Category:Inservice/Preservice Inspection and Test Report
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Inservice/Preservice Inspection and Test Report"
The following 200 pages are in this category, out of 3,164 total.
(previous page) (next page)C
- CNRO-2004-00026, Request for Alternative ANO1-R&R-006 - Proposed Alternative to ASME Weld Examination Requirements for Repairs Performed on Reactor Vessel Head Penetration Nozzles
- CNRO-2007-00009, Arkansas One, Unit 1 - Request for Alternative ANO1-ISI-008, Request to Extend the Current ASME Inservice Inspection Interval in Accordance with NRC Information Notice 98-44
- CNRO-2007-00033, Request ISI-2007-1, Use of Later ASME Section XI Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non-Destructive Examination Activities
- CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals
- CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan
- CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval
- CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval
- CNRO-2009-00003, Letter from Entergy Response to Request for Additional Information Regarding Request ISI-2008-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activ
- CNS-14-001, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 19 Refueling Outage
- CNS-14-105, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage
- CNS-15-022, Request to Use a Portion of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section Xl, for Inservice Inspection Activities
- CNS-15-047, Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage, Response to NRC Requests for Additional Information (Rais)
- CNS-15-061, Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 20 Refueling Outage
- CNS-15-074, CISI-1462.10.0040, Revision 0, Fourth Interval Inservice Inspection Outage Schedule, Quality Assurance Program Related
- CNS-16-020, Inservice Inspection Report for End of Cycle 22 Refueling Outage
- CNS-16-042, Snubber Program Plan for the Fourth Ten-Year Inservice Testing Interval
- CNS-16-067, ASME OM Code In-Service Testing Program Document
- CNS-17-002, End of Cycle 21 Refueling Outage, Lnservice Inspection Report and Steam Generator Lnservice Inspection Summary Report
- CNS-17-044, Inservice Inspection Report for Unit 1 End of Cycle 23 Refueling Outage
- CNS-17-061, Third Ten-Year Inservice Inspection Plan, Limited Volumetric Examinations Response to NRC Requests for Additional Information
- CNS-18-032, Refueling Outage 22 (C2R22) Inservice Inspection Report Summary Report
- CP-200800348, Transmittal of Inservice Inspection Program Plan, Revision 3, (ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date August 3, 2004, Second Interval)
- CP-200800928, Submittal of Tenth Refueling Outage (2RF10) Inservice Inspection (ISI) Summary Report (Unit 2: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 3, 2004, Second Interval)
- CP-200801132, Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)
- CP-200801342, Submittal of Tenth Refueling Outage (2RF10) Steam Generator Inspection 180 Day Report
- CP-200900008, Submittal of Unit 1 Thirteenth Refueling Outage (1RF13) Inservice Inspection (ISI) Summary Report (Unit 1:1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/13/2000, Second Interval
- CP-200900009, Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and Analyses
- CP-200900707, Revision to Relief Request No. P-2 for the Units 1 & 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)
- CP-201000888, Submittal of Unit 1 Fourteenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2000, Second Interval)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201001545, Relief Request No. B-10 for the Unit 1 Second 10 Years ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000)
- CP-201100852, Submittal of 12th Refueling Outage (2RF12) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 4,2004, Second Interval)
- CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)
- CP-201101429, Twelfth Refueling Outage (2RF12) Steam Generator 180 Day Report
- CP-201200045, Submittal of Unit 1 Fifteenth Refueling Outage (1RF15) Inservice Inspection (ISI) Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2010, Third Interval)
- CP-201200879, Relief Request No. V-1 for Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 2004 Edition, Through 2006 Addenda; Third Interval Start Date: August 3, 2013)
- CP-201300003, Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010)
- CP-201300005, Submittal of Inservice Inspection Summary Report for the 13th Refueling Outage
- CP-201300143, Response to RAI for Unit 1 Relief Request No. B-2
- CP-201400933, Comanche Peak - Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section Xi, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date:
- CP-201400933, Submittal of Unit 2 Fourteenth Refueling Outage (2RF14) Inservice Inspection (ISI) Summary Report (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August 3, 2004 Second Interval End Date: August 2, 2014
- CP-201401035, Relief Requests Nos. B-7, B-12 and B-13 for the Second 10-Year ISI Interval (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014)
- CP-201401379, Transmittal of Inservice Testing Plan for Pumps and Valves Third Interval, Revision 1
- CP-201500157, Relief Request No. 2C3-1 for the Reactor Pressure Vessel Leak-Off Flange (Third ISI Interval Start Date: August 3, 2014; Third ISI Interval End Date: August 2, 2023)
- CP-201500222, Comanche Peak, Submittal of Unit 1, Seventeenth Refueling Outage (1RF17) Inservice Inspection Summary Report (2007 Edition of ASME Code, Section Xi, 2008 Addenda Third Interval Start Date August 13, 2010 Third Interval End Date: August
- CP-201500222, Submittal of Unit 1, Seventeenth Refueling Outage (1RF17) Inservice Inspection Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date August 13, 2010 Third Interval End Date: August 12, 2020)
- CP-201500244, Relief Request 2A3-1 for Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds (2007 Edition of ASME Code.
