Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage
ML14273A440
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/25/2014
From: Henderson K
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNS-14-105
Download: ML14273A440 (24)


Text

Kelvin Henderson DUKE Vice President ENERGY. Catawba Nuclear Station Duke Energy CNO1VP 1 4800 Concord Road York, SC 29745 CNS-14-105 o: 803.701.4251 f: 803.701.3221 September 25, 2014 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555

Subject:

Duke Energy Carolinas, LLC (Duke Energy)

Catawba Nuclear Station, Unit 1 Docket Number 50-413 Inservice Inspection Report and Steam Generator Inservice Inspection Summary Report for End of Cycle 21 Refueling Outage In accordance with Section XI of the ASME Code, please find attached the subject 90-day reports which provide the results of the inservice inspection and the steam generator inspection associated with the subject outage. Note that the steam generator inservice inspection summary report includes all of the information required to be submitted in the 180-day report required by Catawba Technical Specification 5.6.8, "Steam Generator (SG)

Tube Inspection Report". Therefore, no additional report is required to be submitted for this outage.

There are no regulatory commitments contained in this letter or its attachments.

If you have any questions concerning this material, please call L.J. Rudy at (803) 701-3084.

Very truly yours, Kelvin Henderson Vice President, Catawba Nuclear Station LJR/s Attachments A047 www.duke-energy.comn

Document Control Desk Page 2 September 25, 2014 xc (with attachments):

V.M. McCree Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, III, Senior Resident Inspector U.S. Nuclear Regulatory Commission Catawba Nuclear Station G.E. Miller (addressee only)

NRC Project Manager (Catawba)

U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738

Attachment 1 Catawba Unit 1 End of Cycle 21 Inservice Inspection Report

CASE N-532-4 FORM OAR-i OWNER'S ACTIVITY REPORT Report Number Owner's Activity Report for Refueling Outage 1 EOC21 Plant Catawba Nuclear Station, 4800 Concord Road, York, SC 29745 Unit No. 1 Commercial service date 6/29/1985 Refueling outage no. 1 EOC21 (if applicable)

Current inspection interval 3rd for Class 1, 2, & 3 Components & Supports and 2 nd for Class MC Containment (1st, 2nd, 3rd, 4th, other)

Current inspection period 3rd for Class 1, 2, & 3 Components & Supports and Class MC Containment (1sf, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition through the 2000 Addenda Date and revision of inspection plans See Attachment Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used: The following Code Cases are permitted by the ISI Plans: N-460, N-504-3, N-513-2, N-532-4, N-533-1, N-566-2, N-586-1, N-613-1, N-616, N-624, N-639, N-643-2, N-647, N-663, N-665, N-683, N-685, N-686, N-686-1, N-694-1, N-695, N-696, N-697, N-700, N-706, N-722-1, N-729-1, N-731, N-770-1 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1EOC21 conform to the requirements of Section XI.

(refueling outage number)

Signed ~43~- ~ A 9 ~ ,4 g Date '?Xo/~

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of South Carolina and employed by HSB Global Standards of CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

':2.t-AIX ._ e-" Commissions n/1 JZ'J, rZigtq re "'3 Inspector's Signature National Board, State, Province, and Endorsements Date I-//- )

Attachment Catawba Unit 1 End of Cycle 21 Inservice Inspection Report Date and Revision of Inspection Plans:

1. The following documents comprise the Catawba Nuclear Station 3 rd Interval Inservice Inspection Plan for Unit 1 (Class 1, 2, and 3 Components):
a. Third Interval Inservice Inspection Plan Catawba Nuclear Station Units 1 and 2 General Requirements, Document #CISI-1462.10-0030-GEN REQ, Rev 1, dated 06/26/2008, including the following addenda:
i. CISI-1462.10-0030-3CNS-021 through CISI-1462.10-0030-3CNS-036
b. Catawba Nuclear Station Unit 1-Third Inspection Interval Inservice Inspection NDE Plan, Document #CISI-1462.10-0030-UNIT 1, Rev 1, dated 06/25/2008, including the following addenda:
i. CISI-1462.10-0030-3CNS1-028 through CISI-1462.10-0030-3CNS1-083
2. The following documents comprise the Catawba Nuclear Station 3 rd Interval Inservice Inspection Pressure Test Plan for Unit 1:
a. Third Inspection Interval Inservice Inspection Pressure Test Plan for Catawba Unit 1, Document #CISI-1462.20-0020-U1PTPLAN, Rev 1, dated 07/23/2008, including the following addenda:
i. CISI-1462.20-0020-Cl-PT-031 through CISI-1462.20-0020-Cl-PT-052
3. The following documents comprise the Catawba Nuclear Station 2 nd Interval Containment Inservice Inspection Plan for Unit 1 (Class MC):
i. Catawba Nuclear Station Units 1 and 2 - Second Interval Containment Inservice Inspection Plan, Document #CN-ISIC2-1042-0001, Rev 4, dated 06/04/2014

CASE N-532-4 Catawba Nuclear Unit 1 Form OAR-1 Owner's Activity Report Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number Boric acid residue found on valve I1NV37A, NC Pump Areas identified in PIPs C-12-11351, C-14-04813, Boi B15.70 residue found onleI 1DSacid P entatn (one C-14-06204, C-14-06758, C-14-06759, and C B-P / B15.70 1D Seal Housing, and Incore Instrumentation (Zone 06760 were evaluated by Engineering and found Number lNC-001 L-A) to be acceptable.

Boric acid residue found on valve 1ND-19 (Zone Area identified in PIP C-12-10746 was evaluated Number 1ND-001 L-B) by Engineering and found to be acceptable.

Boric acid residue found on 1A NI Pump (Zone Number Areas identified in PIPs C-13-06761, C-13-06762, c-H C7.1 Boric acid re e fand C-13-06763 were evaluated by Engineering 1NI-003L-B) and-found to be acceptable.

Boric acid residue found valve 1NI 143 (Zone Number Area identified in PIP C-13-02236 was evaluated 1NI-005L-B) by Engineering and found to be acceptable.

Areas identified in PIPs C-13-05121, C-13-05123, C-H / C7.10 Boric acid residue found on eANS Pump and bolted and C-1 3-05127, and C-1 3-5129 were evaluated connection #1 NSFE5020 (Zone Number 1NS-001 L-B) by Engineering and found to be acceptable.

Boric acid residue found on NS Pump seal l BNSPumber area and Areas identified in PIPs C-1 3-02422 and C C-H / C7.10 boltdacidnrectiduefound cbolted one1B connection (Zone seal a02423 Number 1NS-002L-B) were evaluated by Engineering and found to be acceptable.

Boric acid residue found on valve 1NV15B (Zone Area identified in PIP C-13-00435 was evaluated Number 1NV-001 L-B) by Engineering and found to be acceptable.

Areas identified in PIPs C-1 3-06060, C-i13-06061, Boric acid residue found on 1NV-265 threaded i C- 3-06062,Cc- 3-06063, C-i 3-06064e C-H / C7.10 connection, 1A NV Pump seal area, suction connection, C-13-06062, C-1 3-06063, and C-1 3-06064 were and discharge connection (Zone Number 1 NV-002L-B) acceptable.

Boric acid residue found on 1B NV Pump seal area, Areas identified in PIPs C-1 3-04892, C-1 3-04893, C-H / C7.10 suction connection, and discharge connection (Zone C-1 3-04900, and C-1 3-04903 were evaluated by Number 1NV-003L-B) Engineering and found to be acceptable.

Areas identified in PIPs C-14-04282, C-14-04287, Boric acid residue found on components within Zone C-14-04290, C-14-04294, C-14-04295, C D-B / D2.10 1KF-001L-C (1A KF Pump, Valves 1KF4, 1KF5, 1KF6, 04297, C-14-04300, and C-14-04302 were 1KF7, and blind flange connection, evaluated by Engineering and found to be acceptable.

Areas identified in PIPs C-14-04279, C-14-04280, Boric acid residue found on components within Zone C-14-04281, C-14-04283, C-14-04284, and C D-B / D2.10 1KF-002L-C (lB KF Pump, Valves 1 KF19, 1KF20, 04285 were evaluated by Engineering and found 1KF21, and 1KF22. to be acceptable.

Cold Load settings on drawing unclear.

F-A/ F1.10 Cl.F1.12.0015 / 1-R-NC-1535 Evaluation found to be acceptable. Reference PIP C- 14-04740 VT-3 examination observed rust and corrosion.

F-A / F1.20 Cl.F1.20.0017 / 1-R-FW-0002 Structural integrity not affected. Evaluation found to be acceptable. Reference PIP C-14-04997 VT-3 examination revealed loose locknut on strut.

F-A / F1.20 Cl .F1.20.0049 / 1-R-NI-2275 WR# 1110350 written to tighten. Evaluation found to be acceptable. Reference PIP C-14-04736 VT-3 examination revealed small gap between baseplate and wall. Problem was previously F-A / F1.20 Cl .Fl.20.0078/ 1-R-NS-0039 identified in 2005 and found to be acceptable (see PIP C-05-01594). Evaluation remains acceptable

- reference PIP C-14-04743

CASE N-532-4 Catawba Nuclear Unit 1 Form OAR-1 Owner's Activity Report Table 1 (Continued)

Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service Examination Category and Item Description Evaluation Description Item Number VT-3 examination revealed loose locknut on pipe F-A / F1.20 Cl .Fl.20.0127 / 1-R-SV-1 522 clamp WR# 1110019 written to tighten.

Evaluation found to be acceptable.- reference PIP C-14-04564 VT-3 examination revealed loose locknut on pipe F-A / F1.20 Cl .F1.20.0128 / 1-R-SV-1524 clamp WR# 1110019 written to tighten.

Evaluation found to be acceptable..- reference PIP C-14-04573 VT-3 examination revealed loose locknut on pipe F-A / F1.20 Cl.F1.21.0001 / 1-R-CA-1654 clamp WR# 1110354 written to tighten.

Evaluation found to be acceptable..- reference PIP C-14-04658 VT-3 examination revealed broken snap ring.

F-A / Fl.20 C1F1.21.0026 /1-R-NI-2271 WR# 1110327 written to replace snap ring.

Evaluation found to be acceptable - reference PIP C-14-04734 VT-3 examination revealed damaged and missing F-A / F1.20 Cl1Fl1.22.0027 / 1-R-NI-2264 snap rings. WR# 1110221 written to replace snap rings. Evaluation found to be acceptable.-

reference PIP C-14-04738 VT-3 examination revealed strut and pipe clamp has a 6 degree misalignment. Evaluation determined this is within manufacturer's tolerance and these conditions do not affect function. WR 01110906 written to correct alignment - reference PIP C-14-05064 VT-3 examination revealed loose locknut on pipe F-A / F1.30 Cl .Fl.30.0087 / 1-R-SA-001 5 clamp. WR# 1110351 written to tighten.

Evaluation found to be acceptable.- reference PIP C-14-04822 VT-3 examination revealed loose concrete anchors. WO# 02154142-02 written to tighten anchors. Evaluation found to be acceptable.-

reference PIP C-14-05392 VT-3 examination revealed loose locknut on pipe F-A / F1.30 Cl1Fl1.31.0130 / 1-R-KC-0858 clamp. WR# 1111370 written to tighten.

Evaluation found to be acceptable.- reference PIP C-14-05396 VT-3 examination revealed loose base plate anchors. WO# 02156818 written to tighten anchors. Evaluation found to be acceptable.-

reference PIPs C-14-04823 & C-14-05790

CASE N-532-4 Catawba Nuclear Unit 1 Form OAR-1 Owner's Activity Report Table 2 Abstract of Repair/Replacement Activities Required For Continued Service Code Class Item Description Description of Work Date Completed Repair / Replacement Plan Number Category F-A, Pipe support repaired 3 Summary Number due to water hammer 06/02/2014 Work Order #

C1.Fl.30.0052, damage. Reference 02152603-06 Support 1-R-KC-0875 PIP C-14-04823 Pipe support repaired Category F-A, due to water hammer Work Order #

3 Summary Number damage. Reference 06/04/2014 02152603-01 C1l.F1.31.0011, PIPs C-14-04823& C-Support 1-R-KC-0874 14-04392 14-06392 Pipe support repaired Category F-A, due to water hammer 3 Summary Number damage. Reference 05/29/2014 Work Order #

Ci .F1.31.0096, PIsC-14-04823 &C- 02154142-01 Support 1-R-KC-0876 PIPs 14-05392 3 Nuclear Service Water Replaced piping due to 01/20/2014 Work Order#

System Piping thru wall leak. I 02098791-09

Attachment 2 Catawba Unit 1 End of Cycle 21 Steam Generator Inservice Inspection Summary Report

Steam GeneratorOutage Summary Report Catawba Unit 12014 Outage EOC21 Location: 4800 Concord Road, York, South Carolina 29745 NRC Docket No. 50-413 National Board No. 130 Commercial Service Date: June 29, 1985 Owner: Duke Energy Corporation 526 South Church St.

Charlotte, N.C. 28201-1006 Revision 0 Prepared By: )ate: Y-.42dŽ*

Reviewed By: 8 3 a )ate: q__

IA )

.DA o tAA o5S.

)ate: Qqlq/ 90-O1 Approved By: 'E JamesR /1 &'

Copy No. Assigned To:

Controlled: Uncontrolled:

Page I of is

ControlledDistribution Copy No. Assigned To Original Catawba Nuclear Station Document Control Master File CN-208.21 1 NRC Document Control UncontrolledDistribution 2 Hartford Steam Boiler Inspection and Insurance Co. (AIA)

Electronic Steam Generator Desktop Page 2 of 15

FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules

1. Owner: Duke Energy Corporation, 526 S. Church St.. Charlotte, NC 28201-1006 (Name and Address of Owner)
2. Plant: Catawba Nuclear Station, 4800 Concord Road, York, SC 29745 (Name and Address of Plant)
3. Plant Unit: 1
4. Owner Certificate of Authorization (if required) N/A
5. Commercial Service Date: June 29, 1985
6. National Board Number for Unit 130
7. Components Inspected:

Manufacturer State or National Component Manufacturer Serial No. Province No. Board No.

Steam Generator I A BWI 770101 N/A 151 Steam Generator 1B BWI 769304 N/A 150 Steam Generator IC BWI 769302 N/A 147 Steam Generator ID BWI 769303 N/A 149 Note: Supplemental sheets in form of lists, sketches, or drawings maybe used provided (1) size is 81/2 in. x II in.,

(2) information in items 1 through 6 on this data report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.

Page 3 of 15

FORM NIS-1 (Back)

8. Examination Dates June 7,2011 to Junme27,2014
9. Inspection Period Identification: Third
10. Inspection Interval Identification: Third i1. Applicable Edition of Section X) 1998 Addenda 2000
12. Date/Revision of Inspection Plan: June 27, 2005/RevO; Per CNS Technical Specification
13. Abstract ofExaminations and Test. Include a list of examinations and tests and a statement concerning status of work required fbr the Inspection Plan. Refeenoe attached ram
14. Abstract of Results of Examination and Tests. Refencc atyAW _
15. Abstract of Corrective Measures. Refemce attaMced reaorL We certify that a) the statements made in this report are correct b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) NA Expiration Date NA Date Seo- 9 , 2o1q ' signed Duke EnergCorp.

Owner By 4)l Me5 .

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of5-,. j, eA,gt. z. employed by *The Hartford Steam Boiler lnsoecgion nsurance Com9n f Connecticut have inspected the components described in this Owners' Report during the period. - I- to S *4rx 1, - i *.and state that to thebestof my knowledge and belief the Owner has performed exanuinations and tests and taken corrective measures described in the Owners Report in accordance with the Inspection Plan and as required by the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, test, and corrective measures described in this Ownersi Report. Furthermore. neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising fiom or connected with this inspection

'-eý &X,.- Commissions A/j A3 j1 '41 Z JV .c 2-3 Inspector's Signature National Board, State, Province, and Endorsements Date - /, 20

  • The Hartford Stram Boiler Inspetion & Insurance Company ofConnecticm 200 Ashford Center Noth Suite 205 Atlanta. OA. 30338 Page 4 of 5

Catawba I EOC21 Steam Generator Tube Inspection Report Pursuant to ASME Section XI and Catawba technical specification 5.6.8 the following information is provided:

a. The scope of inspection performed on each SG The unit 1 steam generatorshad an accumulatedservice life of 14.6 EFPY at the end of cycle 20 and 16 EFPY by the end of cycle 21.

Baseline inspection scope shall includefull length data acquisitionand bobbin coil analysisfor allfour (4) steam generatorsas follows.

1) All tubes with previous indications.
2) All tubes surroundingplugged tubes.
3) Peripherytubes two rows deep of the hot leg and cold leg (outer perimeterand open lane) with bobbin probe.
4) Arrayprobe acquisitionand analysisfive tubepitches deep on periphery- hot leg, cold leg, and along open lanefrom top of tubesheet up to the first lattice grid.
5) 50% random sample of remaining in-service tubes.

Note: There were 3,742 tubes inspected with bobbin in the A SG, 3,739 in the B SG, 3, 738 in the C SG, and 3,783 in the D SG.

Special interest inspection scope shall include data acquisitionand arraydata analysis as follows:

1) Locations where bobbin coil indicationsare observed that requirefurther characterization.
2) New dent and new % through wall indications.
3) Bounding inspections aroundall PLP indicationsconfirmed with array.
4) Ten pairs ofperiphery tubes in SG ID, monitoringfor evidence of tubes touching.

No touching is evident.

Plug inspectionscope shall be asfollows:

1) Visual inspection of all plugs. There was no degradationobserved.
2) Bowl cladding inspection (NSAL 12-1). There was no degradationobserved.
b. Active degradation mechanisms found Active degradationfound in allfour (4) steam generatorsinclude wear at support structures and wearfrom loose objects.

Page 5 of 15

c. Non-destructive examination techniques utilized for each degradation mechanism Bobbin was used to detect wear at support structures.Bobbin and array were used to detect wearfrom loose objects.
d. Location, orientation (if linear), and measured sizes (if available) of serviced induced indications The complete listingfor service induced indicationsis attached.
e. Number of tubes plugged during the inspection outage for each active degradation mechanism No tubes werefound to requireplugging.
f. The total number and percentage of tubes plugged to date I SG A SG B I SG C SG D Total Priorto EOC21 8 0 24 17 49 EOC21 0 0 0 0 0 Total 8 0 24 17 49

% Plugged 0.12 0.00 0.36 0.26 0.18 Each SG contains 6,633 tubes

g. The results of the condition monitoring, including the results of tube pulls and in-situ pressure testing Condition monitoringand operationalassessment evaluationsfor the Catawba Unit 1 steam generatorswere performed based on the inspection resultsfrom JEOC21. These evaluations were performed accordingto NEI 97-06 using proceduresfrom the EPRI Steam GeneratorIntegrity Assessment Guidelines and the EPRI Steam Generator DegradationSpecific Management Flaw Handbook.

The observed tubing degradationat JEOC21 consistedof wear at tube support locations and two instances ofpreviously detectedforeign object wear. The maximum observed NDE degradationdepth for wear at support structureswas 31% TW. The projected worst case support structurewearfrom the JEOCJ9 CMOA was 48% TW. As predicted by the previous CMOA, there was no growth offoreign object wear locationsfrom JEOC19 to JEOC21. Therefore, the 1EOC19 CMOA calculationwas appropriateand conservative.

No tube plugging was performed at CNS JEOC21. The present state of degradationof the Catawba Unit I steam generatortubing is very mild and does not challenge structuraland leakage integrity requirements.Acceptable structuraland accident leakage integrity is projectedfor the next 3.0 EFPY of operation.

Page 6 of 15

Additional Information to assist with locations within the SG's.

FB4, FB5 4,1 CFR 80 CB- CB Tube Information:

U1 09H 09C No. of Tubes 6633 Material: Inconel 690 Nominal Dia.: 0.688" 08H 08C Nominal Wall: 0.040" Row 1 Radius: 3.973" Straight Length: 31.9'/32.7' Tube Pitch: .930" 07H 07C Tube Support Information 06H 06C Type: Lattice Material 410 Stainless Thickness:

05C High: 3.150" 05H Med.: 2.562" Low: 1.000" 04C Connector Bar 04H Material: 410 Stainless NOTE: Dimensions are to the centerline 03C of the tube support structures.

03H Fan Bars Material: 410 Stainless Thickness 0.110" 02H 02C Width 1.25" 01H TSH TSC Page 7 of 15

Typical Tube Sheet Layout:

5 10 is " 25 30 35 40 45 50 55 Go 05 70 75 So 85 a0 09 5 6 1015 110 115 120 125 IN 135 14" j ~~to0 9 0T00to .~~i~

. I 110 °-°-- . . . . . .... . ... .. ... 11I 110 lie 0, - 0- - - - - - - - -

165 0 . . . 105 In 0 oO- . . . . . 0.l . . - I" o i . . .0 6 0 Ais

. . .. . .0 . 0..

95 05 in 90 of 05

. .-. . . .. .. . .. I.. I .. I.. .... . .. I.-. ,.... . .. . .. .-.- . 5s 100 as 00 7e ,°... . -- I - -- I -.-I .-- .-I. -. . I. . . :. l - - -l  : '.o. 75 76 70 65 85 0 0. . . . . . . . . . .

So 55 55

... . . .. . .,. . . .. ., . ..., so 54 ..... .. . . .. .. .. .

c0 45 45

4. 4.

35 35 oo- . . 0...

30 30 00 . . . . . .0 0.

25 0 1 . . . . . . . . . . . 25 S

20 0 .o. o*".-go 15 . . . .0 0.

o0 15 10 71---

14L \ \ ' \ X\ x ' -:

5 10 fx-,l.v~,

15 20

,i 25 30 35 &a 45 55 55 of 65 76 75 of 85 go 95 IN 105 110 115 120 125 130 135 1" wemafý 00sa"L~.c - OTUwo mr~ D Page 8 of 15

These codes are used in the following list of service indications and are provided to assist in reviewing the data.

Code Description WAR Wear PCT Percent Through Wall Probe code ZBAZ1 Bobbin ZYAXP Array Page 9 of 15

SG - A A"achment 1 - Senvice Induced Degreclation produced from STMax databasa Catawba 1 1EOC21 DCP 20140501 09103/2014 10:56:59

--- ---- I -- .- . 4--.4-.--4-- .---- 4--.......4-- - ...-.....-. - .- -

+----- -----... -------- . . .-- ------

I INSPOATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWI0 CEG BEGT ENDT POIA PTYPE CAL L IDXI


.-- ------ -.-- -- I.--- .-.----.

