MONTHYEARML20217L7971999-10-20020 October 1999 Submits Results of Review of 990521 & 0709 Ltrs Which Provided Core Shroud Insp Results & Tie Rod Stabilizer Assemblies ML20217G1291999-10-15015 October 1999 Forwards Errata to Safety Evaluation for Amend 168 Issued to FOL DPR-63 on 990921.Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend ML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML20212K8601999-10-0606 October 1999 Responds to Concern in 990405 Petition Re Residual Heat Removal Alternate Shutdown Cooling Modes of Operation at Nine Mile Point Nuclear Station,Unit 2 ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212J4651999-09-30030 September 1999 Informs of Completion of mid-cyle PPR of Nine Mile Point Nuclear Station on 990916.Determined That Problems in Areas of Human Performance & Work Control Required Continued Mgt Attention.Historical Listing of Plant Issues Encl ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20212K8641999-09-30030 September 1999 Informs That During 990927 Telcon Between J Williams & J Bobka,Arrangements Were Made for Administration of Exams at Plant During Wk of Feb 14,2000.Preliminary RO & SRO License Applications Should Be Submitted 30 Days Prior Exam ML20212J8831999-09-30030 September 1999 Informs That Util 980810 & 990630 Responses to GL 98-01 & Suppl 1, Y2K Readiness of Computer Sys at NPPs Acceptable. NRC Considers Subj GL to Be Closed for Plant ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212B2821999-09-14014 September 1999 Responds to 990712 Correspondence Which Responded to NRC Ltr Re High Failure Rate for Generic Fundamentals Exam of 990407 for Nine Mile Point.Considers Corrective Actions Taken to Be Acceptable ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211K5031999-08-30030 August 1999 Responds to Ltr Addressed to Chairman Dicus, Expressing Concerns Involving 990624 Automatic Reactor Shutdown.Insp Findings & Conclusions Will Be Documented in Insp Repts 50-220/99-06 & 50-410/99-06 by mid-Sept 1999 ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211P5161999-08-26026 August 1999 Discusses Submitted on Behalf of Niagara Mohawk Power Corp Written Comments Addressing 10CFR2.206 Petition & Request That Ltr & Attached Response Be Withheld from Public Disclosure.Request Denied ML20211G4921999-08-26026 August 1999 Advises That Info Re Comments Addressing 10CFR2.206,dtd 990405 Will Be Withheld from Public Disclosure,In Response to ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210Q0031999-08-11011 August 1999 Informs That Due to Printing Malfunction,Some Copies of Author Ltr Dtd 990726,may Not Have Included Second Page of Encl 2 of Ltr ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML20210L5321999-08-0606 August 1999 Forwards List of Subjects Discussed During 990714 Telcon with Representatives of Niagara Mohawk Power Corp on Unit 1 Re USI A-46 Issue ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20216E1491999-07-26026 July 1999 Forwards Two Ltrs Received from NMPC Re Nine Mile Point Unit 1 Core Shroud Related to 10CFR2.206 ML20210E9151999-07-23023 July 1999 Discusses Evaluation of Recirculation Line Weld 32-WD-050 Indication Found During 1997 Refueling Outage (RFO14) at NMPNS Unit 1.Requests Notification of Decision to Retain Category F Classification Until Listed Conditions Satisfied ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20196J6421999-06-30030 June 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Issued on 960110 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20196K6461999-06-29029 June 1999 Discusses Ofc of Investigations Rept 1-98-33 Re Unqualified Senior Reactor