| | Start date | Site | Title | Topic |
|---|
| IR 05000259/2025004 | 9 February 2026 | Browns Ferry | Integrated Inspection Report 05000259/2025004, 05000260/2025004 and 05000296/2025004 | Enforcement Discretion Coatings Functionality Assessment Corrosion bonding Significance Determination Process Operability Determination Pressure Boundary Leakage Pressure boundary leak Power change Unidentified leak Power Uprate Operational leakage |
| 05000254/LER-2025-005-01, For Quad Cities Nuclear Power Station, Unit 1, Scram Due to 125 Vdc Voltage Fluctuations from Battery Cell Failure | 6 February 2026 | Quad Cities | For Quad Cities Nuclear Power Station, Unit 1, Scram Due to 125 Vdc Voltage Fluctuations from Battery Cell Failure | Reactor Vessel Water Level Past operability Intergranular Stress Corrosion Cracking |
| IR 05000315/2025004 | 5 February 2026 | Cook | Integrated Inspection Report 05000315/2025004 and 05000316/2025004 | Boric Acid Mission time Fire Barrier Enforcement Discretion Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Fire Watch |
| IR 05000354/2025004 | 4 February 2026 | Salem Hope Creek | Integrated Inspection Report 05000354/2025004 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2024001 and Exercise of Enforcement Discretion | High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area High Energy Line Break Aging Management Significance Determination Process Local Leak Rate Testing Notice of Violation Operability Determination License Renewal Liquid penetrant Fire Protection Program Hourly Fire Watch Continuous basket shim |
| IR 05000369/2025004 | 3 February 2026 | Mcguire McGuire | Integrated Inspection Report 05000369/2025004 and 05000370/2025004 | Boric Acid Enforcement Discretion Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Maintenance Rule Program Offsite Circuit Fire Protection Program Downpower |
| IR 05000382/2025002 | 2 February 2026 | Waterford | Amended Integrated Inspection Report 05000382/2025002 | Boric Acid High Radiation Area Ultimate heat sink Stroke time Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Notice of Violation Operability Determination Liquid penetrant Fire Protection Program Scaffolding Seal weld |
| IR 05000275/2025004 | 28 January 2026 | Diablo Canyon | Integrated Inspection Report 05000275/2025004 and 05000323/2025004 | Boric Acid Probabilistic Risk Assessment Nondestructive Examination Functionality Assessment Significance Determination Process Feedwater Heater Operability Determination Maintenance Rule Program Fire Protection Program Operability Assessment Government shutdown |
| IR 05000263/2025010 | 28 January 2026 | Monticello | Comprehensive Engineering Team Inspection Report 05000263/2025010 | Stroke time Tornado Missile Probabilistic Risk Assessment Incorporated by reference Condition Adverse to Quality High Energy Line Break Significance Determination Process Operability Determination Battery sizing Power Operated Valves Weak link Pressure locking Thermal binding |
| IR 05000334/2025004 | 28 January 2026 | Beaver Valley | Integrated Inspection Report 05000334/2025004 and 05000412/2025004 | Boric Acid High Radiation Area Nondestructive Examination Temporary Modification Functionality Assessment Operability Determination Moisture barrier EVT-1 Fire Protection Program Coast down Government shutdown |
| IR 05000482/2025004 | 23 January 2026 | Wolf Creek | Integrated Inspection Report 05000482/2025004 | Boric Acid Fire Barrier Past operability Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Local Leak Rate Testing Operability Determination Fire Protection Program Coast down Overspeed Seal weld Government shutdown |