February 2006 Monthly Operating Report for Seabrook Station Unit 1
ML060800498
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/10/2006
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-06050
Download: ML060800498 (2)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station RO. Box 300 Seabrook, NH 03874 (603) 773-7000 March 10, 2006 Docket No. 50-443 SBK-L-06050 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station February 2006 Monthly Operating Report Enclosed please find Monthly Operating Report 06-02. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of February, 2006 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC (ene F. St. PierruJ ite Vice Preside t cc:

S. J. Collins, NRC Region I Administrator G.E. Miller, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector

-- If

--- L e)

an FPL Group company

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50443 Seabrook 1 March 06, 2006 Kevin Randall (603) 773-7992 February 2006

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 1,222.00 1,221.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 672.00 672.00 0.00 819,400.09 Yr-to-Date 1,416.00 1,416.00 0.00 1,726,803.06 Cumulative 121,043.68 118,043.16 0.00 133,813,306.32 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for 631 out of 672 hours0.00778 days <br />0.187 hours <br />0.00111 weeks <br />2.55696e-4 months <br /> this month. ISO-NE requested several load reductions to below 1200 MWe (2-3% RTP). The Unit returned to full power operation following each. This yielded an availability factor of 100% and a capacity factor of 99.86% based on the MDC value of 1221.0 Net MWe.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic TriplScram 4

Continuation 5

Other (Explain)

Page 1 of 1