FPL Energy Seabrook Station FPL Energy Seabrook Station RO. Box 300 Seabrook, NH 03874 (603) 773-7000 JUN 1 4 2005 Docket No. 50-443 SBK-L-05131 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station May 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-05. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of May, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Mark E. Warner

-rt Site Vice President cc:

S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

,I 12,,4 an FPL Group company

OPERATING DATA REPORT DOCKET NO.

UNIT NAME i

DATE I

COMPLETED BY I

TELEPHONE REPORTING PERIOD:

50-443 ieabrook I June 08, 2005 Peter Nardone 303 773-7074 May 2005

j.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 1,220.00 1,218.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month Yr-to-Date Cumulative 726.55 2,876.88 114,490.68 682.32 2,791.87 111,490.16 0.00 0.00 0.00 768,634.64 3,188,607.14 125,819.903.91 UNIT SHUTDOWNS Type Method of No.

Date F: Forced Duration Reason I Shutting Cause & Corrective Action No.

S: Scheduled (Hours)

Down 2 Comments 05-02 04/01/2005 S

33.55 C

4 Scheduled Refueling Outage 05-03 05/02/2005 S

21.47 B

1 Turbine off-line for overspeed testing and balancing 05-04 05/04/2005 F

6.67 A

5 Turbine offline to repair steam leak on Main Steam Drain line from Turbine Control Valve # 3. Reactor power held at 16%RTP.

SUMMARY

The Unit returned to full power operation following Refueling Outage 10. It is now operating at a new uprated 100% RTP of 3587 MMt.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1