2012-03-15015 March 2012 Response to Request for Additional Information Regarding License Amendment Request 10-02, Application for Change to the Technical Specifications for the Containment Enclosure Emergency Air Cleanup System SBK-L-11190, Supplement to Request for Closed Meeting to Discuss Proprietary Test2011-09-19019 September 2011 Supplement to Request for Closed Meeting to Discuss Proprietary Test SBK-L-11184, Response to Request for Additional Information Regarding License Amendment Request 10-02, Regarding the Containment Enclosure Emergency Air Cleanup System2011-09-16016 September 2011 Response to Request for Additional Information Regarding License Amendment Request 10-02, Regarding the Containment Enclosure Emergency Air Cleanup System ML11223A4462011-08-0808 August 2011 (Friends of the Coast, New England Coalition) Declaration of Dr. Arjun Makhijani Regarding Safety and Environmental Significance of NRC Task Force Report Regarding Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident ML11223A3772011-08-0808 August 2011 (Beyond Nuclear, Seacoast Antipollution League, Sierra Club of Nh) Declaration of Dr. Arjun Makhijani Safety and Environmental Significance of NRC Task Force Report Regarding Lessons Learned from Fukushima Daiichi Nuclear Power Station Acci ML1111000032011-04-20020 April 2011 Declaration and Cv of Dr. Arjun Makhijani in Support of Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned from Fukushima Daiichi Power Station Acc ML1111000052011-04-19019 April 2011 Letter to Commissioners Transmitting Declaration and Cv of Dr. Arjun Makhijani in Support of Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions . . ML1110504752011-04-15015 April 2011 Certificate of Service for Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions Pending Investigation of Lessons Learned from Fukushima Daiichi Nuclear Power Station Accident ML1106805352011-03-0909 March 2011 Certificate of Service for Commonwealth of Massachusetts' Request to Participate as an Interested State, and Notice of Appearance of Matthew Brock on Behalf of the Commonwealth of Massachusetts SBK-L-08039, License Amendment Request 08-01, Application for Change to the Technical Specification Surveillance Requirements for Nuclear Instrumentation2008-03-0707 March 2008 License Amendment Request 08-01, Application for Change to the Technical Specification Surveillance Requirements for Nuclear Instrumentation SBK-L-08005, License Amendment Request 07-04 Application for Amendment to Delete Post-Maintenance Testing Surveillance Requirement for Containment Isolation Valves2008-02-0808 February 2008 License Amendment Request 07-04 Application for Amendment to Delete Post-Maintenance Testing Surveillance Requirement for Containment Isolation Valves SBK-L-07112, License Amendment Request 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process.2007-07-17017 July 2007 License Amendment Request 07-02, Application to Revise the Technical Specifications Regarding Control Room Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process. SBK-L-07042, License Amendment Request 07-01 Setpoint Change for Reactor Trip System Interlock P-92007-03-29029 March 2007 License Amendment Request 07-01 Setpoint Change for Reactor Trip System Interlock P-9 SBK-L-06166, Proprietary Information to Support Response to Request for Additional Information Re License Amendment Request 05-08, Limited Inspection of Steam Generator Tube Portion within the Tubesheet.2006-08-0808 August 2006 Proprietary Information to Support Response to Request for Additional Information Re License Amendment Request 05-08, Limited Inspection of Steam Generator Tube Portion within the Tubesheet. ML0534903472005-12-12012 December 2005 Caldon Inc. Proprietary Information Package, INFO-18 SBK-L-05186, License Amendment Request 05-08, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet2005-09-29029 September 2005 License Amendment Request 05-08, Limited Inspection of the Steam Generator Tube Portion within the Tubesheet SBK-L-04052, Re-submittal of Proprietary Information to Support License Amendment Request 04-03, Application for Stretch Power Uprate2004-09-13013 September 2004 Re-submittal of Proprietary Information to Support License Amendment Request 04-03, Application for Stretch Power Uprate 2023-02-24
[Table view] Category:Letter type:SBK
MONTHYEARSBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic SBK-L-20077, Core Operating Limits Report for Cycle 212020-06-0101 June 2020 Core Operating Limits Report for Cycle 21 SBK-L-20057, Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request2020-05-20020 May 2020 Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request 2023-06-22
