7.,
I
- 4g p
1 UNITED STATES l'
- g-
]
NUCLEAR REGULATORY COMMISSION L*
wasniwarow, u.c. sones.cooi May 18, 1999 t
Carl Terry, BWRVlP Chairman Niagara Mohawk Power Company Post Office Box 63 l
Lycoming, NY 13093
SUBJECT:
SAFETY EVALUATION OF THE *BWR VESSEL AND INTERNALS PROJECT, BWR TOP GUIDE INSPECTION AND FLAW EVALUATION GUIDELINES (BWRVIP-26)," EPRI REPORT TR-107285, DECEMBER 1996 (TAC NO.
l M97803)
Dear Mr. Terry,
The NRC staff has completed its review of the Electric Power Research Institute (EPRI) proprietary report TR-107285, "BWR Vessel and intemals Project, BWR Top Guide Inspection and Flaw Evaluation Guidelines (BWRVIP-26)," December 1996. This report was submitted by letter dated December 27,1996, and supplemented by letter dated December 19,1997, which was in response to the staff's request for additional information, dated March 14,1997.
The BWRVIP-26 report provides generic guidelines intended to present the appropriate inspection recommendations to assure safety function integrity of the subject safety-related RPV intemal components. The report also provides design information on the top guide, geometries, weld locations, and potential failure locations for the several categories of boiling water reactors (BWR/2 through BWR/6).
The staff has reviewed the BWRVIP-26 report and finds, in the enclosed Safety Evaluation (SE), that the guidance of the BWRVIP-26 report is acceptable forinspection and flaw evaluation of the subject safety related RPV intemal components, except where the staff's conclusions differ from the BWRVIP's, as discussed in the enclosed SE. The staff has concluded that licensee implementation of the guidelines in the BWRVIP 26 report will provide an acceptable level of quality forinspection and flaw evaluation, with modifications to address the staff's conclusions in the enclosed SE, of the safety-related components addressed.
The staff requests that the BWRVIP review and resolve the issues raised in the enclosed SE, and incorporate the staff's conclusions into the revised BWRVIP 26 report. Please inform the staff within 90 days of the date of this letter of your proposed actions and schedule for l
revisions.
p^ 7 0!YJ 3
,9 D o '
V m
9905280097 990518
?
h l
PDR ADOCK 05000220 G
PDR g
l
v Cirl Terry.
Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.
l I
Sincerely, a
/W Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page l
i
~
9 Carl Terry !
l Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.
l l
Sincerely, Original Signed By:
Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated i
l cc: See next page l
1 l
L DISTRIBUTION:
l EMCB R/F GHolahan WDLanning, R1 MEMayfield l
PUBLIC KAKavanagh BSMallet, R2 TYChang File Center JRRajan JGrobe, R3 l
ACRS AHowell, R4 Document Name: G:\\BWRVIPWIP26SER.WPD k MOICATE M BOX: "C"= COPY W/O ATTACHMENTENCLOSURE,"E"= COPY W/AhEh CL,"N"=NO COPY EMCB: LPM lE EMCB:SLS lE EMgB:Sg j (/
lE l
CECarpenter a pp RAHermfryff K%dif' 03/22/1999 bW
/1//1999
/1999 uma num se l
EMCB:(A)BC l _
- E DE:DD 4
DE:D O
ti CJCf; nd,6ml/AW RHWessman MQ JRStrosnider Q
$ l/1999 4 /9 /1999
$ /JO/1999 [
OFFICIAL RECORD COPY
()
Af$v 4'k l
t h
{
Carl Terry Please contact C. E. (Gene) Carpenter, Jr., of my staff at (301) 415-2169 if you have any further questions regarding this subject.
Sincerely, Original Signed By:
Jack R. Strosnider, Director Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page DISTRIBUTION:
EMCB R/F GHolahan WDLanning, R1 MEMayfield PUBLIC KAKavanagh BSMallet, R2 TYChang File Center JRRajan JGrobe, R3 i
ACRS AHowell, R4 Document Name: G:\\BWRVIP\\ VIP 26SER.WPD k WDICATE W BOX: "C"= COPY W/O ATTACHMENTTNCLOSURE, *E"= COPY W/A / ENCL, *N"eNO COPY EMCB: LPM E
EMCB:SLS lE EMCp:@ j (p lE CECarpenter
,q pp RAHermW K@
03/22/1999 C
/1999 E
DE:DD 4
DE:D l}
E 1
i 4idGwilevan%,MITS/Ak) RHWessman M*gd JRStrosnider @
Al l/1999 4 /3 /1999
$ /lb/1999 [
OFFICIAL RECORD COPY
()
- 1 s v k
L.
cc:
George Jones, Executive Chairman Steve Lewis, Technical Chairman BWRVIP Assessment Task BWRVIP Assessment Task l
l Pennsylvania Power & Light Entergy l
A6-1 P. O. Box 756
(
Two North Ninth Street Waterloo Road Allentown, PA 18101 Port Gibson, MS 39150 Joe Hagan, Executive Chairman Carl Larsen, Technical Chairman BWRVIP inspection Task BWRVIP inspection Task PECO Energy Yankee Atomic 965 Chesterbrook Blvd.
580 Main Street MC 62C-3 Bolton, MA 01740 Wayne, PA 19087-5691-Lewis Sumner, Executive Chairman John Wilson, Technical Chairman BWRVIP Mitigation Task BWRVIP Mitigation Task Southern Nuclear Operating Co.
Clinton Power Station, M/C T-31C I
40 inverness Center Parkway -
P.O. Box 678 Birmingham, AL 35201 Clinton,IL 61727 Robert Carter, EPRI BWRVIP Vaughn Wagoner, Technical Chairman Assessment Manager BWRVIP Integration Task Greg Selby, EPRI BWRVIP Carolina Power & Light Company inspection Manager One Hannover Square 9C1 i
EPRI NDE Center P.O. Box 1551 P. O. Box 217097 Raleigh, NC 27612 1300 W. T. Harris Blvd.
Charlotte, NC 28221 Bruce McLeod, TechrJ:9 Chairman BWRVIP Repair Task Southem Nuclear Operating Co.
Post Office Box 1295 40 invemess Center Parkway Birmingham, AL 35201 Warren Bilanin, EPRI BWRVIP Integration Manager Raj Pathania, EPRI BWRVIP Mitigation Manager I
Ken Wolfe, EPRI BWRVIP Repair Manager Electric Power Research Institute P. O. Box 10412 3412 Hillview Ave.
Palo Alto, CA 94303