SBK-L-07192, Transmittal of LER 07-S01-01, Seabrook Station Loss of Control of Safeguards Information at a Contract Company

From kanterella
Jump to navigation Jump to search
Transmittal of LER 07-S01-01, Seabrook Station Loss of Control of Safeguards Information at a Contract Company
ML073370321
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 11/28/2007
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-07192 LER 07-S01-01
Download: ML073370321 (1)


Text

FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 November 28, 2007 Docket No. 50-443 SBK-L-07192 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Licensee Event Report (LER) 2007-SOI-01 Loss of Control of Safeguards Information at a Contract Company Enclosed is Licensee Event Report (LER) 2007-SO1-01. This LER reports an event that occurred on November 23, 2006 and supplements LER 2007-SO1-00, which was submitted on August 31, 2007. This event is reported pursuant to the requirements of 10 CFR 73.71(d). The enclosure contains security-related information, and FPL Energy Seabrook, LLC requests that the enclosure be withheld from public disclosure in accordance with 10CFR 2.390.

Should you require further information regarding this matter, please contact Mr. James M.

Peschel, Regulatory Programs Manager, at (603) 773-7194.

Very truly yours, FPL ENERGY SEABROOK, LLC Gene St. Pierre Site Vice President cc: Director, Division of Nuclear Security, Office of Nuclear Security and Incident Response S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate 1-2 W. J. Raymond, NRC Senior Resident Inspector an FPL Group company