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2023-064, License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-05-11011 May 2023 License Amendment Request 23-01, Revision 1, Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2023-012, License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves2023-03-15015 March 2023 License Amendment Request 23-01, Remove Period of Applicability (Poa) from Pressure Temperature Limits (PTL) and Low Temperature Overpressure Protection (L Top) Curves L-2022-176, License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements2022-12-0909 December 2022 License Amendment Request to Revise Cooling Tower Service Water Loop or Cell Requirements L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML22200A1082022-07-19019 July 2022 Acceptance Review for TSTF-577 Amendment SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating ML20120A0472020-04-29029 April 2020 Correction to Amendment No. 162 Issued November 18, 2019, Revisions to Technical Specifications Associated with Movable Control Rods SBK-L-20001, License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint2020-01-24024 January 2020 License Amendment Request 19-03, Application to Revise Degraded Voltage Time Delay Setpoint SBK-L-18089, License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-153762019-11-0101 November 2019 License Amendment Request 17-06, Change to the Technical Specification Requirements for Reactor Trip System Instrumentation and Engineered Safety Features Actuation System Instrumentation to Implement WCAP-14333 and WCAP-15376 SBK-L-19104, License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements2019-10-0303 October 2019 License Amendment Request 19-02, One-Time Change to the Seabrook Technical Specifications Onsite Power Distribution Requirements SBK-L-19049, License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators2019-06-0404 June 2019 License Amendment Request 19-01, Application to Revise the Technical Specifications Associated with Emergency Core Cooling System Accumulators SBK-L-18151, Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application2018-08-29029 August 2018 Supplement 61 - Additional Changes to the NextEra Energy Seabrook License Renewal Application L-2018-049, Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2018-05-29029 May 2018 Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications SBK-L-18075, Eighth Annual Update to License Renewal Application2018-05-0101 May 2018 Eighth Annual Update to License Renewal Application SBK-L-18013, Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program2018-03-16016 March 2018 Nextera Energy Seabrook - License Amendment Request 18-01, Application to Revise Frequencies in the Control Room Habitability Program SBK-L-18006, Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application2018-01-23023 January 2018 Additional Change to Seventh Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-17185, License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications2017-12-0101 December 2017 License Amendment Request 17-04: Remove Limitation to Perform Certain Surveillance Requirements During Shutdown and Changes to Administrative Technical Specifications SBK-L-17163, Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program2017-10-0606 October 2017 Supplement 57 - Revision to License Renewal Application 10 CFR 50 Appendix J Program SBK-L-17081, License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries2017-07-28028 July 2017 License Amendment Request 17-02, Change to the Technical Specifications Requirement for DC Batteries SBK-L-17108, Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience2017-07-20020 July 2017 Supplement 56 - Revision to License Renewal ASME Section XI, Subsection Iwl, Program Operating Experience L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process ML17046A4432017-03-15015 March 2017 Issuance of Amendment Extension of Containment Leakage Rate Test Frequency SBK-L-16181, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-12-23023 December 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program SBK-L-16146, Sixth Annual Update to the Renewal Application2016-10-0707 October 2016 Sixth Annual Update to the Renewal Application SBK-L-16013, License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program2016-08-0909 August 2016 License Renewal Application Relating to the Alkali-Silica Reaction Monitoring Program ML16216A2412016-07-31031 July 2016 MPR-4288, Revision 0, Seabrook Station: Impact of Alkali-Silica Reaction on Structural Design Evaluations, July 2016 ML16216A2422016-07-31031 July 2016 MPR-4273, Revision 0, Seabrook Station - Implications of Large-Scale Test Program Results on Reinforced Concrete Affected by Alkali-Silica Reaction, July 2016 SBK-L-16071, Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 02016-07-27027 July 2016 Sg&H Report 160268-R-01 Development of ASR Load Factors for Seismic Category I Structures (Including Containment) at Seabrook Station. Seabrook, Nh Revision 0 ML15310A1022015-11-19019 November 2015 License Renewal Application Online Reference Portal SBK-L-15187, Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 242015-10-0909 October 2015 Supplement 43 - Responses to Request for Additional Information Related to the Review of the License Renewal Application - Set 24 SBK-L-15093, License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.42015-07-13013 July 2015 License Amendment Request (LAR) 15-01, Application to Add a Note to Technical Specification TS 4.4.1.3.4 SBK-L-14155, License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15)2014-09-24024 September 2014 License Amendment Request 14-06 - Change to the Technical Specifications to Remove the Cold Leg Injection Permissive (P-15) SBK-L-14126, Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement2014-07-24024 July 2014 Station,Proposed Change to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement SBK-L-14080, Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations2014-07-24024 July 2014 Changes to Technical Specification 3.3.3.1. Radiation Monitoring for Plant Operations ML14167A4302014-06-12012 June 2014 Supplement to License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-14086, Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program2014-05-15015 May 2014 Nextera Energy Seabrook - Letter Regarding Response to Requests for Additional Information for the Review of the License Renewal Application Set 20 Relating to the Alkali-Silica Reaction (ASR) Monitoring Program SBK-L-13224, Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts2013-12-20020 December 2013 Request for Review and Approval of License Amendment Request (LAR) 11-04, Changes to Technical Specifications for New and Spent Fuel Storage, in Two Parts SBK-L-13121, License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology2013-09-10010 September 2013 License Amendment Request 13-05, Fixed Incore Detector System Analysis Methodology SBK-L-13030, LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process2013-03-27027 March 2013 LAR 13-02 - Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process SBK-L-13028, License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications2013-03-0101 March 2013 License Amendment Request 13-01 Application for Administrative Change and Corrections to the Technical Specifications SBK-L-12235, License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process2012-12-20020 December 2012 License Amendment Request 12-06, Application for Technical Specification Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line Item Improvement Process SBK-L-12186, Second Annual Update to the NextEra Energy Seabrook License Renewal Application2012-09-18018 September 2012 Second Annual Update to the NextEra Energy Seabrook License Renewal Application SBK-L-12105, License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change2012-06-20020 June 2012 License Amendment Request 12-03, Cyber Security Plan Implementation Schedule Milestone Change SBK-L-12101, NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring2012-05-16016 May 2012 NextEra Energy Seabrook License Renewal Application, Structures Monitoring Program Supplement-Alkali-Silica Reaction (ASR) Monitoring SBK-L-12062, License Amendment Request 12-01 Proposed Changes to Emergency Action Levels Regarding Safety System Indications2012-04-30030 April 2012 License Amendment Request 12-01 Proposed Changes to Emergency Action Levels Regarding Safety System Indications SBK-L-12072, License Amendment Request 12-02, Request for Permanent Application of Steam Generator Tube Alternate Repair Criteria, H2012-04-10010 April 2012 License Amendment Request 12-02, Request for Permanent Application of Steam Generator Tube Alternate Repair Criteria, H SBK-L-11245, License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage2012-01-30030 January 2012 License Amendment Request 11-04, Changes to the Technical Specifications for New and Spent Fuel Storage 2023-05-11
[Table view] |
Text
FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 September 29, 2005 Docket No. 50-443 SBK-L-05186 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Seabrook Station Proprietary Information to Support License Amendment Request 05-08, Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet
References:
- 1. FPL Energy Seabrook, LLC letter SBK-L-05185, LAR 05-08, Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet, dated September 29, 2005.
FPL Energy Seabrook, LLC (FPL Energy Seabrook) letter SBK-L-05185 (Reference 1) submitted License Amendment Request (LAR) 05-08 which proposed changes to Seabrook Station Technical Specification 4.4.5, "Steam Generators," to incorporate changes in the steam generator tube inspection scope commencing with the upcoming refueling outage 11 (ORI 1).
Reference 1 stated that some of the information required to support LAR 05-08 is considered proprietary by Westinghouse Electric Company LLC (Westinghouse) and, thus, a non-proprietary version of the Westinghouse analysis was included as part of the LAR submittal.
Additionally, Reference 1 stated that a separate letter would follow containing the proprietary information and application for withholding proprietary information from public disclosure.
This letter contains herein the Westinghouse proprietary information in LTR-CDME-05-170-P, "Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet at Seabrook Generating Station," dated August 2005, and is provided as Attachment 1.
As Attachment 1 contains information proprietary to Westinghouse, it is supported by an affidavit signed by Westinghouse, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b) (4) of Section 2.390 of the Commission's regulations.
A4pt (
an FPL Group company
U. S. Nuclear Regulatory Commission SBK-L-05186 / Page 2 Accordingly, it is respectfully requested that the information which is proprietary to Westinghouse be withheld from public disclosure in accordance with 10 CFR Section 2.390 of the Commission's regulations. contains Westinghouse letter CAW-05-2052, "Application for Withholding Proprietary Information from Public Disclosure," with accompanying Affidavit, Proprietary Information Notice, and Copyright Notice.
