MONTHYEARML22262A3142022-10-0404 October 2022 Relief Requests 3IR-18 and 3IR-19, Relief from the Requirements of the ASME Code ML22116A2442022-04-26026 April 2022 Acceptance of Requested Licensing Action Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage ML20237F3442020-09-21021 September 2020 Authorization of Alternative (Relief Request 3IIR-7) from Certain Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (EPIDs L-2020-LLR-0055, L-2020-LLR-0056, and L-2020-LLR-0057) ML20101L0402020-04-10010 April 2020 Acceptance of Requested Licensing Action Relief Request to Use Code Case OMN-13 with 2012 Edition of the OM Code ML20101H3912020-04-0808 April 2020 Verbal Authorization for Seabrook Relief Request 3IIR-7 SBK-L-20049, Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable2020-04-0505 April 2020 Relief Request 3IIR-7, Proposed Alternative to Deter Examinations Beyond the 1 Year Code Allowable SBK-L-20017, Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code2020-03-20020 March 2020 Relief Request SG-1 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(l), Use of Code Case OMN-13 with 2012 Edition of the OM Code ML20076D2812020-03-17017 March 2020 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19340A1282019-12-13013 December 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML19249B1012019-09-30030 September 2019 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code; Relief Request RA-19-001 ML18106B1212018-04-25025 April 2018 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques L-2017-121, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-07-24024 July 2017 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML17065A1482017-03-27027 March 2017 Relief from the Requirements of the ASME Code ML17080A0382017-03-27027 March 2017 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code SBK-L-17027, Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2017-02-0606 February 2017 Relief Request RA-17-002, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) ML16330A1182016-12-15015 December 2016 NextEra Fleet - Safety Evaluation for Proposed Alternative to the American Society of Mechanical Engineers Operation and Maintenance Code by Adoption of Approved Code Case OMN-20, Inservice Test Frequency (CAC Nos. MF8195 Through MF8201) ML14071A4102014-04-10010 April 2014 Request for Relief RA-14-001 from American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI Requirements Regarding the Reactor Vessel Head Flange Seal Leak Detection Piping (TAC No. Mfxxxx) ML12144A2402012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-17 ML12145A1702012-06-0404 June 2012 Second 10-Year Interval Inservice Inspection Program Plan Request for Relief No. 2lR-20 SBK-L-11192, Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds2011-10-27027 October 2011 Request for Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds ML1031901392010-11-22022 November 2010 Relief Request for Use of Alternate Depth Sizing Qualification, Third 10-Year Interval ML1023503412010-10-15015 October 2010 Relief Request for System Pressure Test Examinations on Class 1 Component Pressure Boundaries, Third 10-Year Interval ML1013801662010-06-0303 June 2010 Relief Request for Containment Building Spray Pump Bearing Vibration Alert Range Limit, Third 10-Year Interval SBK-L-09038, Supplement to Request for Relief from Inservice Inspection Requirements2009-02-24024 February 2009 Supplement to Request for Relief from Inservice Inspection Requirements SBK-L-08204, CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer2008-12-11011 December 2008 CFR 50-55a Request for Alternative Requirements for ASME Class 1 Upper Level Instrumentation Lines on the Pressurizer SBK-L-08174, Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface2008-09-30030 September 2008 Request for Relief to Use of an Alternate Depth Sizing Qualification Requirement for Coordinated Implementation of ASME Section XI, Supplements 2 and 10 for Piping Examinations Performed from Inside Surface SBK-L-08175, Request for Relief from Inservice Inspection Requirements2008-09-30030 September 2008 Request for Relief from Inservice Inspection Requirements ML0422603122004-10-12012 October 2004 Relief, American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Relief for Class 3 Service Water Piping System ML0334400092004-02-0404 February 2004 Relief Inservice Testing Program Relief Request PR-3 ML0310705102003-05-30030 May 2003 Relief, from ASME Code Operations and Maintenance Code Istb 4.3(e)(1) Ten-Year Interval Inservice Test for Containment Spray Pumps CBS-P9A and CBS-P9B (Tac No. MB6676) ML0314100182003-05-0909 May 2003 Inservice Test Program Relief Request PR-3 ML0134603962002-01-28028 January 2002 Inservice Inspection Program Relief Requests 2AR-03, 2AR-04, 2AR-05, and 2IR-14 2022-04-26
[Table view] Category:Letter type:SBK
