April 13, 2021

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - INTEGRATED INSPECTION REPORT 05000237/2021001 AND 05000249/2021001

Dear Mr. Rhoades:

On March 31, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Dresden Nuclear Power Station, Units 2 and 3. On April 6, 2021, the NRC inspectors discussed the results of this inspection with Mr. P. Karaba, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Kenneth R. Riemer, Chief Branch 1 Division of Reactor Projects

Docket Nos. 05000237 and 05000249 License Nos. DPR-19 and DPR-25

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000237 and 05000249

License Numbers:

DPR-19 and DPR-25

Report Numbers:

05000237/2021001 and 05000249/2021001

Enterprise Identifier: I-2021-001-0033

Licensee:

Exelon Generation Co., LLC

Facility:

Dresden Nuclear Power Station, Units 2 and 3

Location:

Morris, IL

Inspection Dates:

January 01, 2021 to March 31, 2021

Inspectors:

K. Barclay, Reactor Inspector

J. Corujo-Sandin, Senior Reactor Inspector

M. Domke, Resident Inspector

R. Elliott, Resident Inspector

A. Nguyen, Senior Resident Inspector

C. Phillips, Project Engineer

M. Porfirio, Illinois Emergency Management Agency

Approved By:

Kenneth R. Riemer, Chief

Branch 1

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Dresden Nuclear Power Station, Units 2 and 3, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Unit 2 began the inspection period at rated thermal power. On March 13, 2021, the unit was down powered to 77 percent to perform a quarterly control rod sequence exchange and routine testing. The unit was returned to rated thermal power on March 14, 2021, and remained at or near rated thermal power for the remainder of the inspection period.

Unit 3 began the inspection period at rated thermal power. On March 6, 2021, the unit was down powered to 55 percent to perform a quarterly control rod sequence exchange, conduct control rod drive testing, and repair a main turbine control valve cable. The unit was returned to rated thermal power on March 7, 2021, and remained at or near rated thermal power for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19),resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of extreme low temperatures from February 5, 2021 through February 12, 2021 for the following systems:
  • Safety-related secondary-side instrumentation
  • Fire protection system

Impending Severe Weather Sample (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather winter on January 26, 2021

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 3 turbine building closed cooling water (TBCCW) system on January 19, 2021
(2) Unit 3 station blackout (SBO) diesel generator system on January 27, 2021
(3) Unit 2 isolation condenser (IC) and makeup system on March 1, 2021

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) Emergency diesel generators the weeks of March 8 - 12 and March 22 - 26, 2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone (FZ) 8.2.6.C, Unit 2/3 heat exchanger area, Elev. 534 on January 15, 2021
(2) FZ 8.2.1.A, Unit 2 condensate pumps, Elev. 469 and FZ 8.2.2.A, Unit 2 CCSW pumps, Elev. 495 on January 15, 2021
(3) Fire hose station compensatory measures due to Unit 2 turbine building fire header isolation on January 15, 2021
(4) FZ 1.1.2.2, Unit 2 reactor ground floor, Elev. 517' on February 9, 2021
(5) FZ 1.1.2.5.A, Unit 2 isolation condenser area, Elev. 589' on February 9, 2021
(6) FZ 6.2, auxiliary electric equipment room (AEER), Elev. 517' on March 1, 2021

71111.06 - Flood Protection Measures

Cable Degradation (IP Section 03.02) (1 Sample)

The inspectors evaluated cable submergence protection in:

(1) Manhole 8 after cables for Transformer 13 failed due to age-related degradation and submergence

71111.07A - Heat Sink Performance

Annual Review (IP Section 03.01) (1 Sample)

The inspectors evaluated readiness and performance of:

(1) 3A TBCCW heat exchanger

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated an out-of-the-box scenario and licensee evaluation of operator performance on February 23, 2021

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Unit 2 and Unit 3 high pressure cooling injection (HPCI) systems

