ET 02-0046, Results of Eleventh Steam Generator Tube Inservice Inspection

From kanterella
Jump to navigation Jump to search
Results of Eleventh Steam Generator Tube Inservice Inspection
ML030020006
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/11/2002
From: Fader G
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ET 02-0046
Download: ML030020006 (35)


Text

W LF CREEK -'NUCLEAR OPERATING CORPORATION Gary B. Fader Vice President Technical Services DEC 11 2002 ET 02-0046 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: Results of the Eleventh Steam Generator Tube Inservice Inspection Gentlemen:

The attached Steam Generator Tube Inspection Report is submitted in accordance with Wolf Creek Generating Station Technical Specification 5.6.10.b. This report provides the results of Wolf Creek Generating Station's eleventh steam generator tube inservice inspection. The Steam Generator Tube Inspection Report includes the number and extent of tubes inspected, location and percent of wall-thickness penetration for each indication of an imperfection, and identification of tubes plugged. Attachment I provides the Steam Generator Tube Inspection Report.

No commitments are contained in this correspondence.

If you have any questions concerning this matter, please contact me at (620) 364-4034, or Mr.

Tony Harris at (620) 364-4038.

Very truly yours, GBF/rlg Attachment I - Steam Generator Tube Inspection Report cc: J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), w/a AOO I RO. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET

Attachment I to ET 02-0046 Page 1 of 34 STEAM GENERATOR TUBE INSPECTION REPORT This report is being submitted pursuant to Technical Specification 5.6.10.b to report the results of the eleventh steam generator tube inservice inspection. Additional information established by NEI 97-06, "Steam Generator Program Guidelines," is also included with this report.

Summary The eleventh steam generator tube inservice inspection was completed by Westinghouse Electric Corporation on April 8, 2002, during Refuel 12. Section 1 of this report describes the inspection programs, which were completed in Steam Generators "B" and "C" including: 100%

bobbin coil except the U-bend portion of row 1 and row 2, 55% Rotating Pancake Coil (RPC) top of tube sheet on the hot leg side, 50% RPC row I and 2 U-bends, and a special interest program. The inspection results, which include the location and percent of wall-thickness penetration for each indication of an imperfection, are listed in Section 2 of this report.

Mechanical plugging was necessary due to indications found during the inservice inspection.

Of the 5604 tubes inspected in Steam Generator "B", five tubes were plugged due to anti vibration bar (AVB) wear indications that exceeded the 40 percent through wall Technical Specification acceptance criteria. One additional tube in Steam Generator B was administratively plugged due to a single circumferential anomaly. This tube was inspected with an ultrasonic technique, which confirmed that no crack-like indications were present. Three of the 5610 tubes inspected in Steam Generator "C" were plugged due to AVB wear indications that exceeded the 40 percent through wall Technical Specification acceptance criteria.

Identification of tubes plugged, as well as the total number and percentage of tubes plugged to date for each steam generator, is included in Section 3 of this report.

The results of the eleventh steam generator tube inservice inspection have been classified as Category C-2. Category C-2 is defined in Technical Specification 5.5.9 as inspection results that indicate "one or more tubes, but not more than 1% of the total tubes inspected are defective, or between 5% and 10% of the total tubes inspected are degraded tubes." Steam Generator "B" had 0.09 percent defective tubes and 2.64 percent degraded tubes. Steam Generator "C" had 0.05 percent defective tubes and 1.57 percent degraded tubes.

Attachment I to ET 02-0046 Page 2 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Technical Specification Required Reports Section 1: Number and Extent of Tubes Inspected.

A. Steam Generator "B": A total of 5604 tubes were inspected B. Steam Generator "C": A total of 5610 tubes were inspected Steam Steam Test Extent Generator B Generator C Bobbin Full Length 5361 5366 Bobbin Cold Leg Straight Length 243 244 Bobbin Hot Leg Straight Length 243 244 RPC Hot Leg Top of Tubesheet (+/- 3 inches) 3297 3271 RPC Row 1 and 2 U-bends 121 122 An extensive special interest program was performed during the steam generator tube inservice inspection. All freespan indications reported were reviewed in history. Those indications, which could either not be detected or showed a change from history, were reported as an "I"code and RPC tested. A sampling of calls that were found not to have changed from history were also RPC tested. RPC inspections were also performed to track Flow Distribution Baffle wear indications. None of the freespan or support plate indications tested with RPC were reported as degradation.

In addition, two tubes in Steam Generator B were tested with ultrasonic examination. No crack like indications were observed in the inspected region with the shear wave transducers.

Section 2: Location and Percent of Wall Thickness Penetration for Each Indication of an Imperfection.

The following tables contain all tubes inspected that had a percent through wall loss indication.

In addition, tube (55,71) in Steam Generator B contained a single circumferential anomaly.

This tube was further inspected with an ultrasonic technique, which confirmed that no crack-like indications were present. This tube was administratively plugged.

The key below provides a description of the abbreviations used in the following tables.

  1. H, #C (# = number) of Support Plate(s) Hot Leg or Cold Leg Side AV# Anti-Vibration Bar (# = number)

TSH Tube Sheet Hot Leg FBC Flow Baffle Cold Leg

Attachment I to ET 02-0046 Page 3 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 17 5 26 2C -0.59 17 5 9 2C 0.31 26 7 12 AV2 0.00 26 7 12 AV5 0.00 27 8 22 AV1 0.00 27 9 12 AV1 0.00 27 9 18 AV5 0.00 28 9 16 AV5 0.00 29 9 18 AV2 0.00 29 9 15 AV5 0.00 30 9 24 AV2 0.00 30 10 23 AV5 0.11 32 12 15 AV4 0.00 32 12 17 AV5 0.00 33 12 13 AV2 0.05 33 12 21 AV5 0.13 33 12 15 AV6 0.00 34 16 13 AV5 -0.08 45 22 21 AV5 0.00 45 22 30 AV6 0.05 42 23 13 AV2 0.00 42 23 15 AV3 0.00 42 23 14 AV4 0.00 30 24 25 TSH 0.20 45 24 16 AV2 0.03 46 24 18 AV5 -0.03 47 24 16 AV5 0.08 47 24 17 AV6 0.00 46 25 14 AV2 -0.14 46 25 23 AV3 0.11 46 25 29 AV4 0.03 46 25 28 AV5 0.00 46 25 20 AV6 0.16 48 25 16 AV5 -0.03 48 25 17 AV6 0.11 49 27 19 AV6 0.00 49 28 19 AV4 0.00 49 28 29 AV5 0.00 49 28 19 AV6 0.00 44 30 16 AV4 0.00

