SBK-L-04132, November 2004 Monthly Operating Report for FPL Energy Seabrook Station
| ML043510164 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/08/2004 |
| From: | Warner M Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| SBK-L-04132 | |
| Download: ML043510164 (2) | |
Text
I;V FPL Energy Seabrook Station FPL Energr P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 DEC 8 2004 Docket No. 50-443 SBK-L04132 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station November 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-1 1. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of November, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.
Very truly yours, FPL Energy Seabrook, LLC A~~ L ark E Warer Site Vice President cc:
S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector an FPL Group company
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-443 Seabrook I December 02,2004 Peter Nardone (603) 773-7074 REPORTING PERIOD:
November 2004
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,148.00 1,155.30 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 720.00 720.00 833,895.08 Yr-to-Date Cumulative 8,040.00 110,869.80 8,040.00 107,954.29 0.00 0.00 9,314,346.96 121,768,678.18 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration Reason I Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The unitoperatedat 100% powerforthe entire month. Thisyieldedan availabilityfactorof 100% and a capacity factor of 100.25% based on the MDC value of 1155.3 Net MWe.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1