I.- ..---- ---- ------------- -------- -------- ------. ---- -----.--------- -.----- I--- . . --- ..------

2014/05/01 56 57 .12 0 PCT 6 P2 FB4 .89 WAR TEH TEC .560 Z6AZ1 61 C 1011 2014/05/01 114 63 .25 0 PCT 11 P2 FB7 1.86 WAR TEH TEC .560 ZBAZI 61 C 1051 2014/05/01 73 64 .21 0 PCT 10 P2 F86 -. 63 WAR TEH TEC .560 ZBAZI 61 C 1021 I

2014/05/01 109 66 .28 0 PCT 13 P2 F87 -1.98 WAR TEH TEC .560 ZOAZI 63 C 771 I2014/05/01 55 70 .16 0 PCT 9 P2 F4 -.63 WAR TEN TEC .560 ZBAZ1 63 C 79 2014/05/01 61 70 .21 0 PCT 11 P2 FB4 .42 WAR TEH TEC .560 ZBAZ1 63 C 781 2014105101 89 72 .44 0 PCT 17 P2 FBS -. 03 WAR TEH TEC .580 ZBAZ1 61 C 1251 I2014/05101 89 72 .44 0 PCT 17 P2 P86 .00 WAR TEN TEC .560 ZA 61 C 1251 2014/05/01 890 75 .12 0 PCT 6 P2 FB4 -. 09 WAR TEH TEC .560 ZOAZ1 61 C 1091 I2014105101 114 75 .18 0 PCT 8 P2 P95 1.54 WAR TEN TEC .560 ZOAZi 61 C 1241 I2014/05/01 51 76 .22 0 PCT 11 P2 0IN -1.43 WAR TEN TEC .560 Z8AZI 63 C 801 2014/05/01 55 78 .25 0 PCT 10 P2 FB4 1.43 WAR TEH TEC .560 ZBAZ1 61 C 1061 1 I2014/05/01 89 78 .23 0 PCT 10 P2 PBS -.61 WAR TEN TEC .560 ZBAZ1 61 C 1121 I

2014/05/01 101 78 .38 0 PCT 14 P2 FB4 -1.31 WAR TEH TEC .560 ZBAZ1 61 C 12311 2014/05/01 103 78 .24 0 PCT 10 P2 FB5 -. 54 WAR TEH TEC .560 ZBAZ1 61 C 12211 2014/05/01 92 79 .31 0 IPCT 13 P2 P64 -. 64 WAR TEH TEC .560 ZBAZ1 61 C 1131I 2014/05/01 81 g8 .15 0 PCT 8 P2 FB7 -. 72 WAR TEH TEC .560 ZBAZ1 63 C 841 2014/05/01 89 80 .29 0 IPCT 14 P2 FB5 -1.18 WAR TEH TEC .560 ZBAZ1 63 C 891I 2014/05/01 91 80 .32 0 PCT 13 P2 FB6 1.16 WAR TEH TEC .560 ZBAZ1 61 C 1211 2014/05101 88 81 .18 0 PCT 10 P2 F85 -1.78 WAR TEH TEC .560 ZBAZ1 63 C 881 2014/05/01 90 81 .14 0 PCT 8 P2 FP5 -1.8 WAR TEH TEC .560 ZBAZ1 63 C 901 2014/05/01 94 81 .30 0 PCT 11 P2 FB7 1.86 WAR TEH TEC .860 ZBAZ1 61 C 1141 I2014/05/01 49 92 .23 o paT io P2 P62 1.03 WAR TEN TEC .560 ZBAZI 61 C 1071 I

2014/05/01 77 82 .26 0 PCT 13 P2 FB5 -. 87 WAR TEH TEC .560 ZBAZ1 63 C 8311 2014105/01 100 81 .34 0 PCT 15 P2 FB5 1.03 WAR TEH TEC .560 ZBAZ1 63 C 914 1 2014/05/01 102 83 .34 0 PCT 13 P2 FB6 1.31 WAR TEH TEC .560 ZBAZ1 61 C 11511 2014/05/01 12014/05/01 91 495 84 86 .34

.25 0 PCT 13 12 P2 F86 FB2 -1.30

-1.19 WAR TEH TEH TEC TEC .560 ZBAZ1 63 C 671 9117 4

2014/05/01 95 86 .24 0 PCT 12 P2 FB4 -1.19 WAR TEH TEC .560 ZBAZ1 63 C 901 1

2014/05/01 95 88 .23 0 PCT 11 P2 FP4 -. 70 WAR TEH TEC .560 ZBAZ1 63 C 861 2014(08/01 108 93 .20 0 PCT 10 P2 FB5 1.49 WAR TEH TEC .560 ZBAZ1 63 C 911 2014/05/01 96 109 .31 0 PCT 12 P2 FP5 1.61 WAR TEH TEC .560 ZBAZ1 61 C 1171

  • -------I----------

4-----4--------------*------~-----4-----4--------4 --------------- ------------------ *------*--------------

I INSP0ATE ROW COL VOLTS 0D0 ND PER CNN LOCN iNCN1 iNCN2 UTiLl UTiL2 CRLEN CRWi CEO BOOT ENOT PDiA

.DX8 PTYPE CAL L 4-------- I------------ 4----------4 ---- 4-- - -- - - ---------- -


------ I---------------4-----4------4 --- -------

Tubes: 30 Records: 32 1 ST Max Page 10 of 15

SG - 8 Attachment 1 - Service Induced Degradation produced from ST Mw database Catawba 1 1EC021 DOCP20140501 09/03/2014 11:05:56 I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 UTIL1 UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L IDXl

- - - - - - - - - - - - - - - - - - - - - - - - -- - - -- - ---- ----- - ------ WAR- ---.......- ÷-....... --- - TEC TEN---------- .560...--1 ------- I 2014/05/01 89 60 .36 0 PCT 15 P2 F55 -1.05 WAR TEC TEH .560 ZBAZ1 H 1231 2014/05/01 89 PCT P2 F86 -1.10 WAR TEC TEH .560 ZBAZ1 H 1231 2014/05/01 99 PCT P2 F8P -75 WAR TEC TEH .560 ZBAZ1 H 821 2014/05/01 80 PCT P2 F85 -1.34 WAR TEC TEH .560 ZBAZI H 1251 2014/05101 100 PCT P2 FB6 -1.76 WAR TEC TEH .560 Z9AZ1 N 811 2014/05/01 100 PCT P2 FP6 1.60 WAR TEC TEH .560 Z9AZI H 811 2014/05101 95 PCT P2 FP5 -. 81 WAR TEC TEH .560 ZBAZ1 H 1261 2014105/01 100 PCT P2 FB4 -. 81 WAR TEC TEH .560 ZBAZ1 H 1331 2014/05/01 69 PCT P2 F84 .98 WAR TEC TEH .560 ZBAZ1 H 851 N 136 2014/05/01 91 PCT P2 FB4 -75 WAR TEC TEH .560 ZBAZ1 H 1361 2014/05/01 91 PCT P2 FP5 .67 WAR TEC TEH .560 ZBAZ1 H 1361 2014105/01 91 PCT P2 FB6 1.04 WAR TEC TEH .560 ZBAZI H 1351 2014/05/01 97 PCT P2 FP5 -1.04 WAR TEC TEH .560 ZBAZ1 N 135 2014/05/01 97 PCT P2 FB5 .87 WAR TEC TEH .560 ZBAZ1 H 1351 2014105/01 97 PCT P2 F96 -1.00 WAR TEC TEH .560 ZBAZI H 1351 2014/05101 97 PCT P2 F86 .94 WAR TEC TEH .560 ZBAZ1 H 1351 97 PCT P2 FB8 1.20 WAR TEC TEH .560 ZBAZ1 2014/05/01 2014/05/01 103 PCT P2 F84 -. 51 WAR TEC TEH .560 ZBAZ1 H 1341 117 PCT P2 FB5 -. 65 WAR TEC TEH .560 ZBAZl H 611 2014/05/01 117 PCT P2 F85 .37 WAR TEC TEH .560 ZBAZ1 H 611 2014/05/01 117 PCT P2 FP6 .18 WAR TEC TEH .560 ZBAZ1 H 611 2014/05/01 66 PCT P2 FP5 .24 WAR TEC TEH .560 ZBAZ1 H 861 2014/05/01 2014/05/01 82 PCT P2 FB4 -1.16 WAR TEC TEH .560 ZBAZ1