Attachment I to ET 02-0046 Page 4 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 30 12 AV5 0.00 1 31 23 FBC 0.23 30 31 18 AV2 -0.11 49 31 12 AV2 -0.11 49 31 27 AV5 0.16 49 31 13 AV6 -0.19 1 32 14 FBC -0.39 1 32 16 FBC 0.37 48 32 17 AV5 0.00 48 32 15 AV6 -0.11 1 33 11 FBC -0.31 1 33 17 FBC 0.29 45 33 18 AV3 0.03 49 33 11 AV2 0.08 49 33 23 AV3 0.08 49 33 16 AV4 0.05 49 33 34 AV5 0.21 49 33 16 AV6 -0.08 44 34 16 AV2 0.00 44 34 16 AV3 0.00 44 34 10 AV4 0.00 49 34 13 AV3 0.06 36 35 16 AV2 0.00 36 35 16 AV3 0.00 36 35 19 AV4 0.00 36 35 19 AV4 0.05 53 35 11 AV2 0.00 53 35 24 AV4 0.00 53 35 34 AV5 0.00 53 35 17 AV6 0.00 36 36 16 AV3 0.00 42 36 18 AV2 0.00 42 36 17 AV4 0.00 47 36 17 AV2 0.06 47 36 16 AV3 -0.06 47 36 19 AV4 -0.10 47 36 30 AV5 0.21 47 36 17 AV6 0.13 49 36 21 AV3 0.17 49 36 29 AV4 0.26

Attachment I to ET 02-0046 Page 5 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 49 36 22 AV5 0.00 49 36 15 AV6 -0.05 36 37 17 AV4 0.03 49 37 18 AV2 0.25 49 37 15 AV3 -0.03 49 37 17 AV4 0.00 49 37 21 AV5 0.05 49 37 11 AV6 0.03 50 37 35 AV4 0.13 50 37 25 AV5 0.19 54 37 15 AV3 0.00 54 37 13 AV5 0.00 36 38 14 AV2 0.00 45 38 14 AV4 -0.13 47 38 23 AV3 0.00 48 38 22 AV2 0.22

'48 38 25 AV3 0.19 48 38 22 AV4 0.05 48 38 35 AV5 0.34 50 38 20 AV3 0.11 50 38 25 AV4 0.05 50 38 21 AV5 -0.13 52 38 16 AV2 0.16 52 38 16 AV3 0.00 52 38 32 AV4 0.08 52 38 19 AV5 -0.05 39 39 10 AV2 -0.14 41 39 10 AV2 0.19 42 39 13 AV2 -0.08 42 39 14 AV3 -0.08 42 39 10 AV4 -0.21 45 39 13 AV2 -0.14 50 39 21 AV2 0.14 50 39 28 AV3 0.16 50 39 30 AV4 0.05 50 39 27 AV5 0.26 50 39 10 AV6 -0.13 36 40 11 AV1 0.00 42 40 13 AV2 0.00 42 40 19 AV3 0.00 to ET 02-0046 Page 6 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 42 40 13 AV6 0.00 47 40 11 AV2 0.00 54 40 12 AV2 0.00 55 40 14 AV4 0.00 41 41 11 AV3 -0.06 42 41 10 AV3 0.14 42 41 16 AV5 0.26 46 41 12 AV2 0.08 48 41 18 AV3 0.17 39 42 20 AV4 0.00 37 43 12 AV2 -0.03 37 43 18 AV3 -0.03 44 43 15 AV3 -0.08 46 43 14 AV6 -0.05 47 43 11 AV2 0.16

.47 43 12 AV3 -0.16 56 43 21 AV5 0.05 44 45 15 AV3 0.25 44 45 17 AV4 0.05 47 45 12 AVI 0.41 47 45 15 AV2 0.05 47 45 12 AV4 0.11 48 45 34 AV4 0.00 48 45 23 AV5 0.00 48 45 19 AV6 -0.13 49 45 33 AV2 0.11 49 45 14 AV3 -0.22 49 45 36 AV4 0.24 49 45 29 AV5 0.05 49 45 24 AV6 0.34 52 45 16 AV3 0.14 52 45 17 AV4 0.03 52 45 15 AV5 0.05 53 45 13 AV2 0.11 53 45 14 AV3 0.05 53 45 29 AV4 0.11 53 45 40 AV5 0.13 53 45 22 AV6 0.26 44 46 20 AV1 0.00 44 46 17 AV2 0.00

Attachment I to ET 02-0046 Page 7 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 46 21 AV3 0.00 44 46 24 AV4 0.00 44 46 23 AV5 0.00 53 46 20 AV4 0.03 53 46 22 AV5 0.18 53 46 21 AV6 0.03 30 47 10 AV2 0.00 41 47 16 AV2 -0.21 42 47 17 AV3 0.13 42 47 13 AV4 0.08 42 47 15 AV6 0.16 44 47 15 AV2 0.11 46 47 17 AV6 0.00 47 47 15 AV2 0.05 47 47 11 AV5 -0.05 48 47 13 AV2 0.00 50 47 13 AV1 0.38 50 47 36 AV2 0.14 50 47 31 AV3 0.00 50 47 21 AV4 0.00 50 47 11 AV5 0.00 50 47 13 AV6 0.00 53 47 29 AV2 0.00 53 47 15 AV3 0.16 56 47 24 AV4 -0.03 56 47 22 AV5 -0.05 34 48 19 AV6 0.00 48 48 17 AV2 0.00 48 48 23 AV3 0.35 48 48 31 AV4 0.26 48 48 21 AV5 0.00 48 48 19 AV6 0.00 50 48 21 AV2 0.00 50 48 19 AV3 0.27 50 48 17 AV4 0.00 50 48 24 AV5 0.03 30 49 18 AV2 0.00 30 49 27 AV5 0.08 30 49 21 AV6 0.16 39 49 20 AV4 0.11

