January 28, 2021
SUBJECT:
NORTH ANNA POWER STATION - INTEGRATED INSPECTION REPORT 05000338/2020004 AND 05000339/2020004; 07200016/2020002
Dear Mr. Stoddard:
On December 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at North Anna Power Station. On January 14, 2021, the NRC inspectors discussed the results of this inspection with Mr. Fred Mladen, Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 05000338 and 05000339 License Nos. NPF-4 and NPF-7
Enclosure:
As stated
Inspection Report
Docket Numbers: 05000338 and 05000339; 07200016 License Numbers: NPF-4 and NPF-7 Report Numbers: 05000338/2020004 and 05000339/2020004; 07200016/2020002 Enterprise Identifier: I-2020-004-0055; I-2020-002-0079 Licensee: Virginia Electric & Power Co.
Facility: North Anna Power Station Location: Mineral, VA Inspection Dates: October 1, 2020 to December 31, 2020 Inspectors: M. Tobin, Senior Resident Inspector M. Thomas, Senior Resident Inspector K. Carrington, Resident Inspector B. Towne, Resident Inspector P. Niebaum, Senior Project Engineer D. Jackson, Project Engineer Approved By: Stewart N. Bailey, Chief Reactor Projects Branch 4 Division of Reactor Projects Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at North Anna Power Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
PLANT STATUS
Unit 1 operated at or near rated thermal power for the entire inspection period.
Unit 2 began the inspection period shutdown in a planned refueling outage. Operators commenced startup on October 16, 2020. The reactor reached criticality on October 18, 2020, and the turbine generator was synchronized to the grid on October 19, 2020. The unit was returned to rated thermal power on October 22, 2020, and remained at or near rated thermal power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the Coronavirus Disease 2019 (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week; conducted plant status activities as described in IMC 2515, Appendix D, Plant Status; observed risk-significant activities; and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or portions of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated readiness for seasonal extreme weather conditions prior to the onset of seasonal cold temperatures for the following systems:
- Units 1 and 2 emergency diesel generator systems on December 14, 2020
- Units 1 and 2 turbine driven auxiliary feedwater system on December 21, 2020
Impending Severe Weather Sample (IP Section 03.02) (1 Sample)
- (1) The inspectors evaluated the adequacy of the overall preparations to protect risk-significant systems from impending severe weather, flash flooding and high lake levels on November 12, 2020.
71111.04 - Equipment Alignment
Partial Walkdown Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2 turbine driven and motor driven auxiliary feedwater pump rooms on October 21, and October 23, 2020.
- (2) Unit 2 component cooling water pump '1B' following maintenance on November 23 and November 24, 2020.
71111.05 - Fire Protection
Fire Area Walkdown and Inspection Sample (IP Section 03.01) (3 Samples)
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
- (1) Unit 1 and Unit 2 station and main auxiliary transformer areas (TF-1 and TF-2) on October 23, 2020.
- (2) Unit 1 and Unit 2 service water pump house on October 9, 2020.
- (3) Unit 2 H emergency diesel generator room on October 1, 2020.
71111.06 - Flood Protection Measures
Cable Degradation (IP Section 03.02) (1 Sample)
The inspectors evaluated cable submergence protection in:
- (1) Manhole 04MH03
71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance
Requalification Examination Results (IP Section 03.03) (1 Sample)
The licensee completed the annual requalification operating examinations required to be administered to all licensed operators in accordance with Title 10 of the Code of Federal Regulations 55.59(a)(2), Requalification Requirements, of the NRCs Operators Licenses. During the week of November 9, 2020, the inspector performed an in-office review of the overall pass/fail results of the individual operating examinations, the crew simulator operating examinations, and the biennial written examinations in accordance with IP 71111.11, Licensed Operator Requalification Program. These results were compared to the thresholds established in Section 3.02, Requalification Examination Results, of IP
===71111.11.
- (1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on October 20, 2020.
71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
=
- (1) The inspectors observed and evaluated licensed operator performance in the control room during reactor startup activities following the refueling outage on October 18, 2020.
Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)
- (1) The inspectors observed and evaluated a simulator training drill on November 5, 2020.