Correspondence with respect to the copyright or proprietary aspects of LTR-CDME-05-170-P or supporting Westinghouse affidavit should reference CAW-05-2052 and should be addressed to B. F. Maurer, Acting Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.
Should you have any questions concerning this correspondence, please contact Mr. James M.
Peschel, Regulatory Programs Manager, at (603) 773-7194.
Very truly yours, FPL Energy Seabrook, LLC Gene St. Pierre Site Vice President Attachments (2) cc: S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector Mr. Bruce G. Cheney, ENP, Director, Division of Emergency Services NH Department of Safety Division of Emergency Services, Communications, and Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Oath and Affirmation I, Gene St. Pierre, Site Vice President of FPL Energy Seabrook, LLC hereby affirm that the supplemental information and statements contained herein to support License Amendment Request 05-08 are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.
Sworn and Subscribed Before me this aS2tday of&06 2005 e St. Pierre Vice President
U. S. Nuclear Regulatory Commission SBK-L-05 186 ATTACHMENT 2 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE INCLUDING AFFIDAVIT, PROPRIETARY INFORMATION NOTICE, AND COPYRIGHT NOTICE
O Westinghouse Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Directtel: (412) 3744419 Document Control Desk Directfax: (412) 3744011 Washington, DC 20555-0001 e-mail: maurerbfewestinghouse.com Our ref: CAW-05-2052 September 7, 2005 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
LTR-CDME-05-170-P, "Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet at Seabrook Generating Station," dated August 2005 (Proprietary)
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-05-2052 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.390 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Florida Power and Light Energy.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-05-2052, and should be addressed to B. F. Maurer, Acting Manager, Regulatory Compliance and Plant Licensing, Westinghouse Electric Company LLC, P.O. Box 355, Pittsburgh, Pennsylvania 15230-0355.
Very truly yours, B. F. Maurer, Acting Manager Regulatory Compliance and Plant Licensing Enclosures cc: B. Benney, NRC L. Feizollahi, NRC A BNFL Group company
CAW-05-2052 bcc: B. F. Maurer (ECE 4-7) IL R. Bastien, 1L (Nivelles, Belgium)
C. Brinkman, IL (Westinghouse Electric Co., 12300 Twinbrook Parkway, Suite 330, Rockville, MD 20852)
RCPL Administrative Aide (ECE 4-7A) IL, IA (letter and affidavit only)
G. W. Whiteman, Waltz Mill R. F. Keating, Waltz Mill H. 0. Lagally Waltz Mill D. E. Peck, ECE-560G P. J. McDonough, ECE 520B A BNFL Group company
CAW-05-2052 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF ALLEGHENY:
Before me, the undersigned authority, personally appeared B. F. Maurer, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
B. F. Maurer, Acting Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this 1 day Of ,2005 Notary Public Noal Seal L
Sharm Fli, Noway uWc Mnme Bai, Akoieny County My CunssiSores January 29,2007 AssoiationGPermnyvarda or Notaries
2 CAW-05-2052 (1) I am Acting Manager, Regulatory Compliance and Plant Licensing, Nuclear Services, Westinghouse Electric Company LLC (Westinghouse), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of Westinghouse.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.390 of the Commission's regulations and in conjunction with the Westinghouse "Application for Withholding" accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (bX4) of Section 2.390 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
3 CAW-05-2052 (b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
4 CAW-05-2052 (e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in LTR-CDME-05-1 70-P, "Limited Inspection of the Steam Generator Tube Portion Within the Tubesheet at Seabrook Generating Station," dated August 2005 (Proprietary). The information is provided in support of a submittal to the Commission, being transmitted by Florida Power and Light Energy and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted for use by Westinghouse for the Seabrook Generating Station is expected to be applicable to other licensee submittals in support of implementing a limited inspection of the tube joint with a rotating probe within the tubesheet region of the steam generators.
This information is part of that which will enable Westinghouse to:
(a) Provide documentation of the analyses, methods, and testing for the implementation of the limited inspection length of the steam generator tube joint.
(b) Provide a primary-to-secondary side leakage evaluation for Seabrook Generating Station during all plant conditions.
5 CAW-05-2052 (c) Assist the customer to respond to NRC requests for information.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of similar information to its customers for purposes of meeting NRC requirements for licensing documentation.
(b) Westinghouse can sell support and defense of this information to its customers in the licensing process.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar licensing support documentation and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.
In order to conform to the requirements of 10 CFR 2.390 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (f) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4)(ii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.390(b)(1).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.390 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.