Semantic search
Site | Start date | Title | Description | |
---|---|---|---|---|
ML23292A216 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99 | |
ML23291A425 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Section 8.2, Offsite Power System | |
ML23291A387 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.2, General Plant Description | |
ML23291A378 | Susquehanna | 12 October 2023 | 1 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Symbols and Terms Used in Engineering and Text | |
BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 | Vermont Yankee | 10 October 2023 | License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 | |
ML23278A095 | Callaway | 5 October 2023 | EIP-ZZ-00101 Addendum 2 - Emergency Action Level Technical Bases Document Administrative Correction Revision 021 | |
PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | Palisades | 28 September 2023 | Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 | |
ML23257A271 | Saint Lucie | 26 September 2023 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of St. Lucie Plant, Units 1 and 2 | |
TSG-DORL-2021-01, RIPE Temporary Staff Guidance TSG-DORL-2021-01, Rev.3 Incorporating Observations from the Issuance of First Palo Verde RIPE Partial Exemption | 18 September 2023 | RIPE Temporary Staff Guidance TSG-DORL-2021-01, Rev.3 Incorporating Observations from the Issuance of First Palo Verde RIPE Partial Exemption | ||
CP-202300293, (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | Comanche Peak | 14 September 2023 | (CPNPP) - License Amendment Request Proposing Changes to Technical Specifications to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days | |
ML23318A209 | Diablo Canyon | 13 September 2023 | Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 1 (Main Report) | |
ML23318A208 | Diablo Canyon | 13 September 2023 | Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations, July I, 2022 - June 30, 2023 - Volume 2 (Exhibits) | |
ML23264A864 | 6 September 2023 | Transcript of the Advisory Committee on Reactor Safeguards 708th Full Committee Meeting, September 6, 2023, Pages 1-275 (Open) | ||
0CAN092301, Emergency Plan Implementing Procedure Revision | Arkansas Nuclear | 5 September 2023 | Emergency Plan Implementing Procedure Revision | |
ML23219A003 | Saint Lucie | 1 September 2023 | SLRA SER Rev 1 | |
ML23214A241 | Monticello | 31 August 2023 | Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application | |
ML23251A030 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 10 of 19 | ||
ML23251A029 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 11 of 19 | ||
ML23251A026 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 18 of 19 | ||
ML23251A024 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 6 of 19 | ||
ML23251A020 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 19 of 19 | ||
ML23251A019 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 12 of 19 | ||
ML23251A018 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 5 of 19 | ||
ML23251A017 | 31 August 2023 | FOIA-2023-000163 - Responsive Record - Public ADAMS Document Report. Part 1 of 19 | ||
IR 05000395/2023002 | Summer | 14 August 2023 | Integrated Inspection Report - Integrated Inspection Report 05000395/2023002 and Apparent Violation | |
IR 05000416/2023002 | Grand Gulf Arkansas Nuclear | 8 August 2023 | Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 | |
IR 05000346/2023050 | Davis Besse | 3 August 2023 | Special Inspection Report 05000346/2023050 | |
JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | FitzPatrick | 3 August 2023 | License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | |
NUREG-2191, Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version | 31 July 2023 | NUREG-2191 Dfc, Vol 2, Rev 1, Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, Draft Report for Comment, Tracked Changes Version | ||
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 | Comanche Peak | 27 July 2023 | Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 | |
ML23200A146 | Saint Lucie | 21 July 2023 | Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1 and 2 | |
IR 05000483/2023002 | Callaway | 10 July 2023 | Integrated Inspection Report 05000483/2023002 | |
ML23181A166 | Palo Verde | 30 June 2023 | Enclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17 | |
ML23193A901 | Millstone | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML23193A897 | Millstone | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | |
ML23193A894 | Millstone | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | |
ML23193A893 | Millstone | 28 June 2023 | Technical Requirements Manual | |
ML23193A888 | Millstone | 28 June 2023 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML23193A869 | Millstone | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML23193A866 | Millstone | 28 June 2023 | 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted | |
PNO-III-23-002B, Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer | Prairie Island | 8 June 2023 | PNO-III-23-002B Prairie Island Update to PNO-III-23-002 Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer | |
PNO-III-23-002, Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer | Prairie Island | 1 June 2023 | PNO-III-23-002 - Prairie Island Nuclear Power Station Declaration of an Unusual Event Following a Turbine Generator and Reactor Trip Due to Fault on Unit 2 Generator Main Transformer | |
ML23241A681 | Diablo Canyon | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML23241A586 | Diablo Canyon | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems | |
ML23241A126 | Diablo Canyon | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.3-48, Drawing 437557, Revision 41, Sheet 1, Electrical Schematic Diagram Generator Control | |
ML23241A116 | Diablo Canyon | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.3-1, Drawing 441226, Rev. 34, Sheet 1, Electrical Single Line Meter and Relay Diagram Generator Excitation Main and Auxiliary Transformers | |
ML23241A089 | Diablo Canyon | 25 May 2023 | 7 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML23151A451 | Turkey Point | 24 May 2023 | Enclosure 2, Volume 13: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.8, Electrical Power Systems, Revision 3 | |
ML23144A307 | Beaver Valley | 23 May 2023 | Technical Specification Bases Update Status, Revision 47 | |
ML23135A180 | Wolf Creek | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | |
ML23135A175 | Wolf Creek | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML23135A165 | Wolf Creek | 8 May 2023 | 6 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
IR 05000327/2023001 | Sequoyah | 2 May 2023 | Integrated Inspection Report 05000327/2023001 and 05000328/2023001 and Exercise of Enforcement Discretion | |
ML23130A109 | North Anna | 20 April 2023 | Submittal of Annual Environmental Operating Report for 2022 | |
ML23129A430 | Cooper | 20 April 2023 | 1 to Updated Safety Analysis Report, Drawing 3070, Electrical Symbol List | |
ML23129A305 | Cooper | 20 April 2023 | 1 to Updated Safety Analysis Report, Section XIII, Conduct of Operations | |
ML23129A271 | Cooper | 20 April 2023 | 1 to Updated Safety Analysis Report, Section Viii, Electrical Power Systems | |
ML23262B171 | 19 April 2023 | Meeting Slides 20230419-final | ||
CP-202300135, License Renewal Application Revision 0 - Supplement 1 | Comanche Peak | 6 April 2023 | License Renewal Application Revision 0 - Supplement 1 | |
ML23095A374 | FitzPatrick | 5 April 2023 | Enclosure 2: Technical Specification (TS) Bases Revision 58 | |
ML23095A020 | Turkey Point | 4 April 2023 | Enclosure 2 - ITS Section 3.8 Electrical Power Systems, Revision 2, Volume 13 | |
PNP 2023-002, 6 to Updated Final Safety Analysis Report | Palisades | 31 March 2023 | 6 to Updated Final Safety Analysis Report | |
ML23107A059 | Palisades | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 1, Tables | |