Operator Assuming Position of Assistant Station Shift Supervisor at Unit 1 on 980616.One Violation Being Cited as Described in Encl NOV ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20212J4431999-06-25025 June 1999 Discusses Responses to RAI Re GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217K2831999-10-14014 October 1999 Submits Response to NRC Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, for Fiscal Yrs 2000 & 2001 ML20217H3211999-10-0808 October 1999 Forwards Changed Pages for Issue 5,rev 1 of Nine Mile Point Station Physical Security & Safeguards Contingency Plan,Iaw 10CFR50.54(p).Without Encls ML18040A3701999-09-30030 September 1999 Provides Changes to Application for Amend Re Volumes 1-11 of 981016 Submittal & Discard & Insertion Instructions Re Integration of Proposed Changes,In Response to NRC RAIs ML20216J9311999-09-30030 September 1999 Forwards Response to NRC 981119 Suppl RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20212E9801999-09-23023 September 1999 Submits Info in Response to Request for Estimated Initial Operator Licensing Exam Needs,Per Administrative Ltr 99-03 ML20216F7101999-09-17017 September 1999 Forwards Response to NRC 990806 RAI Re USI A-46,verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors.Nrc Is Informed That Actions Required for Resolution of USI A-46 Have Been Completed ML20212D8981999-09-14014 September 1999 Forwards ISI Summary Rept for Refueling Outage 15 & Flaw Indication Repts.Supporting Info Repts & Calculations, Encl ML20212B2581999-09-10010 September 1999 Requests That Name of Bm Bordenick Be Removed from Nine Mile Point,Units 1 & 2 Service List ML20211P5771999-09-10010 September 1999 Forwards Application for Amends to Licenses DPR-63 & NPF-69, to Transfer Licenses to Amergen Energy Co,Llc.Ts Pages & Proprietary Addendum,Included.Proprietary Encl Withheld ML20212A1341999-09-0707 September 1999 Forwards Summary Rept Secondary Containment Leakage Testing, Dtd June 1999 for Nine Mile Point,Unit 1,IAW TS 6.9.3.f ML20211K8141999-09-0101 September 1999 Forwards Reactor Containment Bldg Ilrt,Iaw Plant TS 6.9.3.e.Testing Confirmed That TS 3.3.3/4.3.3 & 6.16 Primary Containment Leakage Requirements Were Satisfactorily Met ML20211L9221999-09-0101 September 1999 Confirms That Licensee Will Retain Weld 32-WD-050 as IGSCC Category F Until Completion of Reinspection Program,In Response to NRC ML20211K3001999-08-30030 August 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for 990101-990630 & Revised ODCM, for Nine Mile Point,Unit 1. Format Used for Effluent Data Is Outlined in App B of Regulatory Guide 1.21,rev 1 ML20211J6461999-08-30030 August 1999 Forwards Response to NRC 990625 RAI Re NMPC Responses to GL 92-01,rev 1,supplement 1, Reactor Vessel Structural Integrity ML20211H1921999-08-26026 August 1999 Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML20211D7731999-08-20020 August 1999 Forwards Semiannual FFD Program Performance Data Rept Covering Period 990101 Through 990630 ML20211B9371999-08-18018 August 1999 Provides Addl Info Re Application of Method a at Nmp,Unit 1 as Described in Generic Implementation Procedure,Rev 2 (GIP-2),NRC Supplemental SER 2 & Documents Ref in GIP-2 Upon Which GIP-2 Is Based ML18040A3691999-08-16016 August 1999 Forwards Response to NRC 990510 RAI Pertaining to NMP Application for Amend Re Conversion of NMPNS Unit 2 Current TS to Its.Nrc Requested Info Re Several Sections,Including Section 3.6, Containment Sys. ML20210R6661999-08-10010 August 1999 Confirms Conversation on 990721 Re Concerns of Syracuse Anti-Nuclear Effort on Status of 2.206 Petition (Filed 990524) & Upcoming NRC