Attachment I to ET 02-0046 Page 8 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 49 11 AV2 0.05 44 49 15 AV3 0.35 52 49 13 AV3 0.05 33 50 17 AV4 0.21 44 50 17 AV2 0.00 44 50 17 AV3 0.27 44 50 13 AV4 0.00 45 50 18 AV3 0.03 45 50 21 AV4 0.10 45 50 20 AV5 -0.05 47 50 23 AV2 0.17 47 50 30 AV3 0.30 47 50 12 AV4 0.00 47 50 17 AV5 0.00 47 50 15 AV6 0.00 53 50 22 AV1 0.14 53 50 27 AV2 0.00 53 50 31 AV3 0.25 53 50 27 AV4 0.08 53 50 31 AV5 0.00 55 50 26 AV5 0.00 44 51 14 AV2 0.00 44 51 20 AV3 0.00 46 51 21 AV2 0.00 50 51 20 AV2 0.00 50 51 23 AV3 0.00 50 51 37 AV4 0.00 50 51 34 AV5 0.00 25 52 18 AV5 0.00 25 52 16 AV6 0.24 35 52 11 AV2 0.00 35 52 11 AV4 -0.26 40 52 21 AV4 0.00 40 52 15 AV5 -0.05 45 52 19 AV1 -0.03 45 52 52 AV2 0.00 45 52 30 AV4 0.00 50 52 11 AV1 -0.16 50 52 15 AV2 0.00 37 53 15 AV4 -0.10

Attachment I to ET 02-0046 Page 9 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 53 30 AV2 0.05 44 53 18 AV3 0.00 45 53 19 AV2 0.11 45 53 34 AV3 0.24 46 53 30 AV3 0.30 46 53 17 AV6 0.00 49 53 25 AV4 0.21 49 53 30 AV5 0.23 42 54 23 AV1 0.00 42 54 23 AV2 0.00 42 54 19 AV3 0.00 42 54 17 AV4 0.00 42 54 31 AV5 0.00 42 54 22 AV6 0.00 45 54 21 AV2 0.00 45 54 32 AV3 0.00 45 54 25 AV4 0.00 46 54 16 AV4 0.05 47 54 16 AV1 0.00 47 54 18 AV2 0.19 47 54 11 AV3 0.14 47 54 12 AV5 0.00 50 54 20 AV3 0.14 50 54 17 AV4 0.00 50 54 21 AV5 0.00 51 54 18 AV4 0.03 51 54 13 AV5 0.00 40 55 18 AV4 0.11 43 55 27 AV2 -0.05 43 55 22 AV3 -0.05 43 55 29 AV4 -0.05 45 55 13 AV2 0.08 46 55 19 AV2 -0.06 46 55 21 AV5 0.16 47 55 15 AV3 0.00 51 55 21 AV5 0.21 51 55 23 AV6 -0.05 32 56 12 AV2 0.00 36 56 15 AV2 0.00 37 56 18 AV2 0.00

Attachment I to ET 02-0046 Page 10 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 37 56 19 AV3 0.00 37 56 13 AV4 0.00 46 56 11 AV4 0.03 46 56 17 AV5 -0.03 54 56 22 AVI 0.05 54 56 34 AV2 0.00 54 56 28 AV3 0.27 54 56 22 AV4 0.03 54 56 29 AV5 0.00 54 56 15 AV6 0.00 40 57 15 AV2 0.03 40 57 15 AV3 0.11 48 57 25 AV3 0.00 48 57 36 AV4 0.00 48 57 23 AV5 0.00 48 57 20 AV6 0.00 52 57 21 AV2 0.00 52 57 16 AV3 0.00 53 57 27 AV2 0.00 53 57 26 AV3 0.00 36 58 22 AV2 0.00 36 58 21 AV3 0.00 36 58 14 AV4 0.00 37 58 16 AV4 0.00 41 58 20 AV3 0.00 43 58 16 AV1 0.00 43 58 14 AV2 0.00 43 58 27 AV3 0.00 43 58 28 AV4 0.00 44 58 30 AV2 0.00 44 58 22 AV5 0.00 46 58 13 AV3 0.05 46 58 14 AV5 0.00 47 58 12 AV1 0.00 47 58 19 AV2 -0.05 53 58 10 AV1 0.00 53 58 31 AV2 0.00 53 58 33 AV3 0.35 53 58 43 AV4 -0.32 53 58 51 AV5 0.00

Attachment I to ET 02-0046 Page 11 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 53 58 27 AV6 0.03 59 58 11 AV6 0.00 40 59 18 AV2 0.08 47 59 19 AV2 0.00 47 59 26 AV4 0.00 48 59 20 AV3 0.00 50 59 21 AVI 0.00 50 59 31 AV2 0.00 50 59 21 AV3 0.00 50 59 19 AV4 0.00 50 59 27 AV5 0.00 50 59 18 AV6 0.00 51 59 19 AV6 0.00 59 59 13 AVI 0.00 40 60 18 AV2 0.00 40 60 23 AV3 0.00 42 60 15 AV2 0.33 44 60 18 AV3 0.00 44 60 17 AV5 0.00 46 60 29 AV5 -0.03 46 60 17 AV6 -0.34 47 60 11 AV1 0.00 47 60 11 AV2 0.00 47 60 20 AV3 0.13 48 60 29 AV4 0.03 48 60 36 AV5 0.13 52 60 10 AV4 0.00 52 60 13 AV5 0.00 58 60 13 AV5 0.03 36 61 15 AV3 -0.08 39 61 11 AV3 0.00 42 61 16 AV3 0.00 46 61 15 AVI 0.00 46 61 26 AV3 0.00 46 61 31 AV4 0.00 46 61 15 AV5 0.00 46 61 22 AV6 0.00 47 61 19 AV2 0.00 47 61 16 AV4 0.00 48 61 26 AV4 0.00

Attachment I to ET 02-0046 Page 12 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 48 61 27 AV5 0.00 50 61 18 AV2 0.00 50 61 27 AV3 0.00 50 61 20 AV5 0.00 52 61 17 AV2 0.00 56 61 21 AV2 0.00 56 61 20 AV3 0.00 56 61 47 AV4 0.00 56 61 40 AV5 0.00 39 62 19 AV4 0.03 40 62 22 AV2 0.19 40 62 28 AV5 0.08 41 62 19 AV2 0.13 41 62 12 AV3 -0.03 42 62 34 AV5 0.13 42 62 10 AV6 0.00 43 62 18 AV2 0.05 43 62 18 AV5 -0.03 43 62 12 AV6 -0.21 45 62 16 AV2 0.00 46 62 15 AV2 0.00 46 62 32 AV3 -0.29 46 62 16 AV4 0.03 46 62 21 AV5 0.00 46 62 29 AV6 -0.40 47 62 15 AV2 0.05 48 62 21 AV1 25.90 48 62 22 AV2 0.00 49 62 28 AV2 0.13 53 62 11 AV3 0.00 53 62 26 AV4 0.00 53 62 34 AV5 0.13 53 62 14 AV6 -0.29 35 63 10 AV3 0.00 37 63 27 AV4 0.03 41 63 20 AV5 0.00 43 63 18 AV3 0.00 43 63 16 AV6 0.00 45 63 18 AV2 0.00 45 63 16 AV3 0.00 to ET 02-0046 Page 13 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 45 63 15 AV4 0.00 45 63 25 AV6 0.00 46 63 15 AV3 0.00 46 63 21 AV5 0.00 47 63 21 AV5 0.00 47 63 13 AV6 0.00 48 63 21 AV3 0.00 48 63 16 AV5 0.00 49 63 23 AV3 0.00 50 63 18 AV1 0.00 50 63 17 AV3 0.00 53 63 21 AV2 0.00 53 63 20 AV3 0.00 53 63 15 AV4 0.00 37 64 23 AV4 0.00 37 64 26 AV5 0.00 37 64 18 AV6 0.00 38 64 22 AV3 0.00 38 64 20 AV5 0.21 41 64 15 AV5 0.29 41 64 11 AV6 0.00 42 64 16 AV3 0.11 43 64 21 AV4 0.03 44 64 12 AV4 0.00 44 64 13 AV5 0.18 44 64 12 AV6 -0.16 45 64 16 AV3 0.00 46 64 11 AV1 -0.27 46 64 10 AV2 -0.05 46 64 17 AV3 0.19 46 64 16 AV4 0.00 47 64 10 AV2 0.13 47 64 23 AV3 0.21 48 64 25 AV2 0.03 48 64 18 AV3 0.00 48 64 20 AV4 0.03 49 64 17 AV2 0.03 49 64 14 AV3 0.00 49 64 12 AV4 0.03 51 64 19 AV2 0.00

Attachment I to ET 02-0046 Page 14 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 51 64 16 AV3 0.05 37 65 13 AV4 0.05 37 65 12 AV6 -0.26 42 65 18 AV2 0.00 44 65 17 AV3 0.00 44 65 42 AV4 0.00 44 65 17 AV6 0.00 50 65 39 AV2 0.00 50 65 22 AV3 0.00 50 65 15 AV4 0.00 50 65 16 AV5 0.00 50 65 21 AV6 0.00 51 65 16 AV2 0.00 53 65 29 AV2 0.00 53 65 11 AV3 0.00 53 65 14 AV4 0.00 41 66 13 AV2 0.13 46 66 15 AV3 -0.13 46 66 15 AV4 -0.18 46 66 19 AV5 0.18 47 66 17 AV2 0.00 47 66 20 AV3 -0.16 47 66 24 AV4 0.00 47 66 16 AV5 0.13 54 66 11 AV2 0.00 55 66 10 AV2 0.00 38 67 12 AV4 -0.03 41 67 19 AV3 0.00 44 67 16 AV4 0.00 44 67 16 AV5 0.00 39 68 15 AV3 0.00 42 68 10 AV4 0.00 42 68 11 AV6 0.00 45 68 18 AV5 -0.05 50 68 19 AV2 -0.08 50 68 22 AV3 0.05 42 69 15 AV3 0.00 44 69 18 AV3 0.00 45 69 22 AV4 0.00 45 69 20 AV5 0.00

Attachment I to ET 02-0046 Page 15 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 45 69 15 AV6 0.00 50 69 20 AV3 0.00 51 69 16 AV2 0.00 52 70 14 AV6 0.00 54 70 16 AV1 0.00 54 70 16 AV2 0.05 36 71 10 AV4 -0.03 41 71 18 AV2 0.00 41 71 16 AV3 0.00 48 71 18 AV6 0.00 49 71 21 AV2 0.00 49 71 27 AV3 0.00 49 71 13 AV4 0.00 37 72 20 AV3 0.00 37 72 18 AV5 -0.08 40 72 21 AV2 0.03 40 72 10 AV3 0.00 40 72 23 AV5 0.03 44 72 17 AV5 -0.03 50 72 12 AV2 0.19 50 72 20 AV5 0.05 50 72 17 AV6 -0.05 52 72 13 AV5 -0.05 40 73 18 AV5 0.00 44 73 20 AV2 0.00 44 73 19 AV4 0.00 44 73 20 AV5 0.00 45 73 24 AV5 0.00 49 73 15 AV2 0.00 49 73 16 AV3 0.00 49 73 22 AV4 0.00 49 73 17 AV5 0.00 37 74 20 AV3 -0.09 37 74 17 AV6 -0.37 39 74 12 AV4 0.00 42 74 16 AV2 -0.08 42 74 12 AV3 -0.14 44 74 12 AV2 0.00 44 74 39 AV4 0.16 44 74 15 AV6 0.11

Attachment I to ET 02-0046 Page 16 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 45 74 19 AV3 0.27 45 74 31 AV4 0.34 45 74 31 AV5 -0.03 45 74 19 AV6 -0.32 50 74 26 AV2 0.05 50 74 13 AV5 0.03 51 74 19 AV5 0.05 55 74 21 AV4 0.11 55 74 18 AV5 0.08 55 74 18 AV6 -0.24 46 75 22 AV2 0.00 46 75 20 AV3 0.00 47 75 14 AV6 0.00 50 75 21 AV4 0.00 51 75 15 AV2 0.00 53 75 15 AV6 0.00 41 76 14 AV6 -0.82 44 76 13 AV3 0.00 44 76 15 AV4 0.03 44 76 14 AV5 0.00 45 76 12 AV5 -0.03 44 77 15 AV2 0.00 44 77 19 AV3 0.00 45 77 16 AV3 0.00 45 77 13 AV4 0.00 48 77 17 AV4 0.00 47 78 10 AV4 0.00 41 79 11 AV2 0.00 41 79 14 AV3 0.00 44 79 17 AV2 0.00 44 79 22 AV3 0.00 44 79 26 AV4 0.00 44 79 33 AV5 0.00 44 79 27 AV6 0.00 47 79 13 AV3 0.00 47 79 20 AV4 0.00 47 79 20 AV5 0.00 47 79 17 AV6 0.00 48 79 14 AV5 0.00 50 79 11 AV2 0.00

Attachment I to ET 02-0046 Page 17 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 50 79 23 AV5 0.03 44 80 11 AV3 0.00 45 80 10 AV2 0.00 45 80 14 AV3 0.08 45 80 11 AV4 0.00 45 80 14 AV5 -0.05 47 80 24 AV4 0.00 47 80 10 AV5 0.00 47 80 13 AV6 0.00 35 81 10 AVI 0.00 36 81 10 AV4 0.00 36 81 18 AV5 0.00 40 81 31 AV2 0.00 40 81 24 AV3 0.00 40 81 18 AV4 0.00 40 81 23 AV5 0.00 44 81 18 AV2 0.00 44 81 15 AV3 0.00 47 81 16 AV2 0.00 47 81 22 AV3 0.00 47 81 25 AV4 0.00 47 82 14 AV4 -0.03 48 83 24 AV2 0.00 44 84 11 AV6 0.00 46 84 10 AV3 -0.11 47 84 12 AV5 0.00 45 85 19 AV4 -0.13 45 85 23 AV5 0.00 51 85 18 AV2 -0.36 51 85 24 AV3 0.33 51 85 33 AV4 0.23 51 85 23 AV5 0.05 51 85 14 AV6 -0.16 37 86 14 AV4 0.13 44 86 14 AV3 0.03 44 86 15 AV4 0.05 44 86 12 AV5 0.03 50 86 14 AV3 0.06 50 86 11 AV4 0.00 50 86 12 AV5 0.03 to ET 02-0046 Page 18 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 87 17 AV4 0.08 44 87 24 AV5 -0.05 54 87 11 AV6 0.00 42 88 11 AV3 0.00 44 88 11 AV5 0.00 50 88 11 AV3 -0.08 50 88 12 AV5 0.00 45 89 22 AV4 0.00 52 89 22 AV5 0.03 23 90 18 AV6 -0.37 45 90 16 AV3 0.06 50 90 12 AV3 -0.22 50 90 17 AV4 0.05 50 90 14 AV5 -0.11 53 90 15 AV5 -0.21 53 90 19 AV6 -0.08 47 91 15 AV4 0.00 47 91 19 AV5 0.10 47 91 15 AV6 -0.13 50 91 17 AV5 0.00 50 91 21 AV6 -0.03 45 92 13 AV4 0.00 45 92 10 AV5 0.08 45 92 11 AV6 0.11 44 93 17 AV5 0.13 44 94 13 AV5 0.29 46 94 11 AV2 -0.11 46 94 23 AV3 0.06 46 94 17 AV4 0.03 42 95 14 AV4 0.00 46 95 19 AV2 0.11 46 95 20 AV3 -0.06 46 95 18 AV4 0.00 46 95 19 AV5 0.18 48 95 25 AV6 -0.10 49 95 17 AV6 0.00 38 96 18 AV6 0.00 45 96 13 AV3 -0.03 45 96 17 AV4 0.03 46 96 11 AV2 0.00

Attachment I to ET 02-0046 Page 19 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 46 96 17 AV3 -0.08 46 96 10 AV5 -0.08 47 96 10 AV3 -0.14 47 96 26 AV4 0.11 47 96 20 AV5 0.11 47 96 10 AV6 -0.13 48 96 14 AV6 0.00 49 96 20 AV6 0.08 47 97 26 AV4 0.00 47 97 35 AV5 0.34 47 97 21 AV6 -0.08 48 97 33 AV4 0.05 48 97 21 AV5 -0.18 48 97 21 AV6 -0.05 45 98 13 AV3 -0.11 45 98 21 AV5 0.13 45 98 15 AV6 -0.03 46 98 18 AV4 -0.03 46 98 30 AV5 0.24 48 98 32 AV5 0.29 48 98 30 AV6 0.08 43 99 19 AV3 -0.08 43 99 15 AV4 0.00 45 99 25 AV5 0.21 46 99 17 AV4 0.03 46 99 18 AV6 -0.24 43 100 13 AV3 -0.08 43 100 22 AV5 0.24 43 100 10 AV6 -0.13 44 100 14 AV5 0.24 44 100 39 AV6 0.08 45 100 13 AV2 -0.34 45 100 15 AV5 -0.11 45 100 10 AV6 -0.13 41 101 19 AV6 0.08 42 101 24 AV5 0.24 42 101 20 AV6 0.03 43 101 23 AV6 -0.03 44 101 19 AV3 -0.03 44 101 29 AV4 0.21 to ET 02-0046 Page 20 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "B" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 101 31 AV5 0.37 44 101 19 AV6 0.03 41 102 13 AV4 -0.03 43 102 13 AV4 -0.03 40 103 18 AV5 0.00 41 103 19 AV6 0.03 42 103 23 AV5 0.18 42 103 17 AV6 0.00 43 103 20 AV5 0.16 40 104 17 AV6 0.08 41 104 17 AV5 0.21 41 104 30 AV6 0.00 37 105 13 AV5 0.00 38 105 19 AV3 0.00 38 105 18 AV6 -0.16 39 105 13 AV4 0.13 39 105 10 AV5 0.26 39 105 16 AV6 -0.21 41 105 23 AV6 -0.05 38 107 13 AV5 0.00 36 109 19 AV4 0.00 33 110 16 AV5 0.00 36 110 14 AV6 0.00 33 111 13 AV2 0.00 33 111 15 AV5 0.00 33 111 14 AV6 -0.03 28 113 17 AV5 0.00 26 115 15 AV2 0.00 to ET 02-0046 Page 21 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 16 5 8 TSH 0.23 28 8 15 AV1 0.00 33 13 17 AV4 0.03 33 14 21 AV4 -0.08 33 14 15 AV6 0.16 34 14 23 AV1 0.05 34 14 17 AV3 0.11 34 14 25 AV4 -0.03 35 14 27 AV3 0.03 35 14 26 AV4 0.03 35 15 36 AV2 0.00 35 15 22 AV4 0.11 34 16 23 AV4 -0.08 35 16 17 AV2 0.08 35 16 18 AV4 0.16 35 16 13 AV6 -0.05 34 18 14 AV4 0.24 38 20 20 AV2 0.00 38 20 11 AV3 -0.03 38 20 22 AV4 0.05 36 21 20 AV3 0.03 39 21 17 AV3 0.00 39 22 15 AV4 0.13 40 22 15 AV2 0.00 46 25 15 AV2 0.03 47 25 16 AV2 0.00 47 25 13 AV4 -0.03 48 25 27 AV2 -0.28 48 25 11 AV3 0.08 48 25 38 AV4 0.00 48 25 25 AV5 0.00 47 26 11 AV2 0.00 36 27 19 AV4 0.00 38 27 19 AV2 -0.08 39 27 24 AV4 0.00 39 27 24 AV5 0.05 34 28 16 AV3 0.00 38 28 20 AV4 -0.13 38 28 18 AV5 -0.03 39 29 15 AV3 0.19 38 31 10 AV3 0.17

Attachment I to ET 02-0046 Page 22 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 1 32 5 FBC -0.43 39 32 13 AV4 -0.05 46 32 12 AV2 -0.20 38 33 16 AV3 0.14 38 33 13 AV4 0.08 44 33 25 AV4 -0.03 44 33 17 AV5 -0.05 40 34 12 AV1 -0.14 40 34 18 AV2 0.17 40 34 23 AV3 0.00 40 34 23 AV4 0.16 40 34 35 AV5 0.00 40 34 11 AV6 0.00 38 35 11 AV2 0.00 38 35 19 AV3 -0.11 38 35 17 AV4 0.16 38 35 25 AV5 0.19 52 35 14 AV2 0.17 54 35 12 AV4 0.00 28 36 19 AV5 0.11 27 37 14 AV6 0.00 37 37 10 AV1 0.14 37 37 15 AV3 0.00 37 37 14 AV4 0.00 43 37 23 TSH 0.48 51 37 42 AV2 0.00 51 37 29 AV3 0.08 51 37 36 AV4 0.00 51 37 32 AV5 0.00 51 37 42 AV6 0.00 16 38 10 AV6 -0.27 28 39 20 AVI 0.00 28 39 21 AV2 0.23 28 39 10 AV5 0.03 28 39 22 AV6 0.24 45 39 20 AV3 0.00 34 40 12 AV2 -0.03 34 40 16 AV3 -0.17 38 40 18 AVI 0.00 38 40 10 AV2 0.00 38 40 15 AV3 0.19

Attachment I to ET 02-0046 Page 23 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 38 40 14 AV4 0.00 38 40 12 AV5 0.00 42 40 19 AV1 0.20 42 40 12 AV2 0.17 42 40 20 AV3 0.00 42 40 23 AV4 -0.01 42 40 12 AV5 -0.02 51 40 10 AV3 0.00 51 40 29 AV4 0.00 51 40 14 AV5 0.05 51 40 19 AV6 0.00 24 41 11 AV6 -0.29 26 41 11 AV2 0.00 28 41 13 AV2 -0.03 40 41 13 AV3 0.00 40 41 17 AV4 0.08 40 41 19 AV5 0.13 45 43 17 AV1 -0.23 27 44 21 AV2 0.00 27 44 18 AV5 0.00 31 44 21 AV2 0.00 31 44 19 AV5 0.00 31 44 16 AV6 0.00 38 44 11 AVI 0.00 38 44 17 AV2 0.00 39 44 13 AV2 0.00 39 45 13 AV1 0.00 39 45 12 AV3 0.00 39 45 29 AV4 0.13 39 45 23 AV5 0.21 39 45 16 AV6 -0.08 49 46 19 AV1 0.00 58 46 12 AV4 -0.05 28 47 13 AV5 0.08 35 47 15 AV2 0.06 31 48 18 AV1 0.00 31 48 26 AV2 0.00 31 48 36 AV5 0.00 31 48 28 AV6 0.00 35 48 11 AV2 0.00 45 48 23 AV4 0.00

Attachment I to ET 02-0046 Page 24 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 45 48 27 AV5 0.00 45 48 20 AV6 0.00 31 49 13 AV5 0.19 33 49 13 AV1 0.00 33 49 23 AV2 0.00 33 49 16 AV3 -0.08 33 49 14 AV4 0.11 33 49 15 AV6 0.24 44 49 11 AV2 0.08 27 50 19 AV5 0.00 27 50 16 AV6 0.00 39 50 13 AV3 0.00 39 50 14 AV4 0.00 39 50 18 AV5 0.00 49 50 15 AV2 0.00 27 51 10 AV2 0.00 27 51 10 AV5 0.03 56 51 17 TSH 0.06 29 52 22 AV2 0.00 29 52 20 AV5 0.00 29 52 21 AV6 0.00 24 53 10 AV2 0.11 19 54 19 AV1 0.00 19 54 18 AV6 0.00 38 54 19 AV1 0.00 38 54 20 AV2 0.00 38 54 30 AV3 0.00 38 54 27 AV4 0.00 38 54 24 AV5 0.00 28 55 13 AV2 0.09 29 55 15 AV2 0.00 31 55 15 AV2 0.00 45 55 16 AV2 0.00 45 55 20 AV3 0.00 45 55 21 AV4 0.00 45 55 23 AV5 0.00 38 56 19 AV2 0.00 26 57 14 AV2 0.00 26 57 21 AV5 0.00 27 57 18 AV2 0.00 29 57 13 AV2 -0.16

Attachment I to ET 02-0046 Page 25 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 44 57 14 AV3 0.00 44 57 18 AV4 0.24 46 57 15 AV2 0.00 46 57 18 AV3 0.00 46 57 15 AV4 0.00 47 57 20 AV2 0.00 47 57 13 AV3 0.00 26 58 10 AV2 0.05 26 58 11 AV5 0.00 27 58 11 AV2 0.00 37 58 21 AV2 0.00 37 58 17 AV3 0.00 37 58 22 AV5 0.00 46 58 14 TSH 0.39 30 59 18 AV2 0.00 30 59 16 AV5 0.00 30 59 15 AV6 0.00 33 59 24 AV2 0.00 33 59 14 AV4 0.00 44 59 16 AV2 0.00 44 59 18 AV3 0.00 44 59 16 AV6 0.00 34 60 14 AV2 0.08 34 60 11 AV3 0.00 49 60 14 AV6 -0.26 50 60 15 AV2 -0.13 50 60 12 AV3 0.00 52 60 15 AV2 -0.19 49 61 33 AV2 0.00 49 61 39 AV3 0.00 49 61 31 AV4 0.00 49 61 23 AV5 0.00 49 61 13 AV6 0.00 30 62 13 AV2 -0.21 50 62 14 AV1 0.00 50 62 13 AV3 0.19 50 62 22 AV4 0.00 50 62 20 AV5 0.16 32 63 14 TSH 0.50 50 63 34 AV2 0.00 50 63 31 AV3 0.00

Attachment I to ET 02-0046 Page 26 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 50 63 30 AV4 0.00 50 63 17 AV5 0.00 45 64 17 AV2 -0.16 45 64 20 AV3 -0.24 47 64 19 AVI -0.93 47 64 23 AV2 -0.11 50 64 27 AV2 0.13 50 64 29 AV3 0.13 50 64 13 AV4 0.27 50 64 10 AV5 0.16 35 65 18 AV2 0.00 45 65 20 AV1 0.00 45 65 32 AV2 0.00 45 65 32 AV3 0.00 45 65 27 AV4 0.00 47 65 16 AV2 0.22 35 66 12 AV2 0.16 35 66 25 AV4 -0.03 35 66 13 AV5 0.03 50 66 21 AV2 -0.05 45 67 21 AV4 0.00 19 68 16 AV1 0.00 44 68 20 AV1 -0.03 44 68 20 AV2 0.00 44 68 19 AV3 0.03 44 68 19 AV4 0.29 44 68 17 AV5 0.03 44 68 26 AV6 -0.11 47 68 10 AVI 0.00 47 68 13 AV2 -0.05 49 68 13 AV2 -0.08 50 68 26 AV1 0.03 50 68 27 AV2 0.05 50 68 20 AV3 -0.05 50 68 14 AV4 -0.03 50 68 10 AV5 -0.05 50 68 22 AV6 -0.05 45 69 27 AV1 0.00 45 69 33 AV2 0.00 45 69 37 AV4 0.00 45 69 25 AV5 0.00 to ET 02-0046 Page 27 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 50 69 15 AV1 0.00 50 69 20 AV2 0.11 50 69 15 AV3 0.00 40 70 23 AV3 0.16 45 71 22 AV3 0.00 33 73 19 AV2 0.00 45 74 21 AV5 0.00 29 75 21 AV2 0.00 43 75 28 AV2 0.00 43 75 18 AV3 0.00 43 75 25 AV4 0.03 43 75 12 AV5 0.00 43 75 28 AV6 0.00 49 75 23 AV4 0.27 49 75 21 AV6 0.32 43 76 19 AV2 0.03 51 76 28 AV3 0.00 51 76 18 AV4 0.00 35 77 21 AV2 0.00 35 77 11 AV4 0.00 35 77 18 AV6 0.00 39 77 17 AV5 0.00 39 77 13 AV6 0.00 45 77 21 AV2 0.00 45 77 36 AV3 0.00 45 77 26 AV4 0.00 45 77 14 AV5 0.00 29 78 19 AV2 0.00 35 78 16 AV1 0.00 35 78 20 AV2 0.03 35 78 30 AV3 0.00 35 78 31 AV4 0.00 35 78 26 AV5 -0.08 35 78 21 AV6 0.13 46 79 29 AV3 0.00 46 79 15 AV6 0.00 33 80 22 AV6 0.00 28 81 12 AV1 0.05 28 81 23 AV5 0.11 29 81 18 AV1 0.05 29 81 14 AV2 0.00

Attachment I to ET 02-0046 Page 28 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 36 81 20 AV2 0.03 36 81 21 AV3 0.08 36 81 22 AV4 0.08 36 81 20 AV6 0.00 16 82 14 AVI 0.00 38 83 11 AV3 -0.16 52 83 19 AV6 0.05 40 84 25 AV2 0.00 40 84 14 AV4 0.16 46 84 21 AV3 0.24 46 84 21 AV4 0.11 46 84 17 AV5 0.03 29 85 11 AV6 0.03 36 85 15 AV1 0.03 36 85 21 AV2 0.11 36 85 19 AV3 0.19 36 85 30 AV4 -0.05 38 85 18 AV4 0.13 38 85 17 AV5 -0.11 35 86 22 AV2 -0.13 35 86 21 AV5 -0.03 40 86 35 AV2 0.00 40 86 24 AV4 -0.03 40 86 16 AV5 0.00 44 86 16 AV4 -0.08 44 86 17 AV5 -0.11 1 87 22 TSH 3.32 30 87 12 AV1 -0.08 30 87 16 AV2 0.08 35 87 19 AV2 0.03 35 87 19 AV5 0.03 43 87 14 AV2 -0.05 43 87 15 AV5 0.00 28 88 16 AV6 0.10 39 88 29 AV6 0.00 40 88 17 AV6 0.00 28 89 14 AV6 0.00 35 89 16 AV2 0.00 22 90 11 AV2 -0.13 1 91 9 FBC -0.35 35 91 21 AV3 0.00

Attachment I to ET 02-0046 Page 29 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 36 91 15 AV2 0.00 39 91 14 AV3 0.00 45 91 19 AV3 0.00 45 91 23 AV4 0.00 45 91 30 AV6 0.08 47 91 22 AV6 -0.11 1 92 13 FBC -0.35 8 92 17 TSH 1.51 30 92 26 AV2 0.16 30 92 18 AV5 -0.19 30 92 16 AV6 -0.11 35 92 12 AV2 0.11 38 92 19 AV3 0.16 38 92 13 AV6 0.00 39 92 12 AV3 0.00 39 92 13 AV4 0.05 39 92 15 AV5 0.11 39 92 16 AV6 0.00 1 93 9 FBC -0.35 33 93 14 AV4 0.00 45 93 18 AV4 -0.03 36 94 13 AV3 -0.03 38 94 16 AV5 0.00 38 94 13 AV6 0.00 39 94 12 AV3 0.27 39 94 24 AV4 0.13 39 94 19 AV5 0.11 39 94 13 AV6 0.00 48 94 18 AV3 0.16 48 94 16 AV4 0.03 48 94 18 AV5 -0.05 48 94 14 AV6 -0.05 35 95 11 AV6 0.00 37 95 15 AV2 0.16 37 95 16 AV3 0.05 38 95 16 AV3 0.03 39 96 12 AV4 0.13 44 96 16 AV2 0.05 44 96 25 AV3 0.03 44 96 23 AV4 0.13 44 96 18 AV5 0.16

