July 19, 2021

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION TEAM INSPECTION (FPTI) REPORT 05000348/2021012 AND 05000364/2021012

Dear Mr. Kharrl:

On July 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant and discussed the results of this inspection with Robert Norris and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000348 and 05000364

License Numbers:

NPF-2 and NPF-8

Report Numbers:

05000348/2021012 and 05000364/2021012

Enterprise Identifier: I-2021-012-0007

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Joseph M. Farley Nuclear Plant

Location:

Columbia, AL

Inspection Dates:

June 14, 2021 to July 02, 2021

Inspectors:

J. Dymek, Reactor Inspector

W. Monk, Senior Reactor Inspector (Team Lead)

J. Montgomery, Senior Reactor Inspector

D. Strickland, Reactor Inspector

Approved By:

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection team inspection at Joseph M. Farley Nuclear Plant, in accordance with the Reactor Oversight Process (ROP). The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin tele-work. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

===71111.21N.05 - Fire Protection Team Inspection (FPTI)

Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===

The inspectors verified that components and systems will function as required to support the credited functions stated for each sample. Additional inspection considerations were located in the fire hazards analysis (FHA) or nuclear safety capability assessment (NSCA).

(1) SSC #1 (Fire Prevention) - Combustible Controls and Hot Work Administrative Programs
(2) SSC #2 (Detection/Suppression) - Deluge Fixed Spray Water Suppression Systems (Switchyard and Turbine Building)
(3) SSC #3 (SSD) - Comprehensive Non-Power Operations Review of the RHR System
(4) SSC #4 (SSD) - Comprehensive Safe and Stable Condition Review of the CCW System

a. Review deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.

b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA)analysis and SSA.

c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.

d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.

e. Perform a walkdown inspection to identify equipment alignment discrepancies.

Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.

f. Ensure the selected SSCs that are subject to aging management review (AMR)pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify that the licensees aging management program activities (such as, Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.

g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dispositioned the operating experience in accordance with their processes.

Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)

The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis (CLB). If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.

(1) Fire Protection Administrative Program #1 - NFPA 805 Monitoring Program
(2) Fire Protection Administrative Program #2 - Fire Brigade Drills and Training

Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)

The inspectors verified the following:

a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.

b. The adequacy of the design modification, if applicable.

c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.

d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.

e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.

(1) FPP Changes / Modification #1 - Design Change Package (DCPs) SNC 1054443/1054444/1054445/1054446 Unit 2 AUX & Turbine Building Class B Fire Protection Modifications
(2) FPP Changes / Modification #2 - DCP SNC 968080 Fire Protection Change Evaluation for DECP Install Line Stops on the Fire Pump Discharge Lines

INSPECTION RESULTS

No findings of more than minor significance were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained nor documented in this report.

  • On July 1, 2021, the inspectors presented the Fire Protection Team Inspection (FPTI)results to Robert Norris, Plant Manager and other members of the licensee staff during the Exit Meeting.

THIRD PARTY REVIEWS

Inspectors reviewed ATC-Combustion Engineering Solutions Investigation of the Failure of a Section of Fire Protection Piping at Farley Nuclear Plant during the inspection period. No other third-party documentation was reviewed during the inspection.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.05 Calculations

2380-1102-PGK-01

Evaluation of MOV Pressure Boundaries for IN 92-

Hot-Short Events

SE-C051326701

Farley Nuclear Power Plant Units 1 and 2 NFPA

805 Non-Power Operations

06/09/2020

SE-C051326701-003

FNP NSEL and Safe and Stable Fault Trees

06/09/2020

SE-C051326701-011

FNP Recovery Action Feasibility Evaluation

07/27/2012

SE-C051326701-012

NFPA 805 Defense in Depth (DID) Recovery

Actions Credited in Calculation SE-C051326701-

008

09/05/2012

Corrective Action

Documents

CAR 266711

Attach manufacturer documentation with regards to

3-hour fire door rating

09/15/2016

Corrective Action

Documents

Resulting from

Inspection

CR 10805916

2T-12A SGFP Deluge Nozzles Partially Blocked by

Installed Tarp/Catch Bag

06/15/2021

CR 10806250

System 2A-27 Indicating Light Non-Functional

06/16/2021

CR 10806253

Fire Brigade Ready Room Trash Can with Self-

Extinguishing Lid was Full

06/16/2021

CR 10806280

Lumber on U2 Turbine Deck with No Transient

Combustible Permit

06/16/2021

CR 10806305

FNP-1-AOP-28.1 Attachment 9 has Numbering and

Formatting Issues with Response Obtained and

RNO Steps

06/16/2021

CR 10806350

Procedure Enhancement Suggestions - Hot Work

Procedure

06/16/2021

CR 10806359

Unsecured Ladder Found in Turbine Building

(Personal Safety)

