SBK-L-04004, June 2004 Monthly Operating Report for Seabrook Station
| ML041970287 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 07/08/2004 |
| From: | Pierre G Florida Power & Light Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| SBK-L-04004 | |
| Download: ML041970287 (2) | |
Text
0FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 JUL 8 2004 Docket No. 50-443 SBK-L-04004 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station June 2004 Monthly Operating Report Enclosed please find Monthly Operating Report 04-06. This report addresses the operating and shutdown experience relating to Seabrook Station Unit 1 for the month of June, 2004 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.
Should you require further information regarding this matter, please contact Mr. Paul Reactor Engineering Supervisor, at (603) 773-7776.
V. Gurney, Very truly yours, FPL Energy Seabrook, LLC Gene F. St. Pierre Station Director cc:
H. J. Miller, NRC Region I Administrator S. P. Wall, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector an FPL Group company
OPERATING DATA REPORT DOCKET NO.
5 UNIT NAME DATE COMPLETED BY T
TELEPHONE (I
REPORTING PERIOD:
0-443 Seabrook 1 6 Nardone (603) 773-7074 June 2004
- 1.
Design Electrical Rating 1,148.00
- 2.
Maximum Dependable Capacity (MWe-Net) 1,155.30 This Month Yr-to-Date Cumulative
- 3.
NumberofHourstheReactorwasCritical 720.00 4,367.00 107,196.80
- 4.
Number of Hours Generator On-line 720.00 4,367.00 104,281.29
- -Reserve Shutdown Hours 0;00-0----
0.0----
00.00 --
- 6.
Net Electrical Energy Generated (MWHrs) 835,368.99 5,060,639.77 117,514.970.99 UNIT SHUTDOWNS Type Method of No.
Date F: Forced Duration R
Shutting Cause & Corrective Action S: Scheduled (Hours)
Down 2 Comments
SUMMARY
- The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.43% based on the MDC value of 1155.3 Net MWe.
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain) 2 Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of 1