SBK-L-06125, May 2006 Monthly Operating Report for Seabrook Station
| ML061730210 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 06/12/2006 |
| From: | St.Pierre G Florida Power & Light Co, Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| SBK-L-06125 | |
| Download: ML061730210 (2) | |
Text
FPL Energy Seabrook Station FPL Energy Seabrook Station RO. Box 300 Seabrook, NH 03874 (603) 773-7000 June 12, 2006 Docket No. 50-443 SBK-L-06125 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station May 20(16 Monthly Operating Report Enclosed please find Monthly Operating Report 06-05. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of May, 2006 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Site Vice President cc:
S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate 1-2 G. T. Dentel, NRC Senior Resident Inspector an FPL Group company
0.
OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME So DATE Ju COMPLETED BY Pe TELEPHONE (6C REPORTING PERIOD:
-443
.abrook 1 ne 05, 2006 te Nardone
)3) 773-7074 May 2006 1.
2.
3.
4.
5.
6.
Design Electrical Rating Maximum Dependable Capacity (Net MWe) 1222.00 1221.00 Critical Hours Generator On-line Hours - Month Reserve Shutdown Hours Net Elec Energy (MWHrs)
This Month 744.00 744.00 0.00 908,854.81 Yr-to-Date 3,623.00 3,623.00 0.00 4,420,981.83 Cumulative 123,250.68 120,250.16 0.00 136,507,485.09 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours) Reason I Down 2 Comments
SUMMARY
- The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.05% based on the MDC value of 1221.0 Net MWe.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)
Page 1 of 1