November 2005 Monthly Operating Report for Seabrook Station
ML060040239
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/06/2005
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-05259
Download: ML060040239 (2)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 December 6, 2005 Docket No. 50-443 SBK-L-05259 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station November 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-11. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of November, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Site Vice President cc:

S. J. Collins, NRC Region I Administrator E. Miller, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

-- 9

.1 4?."

an FPL Group company

1 1 4

 ;

I,

I .'

 t; Js sob 4 OPERATING DATA REPORT DOCKET NO.

50-443 UNIT NAME Seabrook I DATE December 02,2005 COMPLETED BY Peter Nardone TELEPHONE (603) 773-7074 REPORTING PERIOD:

November 2005 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 1,222.00 1,221.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 720.00 7,269.88 118,883.68 720.00 7,184.87 115,883.16 0.00 0.00 0.00 878,848.61 8,547,340.39 131,178,637.16 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason1 Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 99.97% based on the MDC value of 1221.0 Net MWe.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & Ucense Examination F Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1