Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
See also: IR 05000424/1985052
Text
. _ _ . _ .- _ . . _ _ . _ . _ - _ .. - -. _. - -. ._ .
@ RIGg UNITED STATES
Do NUCLEAR REGULATORY COMMISSION
g ' , REGION ll i
< j 101 MARIETTA STREET, N.W.
- g ATL ANTA, GEORGI A 30323
% *s. .* /
Report Nos.: 50-424/85-52 and 50-425/85-37
'
Licensee: Georgia Power Company
P.O. Box 4545
Atlanta, GA 30302
Docket Nos.: 50-424 and 50-425 License Nos.: CPPR-108 and CPPR-109
Facility Name: Vogtle Units 1 and 2
Inspection Conducted: November 1 - December 2, 1985
Inspectors: @ M ///o/86
H. H. Livermore, Senior Resident Date Signed
'
Inspector, Construction
D M @& ~
1/ soles
D' ate Signed
>
g J. F.Inspector, Rog'ge, Operations Senior Resident
C AR
7 @d _///o Date Signed
/ f6
M In.spector J. Schepens, ons ruction Resident
ApprovedBy:)(/! u.%M /!/o ffe
M. V. Sirikule, Section Chief te S'igned
Division of Reactor Projects
SUMMARY
Scope: This routine, unannounced inspection entailed 238 resident
4
inspector-hours on site (40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> were on backshifts) inspecting: containment
and safety related structures, piping systems and supports, safety related
components, auxiliary systems, electrical equipment and cables, instrumentation,
quality programs and administrative controls affecting quality, and follow-up on
previous inspection identified items.
Results: One violation was identified in the area of maintenance, paragraph 4.
9601270416 860113
PDR ADOCK 05000425
O PDR
__ __ ___- -
._ ____ . . . . _ _ _ . ___ - _ . _ _ . _ _ . -
- - - - - - - . _ = - - . . _ - . _ - _ _ . . _ - . . - _ _
, .
DETAILS
1. Persons Contacted
,
Licensee Employees
- R. E. Conway, Senior Vice-President, Vogtle Project Director
] D. O. Foster, Vice-President, Project Support
- *R. H. Pinson, Vice-President, Project Construction
- P. D. Rice, Vice-President Project Engineering
W. T. Nickerson, Assistant to the Project Director
- D. G. Smith, Assistant to the Assistant Project Director
D. S. Read, General Manager, Corporate Quality Assurance
,
W. C. Ramsey, Readiness Review Manager
- H. H. Gregory III, General Manager, Site Prudence Audit Activities
M. H. Googe, Project Construction Manager
G. Bockhold, Jr., General Manager Nuclear Operations
, *H. P. Walker, Manager Unit Operation
! 0. Batum, Deputy to the Vice-President Engineering
j *C. W. Hayes, Vogtle Quality Assurance Manager
j *C. E. Belflower, Quality Assurance Site Manager - Operations
-
- E. D. Groover, Quality Assurance Site Manager - Construction
S. D. Haltom, Quality Assurance Engineering Support Supervisor
W. E. Mundy, Quality Assurance Audit Supervisor
J. E. Sanders, Project Construction Manager - Unit 1
D. M. Fiquett, Project Construction Manager - Unit 2 ,
- B. C. Harbin, Manager Quality Control
C. R. Brewer, Assistant Quality Control Manager
,
T. L. Weatherspoon, Assistant Quality Control Manager
,
'
- G. A. McCarley, Project Compliance Coordinator
W. C. Gabbard, Assistant Project Compliance Coordinator
J. O. Dorough, Administrative Manager
W. F. Kitchens, Operations Superintendent
- *P. T. Ciccanesi, Regulatory Compliance Specialist
i. T. Dannemiller, Senior QA Engineer
J. F. D' Amico, Regulatory Compliance Superintendent
, H. W. Swain, Mechanical QC Section Supervisor
! *C, L. Coursey, Maintenance Superintendent
- M. A. Griffis, Maintenance Superintendent
Other licensee employees contacted included craftsmen, technicians,
supervisors, engineers, inspectors, and office personnel.
Other Organizations
- H. M. Handfinger, Preoperational Test Superintendent - Bechtel
M. L. Bagale, QA Surveillance Specialist - Bechtel
l- B. F. Hurless, QA Surveillance Specialist - Bechtel
! *F. B. Marsh, Project Engineering Manager - Bechtel
. * Attended Exit Interview.
i
I
.
. - . _ . . _
_ _ _ _ _ . _ . _ _ _ . - _ _ _ _ _ _, __ _ _ _ - , _ . _ . _ _ _ . , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. _
__
_ _ . _ _ _ __ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ . . _ _____
!
I .
