ML20207K326

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-220/86-24 on 861103-07.No Violations Observed.Rept Identifies Addl Example of Concern Re Lack of Conformance to Approved Procedures (Ref Insp Rept 50-220/86-13)
ML20207K326
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 01/02/1987
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mangan C
NIAGARA MOHAWK POWER CORP.
Shared Package
ML20207K330 List:
References
NUDOCS 8701090391
Download: ML20207K326 (2)


See also: IR 05000220/1986024

Text

.

G'

t

1

JAN 2 1987

.

t

Docket No. 50-220

l Niagara Mohawk Power Corporation

l ATTN: Mr. C. V. Mangan

l Senior Vice President

. 300' Erie Boulevard West

Syracuse, New. York 13202

Gentlemen:

Subject: Inspection Report No. 50-220/86-24

This refers to the routine inspection conducted by Mr. P. Bissett of this

j office on November 3,1986 to November 7,1986 at Nine Mile Point Unit 1,

1 Oswego, New York of activities authorized by NRC License No. DPR-63 and to the

discussions of our findings held by Mr. P. Bissett with Mr. T. Roman and other

members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

l inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

While no violations were observed during this inspection, the enclosed

inspection report identifies another example of our concern regarding lack of

conformance to approved procedures. The details of our observations are

reported in paragrcph 4.3 of the enclosed inspection report. The observations

are especially significant in view of our prior findings in this area (as an

example during inspection no. 50-220/86-13). We recognize recent actions you

have taken to improve conformance to approved procedures; however, we note that

further steps are still necessary. Please provide your continued attention in

this matter.

l No r'eply to this letter is required. Your cooperation with us in this matter

i is appreciated.

Sincerely,

Ovicinni Signed byI

Stewart D. Ebneter, Director

Division of Reactor Safety

l

Enclosure: NRC Region ! Inspection Report Number 50-220/86-24

l 0FFICIAL RECORD COPY IR NMP1 86-24 - 0001.0.0 \

0701090391 870102 12/11/86 p,G

PDR ADOCK 05000220 '

0 PDR

l

_

.

Niagara Mohawk Power Corporation 2

cc w/ encl:

T. E. Lempges, Vice President, Nuclear Generation

J. A. Perry, Vice President, Quality Assurance

'

T. Perkins, General Superintendent, Nuclear Generation

W. Hansen, Manager of Quality Assurance

T. Roman, Station Superintendent

J. Aldrich, Supervisor, Operations

W. Drews, Technical Superintendent

Troy B. Conner, Jr. Esquire

John W. Keib, Esquire

Director, Power Division

Public Document Room (POR)

local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector ,

State of New York

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o encl)

ORP Section Chief

Robert J. Bores, DRSS

l

RI:0RS

Bissett

fit:0RS

Jo son

RI:0RS k

ettenhausbn'

4eu p y g2/ /86

12/io/86 12/g /86 0

!

0FFICIAL RECORD COPY IR NMP1 86-24 - 0002.0.0

12/10/86

4

'.