MONTHYEARSBK-L-23053, Radiological Emergency Plan (Ssrep), Revision 802023-06-22022 June 2023 Radiological Emergency Plan (Ssrep), Revision 80 SBK-L-23031, 2022 Annual Radioactive Effluent Release Report2023-04-28028 April 2023 2022 Annual Radioactive Effluent Release Report SBK-L-23044, 2022 Annual Radiological Environmental Operating Report2023-04-28028 April 2023 2022 Annual Radiological Environmental Operating Report SBK-L-23033, 2022 Annual Environmental Operating Report2023-04-11011 April 2023 2022 Annual Environmental Operating Report SBK-L-22093, 75 Day and 150 Day Submittal Letters2022-12-0101 December 2022 75 Day and 150 Day Submittal Letters SBK-L-22113, Radiological Emergency Plan (Ssrep), Revision 792022-11-16016 November 2022 Radiological Emergency Plan (Ssrep), Revision 79 SBK-L-22114, Independent Spent Fuel Storage Installation (Isfsi), Cask Registration2022-11-0909 November 2022 Independent Spent Fuel Storage Installation (Isfsi), Cask Registration SBK-L-22112, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-11-0303 November 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22094, Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2)2022-10-26026 October 2022 Relief Request 4RA-22-001, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2) SBK-L-22105, Supplement to 2021 Annual Radioactive Effluent Release Report2022-10-24024 October 2022 Supplement to 2021 Annual Radioactive Effluent Release Report SBK-L-22103, 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan2022-10-12012 October 2022 5 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan SBK-L-22102, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2022-10-0606 October 2022 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration SBK-L-22080, Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 20222022-08-12012 August 2022 Submittal of 10 CFR 72.48 Report of Changes, Tests and Experiments for August 2020 to July 2022 SBK-L-22054, SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-06-0909 June 2022 SBK-L-22054 - License Amendment Request 22-01, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections SBK-L-22044, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report SBK-L-22036, Steam Generator Tube Inspection Report2022-04-25025 April 2022 Steam Generator Tube Inspection Report SBK-L-22040, Radiological Emergency Plan (Ssrep), Revision 7822022-04-20020 April 2022 Radiological Emergency Plan (Ssrep), Revision 782 SBK-L-22024, Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2022-03-0707 March 2022 Response to Request for Additional Information (Raj) Regarding License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-22003, Inservice Inspection Examination Report2022-01-24024 January 2022 Inservice Inspection Examination Report SBK-L-21126, Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan2022-01-0404 January 2022 Fourth 10 Year Interval - Inservice Inspection (ISI) Program Plan SBK-L-21135, Submittal of Changes to the Seabrook Station Technical Specification Bases2021-12-29029 December 2021 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-21108, Core Operating Limits Report for Cycle 222021-11-0404 November 2021 Core Operating Limits Report for Cycle 22 SBK-L-21106, Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program2021-09-30030 September 2021 Transmittal of WCAP-18607-NP, Analysis of Capsule X from the NextEra Energy Seabrook Unit 1 Reactor Vessel Radiation Surveillance Program SBK-L-21105, Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension2021-09-27027 September 2021 Withdrawal of Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink One-Time Allowed Outage Time (AOT) Extension SBK-L-21103, Request for Exercise of Enforcement Discretion2021-09-25025 September 2021 Request for Exercise of Enforcement Discretion SBK-L-21104, Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension2021-09-25025 September 2021 Emergency License Amendment Request 21-02, Service Water System I Ultimate Heat Sink Onetime Allowed Outage Time (AOT) Extension SBK-L-21098, Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-09-22022 September 2021 Supplement to License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21083, NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage2021-08-18018 August 2021 NextEra Energy Seabrook, LLC - Relief Request 3IR-18 and 3IR-19 for End of Third 10-Year ISI Interval for Examinations with Limited Coverage SBK-L-21067, License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements2021-07-21021 July 2021 License Amendment Request 21-01, Revise 120-Volt AC Vital Instrument Panel Requirements SBK-L-21049, Revision to Updated Final Response to NRC Generic Letter 2004-022021-06-24024 June 2021 Revision to Updated Final Response to NRC Generic Letter 2004-02 SBK-L-21056, Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References:2021-05-20020 May 2021 Response to Request for Additional Information Regarding Seabrook Steam Generator Tube Inspection Report Review References: SBK-L-21045, Submittal of 2020 Annual Radioactive Effluent Release Report2021-04-30030 April 2021 Submittal of 2020 Annual Radioactive Effluent Release Report SBK-L-21044, 2020 Annual Radiological Environmental Operating Report2021-04-30030 April 2021 2020 Annual Radiological Environmental Operating Report SBK-L-21042, Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to RIS 2021-01 Preparation and Scheduling of Operator Licensing Examinations SBK-L-21033, Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements2021-03-24024 March 2021 Response to Request for Additional Information (RAI) Regarding License Amendment Request (LAR) 20-02, Resolve Non-Conservative Heat Flux Hot Channel Factor (Fo(Z)) Requirements SBK-L-21023, Radiological Emergency Plan (Ssrep), Revision 772021-03-0404 March 2021 Radiological Emergency Plan (Ssrep), Revision 77 SBK-L-20154, Submittal of Changes to the Seabrook Station Technical Specification Bases2020-12-22022 December 2020 Submittal of Changes to the Seabrook Station Technical Specification Bases SBK-L-20149, Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-12-0808 December 2020 Response to Request for Additional Information in Respect to One-Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20146, One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c2020-12-0303 December 2020 One-Time Exemption Request for the Biennial Emergency Preparedness Exercise Requirements of 10 CFR 50, Appendix E. IV.F.2.b and IV.F.2.c SBK-L-20144, Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-23023 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix B, Section VI Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic SBK-L-20143, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-022020-11-19019 November 2020 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 004-02 SBK-L-20132, Fourth Interval Inservice Testing (IST) Program2020-10-21021 October 2020 Fourth Interval Inservice Testing (IST) Program SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report SBK-L-20117, Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request2020-09-23023 September 2020 Response to Request for Additional Information Regarding Technical Specification 3/4.8.1 for a One-Time Extension of Allowed Outage Time License Amendment Request SBK-L-20103, Inservice Inspection Examination Report2020-07-27027 July 2020 Inservice Inspection Examination Report SBK-L-20092, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-4182020-07-13013 July 2020 Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-411 and TSTF-418 SBK-L-20068, License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating2020-07-13013 July 2020 License Amendment Request 20-01, One-Time Change to the Seabrook Technical Specifications A.C. Sources - Operating SBK-L-20085, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-16016 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic SBK-L-20077, Core Operating Limits Report for Cycle 212020-06-0101 June 2020 Core Operating Limits Report for Cycle 21 SBK-L-20057, Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request2020-05-20020 May 2020 Response to Request for Additional Information Regarding Degraded Voltage Time Delay Setpoint License Amendment Request 2023-06-22
[Table view] |
Text
FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 September 30, 2008 Docket No. 50-443 SBK-L-08175 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station Request for Relief from Inservice Inspection Requirements Pursuant to 10 CFR 50.55a(a)(3)(ii), FPL Energy Seabrook, LLC (FPL Energy Seabrook) requests approval for relief from inservice inspection requirements for the Seabrook pressurizer welded attachments and their associated supports.
In accordance with the ASME Boiler and Pressure Vessel Code (Code)Section XI, 1995 Edition through the 1996 Addenda, the pressurizer vessel (PZR) welded attachments and their associated supports require examination during the current 10-year interval. FPL Energy Seabrook is requesting relief from the examination requirements for the PZR welded attachments and their associated supports due to limited normal access and emergency egress concerns.
FPL Energy Seabrook submitted two previous relief requests to the NRC covering the I" and 2 nd ISI intervals. FPL Energy Seabrook is currently in its 2 nd ISI interval, however, the 2nd interval relief request for the PZR attachment welds (21R-12, Rev. 0) did not include the associated supports. The 1st interval relief (IR-12, Rev. 0) for the PZR attachment welds included the associated supports. The inadvertent omission of the supports in the 2nd interval request is corrected in the revised relief request in Attachment 1.
FPL Energy Seabrook requests review and approval of this proposal to support the Seabrook Unit 1 refueling outage in the fall of 2009. Similar alternatives have been submitted for NRC review and approval and are referenced in the attached request.
an FPL Group company
U. S. Nuclear Regulatory Commission SBK-L-08175 Page 2 If you have any questions regarding this submittal, please contact Mr. Michael O'Keefe, Licensing Manager, at (603) 773-7745.
