Forwards Application for Amend to License DPR-63,supporting Implementation of Noble Metal Chemical Addition by Raising Reactor Water Conductivity Limits in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b
ML20211H192
Person / Time
Site: Nine Mile Point 
Issue date: 08/26/1999
From: Conway J
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211H196 List:
References
NMP1L-1458, NUDOCS 9909020039
Download: ML20211H192 (2)


Text

O N

}

John T. ConwaY Ptione: 315.349.4213 Vice President Fax: 315.349.2605 Nuclear Generation August 26,1999 NMP1L 1458 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE:

Nine Mile Point Unit 1 Docket No. 50-220 DPR-63 Gentlemen:

Niagara Mohawk Power Corporation (NMPC) hereby transmits an Application for Amendment to the Nine Mile Point Unit 1 (NMP1) Technical Specifications (TS) as set forth in Appendix A of Operating License DPR-63. The TS Bases have been revised consistent with the proposed changes to the TS and are included in this submittal for issuance with the TS Amendment.

Enclosed as Attachment A are the proposed changes to the NMP1 TS and associated TS Bases. Supporting information and analysis pursuant to 10 CFR 50.92 which demonstrate that the proposed changes do not involve a significant hazards consideration are included as Attachment B. The basis for concluding that this application meets the criteria of 10 CFR 51.22 for categorical exclusion from performing an environmental assessment is included as Attachment C. Also, to assist the NRC Staff with their review, hand marked-up copies of the current TS and Bases pages are provided as Attachment D.

The proposed TS amendment will support the implementation of Noble Metal Chemical Addition (NMCA) at NMP1. NMCA will enhance the effectiveness of Hydrogen Water Chemistry (HWC) in mitigating Intergranular Stress Corrosion Cracking (IGSCC) in NMP1 reactor vessel internal components. Specifically, the proposed TS amendment will raise the reactor water conductivity limit in TS 3.2.3.a from 1.0 micromho per cc.itimeter ( mho/cm) to 20.0 mho/cm and in TS 3.2.3.c.1 from 5.0 pmho/cm to 20.0 mho/cm during NMCA application. The proposed TS amendment will also raise the limit in TS 3.2.3.a and 3.2.3.b from 1 mho/cm to 2 mho/cm for up to a 5 month period at power operation following NMCA application. The reactor water conductivity will be restored to within the limit specified in TS 3.2.3 af ter the NMCA process is complete. Bases changes are proposed consistent with the proposed TS changes.

The initial NMCA application is scheduled to be performed with the plant in a Hot Shutdown condition during a mid-cycle shutdown, currently scheduled to occur in December,1999.

NMPC therefore requests approval of this proposed TS amendment no later than November 15,1999, with implementation to occur prior to NMCA.

{

g o n @ &- ns f\\DO\\

P Nine Mile Point Nuclear Station RO. Box 63. Lycoming, New York 13093-0063 + www.nirno com

l Page 2 Pursuant to 10 CFR 50.91(b)(1), NMPC has provided a copy of this license amendment application and the associated analysis regarding no significant hazards consideration to the appropriate state representative.

Very truly yours, j

T John T. Conway Vice President Nuclear Generation JTC/JMT/ kap Attachments xc:

Mr. H. J. Miller, NRC Regional Administrator, Region 1 Mr. S. S. Bajwa, Section Chief PD-l, Section 1, NRR Mr. G. K. Hunegs, NRC Senior Resident inspector Mr. D. S. Hood, Senior Project Manager, NRR Mr. John P. Spath NYSERDA j

286 Washington Avenue Ext.

)

Albany, NY 12203-6399 Records Management l