SBK-L-06002, December 2005 Monthly Operating Report for Seabrook Station

From kanterella
Jump to navigation Jump to search
December 2005 Monthly Operating Report for Seabrook Station
ML060180348
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/06/2006
From: St.Pierre G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-06002
Download: ML060180348 (2)


Text

FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 January 6, 2006 Docket No. 50-443 SBK-L-06002 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station December 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-12. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of December, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Site Vice President cc:

S. J. Collins, NRC Region I Administrator G.E. Miller, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

.,f"G an FPL Group company

OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIOD 50-443 Seabrook I January 04, 2006 Peter Nardone (603) 773-7074 December 2005

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe.Net) 1,222.00 1,221.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 907,866.10 Yr-to-Date 8,013.88 7,928.87 0.00 9,455,206.49 Cumulative 119,627.68 116,627.16 0.00 132,086,503.26 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action S: Scheduled (Hours)

Down 2 Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 99.94% based on the MDC value of 1221.0 Net MWe.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of I