Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, Issued on 960110
ML20196J642
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/30/1999
From: Hood D
NRC (Affiliation Not Assigned)
To: Mueller J
NIAGARA MOHAWK POWER CORP.
References
GL-96-01, GL-96-1, TAC-M94701, NUDOCS 9907070376
Download: ML20196J642 (5)


Text

~

. < \

jN ( Cloy 4 UNITED STATES pf, j

't NUCLEAR REGULATORY COMMISSION W ASHINGTON, D.c. 2055MKm

\ *****p 8 June 30,1999 Mr. John H. Mueller Chief Nuclear Officer Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Operations Building, Second Floor '

Lycoming, NY 13093 j

SUBJECT:

COMPLETION OF LICENSING ACTION FOR GENERIC LETTER 96-01,

" TESTING OF SAFETY-RELATED LOGIC CIRCUlTS," NINE MILE POINT l

NUCLEAR STATION, UNIT NO.1 (TAC NO. M94701)

Dear Mr. Mueller:

On January 10,1996, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter '

(GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits. The NRC issued GL 96-01 for three principal reasons:

1

1. To notify addressees about problems with testing of safety-related logic circuits;
2. To request that all addressees implement the actions described within the GL; and
3. To require that all addressees submit to the NRC a written response regarding implementation of the requested actions. l in GL 96-01, the NRC staff specifically requested that licensees take the following actions:
1. Compare niectrical schematics and logic diagrams for the reactor protection system, emergen diesel generator load shedding and sequencing, and actuation logic for the engineert safety feature systems against plant surveillance test procedures to ensure that all porbons of the logic circuitry, including the parallel logic, interlocks, bypasses, and inhibit circuits, are adequately covered in the surveillance procedures to fulfill the technical specification requirements. This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function; and

{

2. Modify the surveillance procedures as necessary for complete testing to comply with the '

technical specifications. Additionally, the licensee may request an amendment to the technical specifications if relief from certain testing requirements can be justified.

Furthermore, the NRC staff required that licensees prepare and submit the following:

1. A written response indicating whether or not the licensee would implement the actions requested above or propose an alternative action; I

l

2. A schedule for completing the requested actions or proposed alternative; and
3. A response confirming completion of the requested actions.

[O\

9907070376 990630 PDR ADOCK 05000220 P PDR t ; , .s v L. _

j

, L 1

J. H. Mueller In response to GL 96-01, you provided letters dated April 18, June 18, November 22,1996; August 22,1997.; and June 23,1999 for Nine Mile Point Nuclear Station, Unit 1. These  !

submittals provided both the information requested and the responses required by GL 96-01.

In particular, in your letter of June 23,1999, you provided written confirmation of the completion of the actions requested by GL 96-01, Therefore, TAC No. M94701 is closed.

)

If you have any questions regarding this matter, please contact me by phone on (301) 415-3049 or by electronic mail at dsh@nrc. gov.

Sincerely, BAL#m' Darl S. Hood, Sr. Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page l

l l

i 1

... j. t. -

e E .

Nine Mile Point Nuclear Station Unit No.1 Regional Administrator, Region i U.S. Nuclear Regulatory Commission 475 Allendale Road -

King of Prussia, PA 19406 Resident inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093

{

Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy I State of New York l Department of Public Service Power Division, System Operations 3 Empire State Plaza

  • Albany, NY 12223 Mr. F. William Valentino, President New York State Energy, Research, i and Development Authority Corporate Plaza West 286 Washington Avenue Extension

, Albany, NY 12203-6399

. Mark J. Wetterhahn, Esquire Winston & Strawn i 1400 L Street, NW

Washington, DC 20005-3502 l

l Gary D. Wilson, Esquire j Niagara Mohawk Power Corporation l

300 Erie Boulevard West Syracuse, NY 13202 Supervisor Town of Scriba Route 8, Bcx 382 Oswego, NY 13126

,~L June 30, 1999 J. H. Mueller In response to GL 96-01, you provided letters dated April 18, June 18, November 22,1996; August 22,1997; and June 23,1999 for Nine Mile Point Nuclear Station, Unit 1. These submittals provided both the information requested and the responses required by GL 96-01.

In particular, in your letter of June 23,1999, you provided wri '.in confirmation of the completion of the actions requested by GL 96-01. Therefore, TAC No, ML 1701 is closed.

-i If you have any questions regarding this matter, please contact me by phone on (301) 415-3049 or by electronic mail at dsh@nrc. gov.

Sincerely, -

Original signed by: ,

Darl S. Hood, Sr. Project Manager, Section 1 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page DISTRIBUTION:

.Oschet File? D. Hood PUBLIC S. Bajwa PDI 1 Reading H. Garg OGC W. Long ACRS S. Little ,

M. Oprendek, RGN-l i

l DOCUMENT NAME: G:\PDI-1\NMP1\LTR94701.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with c nclosures "N" = No copy OFFICE PM:PDI ' LA:PDI o O SC:PDI _.n HICB C_ LPM 3 NAME DHood/lec 37.5// Slittl# SBajwa g6'cR HGarg f(LM WLong /(&V DATE 06/t.1/99 06/M/99 (,/20 /99 ( /7///99 h /@ /99 OFFICIAL RECORD COPY J

  • June 30,'1999

'J. H. Mueller In response to GL 96-01, you provided letters dated April 18, June 18, November 22,1996; August 22,1997; and June 23,1999 for Nine Mile Point Nuclear Station, Unit 1. These submittals provided both the information requested and the responses required by GL 96-01. i

' In particular, in your letter of June 23,1999, you provided written confirmation of the completion I of the actions requested by GL 96-01. Therefore, TAC No. M94701 is closed.

If you have any questions regarding this matter, please contact me by phone on (301) 415-3049 or by electronic mail at dsh @nrc. gov.

Sincerely, Original signed by:

Darl S. Hood, Sr. Project Manager, Section 1 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regalation Docket No. 50-220 cc: See next page DISTRIBUTION: I l Docket File D. Hood I PUBLIC S. Bajwa I PDl-1 Reading H. Garg OGC W. Long ACRS S. Little i M. Oprendek, RGN-l I

l DOCUMENT NAME: G:\PDl-1\NMP1\LTR94701.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with encloTures "N" = No copy OFFICE PM:PDI LA:PDI a O SC:PD1 . s) HICB C. LPM l NAME DHood/lec PM/ Slittl# SBajwa 86'cR HGarg ffLM WLong likk DATE 06//,1/99 06/M/99 (,/10 /99 ( /7/f/99 h /je /99 '

OFFICIAL RECORD COPY J