- CP-201500671, Relief Request T-1 for Inservice Testing Program for Application of an Alternative to the ASME OM Code Frequency Specifications, (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval Start Date: August 3.
- CP-201500685, Comanche Peak - Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section Xi Examination Requirements for
- CP-201500685, Response to Request for Additional Information for Relief Request 2A3-1, Unit 2, Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 & 2.
- CP-201500775, Comanche Peak, Unit 2 - Relief Request B-3, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section Xi, 2000 Addenda Second Interval Start
- CP-201500775, Relief Request B-3, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500776, Comanche Peak, Unit 2 - Relief Request B-9, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section Xi, 2000 Addenda Second Interval Start
- CP-201500776, Relief Request B-9, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500777, Relief Request B-10, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500778, Relief Request B-11, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500779, Relief Request B-15, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500780, Comanche Peak, Unit 2 - Relief Request C-2, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section Xi, 2000 Addenda Second Interval Start
- CP-201500780, Relief Request C-2, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201500781, Comanche Peak, Unit 2 - Relief Request C-4, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section Xi, 2000 Addenda Second Interval Start
- CP-201500781, Relief Request C-4, Second Ten Year Inservice Inspection Interval from 10CFR50.55a Inspection Requirements Due to Physical Interferences (1998 Edition of ASME Code, Section XI, 2000 Addenda Second Interval Start Date: August..
- CP-201600117, Submittal of Fifteenth Refueling Outage (2RF15), Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda, Third Interval Start Date: August 3, 2014, Third Interval End Date: August 2, 2023)
- CP-201600148, Requesting Additional Information for Relief Request b-9 for Unit 2 Second Ten Year Inservice Inspection Interval
- CP-201600869, Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report
- CP-201700623, Submittal of Sixteenth Refueling Outage (2RF16) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Third Interval, Start Date: Aug. 3, 2014 Third Interval End Date: Aug. 2, 2023)
- CP-201800086, Submittal of Unit 1 Nineteenth Refueling Outage (IRF19) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Unit 1 Third Interval Start Date: August 13, 2010 Unit 1 Third ..
- CP-201800215, Submittal of Nineteenth Refueling Outage (1RF19) Steam Generator 180 Day Report
- CP-201900496, Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 20 (IRF20)
- CP-202000261, Inservice Inspection (ISI) and Inservice Testing (IST) Program Relief Requests
- CP-202000262, Snubber Testing and Snubber Visual Examinations Relief Request
- CP-202000463, (CPNPP) - Inservice Test (IST) Program Request to Use Later Code Edition
- CP-202100061, (CPNPP) - Inservice Inspection (Isi) Owner'S Activity Report (OAR-1 Form) for Unit 1 Refueling Outage 21 (1RF21)
- CP-202100150, (CPNPP) Units 1 & 2 - Inservice Testing Plan for Pumps & Valves Third Interval, Revision 4
- CP-202100751, (CPNPP) - ASME OM Inservice Test Program Relief Request SNB-3, Snubber Inservice Program Third Internal Extension
- CP-202200200, (CPNPP) Unit 2 Refueling Outage 19 (2RF19) Steam Generator 180 Day Report
- CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)
- CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report
- CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)
- CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program
- CPSES-200101489, Submittal of Unit 1 Eighth Refueling Outage (1RF08) Inservice Inspection (ISI) Summary Report (Unit 1: 1986 Edition of ASME Code, Section XI, No. Addenda, Interval Start Date - August 13, 2000
- CPSES-200200888, Part 2 of Inservice Inspection Program Plan, Rev 5
- CPSES-200201225, Sixth Refueling Outage (2RF06) Steam Generator Inservice Inspection Tube Plugging Special Report No. 2-SR-02-001-00
- CPSES-200202480, Relief Request A-2, Revision 2 to the Inservice Testing Plan for Pumps and Valves (1989 Edition of ASME Code, Section X1, No Addenda; Unit 1 Interval Start Date: August 13, 1990 First Interval. ..
