| | Start date | Site | Title |
|---|
| IR 05000382/2025002 | 2 February 2026 | Waterford | Amended Integrated Inspection Report 05000382/2025002 |
| IR 05000482/2025004 | 23 January 2026 | Wolf Creek | Integrated Inspection Report 05000482/2025004 |
| ML25317A784 | 16 January 2026 | Catawba | – Proposed Alternative to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method |
| ML25079A307 | 31 December 2025 | | Draft Regulatory Guide DG-1446, (RG 1.84 Rev 41) Design, Fabrication, and Materials Code Case Acceptability, ASME Section III |
| ML25080A261 | 31 December 2025 | | Draft Regulatory Guide DG-1447, (RG 1.147 Rev 22) Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1 |
| ML25231A255 | 22 December 2025 | 07201042 | 2. Proposed Technical Specification for CoC No. 1042, Amd 5 Rev 0 |
| IR 05000333/2025003 | 22 December 2025 | FitzPatrick | Integrated Inspection Report 05000333/2025003 and Independent Spent Fuel Storage Installation Report 07200012/2025001 and Exercise of Enforcement Discretion |
| BW250053, Liquid Penetrant Indication in Control Rod Drive Mechanism Nozzle Seal Weld Repair Due to Subsurface Weld Defects Opening from Thermal and Pressure Stresses During Operation (Cover Letter) | 4 December 2025 | Braidwood | Liquid Penetrant Indication in Control Rod Drive Mechanism Nozzle Seal Weld Repair Due to Subsurface Weld Defects Opening from Thermal and Pressure Stresses During Operation (Cover Letter) |
| 05000456/LER-2025-002, Liquid Penetrant Indication in Control Rod Drive Mechanism Nozzle Seal Weld Repair Due to Subsurface Weld Defects Opening from Thermal and Pressure Stresses During Operation | 4 December 2025 | Braidwood | Liquid Penetrant Indication in Control Rod Drive Mechanism Nozzle Seal Weld Repair Due to Subsurface Weld Defects Opening from Thermal and Pressure Stresses During Operation |
| ML25336A300 | 2 December 2025 | 07109397 | Enclosure 2: HI-STAR 330 Rsi Responses (Non-proprietary) |