Sincerely, FPL Energy Seabrook, LLC Gene St. Pierre Site Vice President cc: S. J. Collins, NRC Region I Administrator G. E. Miller, NRC Project Manager W. J. Raymond, NRC Resident Inspector to SBK-L-08175 ATTACHMENT 1 10 CFR 50.55a Request Relief Request in Accordance with CFR 50.55a(a)(3)(ii) 21R-12, Revision 1 SECOND INTERVAL ISI RELIEF FROM INSERVICE INSPECTION REQUIREMENTS ASME Code Components Affected Code class: 1 System: RC Examination Categories: B-K F-A Item No(s). : B 10.10, Pressure Vessel, Welded Attachments F1.40, Supports other than Piping ISI Component ID: RC E-10 A-LUG and associated support RC E-10 B-LUG and associated support RC E-10 C-LUG and associated support RC E-10 D-LUG and associated support
Applicable Code Edition and Addenda
FPL Energy Seabrook, LLC (FPL Energy Seabrook) is currently in the 2nd 10-year in-service inspection (ISI) interval. The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) of record for the current 10-year ISI interval isSection XI, 1995 Edition, including Addenda through 1996.
Applicable Code Requirement
ASME Section XI, 1995 Edition, Table IWB-2500-1, Category B-K, Welded Attachments for Vessels, Piping, Pumps and Valves, requires a surface examination of 100% of the weld length, and Table IWF-2500-1, Category F-A, Supports, requires a VT-3 visual examination of mechanical connections back to the building structure.
Reason for Request
Pursuant to 10 CFR 50.55a(a)(3)(ii), relief is requested from performing the surface examination on the four pressurizer welded attachments and the visual examination of the associated supports on the basis that the Code requirements are impractical to achieve. A 15"
thick concrete shield wall weighing approximately 85,000 pounds surrounds the Seabrook pressurizer approximately three quarters of the way around. The clearance between the shield wall and the pressurizer vessel is approximately 91/2". The north end of the pressurizer cubicle has greater vessel-to-shield wall clearance, however, that is where the pressurizer safety valve and spray piping are located. Ladders or platforms do not exist to make the examination area accessible and neither can any ladders be placed in the area due to restrictions by piping, conduit and other attachments.
The Pressurizer lugs are located on the pressurizer at elevation 23' 6". Potential access is gained by climbing a ladder on the outside of the shield wall and entering the cubicle at the top of the pressurizer at elevation 50'. Safety valve structural steel is used for footing as no platform exists in the cubicle. The FPL Energy Seabrook Safety Department evaluated the lack of normal and emergency access/egress as an unsafe work environment.
In addition to area inaccessibility, each lug is braced on two sides by large support guides which would require removal. Insulation is also wrapped around the lugs and support guides.
Tools and rigging equipment to remove the support guides would be required to provide 360 degrees of access on each lug. Accessibility and removal of the support guides is impractical without a compensating increase in quality and safety.
Proposed Alternative and Basis for Use The pressurizer attachments are subject to VT-2 visual examination as part of the system leakage test on the pressurizer vessel conducted each refueling outage as specified in Table IWB-2500-1, Examination Category B-P of the 1995 Edition through the 1996 Addenda of ASME Code,Section XI.
It is the FPL Energy Seabrook position that it is impractical to provide normal and emergency access/egress inside this highly restricted enclosure, and to remove support guides on these lugs to perform the surface and visual examinations without a compensating increase in quality and safety. It is the FPL Energy Seabrook position that, based on acceptable results of VT-2 visual examinations performed during system leakage tests, there is reasonable assurance of continued structural integrity of the subject attachments and an acceptable level of quality and safety is maintained without the performance of the B-K and F-A required examinations.
Duration of Proposed Alternative The alternative requirements of this request will be applied for the duration of the current, 2nd 10-year ISI interval up to and including the last outage.
Precedents
- A similar first interval relief request, IR-12 Rev. 0 was approved for FPL Energy Seabrook by the NRC in a letter dated September 3, 2002 (TAC No. MB2561)
- A second interval relief request, 21IR-12 Rev. 0 was approved for FPL Energy Seabrook by the NRC for the B-K components listed in this relief request in a letter dated March 21, 2001 (TAC No. MA9902)
Reference ASME Code,Section XI, 1995 Edition, including Addenda through 1996.