Semantic search

Jump to navigation Jump to search
 SiteStart dateTitleDescription
ML23292A216Susquehanna12 October 20231 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99
ML23291A425Susquehanna12 October 20231 to Updated Final Safety Analysis Report, Chapter 8, Section 8.2, Offsite Power System
ML23291A387Susquehanna12 October 20231 to Updated Final Safety Analysis Report, Chapter 1, Section 1.2, General Plant Description
ML23291A378Susquehanna12 October 20231 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Symbols and Terms Used in Engineering and Text
BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317Vermont Yankee10 October 2023License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317
ML23278A095Callaway5 October 2023EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82Palisades28 September 2023Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82
ML23257A271Saint Lucie26 September 2023Report on the Safety Aspects of the Subsequent License Renewal Application Review of St. Lucie Plant, Units 1 and 2
TSG-DORL-2021-01, RIPE Temporary Staff Guidance TSG-DORL-2021-01, Rev.3 Incorporating Observations from the Issuance of First Palo Verde RIPE Partial Exemption18 September 2023RIPE Temporary Staff Guidance TSG-DORL-2021-01, Rev.3 Incorporating Observations from the Issuance of First Palo Verde RIPE Partial Exemption
CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 DaysComanche Peak14 September 2023(CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days
ML23318A209Diablo Canyon13 September 2023Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 1 (Main Report)
ML23318A208Diablo Canyon13 September 2023Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits)
ML23264A8646 September 2023Transcript of the Advisory Committee on Reactor Safeguards 708th Full Committee Meeting, September 6, 2023, Pages 1-275 (Open)
0CAN092301, Emergency Plan Implementing Procedure RevisionArkansas Nuclear5 September 2023Emergency Plan Implementing Procedure Revision
ML23219A003Saint Lucie1 September 2023SLRA SER Rev 1
ML23214A241Monticello31 August 2023Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application
ML23251A03031 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 10 of 19
ML23251A02931 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 11 of 19
ML23251A02631 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 18 of 19
ML23251A02431 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 6 of 19
ML23251A02031 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 19 of 19
ML23251A01931 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 12 of 19
ML23251A01831 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 5 of 19
ML23251A01731 August 2023FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 1 of 19
IR 05000395/2023002Summer14 August 2023Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation
IR 05000416/2023002Grand Gulf
Arkansas Nuclear
8 August 2023Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001
IR 05000346/2023050Davis Besse3 August 2023Special Inspection Report 05000346/2023050
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident AnalysisFitzPatrick3 August 2023License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis
NUREG-2191, Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version31 July 2023NUREG-2191 Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3Comanche Peak27 July 2023Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3
ML23200A146Saint Lucie21 July 2023Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2
IR 05000483/2023002Callaway10 July 2023Integrated Inspection Report 05000483/2023002
ML23181A166Palo Verde30 June 2023Enclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17
ML23193A901Millstone28 June 20236 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML23193A897Millstone28 June 20236 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report
ML23193A894Millstone28 June 20236 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23193A893Millstone28 June 2023Technical Requirements Manual
ML23193A888Millstone28 June 20236 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML23193A869Millstone28 June 20231 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML23193A866Millstone28 June 20231 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted
PNO-III-23-002B, Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main TransformerPrairie Island8 June 2023PNO-III-23-002B Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer
PNO-III-23-002, Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main TransformerPrairie Island1 June 2023PNO-III-23-002 - Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer
ML23241A681Diablo Canyon25 May 20237 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML23241A586Diablo Canyon25 May 20237 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems
ML23241A126Diablo Canyon25 May 20237 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 437557, Revision 41, Sheet 1, Electrical Schematic Diagram Generator Control
ML23241A116Diablo Canyon25 May 20237 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Drawing 441226, Rev. 34, Sheet 1, Electrical Single Line Meter and Relay Diagram Generator Excitation Main and Auxiliary Transformers
ML23241A089Diablo Canyon25 May 20237 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML23151A451Turkey Point24 May 2023Enclosure 2, Volume 13: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.8, Electrical Power Systems, Revision 3
ML23144A307Beaver Valley23 May 2023Technical Specification Bases Update Status, Revision 47
ML23135A180Wolf Creek8 May 20236 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML23135A175Wolf Creek8 May 20236 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23135A165Wolf Creek8 May 20236 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
IR 05000327/2023001Sequoyah2 May 2023Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion
ML23130A109North Anna20 April 2023Submittal of Annual Environmental Operating Report for 2022
ML23129A430Cooper20 April 20231 to Updated Safety Analysis Report, Drawing 3070, Electrical Symbol List
ML23129A305Cooper20 April 20231 to Updated Safety Analysis Report, Section XIII, Conduct of Operations
ML23129A271Cooper20 April 20231 to Updated Safety Analysis Report, Section Viii, Electrical Power Systems
ML23262B17119 April 2023Meeting Slides 20230419-final
CP-202300135, License Renewal Application Revision 0 - Supplement 1Comanche Peak6 April 2023License Renewal Application Revision 0 - Supplement 1
ML23095A374FitzPatrick5 April 2023Enclosure 2: Technical Specification (TS) Bases Revision 58
ML23095A020Turkey Point4 April 2023Enclosure 2 - ITS Section 3.8 Electrical Power Systems, Revision 2, Volume 13
PNP 2023-002, 6 to Updated Final Safety Analysis ReportPalisades31 March 20236 to Updated Final Safety Analysis Report
ML23107A059Palisades31 March 20236 to Updated Final Safety Analysis Report, Chapter 1, Tables
