July 19, 2021
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - TRIENNIAL FIRE PROTECTION TEAM INSPECTION (FPTI) REPORT 05000348/2021012 AND 05000364/2021012
Dear Mr. Kharrl:
On July 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant and discussed the results of this inspection with Robert Norris and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000348 and 05000364
License Numbers:
Report Numbers:
05000348/2021012 and 05000364/2021012
Enterprise Identifier: I-2021-012-0007
Licensee:
Southern Nuclear Operating Co., Inc.
Facility:
Joseph M. Farley Nuclear Plant
Location:
Columbia, AL
Inspection Dates:
June 14, 2021 to July 02, 2021
Inspectors:
J. Dymek, Reactor Inspector
W. Monk, Senior Reactor Inspector (Team Lead)
J. Montgomery, Senior Reactor Inspector
D. Strickland, Reactor Inspector
Approved By:
Scott M. Shaeffer, Chief
Engineering Branch 2
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial fire protection team inspection at Joseph M. Farley Nuclear Plant, in accordance with the Reactor Oversight Process (ROP). The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and industry standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin tele-work. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
===71111.21N.05 - Fire Protection Team Inspection (FPTI)
Structures, Systems, and Components (SSCs) Credited for Fire Prevention, Detection, Suppression, or Post-Fire Safe Shutdown Review (IP Section 03.01)===
The inspectors verified that components and systems will function as required to support the credited functions stated for each sample. Additional inspection considerations were located in the fire hazards analysis (FHA) or nuclear safety capability assessment (NSCA).
- (1) SSC #1 (Fire Prevention) - Combustible Controls and Hot Work Administrative Programs
- (2) SSC #2 (Detection/Suppression) - Deluge Fixed Spray Water Suppression Systems (Switchyard and Turbine Building)
a. Review deficiencies or open fire protection impairments for the selected system, including any temporary modifications, operator workarounds, or compensatory measures.
b. Verify that operator actions can be accomplished as assumed in the licensees FHA, or as assumed in the licensees fire probabilistic risk assessment (FPRA)analysis and SSA.
c. Review repetitive or similar maintenance work requests which could be an indicator of a design deficiency and could affect the ability of the components to perform their functions, when needed.
d. Ensure that post maintenance and/or surveillance activities are performed as scheduled.
e. Perform a walkdown inspection to identify equipment alignment discrepancies.
Inspect for deficient conditions such as corrosion, missing fasteners, cracks, and degraded insulation.
f. Ensure the selected SSCs that are subject to aging management review (AMR)pursuant to 10 CFR Part 54 are being managed for aging (e.g., loss of material, cracking, reduction of heat transfer) in accordance with appropriate aging management programs. Verify that the licensees aging management program activities (such as, Fuel Oil Analysis or Selective Leaching Aging Management Program) associated with FP equipment are being implemented.
g. If a review of operating experience issues will be completed for the selected inspection sample, verify that the licensee adequately reviewed and dispositioned the operating experience in accordance with their processes.
Fire Protection Program Administrative Controls (IP Section 03.02) (2 Samples)
The inspectors verified that the selected control or process is implemented in accordance with the licensees current licensing basis (CLB). If applicable, ensure that the licensees FPP contains adequate procedures to implement the selected administrative control. Verify that the selected administrative control meets the requirements of all committed industry standards.
- (1) Fire Protection Administrative Program #1 - NFPA 805 Monitoring Program
- (2) Fire Protection Administrative Program #2 - Fire Brigade Drills and Training
Fire Protection Program Changes/Modifications (IP Section 03.03) (2 Samples)
The inspectors verified the following:
a. Changes to the approved FPP do not constitute an adverse effect on the ability to safely shutdown.
b. The adequacy of the design modification, if applicable.
c. Assumptions and performance capability stated in the SSA have not been degraded through changes or modifications.
d. The FPP documents, such as the Updated Final Safety Analysis Report, fire protection report, FHA, and SSA were updated consistent with the FPP or design change.
e. Post-fire SSD operating procedures, such as abnormal operating procedures, affected by the modification were updated.