ML23107A038 | Palisades | 31 March 2023 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML23088A254 | Callaway | 23 March 2023 | EIP-ZZ-00101, Addendum 2, Revision 020, Emergency Action Level Technical Bases Document | |
DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update | Diablo Canyon | 23 March 2023 | Independent Spent Fuel Storage Installation, Emergency Plan Update | |
DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts | Diablo Canyon | 17 March 2023 | Responses to NRC Questions Regarding License Renewal Efforts | |
ML23137A261 | Comanche Peak | 13 March 2023 | Comment (2576) of Susybelle Gosslee on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2 | |
ML23055A029 | La Crosse | 24 February 2023 | Staff Evaluation in Support of the La Crosse Class 1 Survey Unit Partial Site Release | |
IR 05000348/2022011 | Farley | 16 February 2023 | NRC Inspection Report 05000348/2022011 | |
IR 05000395/2022004 | Summer | 10 February 2023 | Integrated Inspection Report 05000395/2022004 | |
IR 05000259/2022004 | Browns Ferry | 7 February 2023 | Integrated Inspection Report 05000259/2022004, 05000260/2022004 and 05000296/2022004 | |
ML23033A049 | Grand Gulf | 1 February 2023 | Emergency Action Level (EAL) Technical Bases Document Revision 3 | |
ML23108A188 | Comanche Peak | 25 January 2023 | Comment (1722) of Beate Nilsen on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2 | |
ML23062A640 | Callaway | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
IR 05000338/2022003 | North Anna | 20 December 2022 | Reissue - North Anna Power Station Integrated Inspection Report 05000338/2022003 and 05000339/2022003 | |
L-22-271, Emergency Plan | Perry | 20 December 2022 | Emergency Plan | |
ML22340A202 | Cook | 30 November 2022 | Technical Specifications Bases, List of Effective Pages | |
ML22340A174 | Cook | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML22340A160 | Cook | 30 November 2022 | Technical Specifications Bases, List of Effective Pages | |
ML22340A150 | Cook | 30 November 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and Summary | |
L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | Perry | 18 November 2022 | Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 | |
ML22325A134 | Fermi 07200071 | 17 November 2022 | 4 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML22311A542 | North Anna | 7 November 2022 | Integrated Inspection Report 05000338/2022003 and 05000339/2022003 | |
PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) | Susquehanna | 19 October 2022 | Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) | |
ML22292A095 | Nine Mile Point | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3 Thru Appendix 8A | |
ML22292A076 | Nine Mile Point | 5 October 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1 Thru 8.2 | |
IR 05000348/2022050 | Farley | 30 September 2022 | Special Inspection Reactive Report 05000348/2022050 and Apparent Violation | |
ML23037A831 | Diablo Canyon | 28 September 2022 | Independent Safety Committee; Thirty-Second Annual Report on the Safety July 1, 2021 - June 30, 2022, Volume II - Exhibits | |
ML22263A483 | Summer | 20 September 2022 | (Vcsns), Unit 1 - Revised Expected Submission Date for Supplement to Licensee Event Report 2022-001-00 | |
ML22263A418 | Davis Besse | 20 September 2022 | Enclosure F - DBNPS, Unit 1, Technical Specification Bases, Rev. 32 | |
ML22278A294 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 09, Sections 3 Thru 5 | |
ML22278A260 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report | |
ML22278A250 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22278A212 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML22278A815 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0022, Rev. 67, Sheet 2, P&ID Fire Protection (Unit 1, Unit 2 and Common) | |
ML22278A810 | Limerick | 19 September 2022 | Rev. 21 to Updated Final Safety Analysis Report, Drawing M-0022, Rev. 69, Sheet 4, P&ID Fire Protection (Unit 2) | |
ML22257A033 | Grand Gulf | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22257A005 | Grand Gulf | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22276A263 | South Texas | 8 September 2022 | Initial Exam 2022-08 Post Exam Comments | |
ENS 56073 | North Anna | 27 August 2022 14:15:00 | Turbine Trip Due to Main Transformer Fire | The following information was provided by the licensee via email: At 0810 EDT on August 27, 2022, with Unit 2 at 27% power, the operating crew received an annunciator for a Turbine Trip Without Reactor Trip. At 0812 EDT, a report came in from the field of a fire in the north yard due to an "A" Main Transformer upper bushing failure. The station fire brigade was dispatched and offsite assistance was requested. However, at 0842 EDT the fire was put out, prior to needing the offsite assistance. No Emergency Action Level threshold was exceeded for this event. The switchyard is in a normal alignment for providing offsite power to Unit 2. At 1015 EDT, the Virginia Department of Emergency Management (VDEM) was notified of the event. Additionally, a notification to the Virginia Department of Environmental Quality will be made due to approximately 100 gallons of oil reaching the ground. As such, this issue is being reported per 10 CFR 50.72(b)(2)(xi) for "'Any event or situation for which a news release is planned or notification to other government agencies has been or will be made.' The NRC Resident Inspector was notified. |
IR 05000259/2022002 | Browns Ferry | 8 August 2022 | Integrated Inspection Report 05000259/2022002, 05000260/2022002 and 05000296/2022002 | |
IR 05000327/2022002 | Sequoyah | 1 August 2022 | Integrated Inspection Report 05000327 2022002 and 05000328 2022002 | |
ML22201A002 | 22 July 2022 | Enclosure 2: Risk Insights Based on Ope Including ASP | ||
DCL-22-052, Emergency Plan Update | Diablo Canyon | 6 July 2022 | Emergency Plan Update | |
ML22186A153 | Summer | 5 July 2022 | (VCSNS) Unit 1 - Revised Expected Submission Date for Supplement to Licensee Event Report 2022-001-00 | |
ML23041A377 | Diablo Canyon | 30 June 2022 | Independent Safety Committee Thirty-Second Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations July 1, 2021-June 30, 2022 | |
ML22194A340 | Summer | 27 June 2022 | Submittal of Revision 22 to Updated Final Safety Analysis Report | |
ML22194A277 | Summer | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Figure 9.2-9b, Rev. 19, Demineralized Water | |
ML22194A176 | Summer | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Revision Summary | |
ML22194A143 | Summer | 27 June 2022 | 2 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis | |
ML22193A143 | Millstone | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Technical Requirements Manual Current Through Change No. 207 | |
ML22193A136 | Millstone | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML22193A132 | Millstone | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | |
ML22193A126 | Millstone | 23 June 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22193A066 | Millstone | 23 June 2022 | 0 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML22167A124 | Arkansas Nuclear | 16 June 2022 | Emergency Plan Implementing Procedure Revision | |
ML22140A140 | Point Beach | 20 May 2022 | Attachment 5 - Evaluation of Plant-Specific Variations | |
ML22151A150 | Wolf Creek | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML22151A144 | Wolf Creek | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | |
ML22151A138 | Wolf Creek | 18 May 2022 | 5 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML22130A521 | Point Beach | 18 May 2022 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of Point Beach Nuclear Plant, Units 1 and 2 | |
ML22144A133 | Beaver Valley | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22144A128 | Beaver Valley | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | |
ML22144A127 | Beaver Valley | 18 May 2022 | Rev. 43 to Technical Specification Bases | |
ML22144A120 | Beaver Valley | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML22144A114 | Beaver Valley | 18 May 2022 | 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
L-22-053, Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | Beaver Valley | 16 May 2022 | Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time | |
IR 05000395/2022001 | Summer | 12 May 2022 | Integrated Inspection Report 05000395/2022001 and Apparent Violation | |
IR 05000346/2022001 | Davis Besse | 12 May 2022 | Integrated Inspection Report 05000346/2022001 | |
ML22088A135 | 10 May 2022 | Guidelines for Characterizing the Safety Impact of Issues, Revision 2 | ||
IR 05000269/2022001 | Oconee | 4 May 2022 | Integrated Inspection Report 05000269/2022001, 05000270/2022001 and 05000287/2022001 | |
ML22140A081 | South Texas | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22140A077 | South Texas | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) | |
ML22140A067 | South Texas | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted) | |
ML22140A064 | South Texas | 28 April 2022 | 1 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions | |
IR 05000445/2022001 | Comanche Peak | 26 April 2022 | Integrated Inspection Report 05000445/2022001 and 05000446/2022001 | |
ML22146A369 | LaSalle | 13 April 2022 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (ML22111A237 Redacted) | |
ML22094A115 | Beaver Valley | 4 April 2022 | Response to a Request for Additional Information Regarding a Revision to Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG) Start and Bus Separation Instrumentation (EPID No. L-202 | |
ML22090A240 | Summer | 31 March 2022 | Annual Operating Report | |
ML22111A206 | Clinton | 31 March 2022 | 2 to Updated Safety Analysis Report, Chapter 8, Electric Power | |
ML22089A211 | Turkey Point | 30 March 2022 | Enclosure 2 - Volume 13, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems, Revision 1 | |
ML22073A167 | Grand Gulf | 8 March 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML22111A118 | Saint Lucie | 4 March 2022 | Amendment 27 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML22111A108 | Saint Lucie | 4 March 2022 | Amendment 27 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Part 1 | |
ML22111A101 | Saint Lucie | 4 March 2022 | Amendment 27 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | |
ML22046A065 | North Anna | 28 February 2022 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of the North Anna Power Station, Units 1 and 2 | |
IR 05000269/2021004 | Oconee | 14 February 2022 | Integrated Inspection Report 05000269/2021004 and 05000270/2021004 and 05000287/2021004 and Apparent Violation | |
IR 05000382/2021004 | Waterford | 8 February 2022 | Integrated Inspection Report 05000382/2021004 and Exercise of Enforcement Discretion | |
IR 05000250/2021004 | Turkey Point | 2 February 2022 | Integrated Inspection Report 05000250/2021004 and 05000251/2021004 | |
ML22060A129 | 2 February 2022 | Transcript of the Advisory Committee on Reactor Safeguards 692nd Full Committee Meeting, February 2, 2022, Pages 1-289 (Open) | ||
IR 05000395/2021004 | Summer | 21 January 2022 | Integrated Inspection Report 05000395/2021004 | |
ML21361A213 | Perry | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System | |
ML21361A209 | Perry | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML21361A194 | Perry | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Chapter 8, Electric Power | |
ML21350A036 | Surry | 16 December 2021 | 2B Exam Admin Items Surry 2021-301 (Normal Release) | |
ML21350A045 | Surry | 16 December 2021 | 2A-2 Final Exam Surry 2021-301(2 Yr Delay) | |
ML21356A785 | 15 December 2021 | Transcript of the Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee Meeting, December 15, 2021, Pages 1-165 | ||
ML21334A039 | Beaver Valley | 22 November 2021 | 3 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML21334A034 | Beaver Valley | 22 November 2021 | Technical Specifications Bases Update Status, Revision 41 | |
ENS 55580 | Summer | 15 November 2021 22:28:00 | Manual Reactor Trip Due to Main Transformer Fault | At 1728 EST on 11/15/2021, with Unit 1 in Mode 1 at 47 percent power, the reactor was manually tripped due to a main transformer fault. The trip was not complex, with all systems responding normally post-trip. Operations responded and stabilized the plant. Decay heat is being removed by the emergency feedwater system through the main condenser. Due to the Reactor Protection System actuation while critical, this event is being reported as a four-hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). Additionally, due to the valid actuation of the emergency feedwater system, this event is being reported as a non-emergency notification per 10 CFR 50.72(b)(3)(iv)(A). There was no impact on the health and safety of the public or plant personnel. The NRC Senior Resident Inspector has been notified."
At approximately 0900 (EST) on 11/16/2021, it was identified that mineral oil from the faulted main transformer had surpassed the capability of the oil containment system and discharged into Lake Monticello. It is estimated that less than 50 gallons of mineral oil entered the Lake. The oil is contained with booms and cleanup is ongoing. The EPA National Response Center and the South Carolina Department of Health and Environmental Control have been notified. This is considered a news release or notification to other government agencies; therefore, this event is reportable under 10 CFR 50.72(b)(2)(xi). The NRC Senior Resident Inspector has been notified. Notified R2DO (Miller). |
RA-21-0297, Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1 | Oconee | 11 November 2021 | Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1 | |
ML21262A001 | Millstone | 9 November 2021 | Issuance of Amendment No. 280 Regarding Measurement Uncertainty Recapture Power Uprate | |
ML21307A202 | Perry | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System | |
ML21307A198 | Perry | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML21307A182 | Perry | 28 October 2021 | 2 to Updated Safety Analysis Report, Chapter 8, Electric Power | |
ML21361A325 | Byron | 28 October 2021 | Scenarios | |
ML21361A169 | Byron | 28 October 2021 | Proposed Scenarios | |
IR 05000315/2021003 | Cook 07200072 | 26 October 2021 | Integrated Inspection Report 05000315/2021003; 05000316/2021003; and 07200072/2021001 | |
ML22042B305 | Quad Cities | 21 October 2021 | 5 to Fire Protection Report - Volume 1 - Redacted | |
ML21300A266 | Quad Cities | 21 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 08 - Electric Power | |
IR 05000334/2021011 | Beaver Valley | 19 October 2021 | Temporary Instruction 2515/194 Inspection Report 05000334/2021011 and 05000412/2021011 | |
ML21287A006 | Ginna | 14 October 2021 | Supplemental Information No.1 for R.E. Ginna Nuclear Power Plant to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, - Risk-Informed Categorization and Treatment of Structu | |
ML21286A682 | Callaway | 13 October 2021 | Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | |
ML21294A220 | Susquehanna | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 8.2, Offsite Power System | |
ML21294A152 | Susquehanna | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Section 1.2, General Plant Description | |
ML21294A112 | Susquehanna | 12 October 2021 | 0 to Updated Final Safety Analysis Report, Questions 040 | |
ML21305A245 | Diablo Canyon | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 3 of 4, Drawing 441245-1, Electrical Schematic Diagram Generator Control | |
ML21305A224 | Diablo Canyon | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 1 of 4, Drawing 437557-1, Electrical Schematic Diagram Generator Control | |
ML21305A137 | Diablo Canyon | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Figure 7.3-48, Sheet 2 of 4, Drawing 437558, Revision 37, Sheet 1, Electrical Schematic Diagram Generator Control | |
ML21305A105 | Diablo Canyon | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML21305A089 | Diablo Canyon | 11 October 2021 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML21286A429 | Browns Ferry | 4 October 2021 | Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.4, Normal Auxiliary Power System | |
ML21286A427 | Browns Ferry | 4 October 2021 | Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power | |
ML21286A420 | Browns Ferry | 4 October 2021 | Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3, Transmission System | |
ML21286A413 | Browns Ferry | 4 October 2021 | Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1, Summary Description | |
ML21286A260 | Browns Ferry | 4 October 2021 | Amendment 29 to Updated Final Safety Analysis Report, Appendix O, Aging Management Program | |
IR 05000313/2021011 | Arkansas Nuclear | 23 September 2021 | Design Basis Assurance Inspection (Teams) Inspection Report 05000313/2021011 and 05000368/2021011 | |
ML21265A384 | Turkey Point | 22 September 2021 | Improved Technical Specifications Conversion, Volume 13, Revision 0, Section 3.8, Electrical Power Systems | |
IR 05000440/2021002 | Perry | 12 August 2021 | Integrated Inspection Report 05000440/2021002 | |
IR 05000445/2021002 | Comanche Peak | 10 August 2021 | Integrated Inspection Report 05000445/2021002 and 05000446/2021002 | |
IR 05000255/2021002 | Palisades | 10 August 2021 | Integrated Inspection Report 05000255/2021002 | |
IR 05000528/2021002 | Palo Verde | 9 August 2021 | Integrated Inspection Report 05000528/2021002, 05000529/2021002, and 05000530/2021002 and Exercise of Enforcement Discretion | |
IR 05000336/2021002 | Millstone | 9 August 2021 | Integrated Inspection Report 05000336/2021002 and 05000423/2021002 and Independent Spent Fuel Storage Installation Inspection Report 07200047/2021002 | |
ML21217A283 | Browns Ferry | 5 August 2021 | Resident Integrated Inspection Report 2021-002 | |
CNL-21-026, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) | Sequoyah | 5 August 2021 | License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (SQN-TS-20-03) | |
ML21271A262 | Fort Calhoun | 3 August 2021 | License Amendment Request (LAR) 21-01, Chapter 6 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - F-1 | |
IR 05000275/2021012 | Diablo Canyon | 28 July 2021 | Temporary Instruction 2515/194 Report 05000275/2021012 and 05000323/2021012 | |
IR 05000348/2021012 | Farley | 19 July 2021 | Triennial Fire Protection Team Inspection (FPTI) Report 05000348/2021012 and 05000364/2021012 | |
IR 05000361/2021002 | San Onofre | 6 July 2021 | NRC Inspection Report 05000361/2021002 and 05000362/2021002 | |
ML21326A251 | 2 July 2021 | Power Plant Engineering Manual, Pre-Study Chapter 1, Heat Transfer and Thermal Hydraulics Basics | ||
ML21180A014 | 30 June 2021 | Guidelines for Characterizing the Safety Impact of Issues, Revision 1 | ||
ML21201A193 | Millstone | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Technical Requirements Manual Index / List of Effective Pages | |
ML21201A182 | Millstone | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | |
ML21201A175 | Millstone | 24 June 2021 | 4 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML21201A146 | Millstone | 24 June 2021 | 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML21174A078 | Browns Ferry | 23 June 2021 | 301 Final RO Written Exam (2-Year Delayed Release) | |
ML21174A094 | Comanche Peak | 23 June 2021 | Reactor Trip on June 7, 2021 - Management Directive 8.3 Screening | |
ML21193A184 | Callaway | 22 June 2021 | Revision OL-25 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML21179A031 | Dresden | 21 June 2021 | 4 to Final Safety Analysis Report, Chapter 8, Electrical Power | |
ML21193A321 | Calvert Cliffs | 16 June 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | |
ML21187A310 | Calvert Cliffs | 16 June 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML21187A308 | Calvert Cliffs | 16 June 2021 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
ML21179A099 | Vogtle | 15 June 2021 | 0 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ENS 55295 | Comanche Peak | 7 June 2021 20:27:00 | Automatic Reactor Trip on Turbine Trip Due to Fault and Fire in the Main Transformer | At 1527 (Central Standard Time) Unit 2 Reactor tripped caused by a turbine trip due to a fault and fire on Unit 2 Main Transformer #1. All Aux Feedwater Pumps started due to steam generator Lo-Lo levels. Unit 2 is being maintained in Hot Standby (Mode 3) in accordance with Integrated Plant Operating Procedure IPO-007B. The Emergency Response Guideline Network has been exited. Decay heat is being rejected to the Main Condenser via the steam dump valves. Fire was extinguished at 1546 without offsite assistance. No major injuries reported and no personnel transported offsite for medical attention. Cause of the fault and fire are under investigation. NRC Resident Inspector has been notified. All rods inserted into the core during the trip. There were no relief valves or safety valves lifted during the transient. The plant is stable in its normal shutdown electrical lineup via the auxiliary transformer with all safety equipment available. Unit 1 was not affected by the transient. |
ML21168A113 | Wolf Creek | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML21168A108 | Wolf Creek | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | |
ML21168A101 | Wolf Creek | 7 June 2021 | 4 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML21174A317 | 2 June 2021 | Transcript of the Advisory Committee on Reactor Safeguards 686th Full Committee Meeting, June 2, 2021, Pages 1-134 (Open) | ||
ML21140A324 | Ginna | 20 May 2021 | R. E. Ginna Nuclear Power Plant - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
W3F1-2021-0035, Technical Requirements Manual Update | Waterford | 18 May 2021 | Technical Requirements Manual Update | |
ML21137A169 | Nine Mile Point | 17 May 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | |
ENS 55259 | Callaway | 14 May 2021 18:00:00 | Individual Fall from Scaffold Ladder - Other Government Agency Notification | At approximately 1300 CDT on 05/14/2021, a contract worker, who was using a scaffold ladder to access their work area on the iso-phase bus duct system for the main transformers at the Callaway plant, fell approximately 27 feet to the ground. An ambulance was dispatched to transport the individual to a local hospital. Union Electric (Ameren Missouri) subsequently learned that the event caused the individual to have a serious injury that required an overnight hospital stay. This event is reportable to OSHA per 29 CFR 1904.39(a)(2) by the contract worker's employer and is reportable to the Missouri Public Service Commission in accordance with Missouri regulation 20 CSR 4240-3.190(3)(A). This notification is being made to the NRC pursuant to 10 CFR 50.72(b)(2)(xi) due to other government notifications that will occur as a result of a situation related to the health and safety of onsite personnel. The NRC Senior Resident Inspector has been notified of this event. The individual was not working in a contamination area. |
IR 05000346/2021001 | Davis Besse | 14 May 2021 | Integrated Inspection Report 05000346/2021001 | |
ML21131A189 | Nine Mile Point | 11 May 2021 | Draft Written Examination and Operating Test Outlines (Folder 2) | |
IR 05000261/2021001 | Robinson | 10 May 2021 | Integrated Inspection Report 05000261/2021001 | |
IR 05000387/2021001 | Susquehanna | 5 May 2021 | Integrated Inspection Report 05000387/2021001 and 05000388/2021001 | |
IR 05000348/2021001 | Farley | 4 May 2021 | Integrated Inspection Report 05000348/2021001 and 05000364/2021001 | |
ML21123A303 | Turkey Point | 3 May 2021 | 301 Exam Report Items - SRO as Given Written Exam | |