ML23107A038Palisades31 March 20236 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML23088A254Callaway23 March 2023EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document
DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan UpdateDiablo Canyon23 March 2023Independent Spent Fuel Storage Installation, Emergency Plan Update
DCL-23-020, Responses to NRC Questions Regarding License Renewal EffortsDiablo Canyon17 March 2023Responses to NRC Questions Regarding License Renewal Efforts
ML23137A261Comanche Peak13 March 2023Comment (2576) of Susybelle Gosslee on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2
ML23055A029La Crosse24 February 2023Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release
IR 05000348/2022011Farley16 February 2023NRC Inspection Report 05000348/2022011
IR 05000395/2022004Summer10 February 2023Integrated Inspection Report 05000395/2022004
IR 05000259/2022004Browns Ferry7 February 2023Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004
ML23033A049Grand Gulf1 February 2023Emergency Action Level (EAL) Technical Bases Document Revision 3
ML23108A188Comanche Peak25 January 2023Comment (1722) of Beate Nilsen on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2
ML23062A640Callaway29 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
IR 05000338/2022003North Anna20 December 2022Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022003 and 05000339/2022003
L-22-271, Emergency PlanPerry20 December 2022Emergency Plan
ML22340A202Cook30 November 2022Technical Specifications Bases, List of Effective Pages
ML22340A174Cook30 November 20221 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML22340A160Cook30 November 2022Technical Specifications Bases, List of Effective Pages
ML22340A150Cook30 November 20221 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22Perry18 November 2022Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22
ML22325A134Fermi
07200071
17 November 20224 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22311A542North Anna7 November 2022Integrated Inspection Report 05000338/2022003 and 05000339/2022003
PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)Susquehanna19 October 2022Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)
ML22292A095Nine Mile Point5 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A
ML22292A076Nine Mile Point5 October 20225 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1 Thru 8.2
IR 05000348/2022050Farley30 September 2022Special Inspection Reactive Report 05000348/2022050 and Apparent Violation
ML23037A831Diablo Canyon28 September 2022Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits
ML22263A483Summer20 September 2022(Vcsns), Unit 1 - Revised Expected Submission Date for Supplement to Licensee Event Report 2022-001-00
ML22263A418Davis Besse20 September 2022Enclosure F - DBNPS, Unit 1, Technical Specification Bases, Rev. 32
ML22278A294Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Sections 3 Thru 5
ML22278A260Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report
ML22278A250Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22278A212Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22278A815Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0022, Rev. 67, Sheet 2, P&ID Fire Protection (Unit 1, Unit 2 and Common)
ML22278A810Limerick19 September 2022Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0022, Rev. 69, Sheet 4, P&ID Fire Protection (Unit 2)
ML22257A033Grand Gulf8 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22257A005Grand Gulf8 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22276A263South Texas8 September 2022Initial Exam 2022-08 Post Exam Comments
ENS 56073North Anna27 August 2022 14:15:00Turbine Trip Due to Main Transformer FireThe following information was provided by the licensee via email: At 0810 EDT on August 27, 2022, with Unit 2 at 27% power, the operating crew received an annunciator for a Turbine Trip Without Reactor Trip. At 0812 EDT, a report came in from the field of a fire in the north yard due to an "A" Main Transformer upper bushing failure. The station fire brigade was dispatched and offsite assistance was requested. However, at 0842 EDT the fire was put out, prior to needing the offsite assistance. No Emergency Action Level threshold was exceeded for this event. The switchyard is in a normal alignment for providing offsite power to Unit 2. At 1015 EDT, the Virginia Department of Emergency Management (VDEM) was notified of the event. Additionally, a notification to the Virginia Department of Environmental Quality will be made due to approximately 100 gallons of oil reaching the ground. As such, this issue is being reported per 10 CFR 50.72(b)(2)(xi) for "'Any event or situation for which a news release is planned or notification to other government agencies has been or will be made.' The NRC Resident Inspector was notified.
IR 05000259/2022002Browns Ferry8 August 2022Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002
IR 05000327/2022002Sequoyah1 August 2022Integrated Inspection Report 05000327 2022002 and 05000328 2022002
ML22201A00222 July 2022Enclosure 2: Risk Insights Based on Ope Including ASP
DCL-22-052, Emergency Plan UpdateDiablo Canyon6 July 2022Emergency Plan Update
ML22186A153Summer5 July 2022(VCSNS) Unit 1 - Revised Expected Submission Date for Supplement to Licensee Event Report 2022-001-00
ML23041A377Diablo Canyon30 June 2022Independent Safety Committee Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations July 1, 2021-June 30, 2022
ML22194A340Summer27 June 2022Submittal of Revision 22 to Updated Final Safety Analysis Report
ML22194A277Summer27 June 20222 to Updated Final Safety Analysis Report, Figure 9.2-9b, Rev. 19, Demineralized Water
ML22194A176Summer27 June 20222 to Updated Final Safety Analysis Report, Revision Summary
ML22194A143Summer27 June 20222 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis
ML22193A143Millstone23 June 20225 to Updated Final Safety Analysis Report, Technical Requirements Manual Current Through Change No. 207
ML22193A136Millstone23 June 20225 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22193A132Millstone23 June 20225 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report
ML22193A126Millstone23 June 20225 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22193A066Millstone23 June 20220 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML22167A124Arkansas Nuclear16 June 2022Emergency Plan Implementing Procedure Revision
ML22140A140Point Beach20 May 2022Attachment 5 - Evaluation of Plant-Specific Variations
ML22151A150Wolf Creek18 May 20225 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22151A144Wolf Creek18 May 20225 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML22151A138Wolf Creek18 May 20225 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML22130A521Point Beach18 May 2022Report on the Safety Aspects of the Subsequent License Renewal Application Review of Point Beach Nuclear Plant, Units 1 and 2
