SBK-L-05108, April 2005 Monthly Operating Report for Seabrook Station, Unit 1

From kanterella
Jump to navigation Jump to search
April 2005 Monthly Operating Report for Seabrook Station, Unit 1
ML051370354
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/10/2005
From: Warner M
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-05108 05-04
Download: ML051370354 (2)


Text

.4 FPL Energy Seabrook Station P.O. Box 300 FPL Energy Seabrook, NH 03874 Seabrook Station (603) 773-7000 MlAY 10 2005 Docket No. 50-443 SBK-L-05108 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station April 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-04. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of April, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC K Mark E. Warner rAr Site Vice President cc: S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector an FPL Group company frei2

I OPERATING DATA REPORT DOCKET NO. 50-443 UNIT NAME Seabrook 1 DATE May 03, COMPLETED BY Peter Nardone TELEPHONE (603) 773-7074 REPORTING PERIOD: April 2005

1. Design Electrical Rating 1,148.00
2. Maximum Dependable Capacity (MWe-Net) 1,155.30 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 7.43 2,150.33 113,764.13
4. Number of Hours Generator On-line 0.02 2,109.55 110.807.84
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 0.20 2,419,972.50 125,051.269.27 UNIT SHUTDOWNS Type Method of No. Date F: Forced Duration Reason l Shutting Cause & Corrective Action S: Scheduled (Hours) Down 2 Comments 05-02 04/01/2005 S 718.98 C 1 Scheduled Refueling Outage

SUMMARY

Scheduled Refueling Outage. Unit off-line on April 1 at 0001. Reactor sub-critical at 0043.

Commenced normal reactor restart on April 30 for Low Power Physics Testing. Reactor critical at 1717.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of I