71111.12 - Maintenance Effectiveness
Maintenance Effectiveness (IP Section 03.01) (2 Samples)
The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:
- (1) Units 1 and 2: DB50 reactor trip and bypass breakers, on October 29, 2020
- (2) Common Unit: Station blackout diesel generator unavailability, on December 15, 2020
Quality Control (IP Section 03.02) (1 Sample)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSCs remains capable of performing its intended function:
- (1) Unit 2 J EDG governor replacement performed per WO 59102658577
71111.13 - Maintenance Risk Assessments and Emergent Work Control
Risk Assessment and Management Sample (IP Section 03.01) (2 Samples)
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
- (1) Unit 1 and Unit 2 in elevated green risk due to activities associated with startup activities, planned service water pump maintenance, and emergent issues with a Unit 1 reactor trip bypass breaker on October 22, 2020
- (2) Unit 1 and Unit 2 in yellow risk due to the planned replacement of the reserve station service transformer, the planned replacement of a circulating water pump, and planned testing of service water motor operated valves on November 3, 2020
71111.15 - Operability Determinations and Functionality Assessments
Operability Determination or Functionality Assessment (IP Section 03.01) (5 Samples)
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
- (1) Unit 1 train 'A' reactor trip bypass breaker failed to close on October 21, 2020
- (2) Unit 2 'B' reactor coolant pump due to brown boric acid accumulated on the bolts on October 21, 2020
- (3) Unit 2 emergency switchgear room overfilled cable raceway on October 13, 2020
- (4) Unit 2 reactor coolant pump "C" seal leakage, on November 16, 2020
- (5) Unit 2 service water supply line to heating and ventilation chiller 2-HV-E-4C below administrative limit for pipe wall minimum thickness, on December 4, 2020
71111.18 - Plant Modifications
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
- (1) Unit 2 flow accelerated corrosion program piping replacements for various systems inside containment during refuel outage 2R27 on November 13, 2020
71111.19 - Post-Maintenance Testing
Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
- (1) 2-PT-82.12J, 2J Diesel Generator Isochronous Mode (Start by ESF Actuation), after replacement of the 2 J' emergency diesel generator electronic governor per work order (WO) 59102658577
- (2) 2-PT-71.3Q.1, (2-FW-P-3B) Motor Driven AFW IST Comprehensive Pump and Valve Test, after replacement of the pump motor per WO 59203293492
- (3) 2-PT-77.11B, Control Room Chiller 2-HV-4E-4B Pump and Valve Test, following planned maintenance on November 24, 2020
- (4) WO 59203300987, service water valve, SW-MOV-204A, post maintenance test following motor replacement and valve seat repair, on November 2, 2020
- (5) 2-PT-82.12J 40-OTO1, 2 J emergency diesel generator test following an identified failed surveillance test, on November 20, 2020
71111.20 - Refueling and Other Outage Activities
Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)
- (1) The inspectors evaluated the Unit 2 refuel outage (2R27) activities from October 1, 2020 to October 21, 2020.
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Inservice Testing (IP Section 03.01)
- (1) 1-PT-57.1B, Emergency Core Cooling Subsystem - Low Head Safety Injection Pump (1-SI-P-1B) on November 18, 2020
71114.06 - Drill Evaluation
Drill/Training Evolution Observation (IP Section 03.02) (2 Samples)
The inspectors evaluated:
- (1) Emergency preparedness training drill on November 5, 2020
- (2) Emergency preparedness training drill on December 8,
OTHER ACTIVITIES - BASELINE
===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
MS06: Emergency AC Power Systems (IP Section 02.05) ===
- (1) Unit 1 (October 1, 2019, through September 30, 2020)
- (2) Unit 2 (October 1, 2019, through September 30, 2020)
MS09: Residual Heat Removal Systems (IP Section 02.08) (2 Samples)
- (1) Unit 1 (October 1, 2019, through September 30, 2020)
- (2) Unit 2 (October 1, 2019, through September 30, 2020)
71152 - Problem Identification and Resolution
Annual Follow-up of Selected Issues (IP Section 02.03) (1 Sample)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issue:
- (1) Condition report (CR) 1156615 - reactor pressure vessel (RPV) lower internals scratched surface during lift due to contact with the lower internals storage rack
OTHER ACTIVITIES
- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL
60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants
- (1) The inspectors evaluated the licensees activities related to long-term operation and monitoring of their independent spent fuel storage installation on October 26,
INSPECTION RESULTS
Minor Violation Associated with Scratching of RPV Lower Internals During Lift 71152 Minor Violation: The NRC identified a minor violation of 10 CFR Part 50, Appendix B, Criterion V, Instructions Procedures and Drawings. Specifically, licensee procedure 0-MCM-1112-02, Installation of the Reactor Vessel Lower Internals, did not provide an adequate clearance distance from the lower internals stand during the lift of the lower internal assembly. Accordingly, on September 29, 2020 the Unit 2 RPV lower internals assembly was damaged during the lift to return it to the vessel. The RPV lower internals made contact with the lower internals storage stand during the move, which resulted in scratches on the surface of the lower internals.