2
i
'
2. Exit Interview (30703C)
The inspection scope and findings were summarized on September 26, 1985 with '
those persons indicated in paragraph 1 above. The inspector described the
{ areas inspected and discussed in detail the inspection finding listed below.
j No dissenting comments were received from the licensee. The licensee did
1
not identify as proprietary any of the materials provided to or reviewed by
the inspector during this inspection,
j A separate meeting was held during the inspection period with the General t
- Manager, Nuclear Operations to discuss control of access to plant equipment
j and necessary interfaces between Operations and Construction. ,
!
! (Closed) Inspector Follow-up Item 50-424/85-13-01 " Review Implementation of
i FECO N-17-BF to Install 2 Piece Balance Drum Locknuts into the CVCS Charging
Pumps" - Paragraph 4.
- .
(0 pen) Violation, 50-424/85-52-01 " Failure to Provide Adequate Maintenance
Procedures for Work on Safety-Related Equipment Appropriate to the
Circumstances".
4
s The following NRC exit interviews were attended during the inspection period
I by a resident inspector:
i - .
November 22, 1985 J. R. Harris
November 27, 1985 0. Masnyk
3. Licensee Action on Previous Enforcement Matters (92702)
i
l (Open) Violation 50-424/85-43-01, 50-425/85-32-01; " Failure to Provide
Adequate Protection to Safety-Related Components During In-Plant Storage" A
!
meeting was held on November 22, 1985 at the Resident's office to discuss
,
the licensee's response to NRC Violation 50-424/85-43-01, 50-425-85-32-01,
'
dated November 15, 1985. The licensee informed the inspectors that they
will be issuing a supplement to their response.
!
! 4. Licensee Action on Previous Inspection Items (92701)
! (Closed) Inspector Followup Item, 50-424/85-13-01 " Review Implementation of
l FECO N-17-BF to install two piece balance drum locknuts into the CVCS
} centrifugal charging pumps". The inspector reviewed maintenance work orders
- (MWO) No's. 1811851 and 1811852 for the installation of the new two piece
balance drum locknut assembly per FECO N-17-BF, Rev. O on the Train "A" &
.
"B" CVCS centrifugal charging pumps. In addition, the inspector witnessed
! the installation of the new two piece balance drum locknut assembly on the
l Train "B" CVCS centrifugal charging pump.
!
During the inspection of the Train "B" CVCS centrifugal charging pump
- balance drum locknut assembly change out on November 16 & 18, 1985, the
j inspector reviewed the following MWO's and procedures and the MWO associated
with a lube oil flush and speed increaser gear inspection.
i ,
!
l
_ __--.. _ _ _____ _ _ _ _ . _ _ - - - . _. -_
- - . - - . - - . _-. _.. . - - . - . . _ _ _ . - --
4
.
- 3
1
i
MWO 18511851 MWO To Install New Two-Piece Balance Drum Locknut
i Assembly on Train "A" CVCS Centrifugal Charging
i Pump
, MWO 18511852 MWO To Install New Two-Piece Balance Drum Locknut
i Assembly on Train "B" CVCS Centrifugal Charging
j Pump
MWO to Provide Maintenance Support for Lube Oil
'
'
MWO 18511088
Flush and Inspection / Cleaning of Speed Increaser ;
- Gear
i SUM-22, Rev. 10 Maintenance Work Orders
27116-C, Rev. 1 Pacific RL/IJ Pump Inspection
1
j During the inspection the inspector noted the following discrepancies
< regarding the implementation of SUM-22: i
l a. A MWO was issued without all of the applicable documents. FECC N-17-BF ;
specifies the installation instructions for a new two piece balance ,
drum locknut assembly. MWO 18511852 was issued to implement j
i installation of two piece balance drum locknut assembly utilizing FECO t
N-17-BF. However, upon inspection at the work site FECO N-17-BF was
not part of the MWO package. In addition, when FECO N-17-BF was
obtained and added to the MWO the inspector noted that it was marked as
an uncontrolled copy and not for construction use.
b. MWO was issued without appropriate work procedures and instructions.
i MWO 18511852 & 18511851 were issued with maintenance procedure
i No. 27116-C. This maintenance procedure was for the complete
! disassembly, inspection, and reassembly of a CVCS Pump. The scope of
i work, however, only required the disassembly of the outboard bearing
and seal to achieve access for replacement of the two piece balance
i drum locknut assembly. During the preparation of the MWO the
i unnecessary steps were not deleted nor was the necessary step to affect
replacement of the new locknut added,
j MWO 18511088 was issued without appropriate work procedures and
i instructions for the disassembly, inspection, and reassembly of the
speed increase gear for performing the lube oil flush. In essence the
! three MW0's should have been closely coordinated to achieve the overall
work scope intended for the CVCS Centrifugal Charging Pumps.
[ c. MV0's were processed without the ability to perform adequate reviews.
! As identified in paragraph b above, the MWO's contained numerous steps
i that would not be performed and some steps were not included. Since
each MWO undergoes reviews by representatives from engineering,
1- operation, maintenance and quality control, it was evident that proper
.
reviews could not be performed due to a lack of detailed instructions
to implement the work scope. In the instance of the QC review for MWO
l
!
,
4 ~
l
-, , - _ ,, r--, - - - - , - , - , , - - . . - , . _ , - . - _ .-n , , . - - - - - - - - - - -
-
, ,r- . - . . - . - - -. . . , , -
- - - - - . - - - _ . - . -. .
,
i
.
4
18411852, hold points were established for steps that were not
performed and no hold point was established for witnessing the
i installation of the new locknut. This hold point was later established
, after FEC0 N-17-BF was added to the work package as mentioned in
paragraph a. above.
! d. During the performance of work under MWO 18511852 it was ooserved that
a QC inspector verbally waived a hold point upon recommendation by the
vendor; however, SUM-22 requires an approved and documented consent
waiver prior to work proceeding.
- The above discreparcies are examples of failure to provide adequate
,
control of maintenance activities regarding preplanning and review of
J work.
Several meetings were held with the licensee to fully discuss NRC
concerns in this area. The NRC concern centers on thr- fact that the
MWO process relies on the worker to identify the problems in execution
of the maintenance and seek resolution of the problem while under
i
pressure to complete the work. In the initial execution of MWO
- 18511852 it was observed, and later confirmed by the licensee, that the
workers had not read nor were following the work procedure but instead
'
were following the verbal directions of the vendor representative.
.
The foregoing is considered to be in violation of 10 CFR Part 50,
4
'
Appendix B, Criterion V and will be identified as Violation
50-424/85-52-01 " Failure to provide adequate maintenance procedures for
work on safety-related equipment appropriate to the circumstances".
! Subsequently, the licensee took the following corrective steps prior to
resuming work:
[ -
A maintenance foreman was assigned to supervise all of the MWO's
- associated with the CVCS centrifugal charging pumps through their
completion.
_
-
MWO's 18511851 & 18511852 were enhanced by specifying the exact
l steps required to be performed in maintenance procedure No.
i 27116-C.
-
MWO 18511088 was voided due to inadequate instructions and
! reissued as MWO 18512832.
I
r
-
MWO 18512832 was issued with detailed instructions for performing
l the lube oil flush. Instructions were also providea pertaining to
, the completion of some of the work in support of the lube oil
flush on MWO 18512833,
i
l
l
.
- . -. . - - - - . -
_ . __ _ _ _ . _ _ _ ._ __ _. ._ _ _ _ _ _ _ . _ - _ _ _ _ .
!
.
'
5
i
-
{
-
Maintenance procedure No. 27115-C, Rev. O for the disassembly,
, inspection, and reassembly of the speed increaser gear was issued
I
on November 19, 1985.
.
l -
MWO 18512833 was issued to disassemble, clean, inspect and
!
reassemble speed increaser gear per the maintenance procedure.
, Additional instructions were also provided pertaining to the
J
intermediate reassembly process in support of the lube oil flush
,
per MWO 18512832.
'
,
5. Construction Inspection - Units 1 & 2
i
Periodic inspections were made throughout this reporting period in the form
of general type inspections in different areas of both facilities. The
areas were selected on the basis of the scheduled activities and were varied
to provide wide coverage. Observations were made of activities in progress
.
to note defective items or items of noncompliance with the required codes
i and regulatory requirements. On these inspections, particular note was made
i of the presence of quality control inspectors, supervisors, and quality
4
control evidence in the form of available process sheets, drawings, material
identification, material protection, performance of tests, and housekeeping.
]
Interviews were made with craft personnel, supervisors, coordinators,
,
quality control inspectors, and others as they were available in the work
areas.
t
i The inspector reviewed numerous construction deviation reports to determine
- if requirements were met in the areas of documentation, action to resolve,
4 justification, and approval signatures in accordance with GPC Field
Procedure No. GD-T-01.