06/16/2021

CR 10806366

Pressure Indicator Gauge Broken on Motor Driven

Fire Pump

06/16/2021

CR 10806369

  1. 2 Fire Water Storage Tank Level Control Valve

Cycling

06/16/2021

CR 10806591

U2 TB Battery RM Louver Found Closed (H2 B/U

Concern)

06/17/2021

CR 10806623

Corrosion Found on Pre-action Header in the U2

06/17/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

CCW Room

CR 10806654

U2 Turbine Building Damper out of Normal Position

06/17/2021

CR 10806685

Fire Extinguishers in Equipment Room 115

06/17/2021

CR 10807352

NRC Inspection Lessons Learned - Walkdowns /

Assessments

06/21/2021

CR 10809299

AOP-28.1 Version Update Needed

06/29/2021

CR 10809409

Light Out on Cardox Panel

06/29/2021

CR 10809789

Unsecured Nitrogen Dewars Found on U1 155

06/30/2021

CR 10809791

Evaluate and revise FNP-ACP-35.3 Attachment 2

06/30/2021

CR 10809794

(NRC Identified) Sound Powered Phone Jacks

Degraded

06/30/2021

CR 10809936

DDFP Overspeed Test Enhancement

07/01/2021

Drawings

D 170347

Farley NPP Unit 1 Fire Protection Piping-Auxiliary

Building Below El. 121'.

Revision 16

D-200184

P&ID Fire Protection Main Transformers & Valve

House

2/29/1978

D-205002

P&ID for Component Cooling Water System

31.0

D170345

Fire Protection Piping Diesel Engine Driven Pumps

Fuel & Exhaust Piping

Revision 1

D170366

Fire Protection P & ID Pump House & Yard Mains

Version 1.0

D200-201 Sheet #1

Joseph M. Farley Nuclear Plant Unit #2 Cooling

Tower Layout

Version 5.0

D200-201 Sheet #2

Joseph M. Farley Nuclear Plant Cooling Tower

Layout

Version 1.0

D205041

P&ID for Residual Heat Removal System

20.0

U160130

Fire Protection-Fuel System for Diesel Driven Fire

Pumps

Revision 2

U162363

Fire Protection-Sprinkler System for Main Power

Transformer 1TR66

Version 1.0

U262255

Fan Data-Turbine Building Battery room

2/29/1975

Engineering

Changes

SNC 1054445

U2 Auxiliary & Turbine Building Class B Fire

Protection Modifications

Revision 0

SNC 1054444

U2 Auxiliary & Turbine Building Class B Fire

Protection Modifications

Revision 0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SNC 1054446

U2 Auxiliary & Turbine Building Class B Fire

Protection Modifications

Revision 0

SNC-1150857

1B RCP Seal Leak-Off Line Modification

4/6/2021

SNC471156

NFPA 805: IN 92-18 U1 MOV Hot Short Failure

MOD

03/19/2015

SNC471157

NFPA 805: IN 92-18 U2 MOV Hot Short Failure

MOD

11/06/2014

Engineering

Evaluations

CAR 278955LOE

Cause Determination Report Summary - Fire

Protection Main Rupture

Revision 1

DCP SNC1054443

Unit 2 AUX & TB Class B Fire Protection

Modifications

08/06/2020

SNC 1151384

Reactor Make-Up Water Storage Tank (RMWST)

Cover Replacement

4/30/2021

SNC 1154174

Modification for Leading Edge Flow Meter (LEFM)

Transmitters

4/30/2021

TE 1051647

Technical Evaluation-Focused Area Self

Assessment-Fire Protection

10/5/2020

Miscellaneous

A-181805

NFPA Fire Protection Program Design Basis

Document-Joseph M. Farley Nuclear Plant

Version 8.0

EPRI

30020222936/NUREG2169

Update Non-Suppression Curves 2015

F-021-2020

Fire Drill Package-Unit #1 Turbine Building

Elevation 137'

3/05/2020

F-022-2020

Fire Drill Package-Service Building Annex

3/12/2020

F-2021-03

Fire Drill Package Unit #1 NRSAB Room 191/192

2/19/2021

GN 500

Detail Specification for Fire Protection System

Section System 1 Header and Riser System

05/03/1971

NEIL

Nuclear Electric Insurance Limited-Joseph M.