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Secondary containment breach during fire protection system repair during the week of February 8, 2021
(2) Planned elevated station risk during Unit 2 and Unit 3 HPCI maintenance windows during the weeks of February 22, 2021, and February 29, 2021
(3) Emergent work for Unit 2 Digital Electro-Hydraulic Control (DEHC) pressure transmitter sheared sensing line A during the week of March 8, 2021
(4) Planned elevated station risk during Unit 2 Division 1 ECCS work window during the week of March 29, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Unit 3 station blackout diesel generator air regulator failure on January 6, 2021
(2) Unit 2 HPCI room temperature transmitter failure on February 1, 2021 (3)3B LPCI/CCSW heat exchanger tube side pressure low on February 24, 2021
(4) Unit 2 HPCI gland seal condenser level high control room alarm on February 23, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Unit 2 DEHC modification to input temporary point into pressure controller for failed 2

'A' throttle pressure transmitter on March 12, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) DOS 0300-01, Unit 3 control rod exercising after rod select matrix replacement on January 23, 2021
(2) DOS 6620-07, Unit 2 station blackout diesel generator surveillance test after maintenance window on January 28, 2021
(3) Unit 3 HPCI comprehensive pump test and leakage checks after maintenance window per Work Order (WO) 4894499
(4) Unit 2 emergency diesel generator post-maintenance run and operability surveillance after maintenance window per WO 5079087 and 1823439
(5) Unit 2 HPCI comprehensive pump test and leakage checks after maintenance window per WO 4903464

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) DIS 0700-21, Unit 2 local power range monitor alarm calibration on February 8, 2021
(2) DOS 1500-02, Unit 2 containment cooling service water pump test and In-service test on March 17, 2021
(3) DOS 6600-01, Unit 2/3 emergency diesel generator monthly test for In-service testing (IST) on March 24, 2021

Inservice Testing (IP Section 03.01) (1 Sample)

(1) DOS 1100-04, Unit 3 'A' standby liquid control quarterly/comprehensive pump test for In-service testing (IST) on February 4, 2021

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Focused area drill in technical support center (TSC), first quarter

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

IE01: Unplanned Scrams per 7000 Critical Hours Sample (IP Section 03.01)===

(1) Unit 2 (January 1, 2020 - December 31, 2020)
(2) Unit 3 (January 1, 2020 - December 31, 2020)

IE03: Unplanned Power Changes per 7000 Critical Hours Sample (IP Section 03.02) (2 Samples)

(1) Unit 2 (January 1, 2020 - December 31, 2020)
(2) Unit 3 (January 1, 2020 - December 31, 2020)

IE04: Unplanned Scrams with Complications (USwC) Sample (IP Section 03.03) (2 Samples)

(1) Unit 2 (January 1, 2020 - December 31, 2020)
(2) Unit 3 (January 1, 2020 - December 31, 2020)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On April 6, 2021, the inspectors presented the integrated inspection results to Mr. P. Karaba, Site Vice President, and other members of the licensee staff.

THIRD PARTY REVIEWS

The inspectors reviewed the Institute on Nuclear Power Operations report that was issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

4400717

'A' FLEX Building Heater not Working

2/06/2021

4400777

Reserve Auxiliary Transformer (TR-32) Trouble

2/07/2021

4400786

Unit 2 Stator Water Loop Seal Vent Potentially Blocked

2/07/2021

4400797

Main Transformer 3 Trouble

2/07/2021

4400829

Unit 3 Stator Water Drain Lower Sight Glass not Full of

Water

2/06/2021

Procedures

DOS 0010-22

Preparation for Cold Weather Operations for Unit 2

DOS 0010-25

Preparation for Cold Weather Operations for Unit 3

OP-DR-108-111-

1004

Cold Weather Strategy

71111.04

Corrective Action

Documents

4398456

U3 SBO Isolimiter Noise

01/28/2021

4400510

Elevated Boron Additive Level in Engine Oil

2/05/2021

4410280

2-6600, Unit 2 EDG Turbo Oil Circulating Pump Leak

03/20/2021

Procedures

DOP 1300-E1/M1

Unit 2 Isolation Condenser System Checklist

DOP 3800-M1

Unit 3 Turbine Building Closed Cooling Water System

Checklist

DOP 6600-E1

Unit 3 Standby Diesel Generator

DOP 6600-E1

Unit 2 Standby Diesel Generator

DOP 6600-E2

Unit 2/3 Standby Diesel Generator

DOP 6600-M1

Unit 2 Standby Diesel Generator

DOP 6600-M1

Unit 3 Standby Diesel Generator Checklist

DOP 6600-M2

Unit 2/3 Emergency Diesel Generator Checklist

DOP 6620-16

SBO DG 2(3) Preparation for Standby Readiness

DOP 6620-E2

Unit 3 Station Blackout Electrical Checklist

71111.05

Corrective Action

Documents

4395860

Unit 2 Low Pressure Heater Bay Fire Piping Leak Degrading

01/14/2021

4395944

Leak on 2A Control Rod Drive Pump from Fire Header Leak

01/14/2021

Corrective Action

Documents

Resulting from

Inspection

4396264

NRC Plant Walkdown

01/15/2021

Fire Plans

FZ 1.1.2.2

Unit 2 Reactor Ground Floor, Elev. 517'

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FZ 1.1.2.5.A

Unit 2 Isolation Condenser Area, Elev. 589'

FZ 6.2

Unit 2/3 Computer Room & Auxiliary Electrical Room

Elevation 517'

FZ 8.2.1.A

Unit 2 Condensate Pumps, Elev. 469 and FZ 8.2.2.A, Unit 2

CCSW Pumps, Elev. 495

and 04

FZ 8.2.6.C

Unit 2/3 Heat Exchanger Area, Elev. 534

Miscellaneous

Logs

Fire Hose Station Compensatory Measures Due to Unit 2

Turbine Building Fire Header Isolation

01/15/2021

71111.06

Corrective Action

Documents

4389709

Smoke Reported from Manhole 8

2/11/2020

4396905

Bus 14 and Bus 15 Tie ACB Continuously Cycling Open and

Closed

01/20/2021

Work Orders

5107462

Repair Damaged Faulted Cables in Manhole 8

01/15/2021

71111.07A

Corrective Action

Documents

4397248

Abbreviated Maintenance for TBCCW Heat Exchanger

Year PM

01/21/2021

4397298

3A TBCCW Heat Exchanger Endbell Leak

01/21/2021

4397520

3A TBCCW Heat Exchanger Eddy Current Test Results

01/21/2021

Engineering

Evaluations

418217

Evaluation to Use Replacement Channel Cover Without

"Plasti-cor" Coating

Work Orders

1818634

3A TBCCW Heat Exchanger Eddy Current Test and

Clean/Inspect

01/21/2021

71111.11Q Miscellaneous

Out-of-the-Box Evaluation

2/23/2021

71111.12

Corrective Action

Documents

27061

Leak from Unit 2 HPCI Main Pump

03/06/2019

4317672

HPCI Work Order Instructions Altered Outside of Process

2/13/2020

4350983

DTP 09: Leak on HPCI Main Pump Seal

06/17/2020

4406431

DTP 09: Leak on Unit 2 HPCI Main Pump Seal

03/03/2021

4406436

Unit 2 HPCI Turbine Small Oil Leak

03/03/2021

Engineering

Changes

397957

Replace Unit 3 HPCI Signal Converter and Flow Indicating

Controller

Miscellaneous

High Pressure Injection Health Group Report and Action

Plan

2/05/2021

Work Orders

4896331

Leak from Unit 2 Main HPCI Pump

03/05/2020

5115257

Replace HPCI Pump (Main) South Facing Seal

03/04/2021

71111.13

Corrective Action

4405642

Water Near 2-2202-19B Rack

03/01/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

4407517

Unit 2 DEHC Throttle Pressure Transmitter Failed

03/09/2021

Corrective Action

Documents

Resulting from

Inspection

4412434

2/3-4699-189 Tank A2 Drain Valve Has Air Leak

03/29/2021

4412443

NRC Plant Walkdown

03/29/2021

Engineering

Evaluations

445515

Evaluation of Tophat Needed to Support Maintenance of the

Secondary Containment During Replacement of Line

2-4101-6"

Procedures

DAP 07-44

Control of Temporary Openings in Secondary Containment

During Performance of Work Packages, Surveillances, or

Other Procedures

OP-AA-108-117

Protected Equipment Program

OP-DR-201-012-

1001

Dresden On-Line Fire Risk Management

WC-AA-101

On-line Work Control Process

WC-AA-101-1006

On-Line Risk Management and Assessment

71111.15

Corrective Action

Documents

2138

Unexpected HPCI Alarm (Gland Seal Condenser)

2/20/2003

4388991

3B LPCI Heat Exchanger Tube Side Pressure Reading 0#

2/09/2020

4394322

Unit 3 SBO Engine B Air Regulator Failed

01/06/2021

4399538

Found Temperature Transmitter 22-5703-27A Out of

Tolerance and Unable to Calibrate

2/01/2021

4404311

Unexpected Main Control Room Alarm: HPCI Gland Seal

Condenser Level High

2/23/2021

4404340

3B LPCI HX Tube Side Inlet Pressure Reading 0

2/24/2021

848148

HPCI Gland Seal Condenser Level High Alarm

11/21/2008

Drawings

2E-2575BY

Schematic Diagram Control Room Annunciator Panel 923-5

E

Engineering

Evaluations

2944

Containment Cooling Service Water (CCSW) System Water

Hammer Loss of Keep Fill Analysis

373115

Evaluation of High-Level Alarm in the HPCI Gland Seal

Condenser

11/21/2008

Procedures

DAN 902(3)-3 H-

HPCI Gland Seal Condenser Hotwell Level HI/LO

DAN 923-5 H-1

Unit 2 HPCI Pump Area Temperature High

71111.18

Engineering

633771

Temporary Force Unit 2 DEHC Logic Point to Inhibit

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Evaluations

Automatic Control Transfer from Dome to Throttle Control

71111.19

Corrective Action

Documents

4398523

Unit 2 SBO Surveillance Non-Acceptance Criteria Data out

of Nominal Band

01/28/2021

4398770

2B SBO Engine Duplex Fuel Strainer Differential Pressure

High, Recommend Cleaning

01/28/2021

4398772

2A SBO Engine Duplex Fuel Strainer Differential Pressure

High, Recommend Cleaning

01/28/2021

4398775

Unit 2 SBO Engine A Coolant at Low End of Band

01/28/2021

4404311

Unexpected Main Control Room Alarm: HPCI Gland Seal

Condenser Level High

2/23/2021

4404323

Unit 3 HPCI Room Cooler

2/23/2021

4406433

DTP 09: Unit 2 HPCI Pump Leak from Casing Bolt

03/03/2021

4406434

Unit 2 HPCI Cooling Water PCV Oscillating

03/03/2021

4407817

Unit 2 Diesel Overload Alarm will not Reset

03/10/2021

4407968

Unexpected Alarm: Unit 3 125V DC Ground During Unit 2

EDG Run

03/10/2021

Engineering

Evaluations

373115

Evaluation of High-Level Alarm in the HPCI Gland Seal

Condenser

11/21/2008

Procedures

DOS 0300-01

Control Rod Exercise

Work Orders

23439

Unit 2 Diesel Generator Operability Run

03/10/2021

4598543-02,

4598541-02, and

4598544-02

PMT - Rebuild/Replace Air Start Regulating Valves on SBO

Diesel

01/27/2021

4894499

Unit 3 HPCI Pump Comprehensive Operability Test and IST

Surveillance

2/24/2021

4903464

HPCI Pump Comprehensive Operability Test and IST

Surveillance

03/03/2021

5079087

Unit 2 Diesel Generator Fast Start Operability Surveillance

03/10/2021

5090298

Unit 2 Station Blackout Diesel Generator Surveillance Test

01/28/2021

857684-15

Replace the Unit 3 Rod Select Matrix Module

01/21/2021

71111.22

Corrective Action

Documents

4381265

LPRM 24-09C Downscale

10/31/2020

4401381

Found LPRM Alarm Calibration out of Tolerance

2/08/2021

4401382

Found LPRM Alarm Calibration out of Tolerance

2/09/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

4401384

Found LPRM Alarm Calibration out of Tolerance

2/08/2021

Procedures

DIS 0700-21

Local Power Range Monitor Alarm Calibration

DOS 1100-04

Standby Liquid Control System Quarterly/Comprehensive

Pump Test for the Inservice Testing (IST) Program

DOS 1500-02

Containment Cooling Service Water Pump Test and

Inservice Test

DOS 6600-01

Diesel Generator Surveillance Test

145

71114.06

Miscellaneous

Focused Area Drill for Technical Support Center (TSC), First

Quarter 2021

71151

Miscellaneous

Operator Logs

01/01/2020 -