  • 671 96 PCT P2 FB6 -. 33 WAR TEC TEH .560 ZBAZI N 661 2014/05/01 2014/05/01 95 PCT P2 FB6 -. 26 WAR TEC TEH .560 ZBAZ1 N 1761 PCT S 11 2014/05/01 65 P2 FB4 1.15 WAR TEC TEH .560 ZBAZ1 N ill 74 PCT P2 FB4 1.26 WAR TEC TEH .560 ZBAZ1 N 151 2014/05/01 82 PCT P2 FB4 1.22 WAR TEC TEH .560 ZBAZ1 H 141 2014/05101 86 PCT P2 FB4 1.11 WAR TEC TEH .560 ZBAZI H 131 2014/05/01 86 PCT P2 FB5 1.24 WAR TEC TEH .560 ZBAZ1 H 131 2014105/01 98 PCT P2 FB5 1.04 WAR TEC TEH .560 ZBAZl H 121 2014/05/01 PCT 2014/05/01 46 P2 FB5 1.49 WAR TEC TEH .560 ZBAZI H 1651 PCT WAR TEC TEH .560 ZBAZ1 2014/05/01 84 P2 F83 1.15 H 1611 2014/05/01 93 100 .20 0 PCT 10 P2 07H .50 WAR TEC TEH .560 ZBAZ1 34 H 121

----------- -. ------ - ---- - -------- -------- I+----- --- - I ------- ---. --- ----. ..------------------ I --- ---

INSPDATE ROW COL VOLTS DEG IND PER CHN LOON INCH1 INCH2 UTIL1 UTIL2 CRLEN CRWID CEG BEGT ENOT PDIA PTYPE CAL L DXI

.---- ---- -- ------------------------ --.... ..... -- +-4-...-- - - --.

I. - - I --. + .....


-. . 4----------..

Tubes: 23 Records: 34 ST Max Page 11 of 15

SG - C Attachment 1 - Service Induced Degradation produced from ST Max database Calawba 1 1EOC21 DCP 20140501 09/0312014 11:10:13 I INSPOATE ROW COL VOLTS DOEG INO PER CHN LOCN INCH1 INCH2 UTILl UTIL2 CRLEN CRWIO CEG BEGT ENOT POIA PTYPE CAL L IDXI

. . .- i--.. ......- ÷- ...- ÷- ....-- ....- ÷ ....- ÷- . ..- ÷- .. ......- ÷ .... . ...- ÷- .... ...--- . ... ...- ÷ .. .... .÷- ...... --- .. . ÷ .... ÷ ....- -..... 4- ... .. -i- . .... ÷ _ ÷ ....

2014/05/01 32 31 .24 0 PCT 11 P2 02H .38 WAR TEC TEH .560 ZBAZ1 82 H 971 2014/05/01 63 44 .26 0 PCT 12 P2 FB4 -1.65 WAR TEC TEH .560 ZBAZI 38 H 441 2014/05/01 80 51 .33 0 PCT 14 P2 FB3 -1.54 WAR TEC TEH .560 ZBAZ1 32 H 971 1

2014/05/01 79 52 .62 0 PCT 21 P2 F83 -1.98 WAR TEC TEH .560 ZBAZ1 30 H 1121 I

2014/05/01 76 59 .43 0 PCT 17 P2 FB6 -1.87 WAR TEC TEH .560 ZBAZ1 32 H 621 1

2014/05/01 80 59 .42 0 PCT 17 P2 Fos 1.59 WAR TEC TEH .560 ZBAZ1 32 H 611 1

2014/05/01 75 60 .51 0 PCT 19 P2 FB4 -. 92 WAR TEC TEH .560 ZBAZ1 30 H 541 2014/05/01 75 60 .39 0 PCT 15 P2 Fo6 -1.20 WAR TEC TEH .560 ZBAZI 30 H 541 1

2014105/01 79 60 .34 0 PCT 14 P2 FB4 -1.15 WAR TEC TEH .560 ZBAZ1 30 H 551 2014/05/01 81 60 .29 0 PCT 12 P2 F86 -. 82 WAR TEC TEH .560 ZBAZI 30 H 561 2014/05/01 66 61 .45 0 PCT 17 P2 FP5 1.74 WAR TEC TEH .560 ZBAZ1 38 H 721 2014/05/01 72 61 .37 0 PCT 18 P2 Fo5 1.77 WAR TEC TEH .560 ZBAZ1 30 H 511 2014/05/01 76 61 .47 0 PCT 17 P2 FBs 1.32 WAR TEC TEH .560 ZBAZ1 30 H 491 2014/05/01 80 61 .38 0 PCT 15 P2 F14 .76 WAR TEC TEH .560 ZBAZ1 30 H 471 2014/05/01 80 61 .45 0 PCT 17 P2 FP7 1.15 WAR TEC TEH .560 ZBAZ1 30 H 471 2014/05/01 86 61 .41 0 PCT 16 P2 FB4 -. 96 WAR TEC TEH .560 ZBAZ1 30 H 441 2014/05/01 86 61 .61 0 PCT 21 P2 FB5 -. 55 WAR TEC TEH .560 ZBAZ1 30 H 441 2014/05/01 73 62 .29 0 PCT 13 P2 FP6 -. 87 WAR TEC TEH .560 ZBAZ1 32 H 511 2014105/01 75 62 .55 0 PCT 21 P2 F84 -1.28 WAR TEC TEH .560 ZBAZ1 32 H 521 2014/05/01 79 62 .88 0 PCT 24 P2 FB4 -1.33 WAR TEC TEH .560 ZOAZi 32 H 53I 2014/05/01 79 62 .39 0 PCT 16 P2 F85 .63 WAR TEC TEH .560 ZBAZ1 32 H 531 2014/05/01 85 62 .30 0 PCT 14 P2 F84 -. 68 WAR TEC TEH .560 ZBAZ1 32 H 541 2014/05/01 85 62 .33 0 PCT 14 P2 F85 -. 87 WAR TEC TEH .560 ZBAZI 32 H 541 2014/05/01 91 62 .36 0 PCT 15 P2 FB4 .73 WAR TEC TEH .560 ZBAZI 32 H 551 2014/05/01 91 62 .44 0 PCT 18 P2 FB5 -. 74 WAR TEC TEH .560 ZBAZ1 32 H 551 2014/05/01 91 62 .49 0 PCT 19 P2 F85 .65 WAR TEC TEH .560 Z8AZ1 32 H 551 2014/05/01 109 62 .22 0 PCT 11 P2 F84 -. 90 WAR TEC TEH .560 ZBAZ1 32 H 161 2014/05/01 94 63 .30 0 PCT 13 P2 FB6 -1.45 WAR TEC TEH .560 ZBAZI 32 H 371 2014/05/01 51 64 .37 0 PCT 15 P2 FB3 1.44 WAR TEC TEH .560 ZBAZ1 38 H 1271 2014/05/01 65 64 .38 0 PCT 16 P2 F15 -. 44 WAR TOC TEH .560 ZBAZ1 32 H 71 2014/05/01 74 65 .37 0 PCT 15 P2 FB4 .69 WAR 2014/05/01 74 65 .47 0 PCT 16 P2 FB5 1.47 WAR TEC TEH .560 ZBAZ1 30 H 531 2014/05/01 74 65 .36 0 PCT 14 P2 FB6 -1.86 WAR TEC TEH .560 ZBAZ1 30 H 531 2014105/01 79 66 .24 0 PCT 11 P2 F86 .90 WAR 2014/05/01 97 66 .59 0 PCT 20 P2 F15 .43 WAR TOO TEH TEC TOH .560