Performance Review Meeting on Nine Mile Point Units 1 & 2 ML20210R8101999-08-10010 August 1999 Forwards 1998 Annual Repts for NMP & co-tenants,including Rg&E,Energy East Corp/Nyse&G,Chg&E & Long Island Power Authority,Per 10CFR50.71(b) ML18041A0711999-07-30030 July 1999 Forwards Rev 1 to NMP2-ISI-006, Second Ten Year Interval ISI Program Plan for Nine Mile Point Nuclear Power Station Unit 2. Significant Changes from Rev 0 Listed ML20210J9351999-07-29029 July 1999 Informs That NMP Is Changing Completion Date for Replacement of Valves Having O Rings with Installed Life Greater than Eight Years.Replacement to Be Completed by 991031, During Hydrogen Monitoring Sys Maintenance Outage ML20209G3711999-07-12012 July 1999 Provides Final Root Cause Evaluation Re GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 1 ML20209G7911999-07-12012 July 1999 Provides Info Requested in NRC Re 990407 Generic Fundamentals Exam Failure Causes & Corrective Actions ML20209G2001999-07-0909 July 1999 Forwards RFO-15 Core Shroud Insp Summary Rept, as Required by GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in BWRs & BWRVIP Rept BWR Core Shroud Insp & Flaw Evaluation Guideline (BWRVIP-01) ML20209F8561999-07-0606 July 1999 Forwards Rev 1 to Nmp,Unit 1 COLR for Cycle 14. Rept Is Being Submitted to Commission in Compliance with TS 6.9.1.f.4 ML20211K5071999-07-0606 July 1999 Submits Concerns Re 990624 Event Involving Automatic Reactor Shutdown.More than 5 Failures Were Identified in Event Number 35857 ML20209B7071999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Facilities,As Contained in GL 98-01,Supp 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure,Encl ML20211P5271999-06-29029 June 1999 Submits Written Comments Addressing Petition Dtd 990405, Submitted by R Norway as It Relates to Expressed Concerns That Involve NMPC Activities.None of Relief Requested in Petition Warranted ML20209B3501999-06-25025 June 1999 Submits Torus Shell & Coupon Corrosion Rate Determination for Nmpns,Unit 1.Torus Meets ASME Code Requirements,Iaw NRC 920825 & 940811 SERs ML20209B3531999-06-25025 June 1999 Informs NRC That All Actions Associated with NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs, Has Been Completed.Summary of Actions Completed & Other Pertinent Info Is Provided in Attachment ML20196G1461999-06-23023 June 1999 Informs That Actions Requested in GL 96-01, Testing of Safety-Related Logic Circuits Completed ML20196F5721999-06-23023 June 1999 Forwards Rev 3 to NMP1-IST-003, Third Ten Year Inservice Testing Program Plan, Which Will Begin on 991226.Program Plan Conforms to Requirements of 1989 Edition of ASME Boiler & Pressure Vessel Code.Three Relief Requests,Encl ML20209B2951999-06-22022 June 1999 Informs That Training Re Pressure Relief Panels Was Completed for Remainder of Target Population on 990226 ML20196E9231999-06-21021 June 1999 Forwards Response to NRC 990510 RAI Re NMP 981116 Application Proposing Changes to TSs to Provide Reasonable Assurance That Coupled neutronic/thermal-hydraulic Instabilities Were Detected & Suppressed in NMPN-1 Reactor ML18040A3651999-06-0707 June 1999 Forwards for Filing Original Application of Central Hudson & Gas & Electric Corp Seeking Extension of Expiration Date of Order,Dtd 980719,issued by Commission ML18040A3661999-06-0404 June 1999 Informs That Entire Attachment to Ltr NMP2L 1862 Dtd 990421, Should Be Replaced with Entire Attachment Being Sent with Present Ltr ML20195C9751999-06-0101 June 1999 Informs That Weld 32-WD-050 Will Be Reclassified Back to GL 88-01 Category a Weld & ASME Code Section XI Insps Will Be Conducted in Next Three Insp Periods ML20195C9601999-05-28028 May 1999 Provides Final Extent of Condition Evaluation Re Failed Cap Screw Beyond Upper Spring.Nmpc Continues to Conclude as Stated in That No Addl Mods Are Needed Other than Those Indicated in Ltr ML20207F1811999-05-24024 May 1999 Petitions NRC to Suspend Operating License of NMP for NMPNS Unit 1 Until Such Time as NMPC Releases Most Recent Insp Data on Plant Core Shroud & Adequate Public Review of Plant Safety Accomplished Because of Listed Concerns ML20195B1861999-05-21021 May 1999 Requests Staff Approval of Proposed Mod to Each of Four Tie Rods Per 10CFR50.55a(a)(3)(i).Summary of Tie Rod Insp Findings,Summary of Root Cause Evaluation of Failure of Cap Screw,Calculation B-13-01739-23 & Summary of Se,Encl ML20207D1541999-05-21021 May 1999 Forwards Issue 5,rev 0 of Physical Security & Safeguards Contingency Plan for Nmpns.Summary of Changes Included to Facilitate Review.Encls Withheld ML20207D5331999-05-21021 May 1999 Forwards Issue 3,Rev 1 of NMP Nuclear Security Training & Qualification Plan.Summary of Changes Is Included with Plan to Provide Basis for Individual Changes & to Facilitate NRC Review.Plan Withheld Per 10CFR2.790 ML20206S2621999-05-16016 May 1999 Expresses Concerns About Safety of Nmp,Unit 1 Nuclear Reactor.Nrc Should Conduct Insp of Reactor Including Area Besides Core Shroud Welds & Publicly Disclose Results at Least Wk Before Restart Date ML20195D5911999-05-13013 May 1999 Submits Final Copy of Open Ltr to Central Ny,With Proposals Re Nine Mile One Core Shroud Insp During Refueling Outage Which Began on 990411 ML20206P1981999-05-11011 May 1999 Forwards Response to NRC RAI Re NMP Previous Responses to GL 96-05, Periodic Verification of Design-Basis of SR Movs, for NMP Units 1 & 2 ML20206R6941999-05-10010 May 1999 Responds to 990413 & 0430 Ltrs Re Apparent Violation Noted in Investigation Rept 1-98-033.Util Agrees with Violation, But Disagrees with Characterization That Violation Was Willful or Deliberate ML20206N0291999-05-0707 May 1999 Forwards Rev 39 to NMP Site Emergency Plan & Revised Epips,Including Rev 1 to EPMP-EPP-03,rev 5 to EPIP-EPP-25 & Rev 5 to EPIP-EPP-28 ML20206G8121999-04-30030 April 1999 Forwards Comments on Draft Reg Guide DG-1083, Content of UFSAR IAW 10CFR50.71(e), Dtd Mar 1999.Util Generally Supports DG-1083 ML20206F7731999-04-22022 April 1999 Forwards Renewal Application for SPDES Permit Number NY-000-1015 for Nmpns,Units 1 & 2 1999-09-07
[Table view] |
Text
-
kj September 10,1999 10 CFR Q 50.80 10 CFR Q 50.92 BY HAND DELIVERY U.S. Nuclear Regulatory Commission ATTN: Samuel J. Collins, Director, Office of Nuclear Reactor Regulation Mail Stop O-5 E7 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Re: Nine Mile Point Units I and 2 (NMP 1 & 2)
Facility Operating License Nos. DPR-63 & NPF-69 7, Docket Nos. 50-220 & 50-410
) Annlication for Licente Transfers and Conforming Administrative License Amendments
Dear Mr. Collins:
l Pursuant to Section 184 of the Atomic Energy Act of 1954, as amended (the Act), and 10 CFR
} 50.80:
(1) AmerGen Energy Company, LLC (AmerGen) and Niagara Mohawk Power Corporation (NMPC) hereby request that the Nuclear Regulatory Commission (NRC) consent to the transfer of Facility Operating License No. DPR-63 for Nine Mile Point Unit 1 (NMP 1) to AmerGen; and (2) AmerGen, New York State Electric & Gas Corporation (NYSEG), and NTGC, acting on its own behalf and as agent for the other co-owners of Nine Mile Point Unit 2 (NMP 2), request that the NRC consent to the transfer of NMFC's awl NYSEG's interests in, and NMPC's operating authority under, Facility Operating License No. NPF-69 for NMP 2 to AmerGen.
Through the attachedjoint Application for Order and Conforming Administrative License Amendments for License Transfers (Application), NRC is being asked to consent to these transfers and authorize AmerGen to possess, use, and operate NMP 1 & 2 under essentially the
,. same conditions and authorizations included in the existing NRC licenses for NMPC and
[
k ~') owumss a g3p r{
e J
{[ t..
]fLrk I
9909140043 990910 PDR ADOCK 05000220 L
(\ $, /L0 k lt P PDR C
\$p p .l>
I
(I U.S. Nuclear Regulatory Commission (3
! September 10,1999 Page 2 NYSEG for these units. No physical changes will be made to the NMP facilities as a result of these transfers, and there will be no significant change in the day-to-day operations of either NMP Unit. NRC also is asked to approve certain conforming administrative amendments to the NMP 1 & 2 licenses to reflect the proposed transfers.
AmerGen is a limited liability company formed by PECO Energy Company (PECO Energy) and British Energy plc (British Energy) to acquire and operate nuclear power plants in the United States. The NRC recently approved the transfer of Facility Operating License DPR-50 for Three Mile Island, Unit 1, to AmerGen. See GPUNuclear, Inc., et al. (Three Mile Island, Unit No.1),
Order Approving Transfer of License And Conforming Amendment,64 FR 19202 (April 19, 1999); Safety Evaluation by the Office ofNRR, Transfer ofFacility Operating Licensefrom GPUN, Inc., et al. to AmerGen, (Three Mile Island, Unit No.1), Docket No. 50-289 (April 12, 1999).
NMPC is a wholly-owned subsidiary of Niagara Mohawk Holdings, Inc. NMPC is a regulated energy delivery company providing electric and natural gas retail service to approximately 2 million residential, industrial, and commercial consumers in the State of New York. NMPC is the sole licensed owner and operator of NMP 1. NMPC also holds a 41% undivided ownership
/] interest in NMP 2 and is the licensed operator of NMP 2. NYSEG is a regulated electric and gas b company providing electric and natural gas retail service to approximately 1 million residential, industrial, and commercial consumers in the State of New York. NYSEG holds an 18%
undivided ownership interest in NMP 2.
Following the proposed transfers, AmerGen will become the licensed operator of both NMP Units, the sole owner of NMP 1, and a 59% owner of NMP 2. The other current co-owners of NMP 2, Long Island Lighting Company (LILCO), the Rochester Gas and Electric Corporation (RG&E), and the Central Hudson Gas & Electric Company (CH) will retain their respective undivided ownership interests of I8%,14% and 9% in NMP 2. AmerGen also will assume i NMPC's role as the operator of NMP 2 under the operating agreement among the NMP 2 owners. I In connection with the ongoing restructuring of the electric utility industry in the United States, and the State of New York in particular, NMPC and NYSEG have decided to substantially withdraw fro n $e energy generation business, including nuclear generation, and sell their interests in the NMP Units. On June 23,1999, NMPC and AmerGen executed the NMP 1 Asset Purchase Agreement, and NMPC, NYSEG, and AmerGen executed the NMP 2 Asset Purchase Agreement. Under these agreements,(NMP Agreements), NMPC and NYSEG will transfer their respective ownership and operating interests in NMP 1 & 2 to AmerGen. The parties also l executed, or will execute, certain ancillary r.greements in connection with the NMP Agreements l including Interconnection Agreements and ?ower Purchase Agreements. In accordance with the ;
O l V -.
l
r U.S. Nuclear Regulatory Commission (g'-') September 10,1999 Page 3 1
NMP Agreements, the closing of the transactions will take place on the Closing Date, as defined in the NMP Agreements, once all conditions precedent are satisfied and all required regulatory approvals are obtained.
On and after the Closing Date, the following events will occur pursuant to the NMP Agreements, j the Interconnection Agreements, and the Power Purchase Agreements: i (a) AmerGen will assume NMPC's and NYSEG's right, tith .1nd interest in and to NMP 1 & 2, except as specified in the NMP Agreements-including buildings, equipment, spare parts, fixtures, inventory, documents, records, assignable contracts, new, used and spent nuclear fuel, other NRC licensed materials at the l NMP Units and other property necessary for their operation and maintenance-and assume NMPC's and NYSEG's responsibility for the operation, maintenance, and eventual decommissioning of each unit; (b) AmerGen will offer employment to substantially all NMPC employees working at the NMP 1 & 2 site, and will assume the existing Intemational Brotherhood of Electrical Workers (IBEW) Collective Bargaining Agreement for the transferred union employees; w)
(c) AmerGen will have the right to contract for any necessary transmission service under NMPC's Open Access Transmission Tariff, or its successor (NYISO Tariff) and will have contracted for back-up power to the site consistent with NRC l requirements- l
. .I (d) NMPC will purchase 95% of the capacity and energy from NMP 1 from AmerGen from the Closing Date until the fifth anniversary of the Closing Date; and NMPC and NYSEG will purchase 56.05% of the total capacity and energy '
from NMP 2 from AmerGen, from the Closing Date until the third anniversary of the Closing Date, representing 95% of the output associated with the 59%
ownership interest in NMP 2 conveyed to AmerGen by NMPC and NYSEG; and (e) NMPC will have made or will make additional cash deposits to the decommissioning trust funds for NMP 1, and NMPC and NYSEG will have made or will make additional cash deposits to the decommissioning trust funds for NMP 2. AmerGen anticipates that the fair market value of the fund for Unit 1, after transfer, will meet NRC's financial assurance requirements for decommissioning funding. AmerGen anticipates that the fair market value of the fund for Unit 2, after transfer, plus the additional financial assurances described in m
14/1229$55 8
U.S. Nuclear Regulatory Commission
/o September 10,1999
') Page 4 the Application, will meet NRC's financial assurance requirements for decommissioning funding.,
AmerGen believes that the information contained in this Application demonstrates that:
(1) AmerGen possesses the requisite technical and financial qualifications to own and operate the NMP Units; (2) AmerGen is not owned, controlled, or dominated by an alien, foreign corporation or foreign government, within the meaning of Sections 103d or 104d of the Act; and (3) the proposed transfers and conforming administrative amendments do not present any undue risk to the health and safety of the public.
As discussed in the Application, the proposed transfers and conforming administrative amendments will involve certain organizational and administrative changes, but will not involve any other change to either NMP Unit's current licensing basis. AmerUen does not anticipate any reduction in the commitments in the quality assurance plan, or any reduction in the effectiveness (V) of the emergency and security plans for the NMP Units as a result of the transfers.
f In summary, the proposed transfers will be consistent with the requirements set forth in the Act, NRC regulations, and the relevant NRC licenses and orders, and will neither have any adverse impact on the public health and safety nor be inimical to the common defense and security.
AmerGen, NMPC, and NYSEG therefore respectfully request that the Commission consent to the transfers in accordance with 10 CFR Q 50.80 and approve the conforming administrative amendments pursuant to 10 CFR 50.92.
The Closing Date of the sale of NMPC and NYSEG's interests in NMP 1 & 2 is dependent upon the receipt of all required regulatory approvals, and will occur promptly after receipt of the necessary approvals. It is the parties' desire to close at the earliest practicable date following l receipt of all required regulatory approvals. Therefore, AmerGen, NMPC and NYSEG request that the NRC review this Application on a schedule that will permit the issuance of NRC consent l to the license transfers, and approval of the conforming administrative license amendments, as promptly as possible, and in any event before January 15,2000. Such consent should be immediately effective upon issuance, and should permit the transfers and the implementation j dates of the conforming amendments to occur at any time through September 1,2000, or such later date as may be permitted by the NRC. AmerGen, NMPC and NYSEG will keep the NRC informed if there are any significant changes in the -status of the other required approvals or other developments that have an impact on this schedule.
!~3 V -mss .
l 3
U.S. Nuclear Regulatory Commission
--g (q
September 10,'1999 Page 5 The' Application includes a proprietary, separately bound Addendum with Enclosures 3A,4A, 6A,8A, and I 1 A of the Application, because they contain confidential commercial or financial information. AmerGen requests that this information be withheld from public disclosure pursuant to 10 CFR { 9.17(a)(4) and the policy reflected in 10 CFR Q 2.790, as described in the Affidavit of Gerald R. Rainey provided in Enclosure 15 to the Application. Non-Proprietary versions of these documents suitable for public disclosure are provided as Enclosures 3,4,6,8, and 11 to the Application.
If NRC requires additional information concerning these license transfer requests, please contact Gerald R. Rainey, Chief Executive Officer & Chief Nuclear Officer, AmerGen Energy Company, LLC,965 Ghesterbrook Blvd., Wayne, PA 19087. Service upon the applicants of comments, hearing requests, intervention petitions, or other pleadings, if applicable, should be made to Mark J. Wetterhahn, counsel for NMPC, at Winston & Strawn,1400 L Street, N.W.,
Washington, D.C. 20005 (tel: 202-371-5703; fax: 202-371-5950; c-mail:
mwetterh@winston.com), Samuel Behrends IV, counsel for NYSEG, at LeBoeuf, Lamb, Greene
& MacRae, L.L.P.,'I875 Connecticut Avenue, N.W., Suite 1200, Washington, DC 20009-5728 (tel: 202-986-8018; fax: 202-986-8102; e-mail: sbehrend@llgm.com), and Kevin P. Gallen, counsel for Ame: Gen, at Morgan, Lewis & Bockius LLP,1800 M Street, N.W., Washington, DC 20036-5869 (tel: 202-467-7462; f:x 202-467-7176; e-mail: Kpgallen@mlb.com).
Sine ly,'
' 1erald R. Rainey / John H. Mueller AmerGen Energy Compary' LLC Niagara Mohawk Power Corporation Jeffrey K. Smith New York State Electric & Gas Corporation
~ Encl. (1) Application ec: Document Control Desk, NRC (3 copies)
Hubert J. Miller, Regional Administrator, Region I, NRC Gordon K. Hunegs, NMP, Senior Resident Inspector, NRC Darl S.' Hood, NMP Project Manager, NRC J. P. Spath, NYSERDA S.S. Bajwa, Section Chief PD-1, Section 1, NRR O -.
10 CFR @@ 50.80,50.92 AmerGen NigrahMohawk' MBdi@
A PECO EnergySesh Ermgy Company
- NRC LICENSE TRANSFER APPLICATION September 10,1999 submitted by AmerGen Energy Company, LLC Niagara Mohawk Power Corporation New York State Electric & Gas Corporation Nine Mile Point Station NRC Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410 l
j
- - . U.S. Nuclear Regulatory Commission September 10,1999 Page5
\
The Application includes a proprietary, separately bound Addendum with Enclosures 3A,4A, )
6A,8A, and 11 A of the Application, because they contain confidential commercial or financial
]
information. AmerGen requests that this information be withheld from public disclosure pursuant to 10 CFR Q 9.17(a)(4) and the policy reflected in 10 CFR Q 2.790, as described in the l Affidavit of Gerald R. Rainey provided in Enclosure 15 to the Application. Non Proprietary {
j versions of these documents suitable for public disclosure are provided as Enclosures 3,4,6,8, i and 11 to the Application.