Farley Nuclear Plant Boiler and Machinery and

Property Loss Control Evaluation

9/12/2019

NFPA 10-1973

PORTABLE FIRE EXTINGUISHERS

Code of

Record

1973

NFPA 20-1974

Installation of Centrifugal Fire Pumps

Code of

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Record

1974

NFPA 80-1973

Fire Doors and Fire Windows

Code of

Record

1973

S-FP-115

NFP-SNC-Course Completion Record Table Top

Simulation Fire Drill

6/25/2020

SM-C051326701-016

Master Scoping List Equipment Type-Extinguisher

Procedures

FNP--AOP-29.0

AOP for Plant Fire

53.0

FNP-0-ACP-35.3

ADMINISTRATIVE CONTROL OF TOOLS AND

EQUIPMENT LEFT UNATTENDED IN THE PLANT

Version 7.0

FNP-0-EIP-16.0-F22

Checklist X Hot Shutdown Panels, Unit 1 (EP)

04/16/2021

FNP-0-EIP-16.0-F22

Checklist X Hot Shutdown Panels, Unit 1 (EP)

01/13/2021

FNP-0-EIP-16.0-F23

Checklist Y Hot Shutdown Panels, Unit 2 (EP)

04/16/2021

FNP-0-EIP16.0-F23

Checklist Y Hot Shutdown Panels, Unit 2 (EP)

01/13/2021

FNP-0-FSP 201.2

Diesel Driven Fire Pump #2 Functional Test

Version 20

FNP-0-FSP-201.1

Diesel Driven Fire Pump #1 Functional Test

Version 22

FNP-0-FSP-201.1

No. 1 Diesel Driven Fire Pump Functionality Test

Version 23.0

FNP-0-FSP-201.3

Motor Driven Fire Pump Functional Test

Version 12

FNP-0-FSP-35.0

Portable Extinguisher Monthly Inspection

Version 45.7

FNP-0-FSP-400.0

Diesel Driven Fire Pump Inspection

Version 16.1

FNP-0-FSP-44.0

Inspection of AFFF

Version 5.1

FNP-0-FSP-62.0

Analysis of "A" Fire Diesel Fuel Storage Tank

Contents

Version 10.1

FNP-0-FSP-62.1

Fire Diesel Fuel Oil Bottom Sample Quality

Appearance Test

Version 4.1

FNP-0-GMP-100.0

Catch Bag Control Program

VERSION

6.1

FNP-0-SOP-0.4

Fire Protection Program Administration and FP

LCO Requirements

21.0

FNP-0-SOP-61.0

Fire Protection-Pump House and Yard Main

Version 49.3

FNP-0-UOP-4.0

General Outage Operations Guidance

FNP-1-AOP-28.1

Farley Nuclear Plant AOP 28.1

39.0

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

FNP-1-AOP-28.2

AOP for Fire in The Control Room

31.2

FNP-1-ESP-1.1

SI Termination Operating Procedure

27.1

FNP-1-FSP-39.1

Portable CO2 Fire Extinguishers-Annual

Conductivity Test

Version 4.0

FNP-1-FSP-9.0

Portable Extinguishers - Monthly

VERSION

44.4

FNP-2-FPP-2.0

UNIT 2 TURBINE BUILDING PRE-FIRE PLAN

VERSION

2.0

FNP-2-FSP-39.2

Portable CO2 Fire Extinguisher-Annual Conductivity

Test

Version 4.0

FNP-2-FSP-9.0

Portable Fie Extinguishers-Monthly Inspection

Version 27.2

FNP-2-STP-23.1

2A COMPONENT COOLING WATER PUMP

QUARTERLY INSERVICE TEST

05/26/2021

FNP-2-STP-23.2

2B COMPONENT COOLING WATER PUMP

QUARTERLY INSERVICE TEST

03/15/2021

FNP-2-STP-23.3

2C COMPONENT COOLING WATER PUMP

04/17/2021

NMP-ES-035-001

Fire Protection Program Implementation

VERSION

14.0

NMP-ES-035-003

Fleet Hot Work Instruction

VERSION

10.0

NMP-ES-035-003-F01

Hot Work Permit

VERSION

4.0

NMP-ES-035-006

Fire Protection Program Impact Screen and

Detailed Reviews

Version 13.0

NMP-ES-035-007

Fleet Fire Watch Instruction

Version 10.0

NMP-ES-035-014

Fleet Transient Combustible Controls

VERSION

5.0

NMP-ES-035-018

NFPA 805 Monitoring Program

VERSION

1.1

NMP-ES-035-018

NFPA 805 Monitoring Program

05/03/2021

NMP-ES-036-001

Underground Pipe & Tank Monitoring Program

Implementation

Version 11.1

NMP-HP-501-005

Inspection, Repair and Storage of the MSA G1

SCBA

VERSION

2.1

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NMP-MA-054

General Plant Housekeeping

Version 1.2

Work Orders

SNC 1122664

Diesel Driven Fire Pump #1 Functional Test

4/25/2021

SNC 1140263

Diesel Driven Fire Pump Inspection

2/11/2021

SNC 553311

Fire Distribution System Flow Test

8/2/2018

SNC 719295

Sprinkler System Piping NDE for Wall Thinning and

Flow Blockage

9/15/2016

SNC 731321

Sprinkler System Piping NDE for Wall Thinning and

Flow Blockage

4/4/2020