- CPSES-200202716, (CPSES)-Unit 2, Submittal of Unit 2 Sixth Refueling Outage (2RFO6) Inservice Inspection (ISI) Summary Report
- CPSES-200300365, Submittal of Ninth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1986 Edition of ASME Code, Section XI, No.Addenda, Interval Start Date - August 13, 2000, Second Interval, First Period, Second Outage)
- CPSES-200302398, Unit 2, Seventh Refueling Outage (2RF07) Steam Generator Inservice Inspection Tube Plugging Special Report No. 2-SR-03-001-00
- CPSES-200400143, Submittal of Unit 2 Seventh Refueling Outage (2RF07) Inservice Inspection (ISI) Summary Report (Unit 2:1986 Edition of ASME Code, Section XI, No Addenda, Interval Start Date - August 3, 1993, First Interval)
- CPSES-200401598, Seventh Refueling Outage (2RF07) Steam Generator Twelve Month Report
- CPSES-200401767, Submittal of Unit 1 Tenth Refueling Outage Inservice Inspection Summary Report (Unit 1: 1986 Edition of ASME Code Section XI, No Addenda, Interval Start Date - August 13, 2000, Second Interval.)
- CPSES-200401771, Transmittal of Units 1 and 2 Inservice Testing Plan for Pumps and Valves, Revision 0 (ASME OM Code 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - August 3,2004, Second Interval)
- CPSES-200402110, Relief Request B-4 for the Second 10 Year ISI Interval for Unit 1 and B-1 for the Second 10 Year ISI Interval for Unit 2 from 10 CFR 50.55a for the Purpose of Invoking Code Case N-566-2, Corrective Action
- CPSES-200500454, Relief Requests B-12, B-13, B-14 and C-8 to the Unit 2 Inservice Inspection from 1986 Edition of ASME Code, Section XI
- CPSES-200501615, Submittal of Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report (Unit 2: 1998 Edition of ASME Code Section XI, 1999 and 2000 Addenda, Interval Start Date - August 3. 2004, Second Interval)
- CPSES-200501743, Transmittal of Unit 2 Inservice Inspection Program Plan, Revision 1 (Unit 2: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 3,2004, Second Interval)
- CPSES-200501745, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 4 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 200, Second Interval)
- CPSES-200501960, Submittal of Revised Unit 2 Eighth Refueling Outage Inservice Inspection Summary Report
- CPSES-200501961, Revision to Relief Request P-1 to Units 1 and 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval)
- CPSES-200502474, Relief Request C-1 to the Unit 2 Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 3, 2004, Second Interval)
- CPSES-200600052, Submittal of Unit 1 Eleventh Refueling Outage Inservice Inspection Summary Report (Unit 1: 1998 Edition of ASME Code Section XI, 1999 and 2000 Addenda, Interval Start Date - August 13, 2000, Second Interval)
- CPSES-200601983, Relief Request B-6 to Unit 1 Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval)
- CPSES-200602339, License Amendment Request (LAR) 06-010, Revision to Technical Specification 5.5.16, Containment Leakage Rate Testing Program.
- CPSES-200602340, License Amendment Request (LAR) 06-012, Revision to Technical Specification 3.7.5, Auxiliary Feedwater System, TS 3.8.1, AC Sources - Operating, & TS 3.8.9, Distribution Systems - Operating.