.560 Z8AZ1 ZBAZ1 26 30 H H 1491 131 2014/05/01 99 66 .49 0 PCT 18 P2 F85 .96 WAR TEC TEH .560 ZBAZ1 30 H 141 2014/05/01 99 66 .35 0 PCT 14 P2 F86 .62 WAR TEC TEH .560 ZBAZ1 30 H 141 2014105/01 99 66 .28 0 PCT 12 P2 FB7 .58 WAR TEC TEH .560 ZBAZ1 30 H 141 2014/05/01 98 67 .37 0 PCT 14 P2 FB4 1.04 WAR TOC TEH .560 ZBAZ1 26 H 841 2014/05/01 96 67 .41 0 PCT 15 P2 FB5 .64 WAR TEC TEH .560 ZBAZ1 26 H 641 2014/05101 98 67 .37 0 PCT 14 P2 F87 -1.77 WAR TEC TEH .560 ZBAZ1 28 H 841 2014/05/01 98 67 .52 0 PCT 16 P2 FB7 1.57 WAR TEC TEH .560 ZBAZ1 28 H 141 2014/05/01 108 67 .45 0 PCT 16 P2 F17 1.35 WAR TEC TEH .560 Z6AZ1 28 H 891 2014/05101 77 68 .35 0 PCT 14 P2 F86 -. 55 WAR TEC TEH .560 ZBAZI 28 H 671 2014/05/01 98 69 .47 0 PCT 18 P2 Fo8 .56 WAR 2014/05/01 102 69 .40 0 PCT 16 P2 F85 .46 WAR TOO TOH .560 Z8AZI 26 H 1381 2014/05/01 102 69 .81 0 PCT 25 P2 F86 1.34 WAR WAR TOO TOH .560 Z8AZ1 26 H 1321 2014/05/01 106 69 .42 0 PCT 17 P2 FB6 1.43 TEC TEH .560 Z6AZ1 26 H 1261 TOO TOH .560 Z6A.Z1 26 H 1261 2014/05/01 114 69 .42 0 PCT 17 P2 F86 1.46 WAR TEC TEH .560 ZBAZ1 26 H 121 2014/05/01 93 70 .37 0 PCT 15 P2 FB4 -1.28 WAR TOC TEH .560 ZBAZ1 26 H 1261 2014/05/01 93 70 .34 0 PCT 14 P2 FB5 -1.32 WAR TEC TEH .560 ZBAZ1 26 H 1271 2014/05101 93 70 .36 0 PCT 15 P2 FP8 .86 WAR TEC TEH .560 ZBAZ1 26 H 1271 2014/05/01 93 70 .33 0 PCT 14 P2 FB6 1.32 WAR TEC TEH .560 ZBAZ1 26 H 1261 2014/05/01 g5 70 .32 0 PCT 14 P2 FB4 -1.30 WAR TEC TEH .560 ZBAZ1 26 H 12 2014/05/01 95 70 .33 0 PCT 14 P2 F85 -1.39 WAR TEC TEH .560 ZOAZ1 26 H 121 2014/05/01 95 70 .50 0 PCT 19 P2 FB6 .57 WAR TEC TEH .560 ZBAZ1 26 H 121 WAR TEC TEC TEH TEH .560

.560 Zl3AZ1 ZBAZ1 28 26 H H 127 611 2014/05/01 91 72 .52 0 PCT 18 P2 F86 -. 65 2014/05/01 95 72 .48 0 PCT 17 P2 FP4 .02 WAR TEC TEH .560 ZBAZ1 26 H 101 2014/05/01 95 72 .50 0 PCT 17 P2 FB5 -. 02 WAR 2014/05/01 95 72 .51 0 PCT 18 P2 FB6 .00 WAR TEC TEH .560 ZBAZ1 28 H 641 2014/05/01 98 73 .45 0 PCT 17 P2 FB4 -. 36 WAR TEC TEH .560 ZBAZI 26 H 1081 2014/05/01 98 73 .45 0 PCT 17 P2 F85 -1.27 WAR TEC TEH -560 ZBAZ1 26 H 104 2014/05/01 88 76 .35 0 PCT 13 P2 F89 -1.30 WAR 2014/05/01 96 75 .31 0 PCT 12 P2 F85 -1.43 WAR TEC TEH .560 ZBAZ1 28 H 521 2014/05/01 104 75 .19 0 PCT 8 P2 FP4 -. 51 WAR TEC TEH .560 ZBAZI 28 H 511


. ------------ ------- - ÷-----4---------- -..-----

ST MaxI

..... ÷ ....... ÷ ....... .l. ...... .l. .... ,.,p---

Page 12 of 15

SG - C Attachment 1 - Service Induced Degradation produced from ST Max database Catawba 1 1EOC21 DCP 20140501 09/03/2014 11:10:13 I INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 UTILl UTIL2 CRLEN CRWID CEG BEGT ENDT PDIA PTYPE CAL L IDXI

- ---------- -- ----..I- ----- --------- - ---- - ----- ---- - ----.- ----- ---------- ---------- --------- --------.- -------- ------- - ----- I......


.. I ....

+ ÷-.....--- ... ..----

2014/05/01 75 76 .64 0 PCT 21 P2 FB5 1.37 WAR TEC TEH .560 ZBAZ1 28 H 341 83 76 1.18 0 PCT 31 P2 F85 -. 54 2014/05/01 WAR TEC TEH .560 ZBAZI 28 H 381 2014/05101 83 76 .46 0 PCT 16 P2 FP6 -1.28 WAR TEC TEH .560 ZBAZ1 28 H 381 2014/05/01 85 76 1.10 0 PCT 29 P2 FB5 -1.28 WAR TEC TEH .560 ZBAZ1 28 H 391 2014/05/01 97 76 .32 0 PCT 13 P2 FB4 1.24 WAR TEC TEH .560 ZBAZ1 28 H 441 2014105/01 86 77 .38 0 PCT 15 P2 FB8 .65 WAR TEC TEH .560 ZBAZ1 26 H 941 TEC TEN .560 78471 28 H 921 2014/05101 98 77 .72 0 PCT 24 P2 F85 -1.86 WAR TEC TEH .560 ZBAZ1 26 H 901 2014/05/01 102 77 .49 0 PCT 19 P2 FB3 1.64 WAR TEC TEH .560 ZBAZ1 26 H 901 2014/05/01 102 77 .60 0 PCT 25 P2 F84 -. 43 WAR TEC TEH .560 ZBAZ1 26 H 901 2014/05/01 102 77 .56 0 PCT 20 P2 FP5 -1.35 WAR TEC TEH .560 ZBAZI 26 H 901 2014/05/01 102 77 .53 0 PCT 20 P2 F87 -. 67 WAR 2014/06/01 69 78 .35 0 PCT 18 P2 FP5 -. 75 WAR TEC TEH .560 ZBAZ1 40 H 1601 1

2014/05/01 97 78 .60 0 PCT 21 P2 FB4 .92 WAR TEC TEH .560 ZBAZ1 26 H 811 2014/05/01 97 78 .40 0 PCT 18 P2 FB5 .90 WAR TEC TEH .560 Z8AZ1 26 H 811 2014/05/01 97 78 .90 0 PCT 27 P2 FB6 -1.75 WAR TEC TEH .560 ZBAZ1 26 H 811 1

2014/05/01 99 78 .58 0 PCT 21 P2 FB4 .96 WAR TEC TEH .560 ZBAZ1 26 H 821 0

2014/05/01 101 78 .49 0 PCT 19 P2 F84 -1.27 WAR TEC TEH .560 ZBAZI 26 H 831 2014/05/01 101 78 .51 0 PCT 19 P2 FB4 .94 WAR TEC TEH .560 ZBAZI 26 H 831 2014/05/01 101 78 .52 0 PCT 19 P2 F85 -1.25 WAR TEC TEH .560 ZBAZ1 26 H 631 1

2014/05/01 103 78 .55 0 PCT 20 P2 FP6 -1.49 WAR TEC TEH .560 ZBAZI 26 H 841 2014105/01 69 80 .43 0 PCT 19 P2 FB5 -. 59 WAR TEC TEH .560 ZBAZ1 40 H 1611 1

2014/05/01 79 80 .32 0 PCT 12 P2 FB4 .59 WAR TEC TEH .560 ZBAZ1 28 H 301 2014/05/01 80 81 .51 0 PCT 19 P2 FB4 -1.21 WAR TEC TEH .560 ZBAZ1 26 H 491 1

2014/05/01 96 81 .37 0 PCT 15 P2 FB5 -1.14 WAR TEC TEH .560 ZBAZ1 28 H 571 2014/05/01 100 81 -34 0 PCT 14 P2 FB5 1.60 WAR TEC TEH .560 ZBAZ1 26 H 591 2014/05/01 102 83 .42 0 PCT 17 P2 FB5 -1.44 WAR TEC TEH .560 Z8AZ1 26 H 631 2014/05/01 83 84 .53 0 PCT 20 P2 FB5 -1.24 WAR TEC TEH .560 ZBAZ1 26 H 351 2014/05/01 98 85 -33 0 PCT 13 P2 F83 1.09 WAR TEC TEH .560 ZBAZ1 28 H 61 2014105/01 98 85 .44 0 PCT 16 P2 FB4 .97 WAR TEC TEH .560 ZBAZ1 28 H 61 2014/05/01 98 85 .44 0 PCT 16 P2 FP5 -. 98 WAR TEC TEH .560 ZBAZ8 28 H 61 2014/05/01 98 85 .41 0 PCT 15 P2 F85 .61 WAR TEC TEN .560 ZBAZ1 28 H 61 2014/05101 79 86 .41 0 PCT 15 P2 FB8 -. 97 WAR TEC TEH .560 Z4AZI 28 H 51 2014/05/01 79 86 .35 0 PCT 14 P2 FB6 -. 64 WAR TEC TEH .560 ZBAZl 28 H 51 2014/05/01 97 86 .40 0 PCT 16 P2 FB5 -. 56 WAR TEC TEH .560 ZBAZ1 24 H 831 2014/05/01 97 86 1.07 0 PCT 30 P2 FB6 -. 60 WAR TEC TEH .560 ZSA71 24 H 831 1

101 .43 0 PCT 16 P2 FB5 2014/05101 86 -. 65 WAR TEC TEH .560 ZBAZI 24 H 191 2014/05101 101 86 .33 0 PCT 13 P2 F88 -. 66 WAR TEC TEH .560 ZBAZI 24 H 191 2014105/01 105 86 .39 0 PCT 15 P2 FP8 -. 57 WAR TEC TEH .560 Z8AZ1 22 H 261 2014/05/01 113 86 .30 0 PCT 12 P2 F85 -. 53 WAR TEC TEH .560 ZBAZ1 18 H 331 2014/05/01 74 87 .45 0 PCT 17 P2 FB4 -1.30 WAR TEC TEH .560 ZBAZl 26 H 21l 2014/05/01 90 87 .53 0 PCT 19 P2 FB5 .63 WAR T7C TEH .560 ZBAZ1 26 H 191 2014/05/01 92 87 .62 0 PCT 19 P2 FB5 -1.25 WAR TEC TEH .560 ZBAZl 26 H 201 2014/05/01 96 87 .38 0 PCT 15 P2 F84 1.04 WAR TEC TEH .560 ZBAZ1 26 H 221 2014/05/01 96 87 .45 0 PCT 17 P2 F85 1.568 WAR TEC TEH .560 ZBAZ1 26 H 221 2014/05/01 96 87 .25 0 PCT 11 P2 FB6 -1.15 WAR TEC TEH .560 ZBAZ1 26 H 221 2014/05/01 98 87 .38 0 PCT 16 P2 F89 -1.44 WAR TEC TEH .560 ZBAZ1 26 H 23N 98 87 .46 0 PCT 18 P2 FB6 -1.47 WAR TEC TEH .560 ZBAZ1 26 H 231 2014/05/01 87 .45 0 PCT 17 P2 F84 2014/05/01 100 .66 WAR TEC TEH .560 ZB841 24 H 201 2014/05/01 100 87 .33 0 PCT 13 P2 FB5 -1.41 WAR TEC TEH .560 ZBAZP 24 H 20D 102 87 *.55 0 PCT 20 P2 FB5 -1.53 WAR TEC TEH .560 ZBAZI 26 H 241 2014105/01 63 88 .29 0 PCT 15 P2 F84 -1.19 WAR TEC TEH .560 ZBAZ1 40 H 2161 2014/05/01 2014/05101 77 88 .44 0 PCT 17 P2 FB5 -. 21 WAR TEC TEH .560 ZBAZ1 22 H 1201 79 88 .37 0 PCT 15 P2 FB5 -. 42 WAR TEC TEH -560 ZBAZ1 22 H 1 191 2014/05/01 105 88 .73 0 PCT 21 P2 FB5 -. 51 WAR TEC TEH .560 ZBAZ1 20 H 451 2014/05/01 84 103 .06 0 PCT 4 P2 05H .56 WAR TEC TEH .560 ZBA71 24 H 281 2014/05/01 INSPOATE ROW COL VOLTS CEG IND PER CHN LOCN INCH1 INCH2 UTILI UTIL2 CRLEN CRWID CEG IBEGT ENDT PDIA PTYPE CAL L IDXj


-- I- 4-----


4-----

I------ -------- I----4----- ---- ---- 4---- --- --- -*--

Tubes: 79 Records: 120 ST Max Page 13 of 15

SG - D Attachment 1 - Service Induced Degradation produced from ST Mma database Catawba 1 1EOC21 DCP 20140501 09103/2014 11:1


------ ------------------- ÷------------------- ---- ------- ------------ -------- ----- 4--

