March 4, 2015
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000220/2014001 AND 05000410/2014001)
Dear Mr. Orphanos:
On February 12, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Nine Mile Point Nuclear Station (NMPNS) Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, NMPNS Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at NMPNS during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5262 with any questions you have regarding this letter.
Sincerely,
/RA/
Daniel L. Schroeder, Chief Reactor Projects Branch 1 Division of Reactor Projects
Docket Nos.
50-220 and 50-410 License Nos. DPR-63 and NPF-69
Enclosure:
NMPNS Inspection/Activity Plan
cc w/encl:
Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available
Non-Publicly Available OFFICE RI/DRP RI/DRP
NAME ARosebrook/AAR DSchroeder/DLS
DATE 02/19/15 02/19/15
Page 1 of 2 02/26/2015 13:41:30 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2015 - 06/30/2016 3/2EXAM
- U1 INITIAL OL EXAM
1 FY15-NMP1 INITIAL OPERATOR LICENSING EXAM U01905 02/02/2015 02/06/2015
FY15-NMP1 INITIAL OPERATOR LICENSING EXAM U01905 03/02/2015 03/13/2015 7111108G
- U1 INSERVICE INSPECTION
1 IP Inservice Inspection Activities - BWR 7111108G 03/23/2015 03/27/2015 71124
- RAD SAFETY INSPECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/30/2015 04/03/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 03/30/2015 04/03/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/30/2015 04/03/2015 1, 2 IP Occupational Dose Assessment 71124.04 03/30/2015 04/03/2015 1, 2 IP Performance Indicator Verification 71151 03/30/2015 04/03/2015 71124
- RAD SAFETY INSP
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/11/2015 05/15/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 05/11/2015 05/15/2015 1, 2 IP Occupational Dose Assessment 71124.04 05/11/2015 05/15/2015 71124.07
- RAD SAFETY INSPECTION
1, 2 IP Radiological Environmental Monitoring Program 71124.07 06/01/2015 06/05/2015 1, 2 IP Performance Indicator Verification 71151 06/01/2015 06/05/2015 TRI FI
- TRIENNIAL FIRE PROTECTION INSPECTION
1, 2 IP Fire Protection [Triennial]
7111105T 06/22/2015 06/26/2015 1, 2 IP Fire Protection [Triennial]
7111105T 07/06/2015 07/10/2015 11/30EXM
- U2 INITIAL OL EXAM
2 FY16-NMP2 INITIAL OPERATOR LICENSING EXAM U01920 11/02/2015 11/06/2015
FY16-NMP2 INITIAL OPERATOR LICENSING EXAM U01920 11/30/2015 12/04/2015 71124
- RAD SAFETY INSPECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 08/03/2015 08/07/2015 1, 2 IP Occupational ALARA Planning and Controls 71124.02 08/03/2015 08/07/2015 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 08/03/2015 08/07/2015 1, 2 IP Occupational Dose Assessment 71124.04 08/03/2015 08/07/2015 71152B
- PI&R - BIENNIAL
1, 2 IP Problem Identification and Resolution 71152B 08/10/2015 08/14/2015 1, 2 IP Problem Identification and Resolution 71152B 08/24/2015 08/28/2015 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 02/26/2015 13:41:30 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Nine Mile Point Inspection / Activity Plan 01/01/2015 - 06/30/2016 7111111B
- U2 REQUAL INSP WITH P/F RESULTS
2 IP Licensed Operator Requalification Program 7111111B 10/19/2015 10/23/2015 EP
- EP EXERCISE
1, 2 IP Exercise Evaluation - Hostile Action (HA) Event 7111407 10/19/2015 10/23/2015 1, 2 IP Exercise Evaluation - Scenario Review 7111408 10/19/2015 10/23/2015 RS1234PI
- HP INSPECTION
1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/24/2016 04/28/2016 1, 2 IP Occupational ALARA Planning and Controls 71124.02 04/24/2016 04/28/2016 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 04/24/2016 04/28/2016 1, 2 IP Occupational Dose Assessment 71124.04 04/24/2016 04/28/2016 ISI
- U2 INSERVICE INSPECTION
2 IP Inservice Inspection Activities - BWR 7111108G 04/25/2016 04/29/2016 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure