ao I=PL :nergY Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 March 29, 2007 Docket No. 50-443 SBK-L-07064 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Notification of RCS Leakage Monitoring Change

Reference:

FPL Letter L-2007-013, Inspection and Mitigation of Alloy 82/182 Pressurizer Butt Welds, January 31, 2007 In the referenced letter, FPL Energy Seabrook, LLC (FPL Energy Seabrook) committed to evaluating improvements to its reactor coolant system (RCS) leakage monitoring program and to provide an update to the NRC regarding any changes to the current program.

This letter provides notification that FPL Energy Seabrook is planning to enhance the RCS leakage monitoring software to perform RCS temperature averaging to reduce the effect of process noise on the RCS leak rate calculation. This enhancement is planned to be complete in the 2 d Quarter 2007.

Should you have any questions regarding this matter, please contact' Mr. James M. Peschel, Regulatory Programs Manager at (603) 773-7194.

Very truly yours, FPL Energy Seabrook, LLC Gene St. Pierre Site Vice President W,164, cc:

S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager G. T. Dentel, NRC Senior Resident Inspector A-no an FPL Group company