FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 AUG 2 6 2004 Docket No. 50-443 SBK-L-04019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Semi-Annual Fitness-For-Duty Report In accordance with the requirements of 10 CFR 26.71(d), enclosed is the FPL Energy Seabrook, LLC Semi-Annual Fitness-For-Duty Report. This report includes data from January 1, 2004 through June 30, 2004.

Should you have any questions regarding the enclosed report, please contact Mr. John Giarrusso Jr., Security Manager, at (603) 773-7583.

Very truly yours, FPL Energy Seabrook, LLC Mark L Warner Site Vice President cc: S. J. Collins, NRC Region I Administrator S. P. Wall, NRC Project Manager, Project Directorate I-2 G. T. Dentel, NRC Senior Resident Inspector 4V99A an FPL Group company

ENCLOSURE TO SBK-L-04019 FPL Energy Seabrook, LLC Semi-Annual Fitness-for-Duty Report January 01, 2004, through June 30, 2004

' January - June 2004 FPL Energy Seabrook, LLC FPL Energy Seabrook, LLC Semi-Annual Fitness-for-Duty Report for period ending June 30, 2004 Table of Contents Page Performance Data Sheets (NUMARC format) 1 and 2 II. Management Summary

1. Program Effectiveness 3
2. Initiatives 4
3. Blind Specimen Report 5
4. Telephonically Reported Events 6 III. Graphic Analysis
1. Total Screenings vs. Failures by Test Type 7
2. Percentage of Failures by Test Type 7
3. Licensee Failures by Substance 8
4. Contractor Failures by Substance 8
5. Total Screenings vs. Failures by Day of Week 9
6. Reason for Failure by Day of Week 9
7. Random Screenings by Hour of Day 10
8. Random Screenings by Day of Week 10

January - June 2004 FPL Energy Seabrook, LLC Page 1 01-01 Attachment 5 Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 FPL Energy Seabrook, LLC Six Month Period Ending: 30 June 2004 P.O. Box 300 Seabrook, NH 03874

Contact:

John Giarrusso Jr. Phone: (603) 773-7583 Cutoffs: Screen/Confirmation (ng/ml) [E Appendix A to 10CFR 26 Marijuana 50/ 15 Amphetamines 1000/ 500 Nitrite 500 Cocaine 300/ 150 Phencyclidine 25/ 25 Opiates 300/ 300 Alcohol (% BAC) 0.04 Random Testing Rate Required: 50% Conducted: 51%

Licensee Long-Term Short-Term Testing Results Employees Contractors Contractors Average Number with Unescorted Access 643 0 441 Categories # Tested # Positive # Tested # Positive # Tested # Positive Pre-Access 23 2 0 0 244 6 Host Accident U W V W 0 or For Cause Observed Behavior 2 1 0 0 12 3 Random 177 0 0 0 104 0 Follow-up 36 0 0 0 7 0 Other 0 0 0 0 0 0 Total 238 3 0 0 367 9 Rev. 02

OI-01 Attachment 6 Breakdown of Confirmed Positive Tests for Specific Substances C

1<

Mariuana I NRC I FPLE c C utoff Level ____ ___ ____ ____ ___ ____ ___ ___D________ 2_l _3 _l 45in___ l _ _

1bOngj1 50 ng CocainelIOpiates JAmphetaminesI1PhencyclidinelIAlcohol IRefusal to TestI NitriteI1 2 1 3 1 4ell Licensee Employees i I I II I I I _I I = =

Long-Term Contractors I I I 1 I .

Short-Term Contractorsl 5 1 I 2 I I I I 2 I 1 A Total 61121010 3 11010(010 1321 "~I PV t.1 (D

to (D

F<

0 0

0 I*1 PU 0) to Na Rev. 02

January - June 2004 FPL Energy Seabrook, LLC Page 3 PROGRAM EFFECTIVENESS The data compiled during this reporting period is presented in the graphic analysis beginning after the management summary in this report.

The failure rate for all tests conducted during the first half of 2004 is 1.98% (12 of 605). The licensee failure rate is 0.49% and the short-term contractor failure rate is 1.49%.

Licensees account for 3 failures -- 2 Pre-Access (2 Marijuana)

I For Cause (Alcohol)

Contractors account for 9 failures - 6 Pre-Badging (4 Marijuana, 1 Cocaine, 1 Marijuana & Cocaine) 3 For Cause (2 Alcohol, 1 Administrative)

All available evidence indicates that the continued support of FPL Energy - Seabrook Station management and employees has provided the basis for the FFD program's effective implementation and continued advancement toward the goal of achieving a workplace free of drugs and alcohol and the effects of such substances.

January - June 2004 FPL Energy Seabrook, LLC Page 4 INITIATIVES

1. Recertified five collection personnel for proficiency in urine specimen collection and breath alcohol measurement.
2. Continued cross training with the In-Processing Center.
3. Attended Quality Improvement Program Training to help align AA/FFD programs with all three FPL Nuclear plants and Juno Beach.
4. Revised 4 Office Instructions, and Protocols.
5. During the last audit there were several procedural enhancements identified and 2 findings.

All have been addressed and rectified.

January - June 2004 FPL Energy Seabrook, LLC Page 5 BLIND SPECIMEN REPORT To ensure laboratory quality control, FPL Energy - Seabrook Station contracted with Duo Research Inc., Denver, CO, to provide blind performance test specimens in accordance with the NRC Guidelines (10CFR26, Appendix A). Approximately 80 percent of these blind performance test specimens were blank (i.e., certified to contain no drug) and the remaining samples were positive for one or more drugs per sample in a distribution such that all the drugs tested were included in approximately equal frequencies of challenge.

During the first half of 2004, FPL Energy submitted 70 blind performance test specimens to Quest Diagnostics, Inc., Norristown, PA. The following statistics are presented in such a way as to show that the requirements were met during each quarter of this six-month period as well as for the total reporting period.

First Quarter of 2004 Second Ouarter of 2004 First Half of 2004 Tests Submitted: 241 Tests Submitted: 364 Tests Submitted: 605 Blinds Required: 25 Blinds Required: 37 Blinds Required: 61 Blinds Submitted: 25 Blinds Submitted: 45 Blinds Submitted: 70 Exceeded 10% by: 0 Exceeded 10% by: 8 Exceeded 10% by: 9 Negative: 20 (80%) Negative: 36 (80%) Negative: 56 (80%)

Positive: 5 (20%) Positive: 9 (20%) Positive: 14 (20%)

January - June 2004 FPL Energy Seabrook, LLC Page 6 TELEPHONICALLY REPORTED EVENTS During this period there were no telephonically reported events under the reporting requirements of 10CFR26.

January - June 2004 FPL Energy Seabrook, LLC The following is a Graphic Analysis For the Period January 01, 2004 through June 30, 2004 (pages 7-10)

January - June 2004 FPL Energy Seabrook, LLC Page 7 Total Screenings vs. Failureas by Test Type Total Screenings: 6C15 Total Failures: 112 S lScreenings E

0g0 I

X

- -~M E S" Failures r_ CD e _

co 0.

  • 0 6

& E °. 0 U-a.

  • Failures
  • Screenings Percentage of Failures by Test Type 50 40 30 9R 57 20 12.5 10 2.39 0 l l Random Pre-Badging Pre-Employment Follow-up For Cause Other

January - June 2004 FPL Energy Seabrook, LLC Page 8 Licensee Failures by Substance 4

3 2

1 0 l Random Pre-Badging Pre-Employment Follow-up For Cause Other U Alcohol (1) U Marijuana (2) U Cocaine (0) U Opiates (0)

  • Phencyclidine (0)
  • Amphetamines (0)
  • Administrative (0)

Contractor Failures by Substance 10 9 I 8 *1-7 6

5 4

3 2

I 0 l Random Pre-Badging Pre-Employment Follow-up For Cause Other UAlcohol (2) U Marijuana (5) U Cocaine (2) UOpiates(0)

EPhencyclidine (0) EAmphetamines (0) EAdministrative (1)

January - June 2004 FPL Energy Seabrook, LLC Page 9 Total Screenings vs. Failures by Day of Week 325 304 300 275 250 225 200 175 150 125 105 100 76 79 75 50 - 38 25 -

3

  • 1
  • 1 0 1 0 2 0 0-Monday Tuesday Wednesday Thursday Friday Saturday Sunday
  • Total Screenings U Failures Reason for Failure by Day of Week 10 9

8-7-

6-a

.2 5-Ii U.

4-3-

Uk 2-1-

0-Monday Tuesday Wednesday Thursday Friday Saturday Sunday N Alcohol (3) U Marijuana (7) U Cocaine (2) U Opiates (0)

  • Phencyclidine (0) UAmphetamines (0) UAdministrative (1)

CO)3

aanuary - June 2004 FPL Energy Seabrook, LLC Page 10 Random Screenings by Hour of Day 60 49 50 41 40 30 -26 20 10 10 5

2 O 1 32 23 1 0

O I O2q 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Total Random Screenings: 281 Random Screenings by Day of Week 100 -

90 80 - 5 70 -68 60 -5 50--

40--