ML21123A198 | Nine Mile Point | 3 May 2021 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
ML21209A384 | Summer | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 9, Figure 9.2-9b, Revision 19, Piping System Flow Diagram Demineralized Water | |
ML21209A141 | Summer | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML21209A135 | Summer | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Frontmatter | |
ML21209A122 | Summer | 30 April 2021 | 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | |
ML21133A102 | Limerick | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Sections 3 Thru 5 | |
ML21133A090 | Limerick | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 8, Sections 1 Thru 3 | |
ML21133A080 | Limerick | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Sections 1.1 Though 1.6 | |
ML21252A522 | Limerick | 29 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Fire Protection Evaluation Report. (Redacted) | |
PNP 2021-022, 2020 Annual Non-Radiological Environmental Operating Report | Palisades | 27 April 2021 | 2020 Annual Non-Radiological Environmental Operating Report | |
ML21130A230 | Cooper | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Drawing 3070, Electrical Symbol List | |
ML21130A103 | Cooper | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Section XIII, Conduct of Operations | |
ML21130A069 | Cooper | 21 April 2021 | 0 to Updated Final Safety Analysis Report, Section Viii, Electrical Power Systems | |
AEP-NRC-2021-19, 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | Cook | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary | |
ML21125A576 | Cook | 19 April 2021 | 9 Technical Specification Bases, List of Effective Pages (Unit 2) | |
ML21125A554 | Cook | 19 April 2021 | 0 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML21125A548 | Cook | 19 April 2021 | 2 to Technical Specifications Bases, List of Effective Pages (Unit 1) | |
ML21125A540 | Cook | 19 April 2021 | Rev. 4 to NFPA 805 Fire Protection Program Manual | |
ML21123A241 | Nine Mile Point | 19 April 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML21105A052 | Grand Gulf | 15 April 2021 | EAL Technical Bases Document Revision 1 | |
ML21125A330 | Palisades | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 1, Tables | |
ML21125A312 | Palisades | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems, Sections | |
ML21125A306 | Palisades | 14 April 2021 | 5 to Updated Final Safety Analysis Report, Chapter 8, Figures | |
IR 05000237/2021001 | Dresden | 13 April 2021 | Integrated Inspection Report 05000237/2021001 and 05000249/2021001 | |
ML21103A325 | 13 April 2021 | NRR E-mail Capture - Comments on Draft Nuclear Energy Institute Risk-Informed Process for Evaluations (RIPE) Industry Guidance NEI 2021-01 by NRC RIPE Working Group | ||
ML21137A286 | Arkansas Nuclear | 8 April 2021 | 3_AN2-2021-03 Draft Written Exam | |
ML21134A241 | Arkansas Nuclear | 8 April 2021 | 8_AN2-2021-03 Final Written Exam | |
ML21095A297 | FitzPatrick | 5 April 2021 | Revised Technical Specifications Bases | |
ML21047A314 | Harris | 2 April 2021 | Issuance of Amendment No. 184 Regarding Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times RITSTF Initiative 4B | |
ML21102A354 | Point Beach | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 14, Safety Analysis | |
ML21102A336 | Point Beach | 2 April 2021 | Update to Final Safety Analysis Report, Chapter 8, Introduction to the Electrical Distribution Systems | |
NG-21-0005, NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 | Duane Arnold | 29 March 2021 | NextEra Energy Duane Arnold, LLC - Transmittal of the DAEC Defueled Safety Analysis Report Revision 0 | |
ML21085A026 | Nuclear Energy Institute | 22 March 2021 | NRR E-mail Capture - NEI Draft Industry Guidance to Support Implementation of Nrc'S Risk-Informed Process for Evaluations | |
ML21113A005 | Columbia | 4 March 2021 | CG-2021-02-DRAFT Written Exam | |
ML21098A170 | Columbia | 4 March 2021 | CG-2021-02-FINAL Written Examination | |
ML21050A227 | Limerick | 19 February 2021 | Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) | |
ML22165A327 | Perry | 19 February 2021 | 2021 Perry Ile Administered Written Exam with Reference Handouts-Final | |
ML21096A025 | River Bend | 19 February 2021 | RB-2021-02 Draft Written Exam Comments | |
ML21088A064 | Beaver Valley | 18 February 2021 | Final Written Examination and Operating Test Outlines (Folder 3) | |
ML21047A241 | Oconee | 16 February 2021 | DPO-2019-001, Redacted Differing Professional Opinion (DPO) Case File (Public) | |
ML21271A609 | Fort Calhoun | 14 February 2021 | License Amendment Request (LAR) 21-01, Chapter 8, 10, Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station | |
IR 05000440/2020004 | Perry | 12 February 2021 | Integrated Inspection Report 05000440/2020004 | |
ML21043A207 | Limerick | 12 February 2021 | Handouts to Applicants (Folder 3) | |
ML21070A129 | Monticello | 11 February 2021 | 8 to Updated Safety Analysis Report, Drawings | |
IR 05000483/2020004 | Callaway | 9 February 2021 | CWY2020004-RP-DSB, Callaway Plant - Integrated Inspection Report and Assessment Follow-Up Letter (05000483/2020004) | |
ML21074A331 | Beaver Valley | 7 February 2021 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML20339A570 | 2 February 2021 | Nuclear Power Accidents and Incidents: Lessons for PRA (Uiuc Seminar) | ||
ML21138A805 | 2 February 2021 | PRA Lessons from Ope Uiuc | ||
ML21055A176 | Fermi 07200071 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Drawing 6M721-2135-1, Rev. Bk, Diagram Fire Protection System (Sheet 2) | |
ML21055A072 | Fermi 07200071 | 2 February 2021 | 3 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML20261H462 | 31 January 2021 | U.S Nuclear Regulatory Commission NRC Guidelines for Characterizing the Safety Impact of Issues | ||
ML22166A035 | Perry | 29 January 2021 | 2021 Perry Ile Proposed Written Exam | |
IR 05000338/2020004 | North Anna | 28 January 2021 | Integrated Inspection Report 05000338/2020004 and 05000339/2020004; 07200016/2020002 | |
ML21039A320 | Grand Gulf | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML21039A255 | Grand Gulf | 27 January 2021 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML21088A058 | Beaver Valley | 10 December 2020 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
ML20333A000 | Grand Gulf | 27 November 2020 | Emergency Plan, Revision 81 and Revision 0 of the EAL Technical Bases Document | |
ML20335A142 | Beaver Valley | 23 November 2020 | 8 to Technical Specification Bases Update Status | |
ML20335A141 | Beaver Valley | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20335A136 | Beaver Valley | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | |
ML20335A120 | Beaver Valley | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML20335A125 | Beaver Valley | 23 November 2020 | 5 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
ML20339A221 | Ginna | 20 November 2020 | Technical Specifications Bases, Rev 101 | |
ML20339A182 | Ginna | 20 November 2020 | Fire Protection Program, Revision 18, Volumes I - III | |
ML20339A178 | Ginna | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program, Sections 14.1 Thru 14.6 | |
ML20339A027 | Ginna | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Sections 7.1 Through 7.7 | |
ML20339A020 | Ginna | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 Through 3.7 | |
ML20339A012 | Ginna | 20 November 2020 | 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant, Sections 1.1 Through 1.8 | |
ML20324A703 | Millstone | 19 November 2020 | Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate | |
IR 05000259/2020003 | Browns Ferry | 10 November 2020 | Integrated Inspection Report 05000259/2020003, 05000260/2020003 and 05000296/2020003 | |
L-2020-157, Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | Turkey Point | 5 November 2020 | Supplement to License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors | |
ML20203M269 | 4 November 2020 | IMC1245 Appendix D4 Electrical Advanced Level Training and Qualification Journal | ||
ML21019A574 | Monticello | 3 November 2020 | Initial License Exam Administered Written Exam Key | |
ML21019A209 | Monticello | 3 November 2020 | Initial License Exam Proposed JPMs | |
ML21019A220 | Monticello | 3 November 2020 | Initial License Exam Proposed Written Exam Key | |
ML21019A572 | Monticello | 3 November 2020 | Initial License Exam Administered JPMs | |
ML20323A306 | Watts Bar | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
WBL-20-047, Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) | Watts Bar | 29 October 2020 | Amendment 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Redacted) | |
IR 05000315/2020003 | Cook | 28 October 2020 | Integrated Inspection Report 05000315/2020003 and 05000316/2020003 | |
ML20302A251 | Oconee | 26 October 2020 | File 2A-1 Exam Draft Items Delayed Release | |
ML20121A283 | Farley | 9 October 2020 | Issuance of Amendments 230 and 227 Measurement Uncertainty Recapture Power Uprate | |
ML20309A772 | Mcguire McGuire | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20309A746 | Mcguire McGuire | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables | |
ML20309A735 | Mcguire McGuire | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8A, Tables | |
ML20309A747 | Mcguire McGuire | 8 October 2020 | 2 to Updated Final Safety Analysis Report, Chapter 3, Design Criteria - Structures, Components, Equipment and Systems | |
ML20309A593 | North Anna | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML20309A594 | North Anna | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Frontmatter | |
ML20309A597 | North Anna | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML20309A600 | North Anna | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation | |
ML20309A612 | North Anna | 30 September 2020 | 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power System | |
ML21210A129 | Surry | 30 September 2020 | 2 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted | |
ML20302A323 | Davis Besse | 25 September 2020 | 9 to Fire Hazards Analysis Report, Appendix D, BTP-APCSB 9.5-1, Appendix a Response | |
ML20302A310 | Davis Besse | 25 September 2020 | 9 to Fire Hazards Analysis Report, Section 8, Operating Specifications | |
ML21104A365 | Davis Besse | 25 September 2020 | 3 to Updated Final Safety Analysis Report, Section 8, Electrical Power (Redacted) | |
ML20302A301 | Davis Besse | 25 September 2020 | 9 to Fire Hazards Analysis Report, Section 9, Fire Protection Safety Analysis | |
ML20302A287 | Davis Besse | 25 September 2020 | 9 to Tech Spec Bases | |
ML20302A282 | Davis Besse | 25 September 2020 | 3 to Updated Final Safety Analysis Report, Section 3, Design Criteria - Structures, Components, Equipment, and Systems, Part 3 of 3 | |
ML20302A235 | Millstone | 18 September 2020 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML20322A350 | Ginna | 17 September 2020 | Final Operating Test (Sections a, B, and C) (Folder 3) | |
ML20259A201 | Indian Point | 14 September 2020 | Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes | |
ML20258A282 | Grand Gulf | 14 September 2020 | Submittal of Changes to Emergency Plan Implementing Procedures | |
ML20268A137 | Saint Lucie | 11 September 2020 | Amendment 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses, Vol. 1 | |
ML20268A129 | Saint Lucie | 11 September 2020 | Amendment 26 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems | |
ML20268A128 | Saint Lucie | 11 September 2020 | Amendment 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls | |
IR 05000387/2020002 | Susquehanna | 11 August 2020 | Integrated Inspection Report 05000387/2020002 and 05000388/2020002 | |
IR 05000237/2020002 | Dresden | 10 August 2020 | Integrated Inspection Report 05000237/2020002; 05000249/2020002; and 07200037/2020001 | |
ML20219A683 | 6 August 2020 | Draft Temporary Staff Guidance for Risk-Informed Process for Evaluations | ||
ML20282A786 | South Texas | 29 July 2020 | ST-2020-07 Draft Written Exam | |
ML20282A533 | South Texas | 29 July 2020 | ST-2020-07 Final Written Exams | |
IR 05000397/2020002 | Columbia | 29 July 2020 | Integrated Inspection Report 05000397/2020002 | |
RA-20-0223, Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Harris | 27 July 2020 | Supplement to Application to Revise Harris Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
ML20290A582 | Wolf Creek | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 14, Initial Test Program | |
ML20290A577 | Wolf Creek | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems | |
ML20290A566 | Wolf Creek | 23 July 2020 | Corrected Redacted Version of Rev. 33 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML20329A239 | Ginna | 22 July 2020 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
ML20202A654 | Fort Calhoun | 16 July 2020 | Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report | |
LIC-20-0013, License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654) | Fort Calhoun | 16 July 2020 | License Amendment Request (LAR) 21-01, Response Re Revised Post-Shutdown Decommissioning Activities Report, Chapter 8 2 Updated Environmental Report, File No. 127690-003 (LIC-20-0013, ML 20202A654) | |
ML20303A012 | Millstone | 2 July 2020 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
ML20268B156 | Diablo Canyon | 30 June 2020 | 5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441245, Rev. 29, Sheet 1, Electrical Schematic Diagram Generator Control | |
ML20268B136 | Diablo Canyon | 30 June 2020 | 5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437557-, Rev 39, Sheet 1, Electrical Schematic Diagram Generator Control | |
ML20268B025 | Diablo Canyon | 30 June 2020 | 5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 437558, Rev. 37, Sheet 1, Electrical Schematic Diagram Generator Control | |
ML20268A360 | Diablo Canyon | 30 June 2020 | 5 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20189A089 | Oconee | 29 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20197A084 | 26 June 2020 | NRC-2019-000253 - Resp 5 - Interim. Agency Records Subject to the Request Enclosed. Part 3 of 4 | ||
ML20209A377 | Millstone | 22 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 16, Drawings Incorporated by Reference | |
ML20209A380 | Millstone | 22 June 2020 | 8 to Updated Final Safety Analysis Report, Chapter 8.0, Electrical Systems | |
ML20209A390 | Millstone | 22 June 2020 | Controlled Copy of Technical Requirements Manual Current Through Change No. 199 Updated by Technical Publishing | |
ML20209A401 | Millstone | 22 June 2020 | 3 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report | |
ML20209A402 | Millstone | 22 June 2020 | 3 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | |
ML20209A384 | Millstone | 22 June 2020 | 3 to Updated Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20168A432 | Bellefonte | 16 June 2020 | Final ASP Analysis - Beaver Valley 1 (LER 334-78-043) | |
ET 20-0007, License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers | Wolf Creek | 8 June 2020 | License Amendment Request for Replacement of Engineered Safety Features Transformers with New Transformers That Have Active Automatic Load Tap Changers | |
L-2020-081, Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | Turkey Point | 8 June 2020 | Response to Request for Additional Information Regarding License Amendment Request 264, Adopt Emergency Action Level Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactor | |
ML20233A922 | Arkansas Nuclear | 5 June 2020 | AN1-2020-04 Draft Operating Test | |
ML20156A140 | Point Beach | 4 June 2020 | Final ASP Analysis - Point Beach 2 (LER 301-89-002) | |
ML20156A217 | San Onofre | 4 June 2020 | Final ASP Analysis - San Onofre 1 (LER 206-85-017) | |
ML20204A807 | Arkansas Nuclear | 4 June 2020 | AN1-2020-04 Final Written Exam | |
ML20204A806 | Arkansas Nuclear | 4 June 2020 | AN1-2020-04 Final Op Test | |
ML20150A259 | LaSalle | 4 June 2020 | EPID L-2020-LRO-0020, SUNSI Review of UFSAR Rev 24 and FPR Rev 9 - 008 Chap 08 Electric Power-ML20111A255_Redacted | |
ML20269A406 | Surry | 2 June 2020 | Enclosure 2 - Dominion Energy Surry Power Station Vpdes Permit No. VA0004090: Application for Permit Reissuance - 316(b) 40 CFR 122.21(r)(2)-(13), Part 3 of 3 | |
ML20154K765 | South Texas | 2 June 2020 | Supplemental Response Regarding Bulletin 2012-01 | |
NOC-AE-20003735, Supplemental Response Regarding Bulletin 2012-01 | South Texas | 2 June 2020 | Supplemental Response Regarding Bulletin 2012-01 | |
ML20149K496 | Palisades | 28 May 2020 | Final ASP Analysis - Palisades (LER 255-87-024) | |
ML20149K404 | Maine Yankee | 28 May 2020 | Final ASP Analysis - Maine Yankee (LER 309-88-006) | |
ML20142A530 | Hope Creek | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 1, Introduction & General Description of Plant | |
ML20142A535 | Hope Creek | 21 May 2020 | 4 to Updated Final Safety Analysis Report, Section 8, Electric Power | |
L-20-051, Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2) | Beaver Valley | 20 May 2020 | Technical Specification Bases, Revision 37, Reactor Coolant System (RCS) (Part 2 of 2) | |
ML20140A222 | Waterford | 19 May 2020 | Final ASP Analysis - Waterford (LER 382-95-002) | |
ML20140A221 | Vogtle | 19 May 2020 | Final ASP Analysis - Vogtle 1 (LER 424-90-006) | |
ML20147A022 | Harris | 15 May 2020 | Amendment 63 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | |
ML20147A025 | Harris | 15 May 2020 | Amendment 63 to Final Safety Analysis Report, Chapter 8, Electric Power | |
ML20147A030 | Harris | 15 May 2020 | Amendment 63 to Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
ML20147A027 | Harris | 15 May 2020 | Amendment 63 to Final Safety Analysis Report, Chapter 10, Summary Description | |
ML20135G974 | McGuire | 14 May 2020 | Final ASP Analysis - McGuire 1 (LER 369-91-001) | |
ML20135G963 | Hatch | 14 May 2020 | Final ASP Analysis - Hatch 1 (LER 321-91-001) | |
ML20135G735 | Catawba | 14 May 2020 | Final ASP Analysis - Catawba 2 (LER 414-96-001) | |
ML20135G730 | Byron | 14 May 2020 | Final ASP Analysis - Byron 1 (LER 454-96-007) | |
IR 05000237/2020001 | Dresden | 11 May 2020 | Units, Units 2 and 3 - Integrated Inspection Report 05000237/2020001 and 05000249/2020001 | |
ML20350B584 | 4 May 2020 | NRC-2018-000096 (Formerly FOIA/PA-2018-0003) - Resp 9 - Interim | ||
ML20350B614 | 4 May 2020 | NRC-2018-000103 (Formerly FOIA/PA-2018-0010) - Resp 9 - Interim | ||
ML20118C231 | 4 May 2020 | Draft NRC Guidance for Determining Safety Impact | ||
ML20120A610 | Surry | 30 April 2020 | Report on the Safety Aspects of the Subsequent License Renewal Application Review of the Surry Power Station, Units 1 and 2 | |
ML20170A411 | Fort Calhoun 07100256 | 30 April 2020 | Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.3., Rev. 1, Electrical Systems, Station Distribution | |
ML20170A410 | Fort Calhoun 07100256 | 30 April 2020 | Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.2, Rev. 0, Electrical Systems Network Interconnections | |
ML20170A409 | Fort Calhoun 07100256 | 30 April 2020 | Independent Spent Fuel Storage Installation Updated Decommissioning Safety Analysis Report, DSAR-8.1, Rev. 1, Electrical Systems, Introduction | |
ML20133J938 | South Texas | 29 April 2020 | Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions) | |
ML20106F218 | Three Mile Island | 15 April 2020 | Incident Chronology at TMI from NRC: 1979-2020 | |
IR 05000272/2020010 | Salem | 8 April 2020 | Reissued Temporary Instruction 2515/194 Report 05000272/2020010 and 05000311/2020010 | |
IR 05000275/2020011 | Diablo Canyon | 8 April 2020 | Temporary Instruction 2515/194 Report 05000275/2020011 and 05000323/2020011 | |
ML20105A259 | Clinton | 31 March 2020 | 1 to Updated Safety Analysis Report, Chapter 8, Electric Power | |
ML20077L169 | Salem | 20 March 2020 | Temporary Instruction 2515/194 Report 05000272/2020010 and 05000311/2020010 | |
IR 05000334/2020010 | Beaver Valley | 16 March 2020 | Reissued Temporary Instruction 2515/194 Inspection Report 05000334/2020010 and 05000412/2020010 | |
ML20106E470 | Diablo Canyon | 6 March 2020 | 2020-02-FINAL Outlines | |
ML20106E466 | Diablo Canyon | 6 March 2020 | 2020-02-DRAFT Outlines | |
ML20106E463 | Diablo Canyon | 6 March 2020 | 2020-02-DRAFT Operating Test | |
ML20097A446 | Diablo Canyon | 6 March 2020 | 2020-02-FINAL Operating Test | |
GNRO-2020/00026, 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related | Grand Gulf | 28 February 2020 | 3 to Emergency Plan Implementing Procedure 10-S-01-1, Activation of the Emergency Plan Safety Related | |
ML20078L337 | Davis Besse | 27 February 2020 | Written Exam | |
ML20077J972 | Davis Besse | 27 February 2020 | Proposed Written Exam | |
ML20058D181 | Beaver Valley | 24 February 2020 | Temporary Instruction 2515/194 Inspection Report 05000334/2020010 and 05000412/2020010 | |
ML20049G020 | 24 February 2020 | ASP Program Summary Description (Revision 1) | ||
ML21271A215 | Fort Calhoun | 14 February 2020 | License Amendment Request (LAR) 21-01, Chapter 5 11 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station | |
ML21271A192 | Fort Calhoun | 14 February 2020 | License Amendment Request (LAR) 21-01, Chapter 3, 17, Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station | |
ML21271A185 | Fort Calhoun | 14 February 2020 | License Amendment Request (LAR) 21-01, Chapter 2 2 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station | |
ML21271A145 | Fort Calhoun | 14 February 2020 | License Amendment Request (LAR) 21-01, Chapter 1 11 Radiation Safety and Control Services, Tsd 20-001, Historical Site Assessment for Fort Calhoun Station - 1 | |
RA-20-0050, Emergency Action Levels CSD-EP-RNP-0101-02, Revision 0 | Robinson | 13 February 2020 | Emergency Action Levels CSD-EP-RNP-0101-02, Revision 0 | |
ML20058H618 | Grand Gulf | 10 February 2020 | GG-2020-02 Draft Written Examination | |
ML20274A105 | Calvert Cliffs | 7 February 2020 | Draft Written Examination and Operating Test Outlines (Folder 2) | |
ML20274A066 | Calvert Cliffs | 7 February 2020 | Draft Operating Test (Section a, Section B, Section C) (Folder 2) | |
IR 05000400/2019004 | Harris | 6 February 2020 | Integrated Inspection Report 05000400/2019004 | |
ML20043E123 | Indian Point | 5 February 2020 | Declaration of George W. Heitzman in Support of New York Petition | |
ML19266A072 | Saint Lucie | 27 January 2020 | Issuance of Amendment Nos. 250 and 202 Regarding Technical Specification Changes to Allow the Performance of Selected Emergency Diesel Generator Surveillance Requirements During Power Operation | |
ML20079J095 | River Bend | 22 January 2020 | Emergency Implementation Procedure 2-001 Revision 28 | |
ML20021A271 | 21 January 2020 | Final OPC Backfit Analysis Risk Assessment | ||
ML20015A433 | Quad Cities | 15 January 2020 | Revision 24 to Fire Protection Report, Volume 1 - Redacted | |
ML20023A020 | Arkansas Nuclear | 15 January 2020 | Rev. 45 to Emergency Plan and Emergency Plan Implementing Procedure | |
IR 05000397/2019003 | Columbia | 9 January 2020 | Revised Integrated Inspection Report 05000397/2019003 | |
ML19317F647 | 7 January 2020 | IMC 0611 Power Reactor Inspection Reports | ||
ML19351D276 | Nuclear Energy Institute 99902028 | 31 December 2019 | NEI 00-01, Revision 4, Guidance for Post Fire Safe Shutdown Circuit Analysis. | |
ML19360A020 | Surry | 27 December 2019 | SER 2019-12-23 for ADAMS | |
L-12-001, Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System | Browns Ferry Watts Bar Sequoyah | 26 December 2019 | Revised Response to NRC Bulletin 2012-01, Design Vulnerability in Electrical Power System | |