- CPSES-200602341, License Amendment Request (LAR) 06-006, Revision to Technical Specification (TS) 5.5.8, Inservice Testing Program
- CPSES-200700414, Transmittal of Inservice Inspection Program Plan, Revision 5 (Unit 1: ASME Code Section XI 1998 Edition, 1999 and 2000 Addenda, Interval Start Date - 08/13/200, Second Interval)
- CPSES-200701174, Submittal of Twelfth Refueling Outage (1RF12) Inservice Inspection Summary Report (1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/03/2000, Second Interval)
- CY-13-006, Independent Spent Fuel Storage Installation, Report of 10 CFR 50.59 Changes, Tests, and Experiments for the Period 01/01/2011 - 12/31/2012
D
- DCL-02-061, Inservice Testing (IST) Program Plan, Revision 18
- DCL-02-096, Inservice Inspection Report for Eleventh Refueling Outage
- DCL-02-116, Letter Regards Inservice Testing Program Plan, Revision 19
- DCL-03-009, Inservice Inspection Program Plan, Revision 2, Drawings104628, Sheets 1 - 52
- DCL-03-074, Inservice Inspection Report for Eleventh Refueling Outage
- DCL-04-002, Inservice Testing (IST) Program Plan, Revision 20
- DCL-04-018, Special Report 04-01: Results of Steam Generator Tube Eddy Current Inspections During the Eleventh Refueling Outage
- DCL-04-111, Inservice Inspection Report for Diablo Canyon Unit 1 Twelfth Refueling Outage
- DCL-04-112, Special Report 05-02: Results of Steam Generator Tube Eddy Current Inspections During Twelfth Refueling Outage
- DCL-05-017, Result of Steam Generator Inspections for Plant Twelfth Refueling Outage
- DCL-05-022, Inservice Inspection Report Twelfth Refueling Outage
- DCL-05-023, Inservice Testing (IST) Program - Third Ten-Year Interval and IST Relief Requests
- DCL-06-031, Inservice Inspection Report for Unit 1 Thirteenth Refueling Outage
- DCL-06-099, ASME Section XI Inservice Inspection Program Relief Requests NDE-SLH U2 and NDE-LSL U2
- DCL-06-101, Inservice Inspection Report for Plant Thirteenth Refueling Outage
- DCL-07-084, Inservice Inspection Report for Fourteenth Refueling Outage
- DCL-07-099, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information
- DCL-08-058, Transmittal of Inservice Inspection Report, Fourteenth Refueling Outage
- DCL-08-103, ASME Section XI Inservice Inspection Program Relief Request NDE-Leak Path for the Unit 1, Fifteenth Refueling Outage, Third Ten-Year Inspection Interval to Allow Use of the Rules of the NRC First Revised Order, EA-03-009.
- DCL-09-046, Submittal of Fifteenth Refueling Outage Inservice Inspection Report
- DCL-10-051, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R16 to Allow Use of Alternate Sizing Qualification Criteria
- DCL-10-157, Snubber Visual Examination and Functional Testing Related to the Inservice Inspection Program Third 10-Year Interval
- DCL-11-053, One Hundred Eighty-Day Steam Generator Report - Sixteenth Refueling Outage
- DCL-11-093, Inservice Inspection Report for Sixteenth Refueling Outage
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Cover Page Through Page 100
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Drawing No. 102028, Sheet 39, Through Drawing No. 104628, Sheet 46
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 101 Through Page 200
- DCL-12-006, Diablo Canyon - Inservice Inspection Program Plan, Third 10-Year Inspection Interval, Revision 1, Page 201 Through Drawing No. 102028, Sheet 38
- DCL-12-007, Request for Approval of an Alternative to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section XI Examination Requirement for Class 1 and 2 Piping Welds
- DCL-12-089, Inservice Inspection Report for Unit 1 Seventeenth Refueling Outage
- DCL-13-063, Inservice Inspection Report for Seventeenth Refueling Outage
- DCL-14-027, Request for Relief from the Requirements of Appendix IX of ASME Section XI, 2001 Edition with 2003 Addendum
- DCL-14-053, Owner'S Activity Report for Eighteenth Refueling Outage
- DCL-15-048, ASME Section XI Inservice Inspection Program Request for Relief NDE-PNS-U2A to Allow Use of Alternate Examination Volume Coverage Requirements
- DCL-15-054, One Hundred Eighty-Day Steam Generator Report for Diablo Canyon Power Plant, Unit 2, Eighteenth Refueling Outage
- DCL-15-106, ASME Section XI Inservice Inspection Program Request for Relief NDE-FWNS-U1/U2 to Allow Use of Alternate Examination Volume Coverage Requirements
- DCL-15-116, Submittal of 10 CFR 50.55a Request FLIG-U1, Request for Extension of Third Lnservice Inspection Interval for Performing Reactor Vessel Stud Hole Ligament Examinations
- DCL-16-018, Owner'S Activity Report for Nineteenth Refueling Outage
- DCL-16-024, Submittal of the Fourth Ten-Year Interval Inservice Testing (IST) Program Plan
- DCL-16-056, One Hundred Eighty-Day Steam Generator Report for Nineteenth Refueling Outage
- DCL-16-086, Owner'S Activity Report for Unit 2 Nineteenth Refueling Outage
- DCL-16-115, ASME Section XI Inservice Inspection Program Relief Request NDE-RCS-SE-1R20 to Allow Use of Alternative Depth Sizing Criteria
- DCL-16-116, ASME Section XI Inservice Inspection Program Relief Request NDE-SIF-U2 Due to Impracticality of Full Examination Volume Coverage Requirements
- DCL-17-028, ASME Section XI Inservice Inspection Program Plan - Fourth 10-Year Inspection Interval
- DCL-18-048, Owner'S Activity Report for Unit 2 Twentieth Refueling Outage
- DCL-18-105, Submittal of the Fourth Ten-Year Interval Inservice Testing (1ST) Program Plan, Revision 1
- DCL-19-049, Owner'S Activity Report for Unit 1 Twenty-first Refueling Outage
- DCL-19-084, ASME Section XI Lnservice Inspection Program Request for Alternative NDE-RCSSE-2R22 Use of Alternate Sizing Qualification Criteria Through a Protective Clad Layer
- DCL-20-039, One Hundred Eighty Day Steam Generator Report for Diablo Canyon Power Plant Unit 2 Twenty-First Refueling Outage
- DCL-21-008, Owner'S Activity Report for Unit 1 Twenty-Second Refueling Outage
- DCL-21-055, Owner'S Activity Report for Unit 2 Twenty-Second Refueling Outage
- DCL-22-060, Owner'S Activity Report for Unit 1 Twenty-Third Refueling Outage
- DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage
- DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage
E
- ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection
- ET 02-0049, Containment Inservice Inspection Program First Interval, First Period Owner'S Activity Reports
- ET 03-0006, Implementation of the ASME Code for Operation and Maintenance of Nuclear Power Plants, Regarding the Check Valve Monitoring Program
- ET 05-0004, Steam Generator Tube Plugging Report
- ET 06-0001, Revision to Technical Specification 5.5.8, Inservice Testing Program to Adopt Technical Specification Task Force Standard Technical Specification Change Traveler, TSTF-479, Revision 0
- ET 06-0010, Inservice Inspection Program Plan for the Third Ten-Year Interval and 10 CFR 50.55a Requests I3R-01, I3R-02, and I3R-04
- ET 06-0011, CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval
- ET 10-0012, Results of the Sixteenth Steam Generator Tube Inservice Inspection
- ET 11-0008, (WCGS) - Results of the Seventeenth Steam Generator Tube Inservice Inspection
- ET 13-0030, Results of the Eighteenth Steam Generator Tube Inservice Inspection
- ET 14-0018, 10CFR50.55a Request I3R-10 for Third Inservice Inspection Program Interval
- ET 15-0022, Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0
- ET 15-0024, Results of the Nineteenth Steam Generator Tube Inservice Inspection
- ET 16-0005, Inservice Inspection Plan and 10 CFR 50.55a Requests 14R-01 and 14R-02 for the Fourth Inservice Inspection Program Interval
- ET 17-0007, CFR 50.55a Request 14R-05 for the Fourth Inservice Inspection Program Interval
- ET 17-0008, Results of the Twentieth Steam Generator Tube Lnservice Inspection
- ET 18-0029, (WCGS) - Results of the Twenty First Steam Generator Tube Inservice Inspection
- ET 21-0009, Results of the Steam Generator Tube Inservice Inspection During the 24th Refueling Outage
G
- GNRO-2003/00022, Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station
- GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports
- GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1
- GNRO-2006/00044, Corrections to Inservice Inspection Summary Report
- GNRO-2007/00046, Inservice Inspection Summary Report
- GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0
- GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0
- GNRO-2009/00004, Inservice Inspection Summary Report
- GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing
- GNRO-2012/00110, Submittal of Inservice Inspection Summary Report
- GNRO-2014/00043, Inservice Inspection Summary Report
- GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report
- GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages
- GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report
- GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval
- GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval
- GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency
- GO2-03-147, Inservice Inspection Summary Report for Refueling Outage R-16
- GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan
- GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results
- GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07
- GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan