Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-220/85-06 & Change in Schedule for Completion of as-built safety-related Pipe Support Drawings
ML20207B272
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/04/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8611110558
Download: ML20207B272 (2)


Text

. _

=

i, T

NOV 0 4 G86 Docket No. 50-220 Niagara Mohawk Power Corporation ATTN: Mr. C. V. Mangan Senior Vice President 300 Erie Boulevard West Syracuse, New York 13202 l

Gentlemen:

Subject: inspection No. 50-220/85-06 This refers to your letter dated September .30,1986, in response to our letter dated May 30, 1985.

Thank you for informing us of the change in your schedule for the completion I of as-built safety related pipe support drawings. These actions will be examined'during a future inspection of your facility.

Your cooperation with us is appreciated.

Sincerely, OriginalSIS""EBYt

James T.1116G "8

,%P Stewart D. Ebneter, Director Division of Reactor Safety cc w/ encl:

T. E. Lempges, Vice President, Nuclear Generation J. A. Perry, Vice President, Quality Assurance T. Perkins, General Superintendent, Nuclear Generation W. Hansen, Manager of Quality Assurance T. Roman, Station Superintendent J. Aldrich, Supervisor, Operations W. Drews, Technical Superintendent Troy B. Conner, Jr. Esquire John W. Keib, Esquire g[

Director, Power Division Public Document Room (PDR) 1 Local Public Document Room (LPOR) g g Nuclear Safety Information Center (NSIC) i NRC Resident Inspector State of New York 8611110558 DR 861104 r. DOCK 05000220 PDR OFFICIAL RECORD COPY RL NMP1 85-06 - 0001.0.0 11/03/86

- . __. . .- - --. -

, . ___ . _

v s x,

<. .~ .

. , ..

4. s -. s s

-

,

- t

'

~3, . Niagara Mohawk. Power! Corporation 2

'

s s.

, q, .

'

bec w/ enc 1-Region I Docket Room (with concurrences) i Management Assistant, DRMA (w/o encl)

DRP Section Chief.-

Robert J. Bores, DRSS ,

'

,

'N g

.

..

OMi N k i

%

'

-

. , .

.. y

-

s w

9'

.s. ,

'

, . >,

'

s

- ,

y .,;

.

s . -  :

'

...

-

,

s c ,

i RI:DRS~ RI:DRS RI: 3S-K. Manoly/bc J. Wiggins rr'

19/s/86 $/4/86 p) 4). /86 i 0FFICIAL RECORD COPY RL NMP1 85-06 - 0001.1.0 10/30/86

' ' 5

.

- - . . . . . -, . , . . , - . _ _ _ - _ . _ ,

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_-

,, 4*

N3M

-

. ___

NIAGARA MOHAWK POWER CORPORAT10N/300 ERIE BOULEVARD WEST. SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 September 30, 1986 NMPIL 0100 Mr. Stuart D. Ebneter, Director Division of Reactor Safety U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Ebneter:

In your Inspection Report No. 50-220/85-06 it was indicated that the consolidation of information associated with each (safety related) support onto one as-built drawings would be completed by September 1986. Although all of the drawings have been updated, approximately 2,000 of the approximately 3,900 safety related support drawings have not been reviewed and accepted by Niagara Mohawk Engineering. The review and approval of the as-built drawings will be completed by December 31, 1986.

Very truly yours, h JL T. . Lem s Vice Prc.iident Nuclear Generation TEL:bd 72401 l

!

.