ML22144A133Beaver Valley18 May 20226 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22144A128Beaver Valley18 May 20226 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
ML22144A127Beaver Valley18 May 2022Rev. 43 to Technical Specification Bases
ML22144A120Beaver Valley18 May 20226 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML22144A114Beaver Valley18 May 20226 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
L-22-053, Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay TimeBeaver Valley16 May 2022Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time
IR 05000395/2022001Summer12 May 2022Integrated Inspection Report 05000395/2022001 and Apparent Violation
IR 05000346/2022001Davis Besse12 May 2022Integrated Inspection Report 05000346/2022001
ML22088A13510 May 2022Guidelines for Characterizing the Safety Impact of Issues, Revision 2
IR 05000269/2022001Oconee4 May 2022Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001
ML22140A081South Texas28 April 20221 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22140A077South Texas28 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted)
ML22140A067South Texas28 April 20221 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted)
ML22140A064South Texas28 April 20221 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions
IR 05000445/2022001Comanche Peak26 April 2022Integrated Inspection Report 05000445/2022001 and 05000446/2022001
ML22146A369LaSalle13 April 20225 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (ML22111A237 Redacted)
ML22094A115Beaver Valley4 April 2022Response to a Request for Additional Information Regarding a Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation (EPID No. L-202
ML22090A240Summer31 March 2022Annual Operating Report
ML22111A206Clinton31 March 20222 to Updated Safety Analysis Report, Chapter 8, Electric Power
ML22089A211Turkey Point30 March 2022Enclosure 2 - Volume 13, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems, Revision 1
ML22073A167Grand Gulf8 March 2022Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML22111A118Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML22111A108Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Part 1
ML22111A101Saint Lucie4 March 2022Amendment 27 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
ML22046A065North Anna28 February 2022Report on the Safety Aspects of the Subsequent License Renewal Application Review of the North Anna Power Station, Units 1 and 2
IR 05000269/2021004Oconee14 February 2022Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation
IR 05000382/2021004Waterford8 February 2022Integrated Inspection Report 05000382/2021004 and Exercise of Enforcement Discretion
IR 05000250/2021004Turkey Point2 February 2022Integrated Inspection Report 05000250/2021004 and 05000251/2021004
ML22060A1292 February 2022Transcript of the Advisory Committee on Reactor Safeguards 692nd Full Committee Meeting, February 2, 2022, Pages 1-289 (Open)
IR 05000395/2021004Summer21 January 2022Integrated Inspection Report 05000395/2021004
ML21361A213Perry20 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML21361A209Perry20 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21361A194Perry20 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 8, Electric Power
ML21350A036Surry16 December 20212B Exam Admin Items Surry 2021-301 (Normal Release)
ML21350A045Surry16 December 20212A-2 Final Exam Surry 2021-301(2 Yr Delay)
ML21356A78515 December 2021Transcript of the Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee Meeting, December 15, 2021, Pages 1-165
ML21334A039Beaver Valley22 November 20213 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML21334A034Beaver Valley22 November 2021Technical Specifications Bases Update Status, Revision 41
ENS 55580Summer15 November 2021 22:28:00Manual Reactor Trip Due to Main Transformer Fault

At 1728 EST on 11/15/2021, with Unit 1 in Mode 1 at 47 percent power, the reactor was manually tripped due to a main transformer fault. The trip was not complex, with all systems responding normally post-trip. Operations responded and stabilized the plant. Decay heat is being removed by the emergency feedwater system through the main condenser. Due to the Reactor Protection System actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). Additionally, due to the valid actuation of the emergency feedwater system, this event is being reported as a non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A). There was no impact on the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified."

  • * * UPDATE ON 11/16/21 AT 1649 EST FROM BRUCE BENNETT TO KERBY SCALES * * *

At approximately 0900 (EST) on 11/16/2021, it was identified that mineral oil from the faulted main transformer had surpassed the capability of the oil containment system and discharged into Lake Monticello. It is estimated that less than 50 gallons of mineral oil entered the Lake. The oil is contained with booms and cleanup is ongoing. The EPA National Response Center and the South Carolina Department of Health and Environmental Control have been notified. This is considered a news release or notification to other government agencies; therefore, this event is reportable under 10 CFR 50.72(b)(2)(xi). The NRC Senior Resident Inspector has been notified. Notified R2DO (Miller).

RA-21-0297, Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1Oconee11 November 2021Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1
ML21262A001Millstone9 November 2021Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate
ML21307A202Perry28 October 20212 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML21307A198Perry28 October 20212 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21307A182Perry28 October 20212 to Updated Safety Analysis Report, Chapter 8, Electric Power
ML21361A325Byron28 October 2021Scenarios
ML21361A169Byron28 October 2021Proposed Scenarios
IR 05000315/2021003Cook
07200072
26 October 2021Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001
ML22042B305Quad Cities21 October 20215 to Fire Protection Report - Volume 1 - Redacted
ML21300A266Quad Cities21 October 20216 to Updated Final Safety Analysis Report, Chapter 08 - Electric Power
IR 05000334/2021011Beaver Valley19 October 2021Temporary Instruction 2515/194 Inspection Report 05000334/2021011 and 05000412/2021011
ML21287A006Ginna14 October 2021Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu
ML21286A682Callaway13 October 2021Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors
ML21294A220Susquehanna12 October 20210 to Updated Final Safety Analysis Report, Section 8.2, Offsite Power System
ML21294A152Susquehanna12 October 20210 to Updated Final Safety Analysis Report, Section 1.2, General Plant Description
ML21294A112Susquehanna12 October 20210 to Updated Final Safety Analysis Report, Questions 040
ML21305A245Diablo Canyon11 October 20216 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 3 of 4, Drawing 441245-1, Electrical Schematic Diagram Generator Control
