I FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 May 2, 2006 Docket No. 50-443 SBK-L-06107 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station April 2006 Monthly Operating Repon Enclosed please find Monthly Operating Report 06-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of April, 2006 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Site Vice President 6 -w S cc:
S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate 1-2 G. T. Dentel, NRC Senior Resident Inspector q
an FPL Group company
OPERATING DATA REPORT DOCKET NO.
5 UNIT NAME 4
DATE I
COMPLETED BY T
TELEPHONE (I
REPORTING PERIOD:
50-443 Feabro0ok 1 Peter Nardone 603) 773-7074 April2006
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,222.00 1,221.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 719.00 2,879.00 719.00 2,879.00 0.00 0.00 877,435.75 3,512,127.02 Cumulative 122,506.68 119,506.16 0.00 135,598,630.28 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason 1 Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The Unit operated at 100% power for 679 out of 719 hours0.00832 days <br />0.2 hours <br />0.00119 weeks <br />2.735795e-4 months <br /> this month. ISO-NE requested several load reductions to below 1200 MWe-Net (2-3% RTP). This yielded an availability factor of 100% and a capacity factor of 99.95% based on the MDC value of 1221.0 Net MWe.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)