ML20207N062
| ML20207N062 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 12/18/1986 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Hooten B, Seibert C NIAGARA MOHAWK POWER CORP. |
| Shared Package | |
| ML20207N064 | List: |
| References | |
| GL-83-28, NUDOCS 8701130424 | |
| Download: ML20207N062 (2) | |
See also: IR 05000220/1986013
Text
t
pamaap
UNITED STATES
p*
f,,
NUCLEAR RE2ULATORY COMMISSION
g
y
B
REZioN I
f
$31 PARK AVENUE
e
/
KING OF PRUSSI A. PENNSYI.VANI A 19406
-
3
....+
Decemoer 18, 1986
Docket No. 50-220
License No. DPR-63
Niagara Mohawk Power Corporation
ATTN: Mr. B.G. Hooten
Executive Director
Nuclear Operations
c/o Miss Catherine Seibert
300 Erie Boulevard West
Syracuse, New York 13202
Gentlemen:
Subject:
Inspection Report No. 50-220/86-13
This refers to the special safety inspection conducted by Mr. G. Napuda of this
office on September 10-12 and 15-19,1986, at Nine Mlle Point Unit 1, Oswego,
New York and your corporate offices in Syracuse, New York, of activities
authorized by NRC License No. DPR-63 and to the discussions of our findings
held by Mr. Napuda with Mr. T. Lempges and other members of your staff at the
conclusion of the inspection.
Areas examined caring this inspection are described in the NRC Region I
Inspection report which is enclosed with this letter. Withir, these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, we are concerned that the control for
your operations, surveillance, maintenance and modification activities may be
inadequate.
Similar concerns were also identified in recent NRC Region I
inspections (50-410/86-61, 50-220/86-07, 86-16 and 86-17) of both Units 1 and
2.
The findings of the attached inspection report along with the findings of
NRC inspection 50-410/86-61, 50-220/86-16 and 86-17 will be the subject of
future enforcement conference.
We will contact you, separately to set up a
mutually agreeable date for this conference.
The need for and nature of appropriate enforcement action relative to the
issues identified in the enclosed report will be considered after this
conference and will be the subject of separate correspondence at a later time.
With regard to your actions for control of vendor technical information
(discussed in Section 4.2 of the enclosed report), we believe that your current
1988-1989 schedule for completion of vendor technical manual validation and
.spproval is not responsive to Generic Letter 83-28.
You are therefore
requested to reevaluate your planning in this regard and advise this office in
writing of your actions to expedite the validation process.
8701130424 861218
'
DR
ADOCK 05000220
/.
~"
OCQicsM.9EcoQ COF'y
f\\
-
-
e
f
Niagara Mohawk Power Corporation
2
2'
I
'
Your cooperation with us in this matter is appreciated.
s
Sincerely
V% +)W
M Stewart D. Ebneter, Director
Division of Reactor Safety
Enclosure: NRC Region I Inspection Report No. 50-220/86-13
cc w/ encl:
T. E. Lempges, Vice President, Nuclear Generation
J. A. Perry, Vice President, Quality Assurance
T. Perkins, General Superintendent, Nuclear Generation
W. Hansen, Manager of Quality Assurance
T. Roman, Station Superintendent
J. Aldrich, Supervisor, Operations
W. Drews, Technical Superintendent
Troy B. Conner, Jr. Esquire
John W. Keib, Esquire
Director, Power Division
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New York
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
Robert J. Bores, DRSS
D. Holody, Enforcement Coordinator, RI