ML21305A224Diablo Canyon11 October 20216 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 1 of 4, Drawing 437557-1, Electrical Schematic Diagram Generator Control
ML21305A137Diablo Canyon11 October 20216 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 2 of 4, Drawing 437558, Revision 37, Sheet 1, Electrical Schematic Diagram Generator Control
ML21305A105Diablo Canyon11 October 20216 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML21305A089Diablo Canyon11 October 20216 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21286A429Browns Ferry4 October 2021Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.4, Normal Auxiliary Power System
ML21286A427Browns Ferry4 October 2021Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power
ML21286A420Browns Ferry4 October 2021Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3, Transmission System
ML21286A413Browns Ferry4 October 2021Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1, Summary Description
ML21286A260Browns Ferry4 October 2021Amendment 29 to Updated Final Safety Analysis Report, Appendix O, Aging Management Program
IR 05000313/2021011Arkansas Nuclear23 September 2021Design Basis Assurance Inspection (Teams) Inspection Report 05000313/2021011 and 05000368/2021011
ML21265A384Turkey Point22 September 2021Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems
IR 05000440/2021002Perry12 August 2021Integrated Inspection Report 05000440/2021002
IR 05000445/2021002Comanche Peak10 August 2021Integrated Inspection Report 05000445/2021002 and 05000446/2021002
IR 05000255/2021002Palisades10 August 2021Integrated Inspection Report 05000255/2021002
IR 05000528/2021002Palo Verde9 August 2021Integrated Inspection Report 05000528/2021002, 05000529/2021002, and 05000530/2021002 and Exercise of Enforcement Discretion
IR 05000336/2021002Millstone9 August 2021Integrated Inspection Report 05000336/2021002 and 05000423/2021002 and Independent Spent Fuel Storage Installation Inspection Report 07200047/2021002
ML21217A283Browns Ferry5 August 2021Resident Integrated Inspection Report 2021-002
CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)Sequoyah5 August 2021License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03)
ML21271A262Fort Calhoun3 August 2021License Amendment Request (LAR) 21-01, Chapter 6 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - F-1
IR 05000275/2021012Diablo Canyon28 July 2021Temporary Instruction 2515/194 Report 05000275/2021012 and 05000323/2021012
IR 05000348/2021012Farley19 July 2021Triennial Fire Protection Team Inspection (FPTI) Report 05000348/2021012 and 05000364/2021012
IR 05000361/2021002San Onofre6 July 2021NRC Inspection Report 05000361/2021002 and 05000362/2021002
ML21326A2512 July 2021Power Plant Engineering Manual, Pre-Study Chapter 1, Heat Transfer and Thermal Hydraulics Basics
ML21180A01430 June 2021Guidelines for Characterizing the Safety Impact of Issues, Revision 1
ML21201A193Millstone24 June 20214 to Updated Final Safety Analysis Report, Technical Requirements Manual Index / List of Effective Pages
ML21201A182Millstone24 June 20214 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report
ML21201A175Millstone24 June 20214 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21201A146Millstone24 June 20219 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML21174A078Browns Ferry23 June 2021301 Final RO Written Exam (2-Year Delayed Release)
ML21174A094Comanche Peak23 June 2021Reactor Trip on June 7, 2021 - Management Directive 8.3 Screening
ML21193A184Callaway22 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML21179A031Dresden21 June 20214 to Final Safety Analysis Report, Chapter 8, Electrical Power
ML21193A321Calvert Cliffs16 June 2021Draft Written Examination and Operating Test Outlines (Folder 2)
ML21187A310Calvert Cliffs16 June 2021Final Operating Test (Sections a, B, and C) (Folder 3)
ML21187A308Calvert Cliffs16 June 2021Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML21179A099Vogtle15 June 20210 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ENS 55295Comanche Peak7 June 2021 20:27:00Automatic Reactor Trip on Turbine Trip Due to Fault and Fire in the Main TransformerAt 1527 (Central Standard Time) Unit 2 Reactor tripped caused by a turbine trip due to a fault and fire on Unit 2 Main Transformer #1. All Aux Feedwater Pumps started due to steam generator Lo-Lo levels. Unit 2 is being maintained in Hot Standby (Mode 3) in accordance with Integrated Plant Operating Procedure IPO-007B. The Emergency Response Guideline Network has been exited. Decay heat is being rejected to the Main Condenser via the steam dump valves. Fire was extinguished at 1546 without offsite assistance. No major injuries reported and no personnel transported offsite for medical attention. Cause of the fault and fire are under investigation. NRC Resident Inspector has been notified. All rods inserted into the core during the trip. There were no relief valves or safety valves lifted during the transient. The plant is stable in its normal shutdown electrical lineup via the auxiliary transformer with all safety equipment available. Unit 1 was not affected by the transient.
ML21168A113Wolf Creek7 June 20214 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21168A108Wolf Creek7 June 20214 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML21168A101Wolf Creek7 June 20214 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML21174A3172 June 2021Transcript of the Advisory Committee on Reactor Safeguards 686th Full Committee Meeting, June 2, 2021, Pages 1-134 (Open)
ML21140A324Ginna20 May 2021R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
W3F1-2021-0035, Technical Requirements Manual UpdateWaterford18 May 2021Technical Requirements Manual Update
ML21137A169Nine Mile Point17 May 2021Final Written Examination and Operating Test Outlines (Folder 3)
ENS 55259Callaway14 May 2021 18:00:00Individual Fall from Scaffold Ladder - Other Government Agency NotificationAt approximately 1300 CDT on 05/14/2021, a contract worker, who was using a scaffold ladder to access their work area on the iso-phase bus duct system for the main transformers at the Callaway plant, fell approximately 27 feet to the ground. An ambulance was dispatched to transport the individual to a local hospital. Union Electric (Ameren Missouri) subsequently learned that the event caused the individual to have a serious injury that required an overnight hospital stay. This event is reportable to OSHA per 29 CFR 1904.39(a)(2) by the contract worker's employer and is reportable to the Missouri Public Service Commission in accordance with Missouri regulation 20 CSR 4240-3.190(3)(A). This notification is being made to the NRC pursuant to 10 CFR 50.72(b)(2)(xi) due to other government notifications that will occur as a result of a situation related to the health and safety of onsite personnel. The NRC Senior Resident Inspector has been notified of this event. The individual was not working in a contamination area.