ML20007E359 | 05200001 05200045 | 20 December 2019 | GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 20 - Question and Response Guide | |
ML20007E351 | 05200001 05200045 | 20 December 2019 | GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 16 - Technical Specifications Bases | |
ML20007E348 | 05200001 05200045 | 20 December 2019 | GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 15 - Accident and Analysis | |
ML20007E338 | 05200001 05200045 | 20 December 2019 | GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 09 - Auxiliary Systems | |
ML20007E327 | 05200001 05200045 | 20 December 2019 | GE-Hitachi ABWR Design Control Document Tier 1 & 2, Rev. 7 - Chapter 01 - Introduction and General Description of Plant | |
IR 05000456/2019011 | Braidwood | 19 December 2019 | NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative... in Electric Power Systems (NRC Bulletin 2012-01) Report 05000456/2019011 and 05000457/2019011 | |
CNL-19-122, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights | Browns Ferry | 17 December 2019 | Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights | |
L-2019-203, License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | Turkey Point | 6 December 2019 | License Amendment Request 264, Adopt Emergency Action Level (EAL) Scheme Described in NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. | |
ML19336C709 | Point Beach | 2 December 2019 | NRC Inspection of Temporary Instruction 2515/194, Inspection of the Licensee'S Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (DRS-A.Dahbur).. | |
ML19329A084 | 22 November 2019 | Federal Respondents' Combined Motion to Dismiss and Response to Petitioner'S Stay Motion (DC Cir.)(Case No. 19-1198) - 11-22-19 | ||
ML20209A032 | Callaway | 13 November 2019 | Rev. OL-24 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant | |
ML20009C432 | 7 November 2019 | Transcript of the Advisory Committee on Reactor Safeguard 668th Full Committee Meeting - November 7, 2019 (Open) | ||
IR 05000289/2019003 | Three Mile Island | 6 November 2019 | Integrated Inspection Report 05000289/2019003 | |
IR 05000483/2019003 | Callaway | 5 November 2019 | Integrated Inspection Report 05000483/2019003 | |
IR 05000275/2019003 | Diablo Canyon | 30 October 2019 | Integrated Inspection Report 05000275/2019003 and 05000323/2019003 | |
ML19303C894 | Columbia | 30 October 2019 | Integrated Inspection Report 05000397/2019003 | |
ML19303B425 | Pilgrim | 28 October 2019 | Transport Room (Motion for Stay Pending Appellate Review)(Dc Cir.)(Case No. 19-1198) 10-28-19 | |
ML20055E017 | Nine Mile Point | 28 October 2019 | Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) | |
ML19298B835 | Turkey Point | 25 October 2019 | Integrated Inspection Report 05000250/2019003 and 05000251/2019003 | |
RA-19-0386, Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 | Robinson | 24 October 2019 | Response to Request for Additional Information (RAI) Regarding License Amendment Request Proposing to Revise Technical Specification 3.8.2, AC Sources - Shutdown, Surveillance Requirement 3.8.2.1 | |
IR 05000250/2019013 | Turkey Point | 22 October 2019 | NRC Temporary Instruction 2515/194 Inspection Report 05000250/2019013 and 05000251/2019013 | |
ML19324C991 | Browns Ferry | 4 October 2019 | Amendment 28 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted | |
ML19298B485 | Browns Ferry | 4 October 2019 | Amendment 28 to Updated Final Safety Analysis Report, Appendix O, Aging Management Programs | |
L-2019-111, Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts | Saint Lucie | 30 September 2019 | Attachments 1 Through 5: Evaluation of Proposed Changes, EAL Technical Bases Document, Mark-Up of EAL, EAL Comparison Matrix and Emergency Action Level Matrix Wall Charts | |
ML19205A206 | Peach Bottom | 24 September 2019 | Summary Report for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review | |
ML19269B734 | Surry | 19 September 2019 | Subsequent License Renewal Application - Response to Requests for Additional Information - Sets 3 and 4 Revised SLRA Mark-Ups | |
ML19309E623 | 19 September 2019 | Transcript of the Advisory Committee on Reactor Safeguards Us Apwr Sc Meeting - September 19, 2019 (Open) | ||
ML20258A071 | Waterford | 11 September 2019 | 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted | |
ML19261A329 | La Crosse | 29 August 2019 | Boiling Water Reactor Final Status Survey Final Report - Phase 1 | |
ML19249B774 | Millstone Surry North Anna 07200002 07200055 | 29 August 2019 | Enclosure 5 - Surry Power Station EAL Technical Bases Document Final (Updated) | |
ML19249B772 | Millstone Surry North Anna 07200002 07200055 | 29 August 2019 | Enclosure 4 - North Anna Power Station, EAL Technical Bases Document Final (Updated) | |
ML19249B768 | Millstone Surry North Anna 07200002 07200055 | 29 August 2019 | Enclosure 3 - Millstone Power Station EAL Technical Bases Documents Final (Updated) | |
ML19240A829 | Farley | 28 August 2019 | NRC Temporary Instruction 2515/194 Inspection of the Licensee'S Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electric Power Systems (NRC Bulletin 2012-01) | |
ML19261A338 | La Crosse | 28 August 2019 | Boiling Water Reactor Final Status Survey Release Record Survey Unit L1-SUB-LES | |
ML18277A110 | Browns Ferry Watts Bar Sequoyah | 27 August 2019 | Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection | |
ML19239A035 | Quad Cities | 23 August 2019 | NRC-2019-000303 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
ML19246A718 | FitzPatrick | 23 August 2019 | Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis | |
ML18043A807 | 19 August 2019 | IMC 0611 Power Reactor Inspection Reports | ||
ML19198A001 | Browns Ferry | 13 August 2019 | Issuance of Amendment Nos. 308, 331, and 291 to Extend Implementation Due Date for Modifications 102 and 106 Related to NFPA 805 (Eid L-2019-LLA-0140) | |
IR 05000237/2019002 | Dresden | 8 August 2019 | Integrated Inspection Report 05000237/2019002; 05000249/2019002; and 07200037/2019001 | |
IR 05000338/2019002 | North Anna | 5 August 2019 | Integrated Inspection Report 05000338/2019002 and 05000339/2019002; 07200056/2019001 | |
IR 05000275/2019010 | Diablo Canyon | 1 August 2019 | Design Basis Assurance Inspection (Teams) Inspection Report 05000275/2019010 and 05000323/2019010 | |
IR 05000397/2019002 | Columbia | 1 August 2019 | Integrated Inspection Report 05000397/2019002 and 05000397/2019012 | |
IR 05000254/2019002 | Quad Cities | 31 July 2019 | Integrated Inspection Report 05000254/2019002 and 05000265/2019002 | |
ML19070A308 | 30 July 2019 | OpESS 2019-01 Commercial Grade Dedication Procurement and Design Control | ||
IR 05000255/2019002 | Palisades | 26 July 2019 | Integrated Inspection Report 05000255/2019002 | |
CNL-19-070, TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor | Browns Ferry | 3 July 2019 | TVA Request for Extension of Implementation Due Dates of Modifications 102 and 106 Related to NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor | |
L-2019-118, Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | Saint Lucie | 28 June 2019 | Response to Request for Additional Information Regarding License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation | |
ML19126A030 | Mcguire McGuire | 28 June 2019 | Issuance of Amendments to Technical Specification 3.8.1, AC Sources-Operating | |
AEP-NRC-2019-18, License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank | Cook | 27 June 2019 | License Amendment Request to Delete Technical Specification Surveillance Requirement 3.8.1.20, Regarding Diesel Generator Operation When Connected to Its Load Test Resistor Bank | |
ML19162A414 | 13 June 2019 | 01 Fpra Course Description | ||
ML19168A028 | Surry | 10 June 2019 | (Sps), Units 1 and 2 - Supplement to Subsequent License Renewal Application Change Notice 3 | |
ML19255F523 | Summer | 31 May 2019 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses |