SBK-L-05154, June 2005 Monthly Operating Report for Seabrook Station
| ML052080212 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/14/2005 |
| From: | St.Pierre G Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| SBK-L-05154 | |
| Download: ML052080212 (2) | |
Text
-
0 I*
FPL Energy Seabrook Station FPL Energy Seabrook Station P.D. Box 300 Seabrook, NH 03874 (603) 773-7000 JUL 1 4 205 Docket No. 50-443 SBK-L-05154 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station June 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-06. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of June, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul Reactor Engineering Supervisor, at (603) 773-7776.
V. Gurney, Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Site Vice President cc:
S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate I-2 G.T. Dentel, NRC Senior Resident Inspector an FPL Group company
OPERATING DATA REPORT DOCKET NO.
5 UNIT NAME I
DATE COMPLETED BY IF TELEPHONE REPORTING PERIOD:
iO-443
- eabrook 1 JulFy 11,2005T reter Nardone 603) 773-7074 June 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 1,220.00 1,218.00
- 3.
Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line S.
Reserve Shutdown Hours
- 6.
Net Electrical Energy Generated (MWHrs)
This Month Yr-to-Date 720.00 3,596.88 720.00 3,511.87 0.00 0.00 877,598.62 4,066.205.76 Cumulative 115,210.68 112,210.16 0.00 126,697,502.53 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration ReasonI Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.07% based on the MDC value of 1218.0 Net MWe.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic TriplScram 4
Continuation 5
Other (Explain)