IR 05000346/2021001Davis Besse14 May 2021Integrated Inspection Report 05000346/2021001
ML21131A189Nine Mile Point11 May 2021Draft Written Examination and Operating Test Outlines (Folder 2)
IR 05000261/2021001Robinson10 May 2021Integrated Inspection Report 05000261/2021001
IR 05000387/2021001Susquehanna5 May 2021Integrated Inspection Report 05000387/2021001 and 05000388/2021001
IR 05000348/2021001Farley4 May 2021Integrated Inspection Report 05000348/2021001 and 05000364/2021001
ML21123A303Turkey Point3 May 2021301 Exam Report Items - SRO as Given Written Exam
ML21123A198Nine Mile Point3 May 2021Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML21209A384Summer30 April 20211 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b, Revision 19, Piping System Flow Diagram Demineralized Water
ML21209A141Summer30 April 20211 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21209A135Summer30 April 20211 to Updated Final Safety Analysis Report, Frontmatter
ML21209A122Summer30 April 20211 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses
ML21133A102Limerick29 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Sections 3 Thru 5
ML21133A090Limerick29 April 20210 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Thru 3
ML21133A080Limerick29 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6
ML21252A522Limerick29 April 20210 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report. (Redacted)
PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating ReportPalisades27 April 20212020 Annual Non-Radiological Environmental Operating Report
ML21130A230Cooper21 April 20210 to Updated Final Safety Analysis Report, Drawing 3070, Electrical Symbol List
ML21130A103Cooper21 April 20210 to Updated Final Safety Analysis Report, Section XIII, Conduct of Operations
ML21130A069Cooper21 April 20210 to Updated Final Safety Analysis Report, Section Viii, Electrical Power Systems
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and SummaryCook19 April 20210 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary
ML21125A576Cook19 April 20219 Technical Specification Bases, List of Effective Pages (Unit 2)
ML21125A554Cook19 April 20210 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML21125A548Cook19 April 20212 to Technical Specifications Bases, List of Effective Pages (Unit 1)
ML21125A540Cook19 April 2021Rev. 4 to NFPA 805 Fire Protection Program Manual
ML21123A241Nine Mile Point19 April 2021Final Operating Test (Sections a, B, and C) (Folder 3)
ML21105A052Grand Gulf15 April 2021EAL Technical Bases Document Revision 1
ML21125A330Palisades14 April 20215 to Updated Final Safety Analysis Report, Chapter 1, Tables
ML21125A312Palisades14 April 20215 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems, Sections
ML21125A306Palisades14 April 20215 to Updated Final Safety Analysis Report, Chapter 8, Figures
IR 05000237/2021001Dresden13 April 2021Integrated Inspection Report 05000237/2021001 and 05000249/2021001
ML21103A32513 April 2021NRR E-mail Capture - Comments on Draft Nuclear Energy Institute Risk-Informed Process for Evaluations (RIPE) Industry Guidance NEI 2021-01 by NRC RIPE Working Group
ML21137A286Arkansas Nuclear8 April 20213_AN2-2021-03 Draft Written Exam
ML21134A241Arkansas Nuclear8 April 20218_AN2-2021-03 Final Written Exam
ML21095A297FitzPatrick5 April 2021Revised Technical Specifications Bases
ML21047A314Harris2 April 2021Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B
ML21102A354Point Beach2 April 2021Update to Final Safety Analysis Report, Chapter 14, Safety Analysis
ML21102A336Point Beach2 April 2021Update to Final Safety Analysis Report, Chapter 8, Introduction to the Electrical Distribution Systems
NG-21-0005, NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0Duane Arnold29 March 2021NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0
ML21085A026Nuclear Energy Institute22 March 2021NRR E-mail Capture - NEI Draft Industry Guidance to Support Implementation of Nrc'S Risk-Informed Process for Evaluations
ML21113A005Columbia4 March 2021CG-2021-02-DRAFT Written Exam
ML21098A170Columbia4 March 2021CG-2021-02-FINAL Written Examination
ML21050A227Limerick19 February 2021Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3)
ML22165A327Perry19 February 20212021 Perry Ile Administered Written Exam with Reference Handouts-Final
ML21096A025River Bend19 February 2021RB-2021-02 Draft Written Exam Comments
ML21088A064Beaver Valley18 February 2021Final Written Examination and Operating Test Outlines (Folder 3)
ML21047A241Oconee16 February 2021DPO-2019-001, Redacted Differing Professional Opinion (DPO) Case File (Public)
ML21271A609Fort Calhoun14 February 2021License Amendment Request (LAR) 21-01, Chapter 8, 10, Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station
IR 05000440/2020004Perry12 February 2021Integrated Inspection Report 05000440/2020004
ML21043A207Limerick12 February 2021Handouts to Applicants (Folder 3)
ML21070A129Monticello11 February 20218 to Updated Safety Analysis Report, Drawings
IR 05000483/2020004Callaway9 February 2021CWY2020004-RP-DSB, Callaway Plant - Integrated Inspection Report and Assessment Follow-Up Letter (05000483/2020004)
ML21074A331Beaver Valley7 February 2021Final Operating Test (Sections a, B, and C) (Folder 3)
ML20339A5702 February 2021Nuclear Power Accidents and Incidents: Lessons for PRA (Uiuc Seminar)
ML21138A8052 February 2021PRA Lessons from Ope Uiuc
ML21055A176Fermi
07200071
2 February 20213 to Updated Final Safety Analysis Report, Drawing 6M721-2135-1, Rev. Bk, Diagram Fire Protection System (Sheet 2)
ML21055A072Fermi
07200071
2 February 20213 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20261H46231 January 2021U.S Nuclear Regulatory Commission NRC Guidelines for Characterizing the Safety Impact of Issues
ML22166A035Perry29 January 20212021 Perry Ile Proposed Written Exam
IR 05000338/2020004North Anna28 January 2021Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002
ML21039A320Grand Gulf27 January 2021Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21039A255Grand Gulf27 January 2021Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML21088A058Beaver Valley10 December 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML20333A000Grand Gulf27 November 2020Emergency Plan, Revision 81 and Revision 0 of the EAL Technical Bases Document
ML20335A142Beaver Valley23 November 20208 to Technical Specification Bases Update Status
ML20335A141Beaver Valley23 November 20205 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20335A136Beaver Valley23 November 20205 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program
ML20335A120Beaver Valley23 November 20205 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20335A125Beaver Valley23 November 20205 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML20339A221Ginna20 November 2020Technical Specifications Bases, Rev 101
ML20339A182Ginna20 November 2020Fire Protection Program, Revision 18, Volumes I - III
ML20339A178Ginna20 November 20209 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 14.1 Thru 14.6
ML20339A027Ginna20 November 20209 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7
ML20339A020Ginna20 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7
ML20339A012Ginna20 November 20209 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Sections 1.1 Through 1.8
ML20324A703Millstone19 November 2020Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate
IR 05000259/2020003Browns Ferry10 November 2020Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003
L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorsTurkey Point5 November 2020Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors
ML20203M2694 November 2020IMC1245 Appendix D4 Electrical Advanced Level Training and Qualification Journal
ML21019A574Monticello3 November 2020Initial License Exam Administered Written Exam Key
ML21019A209Monticello3 November 2020Initial License Exam Proposed JPMs
ML21019A220Monticello3 November 2020Initial License Exam Proposed Written Exam Key
ML21019A572Monticello3 November 2020Initial License Exam Administered JPMs
ML20323A306Watts Bar29 October 2020Amendment 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
WBL-20-047, Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted)Watts Bar29 October 2020Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted)
IR 05000315/2020003Cook28 October 2020Integrated Inspection Report 05000315/2020003 and 05000316/2020003
ML20302A251Oconee26 October 2020File 2A-1 Exam Draft Items Delayed Release
ML20121A283Farley9 October 2020Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate
ML20309A772Mcguire
McGuire
8 October 20202 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20309A746Mcguire
McGuire
8 October 20202 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables
ML20309A735Mcguire
McGuire
8 October 20202 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8A, Tables
ML20309A747Mcguire
McGuire
8 October 20202 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems
ML20309A593North Anna30 September 20206 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20309A594North Anna30 September 20206 to Updated Final Safety Analysis Report, Frontmatter
ML20309A597North Anna30 September 20206 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20309A600North Anna30 September 20206 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation
ML20309A612North Anna30 September 20206 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System
ML21210A129Surry30 September 20202 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted
ML20302A323Davis Besse25 September 20209 to Fire Hazards Analysis Report, Appendix D, BTP-APCSB 9.5-1, Appendix a Response
ML20302A310Davis Besse25 September 20209 to Fire Hazards Analysis Report, Section 8, Operating Specifications
ML21104A365Davis Besse25 September 20203 to Updated Final Safety Analysis Report, Section 8, Electrical Power (Redacted)
ML20302A301Davis Besse25 September 20209 to Fire Hazards Analysis Report, Section 9, Fire Protection Safety Analysis
ML20302A287Davis Besse25 September 20209 to Tech Spec Bases
ML20302A282Davis Besse25 September 20203 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Part 3 of 3
ML20302A235Millstone18 September 2020Final Operating Test (Sections a, B, and C) (Folder 3)
ML20322A350Ginna17 September 2020Final Operating Test (Sections a, B, and C) (Folder 3)
ML20259A201Indian Point14 September 2020Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes
ML20258A282Grand Gulf14 September 2020Submittal of Changes to Emergency Plan Implementing Procedures
ML20268A137Saint Lucie11 September 2020Amendment 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Vol. 1
ML20268A129Saint Lucie11 September 2020Amendment 26 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems
ML20268A128Saint Lucie11 September 2020Amendment 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls
IR 05000387/2020002Susquehanna11 August 2020Integrated Inspection Report 05000387/2020002 and 05000388/2020002
IR 05000237/2020002Dresden10 August 2020Integrated Inspection Report 05000237/2020002; 05000249/2020002; and 07200037/2020001
ML20219A6836 August 2020Draft Temporary Staff Guidance for Risk-Informed Process for Evaluations
ML20282A786South Texas29 July 2020ST-2020-07 Draft Written Exam
ML20282A533South Texas29 July 2020ST-2020-07 Final Written Exams
IR 05000397/2020002Columbia29 July 2020Integrated Inspection Report 05000397/2020002
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bHarris27 July 2020Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b
ML20290A582Wolf Creek23 July 2020Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 14, Initial Test Program
ML20290A577Wolf Creek23 July 2020Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20290A566Wolf Creek23 July 2020Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML20329A239Ginna22 July 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML20202A654Fort Calhoun16 July 2020Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report
LIC-20-0013, License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654)Fort Calhoun16 July 2020License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654)
ML20303A012Millstone2 July 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML20268B156Diablo Canyon30 June 20205 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441245, Rev. 29, Sheet 1, Electrical Schematic Diagram Generator Control
ML20268B136Diablo Canyon30 June 20205 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437557-, Rev 39, Sheet 1, Electrical Schematic Diagram Generator Control
ML20268B025Diablo Canyon30 June 20205 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437558, Rev. 37, Sheet 1, Electrical Schematic Diagram Generator Control
ML20268A360Diablo Canyon30 June 20205 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20189A089Oconee29 June 20208 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20197A08426 June 2020NRC-2019-000253 - Resp 5 - Interim. Agency Records Subject to the Request Enclosed. Part 3 of 4
ML20209A377Millstone22 June 20208 to Updated Final Safety Analysis Report, Chapter 16, Drawings Incorporated by Reference
ML20209A380Millstone22 June 20208 to Updated Final Safety Analysis Report, Chapter 8.0, Electrical Systems
ML20209A390Millstone22 June 2020Controlled Copy of Technical Requirements Manual Current Through Change No. 199 Updated by Technical Publishing
ML20209A401Millstone22 June 20203 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report
ML20209A402Millstone22 June 20203 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant
ML20209A384Millstone22 June 20203 to Updated Final Safety Analysis Report, Chapter 8, Electric Power
ML20168A432Bellefonte16 June 2020Final ASP Analysis - Beaver Valley 1 (LER 334-78-043)
ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap ChangersWolf Creek8 June 2020License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive ReactorTurkey Point8 June 2020Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor
ML20233A922Arkansas Nuclear5 June 2020AN1-2020-04 Draft Operating Test
ML20156A140Point Beach4 June 2020Final ASP Analysis - Point Beach 2 (LER 301-89-002)
ML20156A217San Onofre4 June 2020Final ASP Analysis - San Onofre 1 (LER 206-85-017)
ML20204A807Arkansas Nuclear4 June 2020AN1-2020-04 Final Written Exam
ML20204A806Arkansas Nuclear4 June 2020AN1-2020-04 Final Op Test
ML20150A259LaSalle4 June 2020EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 008 Chap 08 Electric Power-ML20111A255_Redacted
ML20269A406Surry2 June 2020Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 3 of 3
ML20154K765South Texas2 June 2020Supplemental Response Regarding Bulletin 2012-01
NOC-AE-20003735, Supplemental Response Regarding Bulletin 2012-01South Texas2 June 2020Supplemental Response Regarding Bulletin 2012-01
ML20149K496Palisades28 May 2020Final ASP Analysis - Palisades (LER 255-87-024)
ML20149K404Maine Yankee28 May 2020Final ASP Analysis - Maine Yankee (LER 309-88-006)
ML20142A530Hope Creek21 May 20204 to Updated Final Safety Analysis Report, Section 1, Introduction & General Description of Plant
ML20142A535Hope Creek21 May 20204 to Updated Final Safety Analysis Report, Section 8, Electric Power
L-20-051, Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2)Beaver Valley20 May 2020Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2)
ML20140A222Waterford19 May 2020Final ASP Analysis - Waterford (LER 382-95-002)
ML20140A221Vogtle19 May 2020Final ASP Analysis - Vogtle 1 (LER 424-90-006)
ML20147A022Harris15 May 2020Amendment 63 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems
ML20147A025Harris15 May 2020Amendment 63 to Final Safety Analysis Report, Chapter 8, Electric Power
ML20147A030Harris15 May 2020Amendment 63 to Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML20147A027Harris15 May 2020Amendment 63 to Final Safety Analysis Report, Chapter 10, Summary Description
ML20135G974McGuire14 May 2020Final ASP Analysis - McGuire 1 (LER 369-91-001)
ML20135G963Hatch14 May 2020Final ASP Analysis - Hatch 1 (LER 321-91-001)
ML20135G735Catawba14 May 2020Final ASP Analysis - Catawba 2 (LER 414-96-001)
ML20135G730Byron14 May 2020Final ASP Analysis - Byron 1 (LER 454-96-007)
IR 05000237/2020001Dresden11 May 2020Units, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001
ML20350B5844 May 2020NRC-2018-000096 (Formerly FOIA/PA-2018-0003) - Resp 9 - Interim
ML20350B6144 May 2020NRC-2018-000103 (Formerly FOIA/PA-2018-0010) - Resp 9 - Interim
ML20118C2314 May 2020Draft NRC Guidance for Determining Safety Impact
ML20120A610Surry30 April 2020Report on the Safety Aspects of the Subsequent License Renewal Application Review of the Surry Power Station, Units 1 and 2
ML20170A411Fort Calhoun
07100256
30 April 2020Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.3., Rev. 1, Electrical Systems, Station Distribution
ML20170A410Fort Calhoun
07100256
30 April 2020Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.2, Rev. 0, Electrical Systems Network Interconnections
ML20170A409Fort Calhoun
07100256
30 April 2020Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.1, Rev. 1, Electrical Systems, Introduction
ML20133J938South Texas29 April 2020Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions)
ML20106F218Three Mile Island15 April 2020Incident Chronology at TMI from NRC: 1979-2020
IR 05000272/2020010Salem8 April 2020Reissued Temporary Instruction 2515/194 Report 05000272/2020010 and 05000311/2020010
IR 05000275/2020011Diablo Canyon8 April 2020Temporary Instruction 2515/194 Report 05000275/2020011 and 05000323/2020011
ML20105A259Clinton31 March 20201 to Updated Safety Analysis Report, Chapter 8, Electric Power
ML20077L169Salem20 March 2020Temporary Instruction 2515/194 Report 05000272/2020010 and 05000311/2020010
IR 05000334/2020010Beaver Valley16 March 2020Reissued Temporary Instruction 2515/194 Inspection Report 05000334/2020010 and 05000412/2020010
ML20106E470Diablo Canyon6 March 20202020-02-FINAL Outlines
ML20106E466Diablo Canyon6 March 20202020-02-DRAFT Outlines
ML20106E463Diablo Canyon6 March 20202020-02-DRAFT Operating Test
ML20097A446Diablo Canyon6 March 20202020-02-FINAL Operating Test
GNRO-2020/00026, 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety RelatedGrand Gulf28 February 20203 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related
ML20078L337Davis Besse27 February 2020Written Exam
ML20077J972Davis Besse27 February 2020Proposed Written Exam
ML20058D181Beaver Valley24 February 2020Temporary Instruction 2515/194 Inspection Report 05000334/2020010 and 05000412/2020010
ML20049G02024 February 2020ASP Program Summary Description (Revision 1)
ML21271A215Fort Calhoun14 February 2020License Amendment Request (LAR) 21-01, Chapter 5 11 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station
ML21271A192Fort Calhoun14 February 2020License Amendment Request (LAR) 21-01, Chapter 3, 17, Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station
ML21271A185Fort Calhoun14 February 2020License Amendment Request (LAR) 21-01, Chapter 2 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station
ML21271A145Fort Calhoun14 February 2020License Amendment Request (LAR) 21-01, Chapter 1 11 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - 1
RA-20-0050, Emergency Action Levels CSD-EP-RNP-0101-02, Revision 0Robinson13 February 2020Emergency Action Levels CSD-EP-RNP-0101-02, Revision 0
ML20058H618Grand Gulf10 February 2020GG-2020-02 Draft Written Examination
ML20274A105Calvert Cliffs7 February 2020Draft Written Examination and Operating Test Outlines (Folder 2)
ML20274A066Calvert Cliffs7 February 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)
IR 05000400/2019004Harris6 February 2020Integrated Inspection Report 05000400/2019004
ML20043E123Indian Point5 February 2020Declaration of George W. Heitzman in Support of New York Petition
ML19266A072Saint Lucie27 January 2020Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation
ML20079J095River Bend22 January 2020Emergency Implementation Procedure 2-001 Revision 28
ML20021A27121 January 2020Final OPC Backfit Analysis Risk Assessment
ML20015A433Quad Cities15 January 2020Revision 24 to Fire Protection Report, Volume 1 - Redacted
ML20023A020Arkansas Nuclear15 January 2020Rev. 45 to Emergency Plan and Emergency Plan Implementing Procedure
IR 05000397/2019003Columbia9 January 2020Revised Integrated Inspection Report 05000397/2019003
ML19317F6477 January 2020IMC 0611 Power Reactor Inspection Reports
ML19351D276Nuclear Energy Institute
99902028
31 December 2019NEI 00-01, Revision 4, Guidance for Post Fire Safe Shutdown Circuit Analysis.
ML19360A020Surry27 December 2019SER 2019-12-23 for ADAMS
L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power SystemBrowns Ferry
Watts Bar
Sequoyah
26 December 2019Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System
ML20007E35905200001
05200045
20 December 2019GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 20 - Question and Response Guide
ML20007E35105200001
05200045
20 December 2019GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 16 - Technical Specifications Bases
ML20007E34805200001
05200045
20 December 2019GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 15 - Accident and Analysis
ML20007E33805200001
05200045
20 December 2019GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 09 - Auxiliary Systems
ML20007E32705200001
05200045
20 December 2019GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 01 - Introduction and General Description of Plant
IR 05000456/2019011Braidwood19 December 2019NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative... in Electric Power Systems (NRC Bulletin 2012-01) Report 05000456/2019011 and 05000457/2019011
CNL-19-122, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of InsightsBrowns Ferry17 December 2019Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights
L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.Turkey Point6 December 2019License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.
ML19336C709Point Beach2 December 2019NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (DRS-A.Dahbur)..
ML19329A08422 November 2019Federal Respondents' Combined Motion to Dismiss and Response to Petitioner'S Stay Motion (DC Cir.)(Case No. 19-1198) - 11-22-19
ML20209A032Callaway13 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML20009C4327 November 2019Transcript of the Advisory Committee on Reactor Safeguard 668th Full Committee Meeting - November 7, 2019 (Open)
IR 05000289/2019003Three Mile Island6 November 2019Integrated Inspection Report 05000289/2019003
IR 05000483/2019003Callaway5 November 2019Integrated Inspection Report 05000483/2019003
IR 05000275/2019003Diablo Canyon30 October 2019Integrated Inspection Report 05000275/2019003 and 05000323/2019003
ML19303C894Columbia30 October 2019Integrated Inspection Report 05000397/2019003
ML19303B425Pilgrim28 October 2019Transport Room (Motion for Stay Pending Appellate Review)(Dc Cir.)(Case No. 19-1198) 10-28-19
ML20055E017Nine Mile Point28 October 2019Nile Mile Point Unit 2 - Draft Written Examination (Folder 2)
ML19298B835Turkey Point25 October 2019Integrated Inspection Report 05000250/2019003 and 05000251/2019003
RA-19-0386, Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1Robinson24 October 2019Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1
IR 05000250/2019013Turkey Point22 October 2019NRC Temporary Instruction 2515/194 Inspection Report 05000250/2019013 and 05000251/2019013
ML19324C991Browns Ferry4 October 2019Amendment 28 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted
ML19298B485Browns Ferry4 October 2019Amendment 28 to Updated Final Safety Analysis Report, Appendix O, Aging Management Programs
L-2019-111, Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall ChartsSaint Lucie30 September 2019Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts
ML19205A206Peach Bottom24 September 2019Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review
ML19269B734Surry19 September 2019Subsequent License Renewal Application - Response to Requests for Additional Information - Sets 3 and 4 Revised SLRA Mark-Ups
ML19309E62319 September 2019Transcript of the Advisory Committee on Reactor Safeguards Us Apwr Sc Meeting - September 19, 2019 (Open)
ML20258A071Waterford11 September 201911 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted
ML19261A329La Crosse29 August 2019Boiling Water Reactor Final Status Survey Final Report - Phase 1
ML19249B774Millstone
Surry
North Anna
07200002
07200055
29 August 2019Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated)
ML19249B772Millstone
Surry
North Anna
07200002
07200055
29 August 2019Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated)
ML19249B768Millstone
Surry
North Anna
07200002
07200055
29 August 2019Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated)
ML19240A829Farley28 August 2019NRC Temporary Instruction 2515/194 Inspection of the Licensee'S Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01)
ML19261A338La Crosse28 August 2019Boiling Water Reactor Final Status Survey Release Record Survey Unit L1-SUB-LES
ML18277A110Browns Ferry
Watts Bar
Sequoyah
27 August 2019Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection
ML19239A035Quad Cities23 August 2019NRC-2019-000303 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed
ML19246A718FitzPatrick23 August 2019Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis
ML18043A80719 August 2019IMC 0611 Power Reactor Inspection Reports
ML19198A001Browns Ferry13 August 2019Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140)
IR 05000237/2019002Dresden8 August 2019Integrated Inspection Report 05000237/2019002; 05000249/2019002; and 07200037/2019001
IR 05000338/2019002North Anna5 August 2019Integrated Inspection Report 05000338/2019002 and 05000339/2019002; 07200056/2019001
IR 05000275/2019010Diablo Canyon1 August 2019Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2019010 and 05000323/2019010
IR 05000397/2019002Columbia1 August 2019Integrated Inspection Report 05000397/2019002 and 05000397/2019012
IR 05000254/2019002Quad Cities31 July 2019Integrated Inspection Report 05000254/2019002 and 05000265/2019002
ML19070A30830 July 2019OpESS 2019-01 Commercial Grade Dedication Procurement and Design Control
IR 05000255/2019002Palisades26 July 2019Integrated Inspection Report 05000255/2019002
CNL-19-070, TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water ReactorBrowns Ferry3 July 2019TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power OperationSaint Lucie28 June 2019Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation
ML19126A030Mcguire
McGuire
28 June 2019Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating
AEP-NRC-2019-18, License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor BankCook27 June 2019License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank
ML19162A41413 June 201901 Fpra Course Description
ML19168A028Surry10 June 2019(Sps), Units 1 and 2 - Supplement to Subsequent License Renewal Application Change Notice 3
ML19255F523Summer31 May 2019Updated Final Safety Analysis Report, Chapter 15, Accident Analyses