SBK-L-09106, 0 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for Seabrook Station

From kanterella
Jump to navigation Jump to search
0 to the Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan for Seabrook Station
ML091530036
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/27/2009
From: O'Keefe M
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-09106
Download: ML091530036 (2)


Text

SAFEGUARDS INFORMATIONEXTera SAFEGUAS INFORMATION NEX ENER r __ý/

ENERG SEABROOK May 27, 27, 2009 2009 Docket Docket No. 50-443 SBK-L-09106 SBK-L-091 06 u.s. Nuclear U.S. Nuclear Regulatory Regulatory Commission Commission ATTN: Document Document Control Desk Desk Washington, DC 20555-001 Revision 1010 to the Physical Security Plan, Training and Qualification Physical Security Qualification Plan, and Safeguards Contingency Safeguards Contingency Plan for Seabrook Station Seabrook Station 50.4(b)(4), "Security accordance with 10 CFR 50.4(b)(4),

In accordance "Security plan and related submissions," CFR submissions," and 10 CFR 50.54(p)(2), "Conditions of licenses,"

50.54(p)(2), "Conditions NextEra Energy Seabrook, LLC (NextEra licenses," NextEra (NextEra Energy Seabrook Station, hereby submits Revision Seabrook), the licensee for Seabrook Seabrook), Revision 10 to the Seabrook Seabrook Physical Security Plan, Training Station Physical Qualification Plan, and Safeguards Training and Qualification Safeguards Contingency Contingency Plan.

Qualification Plan, and Station Physical Security Plan, Training and Qualification Revision 10 to the Seabrook Station Contingency Plan commits to the use of Safeguards Contingency 03-01 Revision 2 for the NEI 03-:01 ofNEI implementation of 10 CFR 26 rules changes effective implementation effective March 31,31, 2009.

One (1) CD-ROM containing containing Safeguards included in this submission. The CD-Safeguards Information is included ROM labeled "Seabrook PSP, Revision 10, Safeguards "Seabrook Station PSP,Revision Information" contains Safeguards Information" contains the following four files:

SBK-L-09106.pdf. SGI - Decontrolled 001 NextEra Energy Seabrook Submittal Letter SBK-L-09106.pdf.

separation upon separation 002 Seabrook Station PSP Rev 10 (SGI).pdf SGI 003 Change Synopsis Seabrook Station PSP Rev 10.pdf SGI-Decontrolled separation SGI-Decontrolled upon separation Index.pdf (includes individual file size). SGI - Decontrolled 004 CD Index.pdf separation Decontrolled upon separation File 002 contains Safeguard Information protected from public disclosure as Information that must be protected 10 CFR 73.22, "Protection of Safeguards Infonnation:

required by 10 Requirements."

Information: Specific Requirements."

SAFEGUARDS INFORMATION INFORMATION Safeguards Information. Upon separation this page is decontrolled.)

(Enclosure contains Safeguards GOO\

Box 300, P.O. Box NextEra Energy Seabrook, LLC, P.O. Road, Seabrook, Lafayette Road, 300, Lafayette 03874 NH 03874 Seabrook, NH KiM\.

K

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION Revision 10 Revision 10toto the theSeabrook StationPhysical Seabrook Station SecurityPlan, Physical Security Training and Plan, Training and Qualification Plan, and QualificationPlan, and Safeguards Contingency Plan continues to refer to FPL Energy Seabrook Safeguards Contingency Plan continues to refer to FPL Energy Seabrook LLC our company LLC our company name name prior prior toto April April 16, 16, 2009.

2009. OnOn April April 16, 16, 2009, 2009, ourour company company namename was was changed changed toto NextEra NextEra Energy Seabrook, LLC. Conforming revisions to reflect the name change will Energy Seabrook, LLC. Conforming revisions to reflect the name change will be be made made inin aa future revisiontoto the future revision theSeabrook Station PSP.

Seabrook Station PSP.

Should Shouldyou you have have any anyquestion questionregarded regarded this this submittal, submittal, please please contact contactJames James Tucker Tucker (james tucker@nexteraenergy.com), Security Manager, at (james_tucker@nexteraenergy.com), Security Manager, at (603) 773-7354. (603) 773-7354.

Very Very truly truly yours, yours, NextEra Energy NextEra Seabrook, LLC Energy Seabrook, LLC Michael O'Keefe /

LicensingManager Licensing Manager Enclosure Enclosure -- SGISGI CD-ROM CD-ROM labeled labeled "Seabrook "Seabrook Station Station PSP, PSP, Rev.

Rev. 10, 10, Safeguards Safeguards Information" Information" cc:

cc: Regional Regional Administrator, Administrator, Region Region II (with (with enclosure) enclosure)

USNRC US NRC Project Manager, Seabrook Project Manager, Seabrook Station (without enclosure)

Station (without enclosure)

Senior Senior Resident Inspector, USNRC, Seabrook Station (without Resident Inspector, USNRC, Seabrook Station (without enclosure) enclosure)

SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION .

(Enclosure contains Safeguards (Enclosure contains Safeguards Information.

Information. Upon separation this Upon separation this page page is is decontrolled.)

decontrolled.)