- (1) FPP Changes / Modification #1 - Design Change Package (DCPs) SNC 1054443/1054444/1054445/1054446 Unit 2 AUX & Turbine Building Class B Fire Protection Modifications
- (2) FPP Changes / Modification #2 - DCP SNC 968080 Fire Protection Change Evaluation for DECP Install Line Stops on the Fire Pump Discharge Lines
INSPECTION RESULTS
No findings of more than minor significance were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained nor documented in this report.
- On July 1, 2021, the inspectors presented the Fire Protection Team Inspection (FPTI)results to Robert Norris, Plant Manager and other members of the licensee staff during the Exit Meeting.
THIRD PARTY REVIEWS
Inspectors reviewed ATC-Combustion Engineering Solutions Investigation of the Failure of a Section of Fire Protection Piping at Farley Nuclear Plant during the inspection period. No other third-party documentation was reviewed during the inspection.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
71111.21N.05 Calculations
2380-1102-PGK-01
Evaluation of MOV Pressure Boundaries for IN 92-
Hot-Short Events
SE-C051326701
Farley Nuclear Power Plant Units 1 and 2 NFPA
805 Non-Power Operations
06/09/2020
SE-C051326701-003
FNP NSEL and Safe and Stable Fault Trees
06/09/2020
SE-C051326701-011
FNP Recovery Action Feasibility Evaluation
07/27/2012
SE-C051326701-012
NFPA 805 Defense in Depth (DID) Recovery
Actions Credited in Calculation SE-C051326701-
008
09/05/2012
Corrective Action
Documents
Attach manufacturer documentation with regards to
3-hour fire door rating
09/15/2016
Corrective Action
Documents
Resulting from
Inspection
CR 10805916
2T-12A SGFP Deluge Nozzles Partially Blocked by
Installed Tarp/Catch Bag
06/15/2021
CR 10806250
System 2A-27 Indicating Light Non-Functional
06/16/2021
CR 10806253
Fire Brigade Ready Room Trash Can with Self-
Extinguishing Lid was Full
06/16/2021
CR 10806280
Lumber on U2 Turbine Deck with No Transient
Combustible Permit
06/16/2021
CR 10806305
FNP-1-AOP-28.1 Attachment 9 has Numbering and
Formatting Issues with Response Obtained and
RNO Steps
06/16/2021
CR 10806350
Procedure Enhancement Suggestions - Hot Work
Procedure
06/16/2021
CR 10806359
Unsecured Ladder Found in Turbine Building
(Personal Safety)
06/16/2021
CR 10806366
Pressure Indicator Gauge Broken on Motor Driven
Fire Pump
06/16/2021
CR 10806369
- 2 Fire Water Storage Tank Level Control Valve
Cycling
06/16/2021
CR 10806591
U2 TB Battery RM Louver Found Closed (H2 B/U
Concern)
06/17/2021
CR 10806623
Corrosion Found on Pre-action Header in the U2
06/17/2021
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CCW Room
CR 10806654
U2 Turbine Building Damper out of Normal Position
06/17/2021
CR 10806685
Fire Extinguishers in Equipment Room 115
06/17/2021
CR 10807352
NRC Inspection Lessons Learned - Walkdowns /
Assessments
06/21/2021
CR 10809299
AOP-28.1 Version Update Needed
06/29/2021
CR 10809409
Light Out on Cardox Panel
06/29/2021
CR 10809789
Unsecured Nitrogen Dewars Found on U1 155
06/30/2021
CR 10809791
Evaluate and revise FNP-ACP-35.3 Attachment 2
06/30/2021
CR 10809794
(NRC Identified) Sound Powered Phone Jacks
Degraded
06/30/2021
CR 10809936
DDFP Overspeed Test Enhancement
07/01/2021
Drawings
D 170347
Farley NPP Unit 1 Fire Protection Piping-Auxiliary
Building Below El. 121'.
Revision 16
D-200184
P&ID Fire Protection Main Transformers & Valve
House
2/29/1978
D-205002
P&ID for Component Cooling Water System
31.0
D170345
Fire Protection Piping Diesel Engine Driven Pumps
Fuel & Exhaust Piping
Revision 1
D170366
Fire Protection P & ID Pump House & Yard Mains
Version 1.0
D200-201 Sheet #1
Joseph M. Farley Nuclear Plant Unit #2 Cooling
Tower Layout
Version 5.0
D200-201 Sheet #2
Joseph M. Farley Nuclear Plant Cooling Tower
Layout
Version 1.0
D205041
P&ID for Residual Heat Removal System
20.0
U160130
Fire Protection-Fuel System for Diesel Driven Fire
Pumps
Revision 2
U162363
Fire Protection-Sprinkler System for Main Power
Transformer 1TR66
Version 1.0
U262255
Fan Data-Turbine Building Battery room
2/29/1975
Engineering
Changes
SNC 1054445
U2 Auxiliary & Turbine Building Class B Fire
Protection Modifications
Revision 0
SNC 1054444
U2 Auxiliary & Turbine Building Class B Fire
Protection Modifications
Revision 0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
SNC 1054446
U2 Auxiliary & Turbine Building Class B Fire
Protection Modifications
Revision 0
SNC-1150857
1B RCP Seal Leak-Off Line Modification
4/6/2021
SNC471156
NFPA 805: IN 92-18 U1 MOV Hot Short Failure
03/19/2015
SNC471157
NFPA 805: IN 92-18 U2 MOV Hot Short Failure
11/06/2014
Engineering
Evaluations
CAR 278955LOE
Cause Determination Report Summary - Fire
Protection Main Rupture
Revision 1
DCP SNC1054443
Unit 2 AUX & TB Class B Fire Protection
Modifications
08/06/2020
SNC 1151384
Reactor Make-Up Water Storage Tank (RMWST)
Cover Replacement
4/30/2021
SNC 1154174
Modification for Leading Edge Flow Meter (LEFM)
Transmitters
4/30/2021
TE 1051647
Technical Evaluation-Focused Area Self
Assessment-Fire Protection
10/5/2020
Miscellaneous
A-181805
NFPA Fire Protection Program Design Basis
Document-Joseph M. Farley Nuclear Plant
Version 8.0
30020222936/NUREG2169
Update Non-Suppression Curves 2015
Fire Drill Package-Unit #1 Turbine Building
Elevation 137'
3/05/2020
Fire Drill Package-Service Building Annex
3/12/2020
Fire Drill Package Unit #1 NRSAB Room 191/192
2/19/2021
GN 500
Detail Specification for Fire Protection System
Section System 1 Header and Riser System
05/03/1971
Nuclear Electric Insurance Limited-Joseph M.
Farley Nuclear Plant Boiler and Machinery and
Property Loss Control Evaluation
9/12/2019
NFPA 10-1973
PORTABLE FIRE EXTINGUISHERS
Code of
Record
1973
NFPA 20-1974
Installation of Centrifugal Fire Pumps
Code of
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Record
1974
NFPA 80-1973
Fire Doors and Fire Windows
Code of
Record
1973
S-FP-115
NFP-SNC-Course Completion Record Table Top
Simulation Fire Drill
6/25/2020
SM-C051326701-016
Master Scoping List Equipment Type-Extinguisher
Procedures
FNP--AOP-29.0
AOP for Plant Fire
53.0
FNP-0-ACP-35.3
ADMINISTRATIVE CONTROL OF TOOLS AND
EQUIPMENT LEFT UNATTENDED IN THE PLANT
Version 7.0
FNP-0-EIP-16.0-F22
Checklist X Hot Shutdown Panels, Unit 1 (EP)
04/16/2021
FNP-0-EIP-16.0-F22
Checklist X Hot Shutdown Panels, Unit 1 (EP)
01/13/2021
FNP-0-EIP-16.0-F23
Checklist Y Hot Shutdown Panels, Unit 2 (EP)
04/16/2021
FNP-0-EIP16.0-F23
Checklist Y Hot Shutdown Panels, Unit 2 (EP)
01/13/2021
FNP-0-FSP 201.2
Diesel Driven Fire Pump #2 Functional Test
Version 20
FNP-0-FSP-201.1
Diesel Driven Fire Pump #1 Functional Test
Version 22
FNP-0-FSP-201.1
No. 1 Diesel Driven Fire Pump Functionality Test
Version 23.0
FNP-0-FSP-201.3
Motor Driven Fire Pump Functional Test
Version 12
FNP-0-FSP-35.0
Portable Extinguisher Monthly Inspection
Version 45.7
FNP-0-FSP-400.0
Diesel Driven Fire Pump Inspection
Version 16.1
FNP-0-FSP-44.0
Inspection of AFFF
Version 5.1
FNP-0-FSP-62.0
Analysis of "A" Fire Diesel Fuel Storage Tank
Contents
Version 10.1
FNP-0-FSP-62.1
Fire Diesel Fuel Oil Bottom Sample Quality
Appearance Test
Version 4.1
FNP-0-GMP-100.0
Catch Bag Control Program
VERSION
6.1
FNP-0-SOP-0.4
Fire Protection Program Administration and FP
LCO Requirements
21.0
FNP-0-SOP-61.0
Fire Protection-Pump House and Yard Main
Version 49.3
FNP-0-UOP-4.0
General Outage Operations Guidance
FNP-1-AOP-28.1
Farley Nuclear Plant AOP 28.1
39.0
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
FNP-1-AOP-28.2
AOP for Fire in The Control Room
31.2
FNP-1-ESP-1.1
SI Termination Operating Procedure
27.1
FNP-1-FSP-39.1
Portable CO2 Fire Extinguishers-Annual
Conductivity Test
Version 4.0
FNP-1-FSP-9.0
Portable Extinguishers - Monthly
VERSION
44.4
FNP-2-FPP-2.0
UNIT 2 TURBINE BUILDING PRE-FIRE PLAN
VERSION
2.0
FNP-2-FSP-39.2
Portable CO2 Fire Extinguisher-Annual Conductivity
Test
Version 4.0
FNP-2-FSP-9.0
Portable Fie Extinguishers-Monthly Inspection
Version 27.2
FNP-2-STP-23.1
2A COMPONENT COOLING WATER PUMP
QUARTERLY INSERVICE TEST
05/26/2021
FNP-2-STP-23.2
2B COMPONENT COOLING WATER PUMP
QUARTERLY INSERVICE TEST
03/15/2021
FNP-2-STP-23.3
2C COMPONENT COOLING WATER PUMP
04/17/2021
NMP-ES-035-001
Fire Protection Program Implementation
VERSION
14.0
NMP-ES-035-003
Fleet Hot Work Instruction
VERSION
10.0
NMP-ES-035-003-F01
Hot Work Permit
VERSION
4.0
NMP-ES-035-006
Fire Protection Program Impact Screen and
Detailed Reviews
Version 13.0
NMP-ES-035-007
Fleet Fire Watch Instruction
Version 10.0
NMP-ES-035-014
Fleet Transient Combustible Controls
VERSION
5.0
NMP-ES-035-018
NFPA 805 Monitoring Program
VERSION
1.1
NMP-ES-035-018
NFPA 805 Monitoring Program
05/03/2021
NMP-ES-036-001
Underground Pipe & Tank Monitoring Program
Implementation
Version 11.1
NMP-HP-501-005
Inspection, Repair and Storage of the MSA G1
VERSION
2.1
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
NMP-MA-054
General Plant Housekeeping
Version 1.2
Work Orders
SNC 1122664
Diesel Driven Fire Pump #1 Functional Test
4/25/2021
SNC 1140263
Diesel Driven Fire Pump Inspection
2/11/2021
SNC 553311
Fire Distribution System Flow Test
8/2/2018
SNC 719295
Sprinkler System Piping NDE for Wall Thinning and
Flow Blockage
9/15/2016
SNC 731321
Sprinkler System Piping NDE for Wall Thinning and
Flow Blockage
4/4/2020