Screening: The inspectors determined the performance deficiency was minor. In accordance with Inspection Manual Chapter 0612 Appendix B, the performance deficiency could not be reasonably viewed as a precursor to a significant event; if left uncorrected, would not have the potential to lead to a more significant safety concern and did not adversely affect a cornerstone objective. Subsequent evaluation by Westinghouse determined that the damage to the RPV lower internals was superficial and presented no danger of loose parts or structural compromise. The reactor was defueled during the incident, there was no risk to reactor safety, no risk of radiological release, and the damage did not pose a risk to future operations.
Enforcement:
The failure to comply with 10 CFR Part 50 Appendix B Criterion V constituted a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy. This event was captured in the licensees corrective action program as CR 1156615. Compliance with 10 CFR Part 50, Appendix B will be restored upon completion of the corrective actions specified in the CR.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On January 14, 2021, the inspectors presented the integrated inspection results to Mr. Fred Mladen, Site Vice President and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
60855.1 Procedures O-PT-4.3 ISFSI Dry Storage Cask Visual Inspection and DG Fuel Oil 16
Sampling
71111.01 Corrective Action CR1159810 1-HV-MOD-129-1 is not Closing When Fan is Off 10/31/2020
Documents
Procedures 0-AP-40 Abnormal Level in North Anna Reservoir (Lake) 20
0-AP-41 Severe Weather Conditions 77
0-GOP-4 Cold Weather Operations 67
GOP 4.2 Extreme Cold Weather Operations 43
71111.04 Corrective Action CR 1162051 Chiller discharge Pressure Gauge found broken for HV-PI-
Documents 600C
Drawings 12050-DAR-79A Appendix R Safe Shutdown Flow Diagram Component Cooling 5
Water
2050-FM-079A Flow/Valve Operating Numbers Diagram Component Cooling 33
Water System, Sheet 1
Miscellaneous SBBD-NAPS-CC Component Cooling System Design Basis Document 20
Procedures 0-MOP-49.30 24
2-OP-51.1 Component Cooling System 25
71111.05 Corrective Action CR1158460 Activation of Deluge System on Unit 1 Main Transformers 10/15/2020
Documents
Miscellaneous Shiftly Fire Watch for Turbine Units 1&2 Lube Oil Deluge
System
71111.06 Drawings 11715-FC-29A, Fuel Oil Pump House & Tanks 14
Sheet 1
11715FE- Manhole Details 17
2H017, Sheet 2
Miscellaneous 1M/MH/MH-4 Cable Ticket
71111.12 Miscellaneous Instructions for Types DB-50, DBF-16, and EBL-50 Air Circuit
Breakers (www.Electricpartmanuals.com)
Procedures ER-AA-MRL-10 Maintenance Rule Program 7
ER-AA-MRL-100 Implementing Maintenance Rule 13
ER-AA-PRS-1001 Plant Health Committee 13
ER-AA-PRS-1010 Preventive Maintenance Task Basis and Maintenance Strategy 13
Inspection Type Designation Description or Title Revision or
Procedure Date
NAS-3014 Specification for Electrical Installation for North Anna Power 21
Station Units 1 & 2
VPAP-1001 Quality Control (QC) Inspection Program 25
71111.13 Miscellaneous 201114A Risk schedule for the week of 11/8/2020 0
Schedule
Evaluation
Plan of Week 10/19- 10/23
Procedures ER-AA-RIE-101 Active Component Risk Significance Insights 2
NF-AA-PRA-101- Probabilistic Risk Assessment Procedures and Methods: PRA 4
20 Risk Summary Information
WM-AA-301 Operational Risk Assessment 20
71111.15 Corrective Action CR 1161718 Below admin UT reading SW supply to 2 HV-E-4C
Documents CR1158954 1-EP-BKR-BYB Bypass BKR B 10/21/2020
CR1162043 Valve Body Erosion
Drawings 11715-CBB- Isometric Drawing
040D, Sheet 5
11715-ESK-6V Elementary Diagram- Reactor Trip Switchgear, Sheet 1 14
11715-ESK-6W Elementary Diagram- Reactor Trip Switchgear, Sheet 2 11
11715-ESK-6Y Elementary Diagram- Reactor Trip Switchgear, Sheet 4 12
11715-FB-040D,
sheet 2
2050-WS-2H85A Erection Control Isometric ANSI B31.7 Class Q3 1
DWG053649 N-9000 Seal for 93A RCP 3
Miscellaneous Maintenance Department Logs 10/22/2020
ANSI/ASME USA Standard Code for Pressure Piping
B31.1- 1980
Edition
NDE Reports BOP-VE-20-016 Unit 2 Chiller Room 12/02/2020
Procedures 0-PT-75.14 Service Water Wall Thickness Monitoring 18
2-AP-33.1 Reactor Coolant Pump Seal Failure 24
AR-N3-404 Implementation of 10 CFR 21 and 10 CFR 50.55(e), Reporting 6
of Defects and Failure to Comply
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.18 Engineering NA-19-00116 Unit 2 2020 Flow Accelerated Corrosion (FAC) Program - 5
Changes Piping Replacements
71111.19 Corrective Action CA8153324
Documents CR1156796 2J EDG Started During Pre-Operational Air Roll 10/02/2020
Drawings 11715-FB-40C- Chilled Water System Drawings
40E
Engineering 2-PT-82.12J 2J Diesel Generator Isochronous Mode (Start by ESF 40
Changes Actuation)
Miscellaneous CR1156796 Human Performance Review Board 10/06/2020
Documentation
Procedures 0-ECM-0708-05 Woodward Digital Reference Unit (DRU) and 2301A Field 9
Adjustments
2-ICP-HV-004B Heating and Ventilation Chiller 2-HV-E-4B Safety Circuitry and 18
Control Calibration
2-OP-21.6 Main Control Room and Relay Room Air Conditioning 36
2-PT-82.12J 2J Diesel Generator Isochronous Mode (Start by ESF 40-OTO1
Actuation)
Work Orders 59203324094 Ckt bkr for 2-MS-TV-211B tripped while Opening Valve 10/17/2020
WO 59203300987 Electrical Disconnect/reconnect for 02-SW-MOV-204A- 0
VALVOP
71111.20 Corrective Action CR 1157564 Mode Hold for Unit 2 Startup 10/07/2020
Documents
Corrective Action CR1158223
Documents
Resulting from
Inspection
Miscellaneous NAPS Outage Master Filter- 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> lookahead 10/16/2020
2R27 North Anna Submit Outage Critique 10/19/2020
2R27 Startup JITT
2R27 North Anna Communicate Handoffs/Issues 10/16/2020
Procedures 2-OP-1.7 Unit Startup from Mode 3 to Mode 2 Following Refueling 36
2-OP-2.1 Unit Startup From Mode 2 to Mode 1 130
71114.06 Miscellaneous 2020 Training Drill Dominion Energy North Anna Power Station 2020 Training Drill 0
NDEC 20 EPD North Anna Emergency Plan Drill 12/8/2020
Inspection Type Designation Description or Title Revision or
Procedure Date
71152 Miscellaneous Prompt Issue Review Team Report, Unit Two Lower Internal 10/2/2020
Package Move - Loss of Load
Procedures 2-AP-33.1 Reactor Coolant Pump Seal Failure 24