If NRC requires additional information concerning these license transfer requests, please contact Gerald R. Rainey, Chief Executive Officer & Chief Nuclear Officer, AmerGen Energy Company, LLC,965 Chesterbrook Blvd., Wayne, PA 19087. Service upon the applicants of ,
comments, hearing requests, intervention petitions, or other pleadings, if applicable, should be made to Mark J. Wetterhahn, counsel for NMPC, at Winston & Strawn,1400 L Street, N.W.,
Washington, D.C. 20005 (tel: 202-371-5703; fax: 202-371-5950; e-mail:
. mwetterh@winston.com), Samuel Behrends IV, counsel for NYSEG, at LeBoeuf, Lamb, Greene -
& MacRae, L.L.P.,1875 Connecticut Avenue, N.W., Suite 1200, Washington, DC 20009-5728 (tel: 202-986-8018; fax: 202-986-8102; e-mail: sbehrend@llgm.com), and Kevin P. Gallen, counsel for AmerGen, at Morgan, Lewis & Bockius LLP,1800 M Street, N.W., Washington, DC 20036-5869 (tel: 202-467-7462; fax: 202-467-7176; e-mail: Kpgallen@mlb.com).
Sincerely, Gerald R. Rainey--
n . YYe_: ~ -
J6flEM6eTler' / '
AmerGen Energy Company, LLC Niagara Mohawk Power Corporation Jeffrey K. Smith New York State Electric & Gas Corporation .
Encl. (1) Application
!: cc: . Document Control Desk, NRC (3 copies)
Hubert J. Miller, Regional Administrator, Region I, NRC Gordon K. Hunegs, NMP, Senior Resident Inspector, NRC Darl S. Hood, NMP Project Manager, NRC J. P. Spath, NYSERDA S.S. Bajwa, Section Chief PD-1, Section 1, NRR j O 4 w1229%5 8
)
f c_ U.S. Nuclear Regulatory Commission September 10,1999 Page5 F
The Application includes a proprietary, separately bound Addendum with Enclosures 3A,4A, 6A,8A, and 11 A of the Application, because they contain confidential commercial or financial information. AmerGen requests that this information be withheld from public disclosure pursuant to 10 CFR { 9.17(a)(4) and the policy reflected in 10 CFR Q 2.790, as described in the Affidavit of Gerald R. Rainey provided in Enclosure 15 to the Application. Non-Proprietary ,
versions of these documents suitable for public disclosure are provided as Enclosures 3,4,6,8, j and 11 to the Application. ;
I If NRC requires additional infonnation concerning these license transfer requests, please contact I Gerald R. Rainey, Chief Executive Officer & Chief Nuclear Officer, AmerGen Energy Company, LLC, %5 Chesterbrook Blvd., Wayne, PA 19087. Service upon the applicants of comments, hearing requests, intervention petitions, or other pleadings, if applicable, should be made to Mark J. Wetterhahn, counsel for NMPC, at Winston & Strawn,1400 L Street, N.W.,
Washington, D.C. 20005 (tel: 202-371-5703; fax: 202-371-5950; e-mail:
mwetterh@winston.com), Samuel Behrends IV, counsel for NYSEG, at LeBoeuf, Lamb, Greene
& MacRae, L.L.P.,1875 Connecticut Avenue, N.W., Suite 1200, Washington, DC 20009-5728 (tel: 202-986-8018; fax: 202-986-8102; e-mail: sbehrend@llgm.com), and Kevin P. Gallen, counsel for AmerGen, at Morgan, Lewis & Bockius LLP,1800 M Street, N.W., Washington, DC 20036-5869 (tel: 202-467-7462; fax: 202-467-7176; e-mail: Kpgallen@mlb.com).
Sincerely, Gerald R. Rainey John H. Mueller AmerGen Energy Company, LLC Niagara Mohawk Power Corporation bel & $ BOY dEff4ySC.&6ith New York State Electric & Gas Corporation Encl. (1) Application ec: Document Control Desk, NRC (3 copies)
Hubert J. Miller, Regional Administrator, Region I, NRC Gordon K. Hunegs, NMP, Senior Resident Inspector, NRC Darl S. Hood, NMP Project Manager, hTC J. P. Spath, NYSERDA S.S. Bajwa, Section Chief PD-1, Section 1, NRR wumss e