Attachment I to ET 02-0046 Page 30 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 48 96 15 AV5 0.08 39 97 17 AV3 0.14 39 97 16 AV6 0.00 44 97 33 AV2 0.00 44 97 31 AV3 0.00 44 97 26 AV4 0.00 44 97 18 AV5 0.19 21 98 15 AV6 0.16 39 98 16 AV4 0.16 48 98 18 AV3 0.11 48 98 14 AV4 0.03 48 98 12 AV5 0.00 48 98 19 AV6 -0.05 35 99 16 AV6 0.08 39 99 18 AV4 0.00 39 99 16 AV6 0.00 40 99 17 AV4 0.08 40 99 27 AV5 0.00 40 99 16 AV6 0.00 45 99 24 AV2 0.00 45 99 18 AV3 -0.03 45 99 36 AV4 0.00 45 99 20 AV5 0.05 45 99 22 AV6 -0.13 35 100 11 AV2 0.33 36 100 10 AV2 0.00 36 100 16 AV3 0.14 36 100 13 AV6 0.00 39 100 12 AV3 0.03 39 100 16 AV4 0.08 44 100 14 AV4 0.08 44 100 15 AV5 0.16 36 101 20 AV3 0.00 37 101 18 AV6 0.00 39 101 18 AV4 0.00 39 101 19 AV6 0.00 40 101 28 AV3 0.00 40 101 31 AV4 0.00 40 101 21 AV5 0.00 40 101 15 AV6 0.16 41 101 11 AV6 0.00

Attachment I to ET 02-0046 Page 31 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 41 101 15 TSH 0.21 35 102 16 AV2 0.22 35 102 10 AV3 0.00 41 102 24 TSH 0.27 42 102 13 TSH 0.27 34 103 17 AV3 -0.32 34 103 16 AV4 -0.38 34 103 10 AV6 0.13 38 103 18 AV3 0.00 40 103 19 AV1 0.00 40 103 36 AV4 0.00 40 103 43 AV5 0.00 40 103 17 AV6 0.00 41 103 14 AV4 0.00 41 103 15 AV5 0.00 30 105 20 AV5 0.00 41 105 13 AV6 0.00 35 106 15 AV4 -0.03 35 106 13 AV6 0.24 40 106 18 AV6 -0.05 32 107 13 AV2 0.00 32 107 20 AV6 0.00 33 107 18 AV6 -0.35 38 107 20 AV2 0.00 38 107 31 AV3 0.00 38 107 24 AV4 0.00 38 107 24 AV5 0.00 38 107 20 AV6 0.00 39 107 14 AV5 0.00 39 107 17 AV6 0.00 33 108 19 AV3 -0.05 33 108 15 AV4 0.11 35 108 15 AV2 0.19 35 108 16 AV6 0.13 36 108 13 AV1 0.05 36 108 12 AV2 -0.03 36 108 35 AV3 0.00 36 108 40 AV4 0.00 36 108 13 AV5 0.21 36 108 21 AV6 0.19 37 108 19 AV5 0.00 to ET 02-0046 Page 32 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Tube Indications on Steam Generator "C" Indication Inch (+/-)

Row Column (% of Wall Thickness) Location From Location 34 109 16 AV2 0.00 34 109 12 AV3 0.00 34 109 20 AV4 0.00 34 109 19 AV5 0.00 35 109 20 AV3 0.00 35 109 31 AV4 0.00 35 109 30 AV5 0.00 33 110 13 AV1 0.08 33 110 17 AV5 0.00 36 110 10 AV3 0.00 36 110 11 AV5 0.05 26 113 14 AV2 -0.14 28 113 20 AV5 0.00 28 114 23 AV2 0.00 28 114 15 AV5 0.00 28 114 11 AV6 0.00 12 121 9 TSH 0.41

Attachment I to ET 02-0046 Page 33 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Section 3: Identification of Tubes Plugged.

A. Steam Generator "B":

New pluggable indication Row Column 53 45 45 52 53 58 56 61 44 65

New pluggable indication Row Column 51 37 40 103 36 108

  • Administratively Plugged Total number of Tubes Plugged in Each Steam Generator (this includes tubes plugged during pre-service inspections):

Steam Generator Total Number of Total Percentage Tubes Plugged Plugged A *26 0.46%

B 28 0.50%

C 19 0.34%

D 80 1.42%

  • An additional 3 plugs are installed in Steam Generator "A" cold leg only, due to tube sheet drilling mistakes during manufacturing. No tubes are installed in those locations.

Attachment I to ET 02-0046 Page 34 of 34 STEAM GENERATOR TUBE INSPECTION REPORT Summary of Tube Integrity Assessment The inspection results confirm that the Wolf Creek Steam Generators currently meet all industry and regulatory structural and leakage integrity guidance.

The operational degradation mechanisms observed during this inspection were tube wear at the AVB intersections and a single indication of wear at a support plate intersection. A number of new AVB wear indications were found in both Steam Generators "B" and "C". AVB wear in Steam Generators "B" and "C"meets the definition of an active degradation mechanism. Tube wear at the support plates does not meet the definition of an active degradation mechanism, but should be regarded as a relevant (i.e., observed but not active) mechanism.

All structural and leakage criteria are projected to be satisfied for Steam Generators "B" and "C" through, at least, end of cycle 14, when they will next be inspected. Based on the results of this inspection, Steam Generators "A" and "D", which were not inspected during Refuel 12, are projected to satisfy all structural and leakage criteria through, at least, end of cycle 13. Steam Generators "A" and "D"will be next inspected at the end of cycle 13.