! On November 19, the inspectors attended one of the licensee briefings given
i to their QC inspectors to inform them of how protection under federal law is
i provided. These briefings were an hour long and were scheduled to be
- presented nine (9) times during the day to reach as many QC personnel on
4
both shifts. The presentation was given by W. C. Whitney, B. C. Harbin and
-
L. B. Glenn. Mr. Whitney described the legal basis for protection
j available to the employee from the Department of Labor and outlined the
, legal process that could take place thru the Supreme Court. He stated that
i Vogtle takes the position that the writing of Deficiency Reports are
i protected activities. Mr. Whitney stressed that no-one on the project will
i be retaliated against for identifying a quality concern. The proper level
- for resolving a concern was identified as first with supervisor then the
! Quality Concerns Program and finally the NRC which is available at any .
l point. In summary, it was stressed that no-one should get the impression
that concerns were not wanted, but instead must bring them forth as part of ,
- your employment. Mr. Glenn presented an overview of the Quality Concerns
Program. In the presentation, i t was pointed out that concerns would be ,
- processed and investigated within seven days to preserve the thirty-day time
4
?
4
-,.------.s ,,v. .---..-,-...----e.-.__---.--.,--,-.--.w
- -- --
.
6
frame the employee would have to submit a complaint to the Department of
Labor. It was also stressed that this program was not in place to be used
as a threat to a supervisor. Mr. Harbin stressed the avenues for raising a
concern; and stated that he thought that Vogtle had the best QC inspectors.
He also made the point that as the QC Manager he was available to discuss
any concerns. The meeting was opened for questions. The inspector noted
that several times during the presentation that emphasis was made to stress
the importance of QC inspectors bringing quality concerns forward for
identification and resolution.
No violations or deviations were identified.
6. Fire Prevention / Protection and Housekeeping Measures - Units 1 & 2 (42051C)
The inspector observed fire prevention / protection measures throughout the
inspection period. Welders were using welding permits with fire watches and
extinguishers. Post indicator valves were being maintained in the open
position. Fire fighting equipment is in its designated areas throughout the
plant.
The inspector reviewed and examined portions of the following procedures
pertaining to the fire prevention / protection measures and housekeeping
measures to determine whether they comply with applicable codes, standards,
NRC Regulatory Guides and licensee commitments.
-GD-T-05, Rev. 6 Fire-Protection Equipment Inspection and Testing
-GD-T-15 Rev. 5 Welding and Cutting
-GD-T-17, Rev. 3 Housekeeping
The inspector observed fire prevention / protection measures in work areas
containing safety related equipment during the inspection period to verify
the following:
-
Combustible waste material and rubbish was removed from the work areas
as rapidly as practicable to avoid unnecessary accumulation of
combustibles.
-
Flammable liquids are stored in appropriate containers and in
designated areas throughout the plant.
-
Cutting and welding operations in progress have been authorized by an
appropriate permit, combustibles have been moved away or safely
covered, and a fire watch and extinguisher was posted as required.
-
Fire protection / suppression equipment was provided and controlled in
accordance with applicable requirements.
No violations or deviations were identified.
7
7. Containment (Structural Concrete) - Unit 2 (47053C)
a. Procedure and Document Review
The inspector reviewed and examined portions of the following
procedures pertaining to the placement of concrete to determine whether
they comply with applicable codes, standards, NRC Regulatory Guides and
licensee commitments.
-
CD-T-02, Rev. 15 Concrete Quality Control
-
CD-T-06, Rev. 9 Rebar and Cadweld Quality Control
-
CD-T-07, Rev. 8 Embed Installation and Inspection
-
CD-T-20, Rev. 6 Installation and Inspection of Trumpets,
>
Rigid Extensions, and Duct Sheathing
b. Installation Activities
The inspector witnessed portions of the concrete placement indicated
below to verify the following:
(1) Forms, Embedment, and Reinforcing Steel Installation
'
-
Forms were p operly placed, secure, leak tight and clean.
-
Rebar and other embedment installation was installed
in accordance with construction specifications and
drawings, secured, free of concrete and excessive rust,
specified distance from forms, proper on-site rebar
bending (where applicable) and clearances consistent
with aggregate size.
(2) Delivery, Placement and Curing
-
Preplacement inspection was completed and approved prior
to placement utilizing a Pour Card (Procedure Exhibit
CD-T-02*18).
-
Construction joints were prepared as specified.
-
Proper mix was specified and delivered.
-
Temperature control of the mix, mating surfaces, and
ambient were monitored.
-
Consolidation was performed correctly.
-
Testing at placement location was properly performed in
accordance with the acceptance criteria and recorded on a
Concrete Pikacement Pour Log (Procedure Exhibit CD-T-02*20).
-
Adequate crew, equipment and techniques were utilized.
-
Inspections during placements were conducted effectively
by a sufficient number of qualified personnel.
-
Curing temperature was monitored.
__ _ ._ __ ._. _ _ _ __ , __
. _ - -
_ . - _ __ . _ _ _ _ _ _ . _ ._ _ _ . . . _ _ . _ _ . _ . . . _ .
l
1
i . <
.
i 8
Pour No. Location Inspection Activity
.
A-1111-087 Control Building Wall Preplacement and Placement
2-59A003, 2-59A-004 Auxiliary Feedwater Preplacement, Placement,
Pump House Base Slab and Curing
I 2-010-042/043 Containment Dome Preplacement and Placement
No violations or deviations were identified.
! 8. Containment (Prestressing) - Unit 1 (47063C)
!
I a. Procedure and Document Review
The inspector reviewed and examined portions of the following
!
'
specification, procedure, and drawings pertaining to the installation
of horizontal tendons, to determine whether they comply with applicable
1 codes, standards, NRC Regulatory Guides and licensee commitments.
-X2AF04 Technical Provisions for Containment
Post-Tensioning System
-AX2AF04-100-12 Field Instruction Manual for Installation
of VSL E5-55 Post-Tensioning System Within
l Nuclear Containment Structures, Rev. 9
, -1X2AF04-50-5 Horizontal Tendon Elevation-Unit 1
Buttress #1 to #2
-1X2AF04-51-4 Horizontal Tendon Elevation-Unit 1
'
Buttress #3 to #1
- -1X2AF04-52-3 Horizontal Tendon Elevation-Unit 1
Buttress #2 to #3
- 4
-AX2AF04-78-4 Horizontal Tendon Stressing Data
-AX2AF04-79-4 Horizontal Tendon Stressing Data
i
b. Installation Activities
The inspector witnessed portions of the installation activities
- indicated below to verify the following:
-
The latest issue (revision) of applicable dra. ngs or procedures
4
are available to the installers and were being used.
!
-
Tendons were free of nicks, kinks, corrosion; were installed in
designated locations; and that the installation sequence and
l technique was per specified requirements.
1
-
Installation crew was properly trained and qualified.
'
-
QC inspection was properly performed by qualified personnel in
accordance with applicable requirements.
!
t
%,
_. .. - . -. . _.
.
9
-
Adequate protective measures were being taken to ensure mechanical ,
and corrosion protection during storage, handling, '
installation, and post installation.
-
Tendons were stressed in the proper sequence.
-
All strands in the tendon were moving together during the
stressing and the tendon is being stressed from both ends
simultaneously.
-
Elongatiari measurements were being taken properly and being
compared to the calculated elongation.
-
Anchor head lift-off force was being taken and documented
properly.
-
The stressing operation was being monitored to identify any strand
slippage.
The following tendons were observed:
Horizontal From Buttress
Tendon No. to Buttress Seq. No. Activity
116 2 East-1 South 20 Pull Through Dummy
Tendon
117 3 West-2 West 20 Tendon Installation
139* 1 North-3 East 24 Tendon Stressing
240 2 East-1 South 24 Tendon Stressing
No violations or deviations were identified.
9. Containment (Steel Structures and Supports) - Units 1 & 2 (48053C)
Periodic inspections were conducted to observe containment steel and support
installation activities in progress, to verify the following:
-
Compenents were being properly handled (included bending or
straightening).
-
Specified clearances were being maintained.
-
Edge finishes and hole sizes were within tolerances.
-
Control, marking, protection and segregation were maintained during
storage.
. -. - - -. . -_ - _- _
_, .
4
s
10
i
-
Fit-up/ alignment meets the tolerances in the specifications and
drawings.
No violations or deviations were identified.
,
10. Safety-Related Structures (Structural Steel and Supports) - Units 1 & 2
(48063C)
'
Periodic inspections were conducted to observe construction activities of
safety-related structures / equipment supports for major equipment outside the
containment to verify that:
-
Materials and components were being properly handled to prevent damage. ,
-
Fit-up/ alignment were within tolerances in specifications and drawing
requirements.
-
Specified clearances from adjacent components were being met.
No violations or deviations were identified.
11. Reactor Coolant Pressure Boundary Piping - Observation of work and work
activities - Unit 1 (49053C) (52063C) (52153C) (37301)
During the inspection period, pipe run walkdowns were performed where piping
installation is near completion to determine whether the piping run was
installed as shown on approved drawings and in accordance with applicable
construction specifications. Specific pipe run walkdowns included a
walkdown of portions of the following lines:
P&ID NO. REVISION PIPE RUN INSPECTED
1X4DB112, Rev. 17 Pressurizer Surge Line (053-14")
- Pressurizer Connections to Root Valves
Pressurizer Spray Line (030-4"/030-6")
Pressurizer PORV & Code Safety
Relief Lines to the PRT (059-6", 063-6", 060-3",
063-6", 064-12", 058-6", 057-6", 056-6", 065-6",
066-6", 067-6" & 068-3/4")
.
Specific areas examined during the pipe run walkdown for compliance with the
applicable isometric drawings and the Plant Design and Instrumentation
Construction Specification No. X4AZ01, were as follows:
l
Vent and Drain Connections and Locations
Instrumentation Connections and Locations
Valve Installation and Orientation
Line Size and Location
Fittings Type and Location
- Pipe / Valve / Fitting End Connections
Hanger Locations and Types
No violations or deviations were identified.
,
,.-o , . , , - - , - - - , , _ . _ - , . , _ _ . , , _. -- , , , , , _ . , _ _ _ , , _ . - .-,,,.---w. ,.c.. . - -. - - .-,,--% -
- _ . - -
-. ._ . _. _ __ . _ . . . _. __.
J
,
t
11
,
k
12. Reactcr Vessel Protection - Units 1 & 2 (50053C)
Periodic . inspections were conducted during the inspection period to
4
determine that proper storage protection practices were in place, entry of
foreign objects and debris was prevented, and that access was controlled for
'
the following:
Unit 1 & 2 Reactor Vessel
Unit 1 Integrated Head Package
Unit 1 Upper and Lower Internals
i No violations or deviations were identified.
'
13. Safety Related Components - Units 1 & 2 (50073C)
The inspection consisted of plant tours to observe storage, handling, and
, protection, installation; and preventive maintenance after installation of
safety-related components to determine that work is being performed in
accordance with applicable codes, NRC Regulatory Guides, and licensee
commitments.
During the inspection the below listed equipment was observed at various
times during the inspection period to verify the following as applicable:
-
Storage, environment, and protection of components were in accordance
with manufacturer's instructions and/or established procedures.
-
Implementation of special storage and maintenance requirements such !
as: rotation of motors, pumps, lubrication, insulation testing
(electrical), cleanliness,etc. ,
-
Performance of licensee / contractor surveillance activities and
documentation thereof was being accomplished.
-
Installation requirements were met such as: proper location, placement,
orientation, alignment, mounting (torquing of bolts and expansion
j anchors), flow direction, tolerances, and expansion clearance.
l -
Appropriate stamps, tags, markings, etc. were in use to prevent
4 oversight of required inspections, completion of tests, acceptance, and
! the prevention of inadvertent operation.
__
The following Unit 1 equipment was inspected:
- -
Residual Heat Removal (RHR) Pumps
-
Diesel Generators
-
Containment Spray (CS) Pumps
-
Pressurizer
I
!
!
- i
1
-. - - _ _ _ . . - . _ . . - - . - . . . -, _ - _ _ , _ . . , _ . - . - _ - - - . - , , . _ _ _ -
-~,..,.,-.,~,_4- .
. . _ . . . _ - -- --. .- - .. - - .
l
- l
.
'
'
12
-
Main Coolant Pumps
4 -
Steam Generators
-
Safety Injection Pumps
-
Containment Penetration Encapsulation Vessel for Train "B"
-
RHR and CS
-
Component Cooling Water (CCW) Heat Exchangers, Surge Tanks & Pumps
,
-
Cable Spreading Room Train A & B
-
'
-
Accumulator Tanks
-
Reactor Coolant Drain Tank Pumps
-
Chemical and Volume Control System (CVCS) Letdown Heat Exchanger
-
Reactor Coolant Drain Tank & Heat Exchanger
-
Reactor Cavity Pumps
.,
-
Battery & Charger Rooms Train A, B, C & D
-
Nuclear Grade Piping, Valves & Fittings
-
Spent Fuel Pool Heat Exchangers
-
Pressurizer Relief Tank
CVCS Centrifugal Charging Pumps & Positive Displacement
'
-
Pump
4
-
Bottom Mounted Instrumentation (BMI) Seal Table
!
'
The following Unit 2 equipment was inspectea:
-
RHR Pumps
-
CS Pumps
I -
CVCS Centrifugal Charging Pumps & Positive Displacement Pump
-
Steam Generators
- -
Safety Injection Pumps
-
CCW Heat Exchangers Surge Tanks & Pumps
,
-
Accumulator Tanks
! -
Pressurizer Relief Tank
-
Diesel Generator Fuel Oil Tanks
! -
Nuclear Grade Piping, Valves, & Fittings
.
No violations or deviations were identified.
<
'
14. Safety Related Pipe Support and Restraint Systems - Unit 1 (50090C)
I Periodic inspections were conducted during the inspection period to observe
i construction activities during installation of safety-related pipe supports
'
to determine that the following work was performed in accordance with
applicable codes, NRC Regulatory Guides, and licensee commitments:
l
-
Spring hangers were provided with indicators to show the approximate
" hot" or " cold" position, as appropriate.
-
No deformation or forced bending was evident.
-
Where pipe clamps are used to support vertical lines, shear lugs were
welded to the pipe (if required by Installation Drawings) to prevent
slippage.
,
l
l , - - , . . , - . - - . - - . . _ - . , . -
- - . , , ... - . ., -
. . . - .,, . , - - - . - - - - , . - - - - . - - _ , . , - - - - . - - - -
'
.
13
-
Sliding or rolling supports were provided with material and/or
lubricants suitable for the environment and compatible with sliding
contact surfaces.
-
Supports are located and installed as specified.
-
The surface of welds meet applicable code requirements and are free
from unacceptable grooves, abrupt ridges, valleys, undercuts, cracks,
discontinuities, or other indications which can be observed on the
welded surface.
No violations or deviations were identified.
15. Electrical (Components and Systems) - Units 1 & 2 (51053C)
Periodic inspections were conducted during the inspection period to observe
safety-related electrical equipment to verify that the storage,
installation, and preventive maintenance were accomplished in accordance
with applicable codes, NRC Regulatory Guides, and licensee commitments.
During the inspection period the inspector conducted an inspection of the
below listed equipment during storage, installation, and cable terminating
to verify the following as applicable:
-
Location and alignment
-
Type and size of anchor bolt:
-
Identification
-
Segregation and identification of nonconforming items
-
Location, separation and redundancy requirements
-
Equipment space heating
-
Cable identification
-
Proper lugs used
-
Condition of wire (not nicked, etc.), tightness of connection
-
Bending radius not exceeded
-
Cable entry to terminal point
-
Separation
The following Unit 1 equipment was inspected:
1-1605-PS-SDA Train "A" Shutdown Panel
1-1605-PS-SDB . Train "B" Shutdown Panel
1-1805-S3-DAD Reactor Coolant Pumps 13.8KV Switchgear ~~
1-1805-S3-CAC Reactor Coolant Pumps 13.8KV Switchgear
1-1804-53-A03 4160V Switchgear 1BA03
1-1804-S3-A02 4160V Switchgear 1AA02
1-1805-S3-BBE MCC 1BBE
1
- _ _ _ _ . ... -- . _ _ ___ . _ _ _
1
.
l
1
.
14 .
1-1805-S3-806 IBB06 Switchgear
1-1805-53-807 1BB07 Switchgear
1-1805-S3-BBC MCC IBBC
1-1805-S3-804 1AB04 Switchgear
.
+
1-1805-S3-805 1AB05 Switchgear
1-1805-S3-BBD MCC 1880 Train "B" '
1-1805-S3-ABD MCC 1ABD Train "A"
j The following Unit 2 equipment was inspected:
~ '
2-1805-S3-806 2BB06 Svitchgear
2-1805-S3-807 28807 Switchgear
2-1605-S3-SDA Train "A" Shutdown Panel
2-1605-S3-SDB Train "B" Shutdown Panel
No violations or deviations were identified.
! 16. Electrical (Cables and Terminations) - Unit 1 (51063C)
!
. a. Raceway / Cable Installation
i
The inspector reviewed and examined portions of the following
procedures pertaining to raceway / cable installation to determine
whether they comply with appiicable codes, NRC Regulatory Guides and
l licensee commitments.
4
- ED-T-02, Rev. 8 Raceway Installation
! - ED-T-07, Rev. 9 Cable Installation
4
'
Periodic inspections were conducted to observe construction activities
i of Safety Related Raceway / Cable Installation in the Containment,
'
itrol and Auxiliary Buildings.
2
In reference to the raceway installation, the following areas were
4
inspected to verify compliance with the applicable requirements:
i
-
Identification
- -
Alignment
-
Bushings (Conduit)
4 -
Grounding
-
Supports and Anchorages
In reference to the cable installation the following areas were
inspected to verify compliance with the applicable requirements:
i
'
-
Protection from adjacent construction activities (welding, etc.)
-
Coiled cable ends properly secured
-
Non-terminated cable ends taped
i
A
.-_ --
- j
15 l
.
-
Cable trays, junction boxes, etc., reasonably free of debris
-
Conduit capped, if no cable installed
-
Cable supported
-
Bend radius not exceeded
-
Separation
b. Cable Terminations
The inspector reviewed and examined portions of the following
procedures pertaining to cable termination to determine whether they
comply with applicable codes, NRC Regulatory Guides and licensee
commitments.
-
.ED-T-08, Rev. 7 Cable Termination
In reference to cable terminations the following areas were inspected
to verify compliance with the applicable requirements.
-
Cable identification
-
Proper lugs used
-
Condition of wire (not nicked, etc.), tightness of connection
-
Bending radius not exceeded
-
Cable entry to terminal point
-
Separation
No violations or deviations were identified. ~
17. Safety Related Piping (Welding) - Unit 1 & 2 (55083C)
Periodic inspections were conducted on safety-related pipe welding at
various stages of weld completion. The purpose of the inspection was to
determine whether the requirements of applicable specifications, codes,
standards, work performance procedures and QC procedures are being met as
follows:
I -
Work was conducted in accordance with a process sheet which identifies
, the weld and its location by system, references procedures or
- instructions, and provides for production and QC signoffs.
!
-
Welding procedures, detailed drawings and instructions, were readily
available and technically adequate for the welds being made.
l -
Welding procedure specification (WPS) were in accordance with the
- applicable ASME Code requirements and that a Procedure Qualification
Record (PQR) is referenced and exists for the type of weld being made,
i
I
!
.
,
16
-
That the base metals, welding filler materials, fluxes, gases, and
insert materials were of the specified type and grade, have been
properly inspected, tested and were traceable to test reports or
certifications.
-
That the purge and/or shielding gas flow and composition were
as specified in the welding procedure specification and that protection
was provided to shield the welding operation from adverse environmental
conditions.
.
-
That the weld joint geometry including pipe wall thickncss was specified
and that surfaces to be welded have been prepared, cleaped and inspected
in accordance with applicable procedures or instructions.
'
-
-
That a sufficient number of adequately qualified QA and QC inspection
personnel were present at the work site, commensurate with the worA in '
progress.
-
That the weld area cleanliness was maintained and that pipe alignment
and fit-up tolerances were within specified units.
-
That . weld filler material being used was in accordance with welding
specifications, that unused filler material was separated from other
types of material and was stored in heated cans, and stubs properly
removed from the work location.
-
That there were no evident signs of cracks, excessive heat input,
sugaring, or excessive crown.
No violations or deviations were identified.
18. Preoperational Test Program Implementation / Verification - Unit 1 (70302)
(71302)
The inspector reviewed, in part, the implementation of the preoperational
test program. Test program attributes inspected included review of
administrative requirements, document control, documentation of major test
events and deviations to procedures, operating practices, instrumentation
calibrations, and correction of problems revealed by testing. Specific
activities reviewed included the following procedures:
Sum No. Sum Procedure Title
11, Rev. 2 Construction Acceptance Test Program
12, Rev. 1 Construction Acceptance Test Implementation
Preop No. Preop Test Procedure Title
1-3BN-17, Rev. O Refueling Water Storage Tank l
1-3KJ-01, Rev. 0 & l
Chg. Reg's. No. 1 Diesel Generator Train "A" Starting Air System '
-_. - - . . _ . -
_- . -- ~ - , _- . _ . _
.
17
The inspector also witnessed portions of the following construction
acceptance tests (CAT):
{
Cat. No. Equipment / Generic CAT
85-2903 RHR Train "A" (CAT-M-01) Pump & Motor (CAT-E-11)85-908 ACCW Pump #1 (CAT-M-01)
Other tests witnessed by the inspector during the inspection period
-
consisted of the train "A" safety injection pump lube oil flush.
4
,
The inspector also reviewed the following completed maintenance procedure
data sheets for the train "A" RHR pump motor prior to witnessing the above
'
listed CAT for the RHR pump & motor.
l
4 Maintenance Procedure No. Maintenance Procedure Title
25734-C, Rev. O High Potential Testing A-C Motors
(4KV Less Than 1000 HP)
, No violations or deviations were identified.
19. Meeting With Local Officials (94600) - Unit 1 and 2
On November 23, a meeting was held to familiarize local officials of the
City of Waynesboro and Burke County Board of Commissioners with the NRC.
The meeting presented the mission of the NRC, introduction of key NRC
personnel, discussion of lines of communication available to local
officials, ard discussion of the facility status. The NRC presentea the
, scope of the inspection and emergency preparedness programs.
>
The meeting was open for questions during the presentation. NRC persons
'
involved with the presentation were as follows:
D. M. Collins, Chief, Emergency Preparedness and Radiological
Protection Branch, Division of Radiation Safety and Safeguards
M. V. Sinkule, Chief, Reactor Projects Section 20, Division of
Reactor Projects
4
J. F. Rogge, Senior Resident Inspector, Operations
R. J. Schepens, Resident Inspector
20. Management Meetings (307028) - Unit 1
i
On November 25, 1985 the resident inspector attended a management meeting at
- the Region II office in Atlanta, Georgia. The purpose of this meeting was
i
'
for Georgia Power Company to present Readiness Review Module No. 8
" Structural Steel"; Appendix D " Document Control Program; and Appendix E
" Material Control" to the NRC for review.
i
i
- - - . _ . - _ . , _ . . _ _ . , . _ . . _ , . _ . . , _ . - - _ , . . _ _ _ . ._,-.______,_..___.____m,