I INSPDATE ROW COL VOLTS DEG INO PER CHN LOCN INCH1 INCH2 oEGT UTIL1 UTIL2 CRLEN CRWID CEG ENOT POIA PTYPE CAL L IDXI

- ----- 4- - ----- ------- - I ---- ----- + -I-- 4- ------------

WAR 2014/05/01 109 5' .14 107 POT 10 P40 05H 32.81 08H .14 .29 48 05H .560 ZYAXP 14 H 301 2014/05/01 72 51 .51 0 PCT P2 FB5 1.19 TEH WAR TEC .560 ZBAZI 31 C 661 ZOAZ1 29 C 1061 2014/05/01 94 60 .44 0 PCT P2 FB5 .60 TEH WAR TEC .560 ZBAZ1 29 C 1051 2014/05/01 94 60 .76 0 PCT P2 F16 1.36 TEH WAR TEC .560 ZBAZI 29 C 1151 2014/05101 114 6 .47 0 PCT P2 F84 -1.02 TEH WAR TEC .560 ZBAZI 29 C 1331 2014/05101 89 6o .35 0 PCT P2 FB5 -. 38 TEH WAR TEC .560 ZBAZ1 29 C 1321 2014/05/01 91 6o .41 0 PCT P2 FB5 -. 36 TEH WAR TEC .660 ZBAZ1 29 C 131 2014/05/01 93 6: .72 0 PCT P2 FB5 -. 40 TEH WAR TEC .560 ZBAZI 29 C 1311 2014/05/01 93 6o .32 0 PCT P2 FB8 -. 41 TEH WAR TEC .560 ZBAZ1 29 C 1301 2014/05/01 95 6: .36 0 PCT P2 FB5 -.65 TEH WAR TEC .560 ZBAZ1 31 C 101 2014/06/01 80 64 .61 0 PCT P2 FB6 -1.00 TEH WAR TEC .660 ZBAZI 31 C 1311 2014/05/01 95 6& .41 0 POT P2 F85 .92 TEH WAR TEC .560 ZBAZ1 31 C 1301 2014/05/01 97 6' .37 0 PCT P2 FB5 -. 43 TEH WAR TEC .560 ZBAZ1 31 C 1291 2014/05/01 99 6' .40 0 PCT P2 FU5 .97 TEH WAR TEC .560 ZBAZI 31 C 1261 2014/05/01 113. 6' .39 0 PCT P2 PB5 -1.41 TEH WAR TEC .560 2014/05101 100 64 .36 0 PCT P2 FB4 .65 TEH WAR TEC .560 ZBAZI 29 C 1681 ZBAZ1 29 C 1731 2014/05/01 110 6! .41 0 PCT P2 FB3 -1.46 TEH WAR TEC .560 ZBAZI 29 C 1731 2014/05/01 110 6& .42 0 PCT P2 FB4 -1.14 TEH WAR TEC .560 ZBAZ1 29 C 1731 2014/05/01 110 6& .53 0 PCT P2 FB5 -1.16 TEH WAR TEC .560 ZBAZI 29 C 1661 2014/05/01 57 64 .76 0 POT P2 FB5 -. 82 TEH WAR TEC .560 ZBAZ1 29 C 1861 2014/05/01 71 64 .35 0 PCT P2 FES .98 TEH WAR TEC .560 ZBAZ1 29 C 1841 2014105/01 77 64 .46 0 PCT P2 F85 .87 TEH WAR TEC .560 ZBAZI 29 C 1831 2014/05/01 79 6o .37 O PCT P2 FB5 .57 TEH WAR TEC .560 ZBAZ1 31 C 1581 2014/05/01 94 6: .42 0 PCT P2 FB4 -. 58 TEH WAR TEC .650 ZBAZI 31 C 1781 2014/05/01 79 64 .40 0 PCT P2 F35 -. 59 TEH WAR TEC .560 2014/05101 81 64 .46 0 PCT P2 F84 .77 TEH WAR TEC .560 ZBAZ1 31 C 1 771 2014/05101 .54 0 PCT FB6 -1.05 TEN WAR .560 Z8AZ1 31 C 1771 81 .64 P2 TEC ZBAZ1 31 C 1761 2014/05/01 95 6f .51 0 PCT P2 FB3 -. 57 TEH WAR TEC .560 ZBAZ1 31 C 1761 2014/05/01 95 64 .72 0 PCT P2 FB5 -. 94 TEH WAR TEC .560 ZBAZI 31 C 1761 2014/05/01 95 6i .70 0 PCT P2 FP7 -1.19 TEH WAR TEC .560 ZBAZ1 31 C 1751 2014/05/01 97 6o .95 0 PCT P2 FE5 -1.01 TEH WAR TEC .560 ZBAZ1 31 C 1741 2014/05/01 99 64 .56 0 PCT P2 F15 .68 TEH WAR TEC .560 ZBAZ1 29 C 2061 2014/05/01 80 61 .29 0 PCT P2 F84 .61 TEH WAR TEC .560 2014/05/01 g0 65 .55 0 PCT P2 FB4 .68 TEH WAR TEC .580 ZOAZ1 29 C 2111 ZBAZ1 29 C 2121 2014/05/01 92 61 .51 0 PCT P2 FB4 .60 TEH WAR TEC .560 ZBAZ1 29 C 2161 2014/05/01 100 61 .52 0 PCT P2 FB5 .86 TEH WAR TEC .560 ZBAZ1 29 C 2161 2014/05/01 100 6 .69 0 PCT P2 FB6 1.05 TEH WAR TEC .560 ZBAZ1 29 C 217 2014/05/01 102 65 .43 0 PCT P2 FB4 .67 TEH WAR TEC .560 ZBAZ1 29 C 2231 2014/05/01 114 &s .34 0 PCT P2 FB4 .94 TEH WAR TEC .560 ZBAZ1 29 C 2231 2014/05/01 114 61 .38 0 PCT P2 FB5 .70 TEH WAR TEC .560 I

0 PCT P2 FB5 ZBAZI 33 C SI 2014/05/01 93 7' .67 -1.12 TEH WAR TEC .560 ZBAZ1 33 C 21 2014/05/01 93 7' .57 0 PCT P2 FEB -1.10 TEH WAR TEC .560 1 ZBAZ1 31 C 2021 2014/05/01 88 7 .44 0 PCT P2 FB5 -1.36 TEH WAR TEC .560 ZBAZ1 31 C 2121 2014105/01 108 7 .50 0 PCT P2 FB5 .48 TEH WAR TEC .560 ZBAZI 36 C 141 2014/05101 93 7 .56 0 PCT P2 FB4 -. 57 TEH WAR TEC .560

.560 ZBAZI 33 C 281 2014/05/01 80 7 .46 0 PCT P2 FB4 1.37 TEH WAR TEC ZBAZ1 33 C 261 2014/05/01 80 7 .68 0 PCT P2 F85 1.57 TEH WAR TEC .560 ZBAZ1 33 C 311 2014/05/01 86 7 .53 0 PCT P2 F84 1.25 TEH WAR TEC .560 ZBAZ1 33 C 311 2014/05/01 86 7 .79 0 PCT P2 FB5 1.70 TEH WAR TEC .560 ZBAZ1 33 C 311 2014/05/01 86 7. .63 0 PCT P2 FP6 -1.20 TEH WAR TEC .560 2014/05/01 88 7 .59 0 PCT P2 FB5 1.58 TEH WAR TEC .560 Z8AZ1 33 C 321 2014/05/01 92 7 .68 0 PCT P2 FB5 .568 TEH WAR TEC .560 ZOAZ1 33 C 341 ZBAZ1 33 C 411 2014/05/01 108 7 .44 0 PCT P2 FB4 .69 TEH WAR TEC .560 ZBAZI 33 C 49I 2014/05/01 65 7, .40 0 PCT P2 FB6 .54 TEH WAR TEC .560 ZOAZ1 33 C 481 2014105/01 67 7 .40 0 PCT P2 FB5 .62 TEH WAR TEC .560 1 P'2 F85 ZBAZI 33 C 471 2014/05/01 69 7 .54 0 PCT .69 TEH WAR TEO .560 1 ZBAZI 37 C 2181 2014/05/01 36 7 .5"1 0 POT P2 03H -1.22 TEH WAR TEC .560 1 ZBAZI 35 C 521 2014/05/01 114 7 .41 0 PCT P2 FB6 -1.29 TEH WAR TEC .520

.90 0 PCT 1.73 WAR .560 ZBAZ1 36 C 551 2014/05/01 53 7 P2 FB4 TEH TEC ZBAZI 35 C 561 2014/05/01 63 7 .28 0 PCT P2 FB5 -1.77 TEH WAR TEC .560 4- ------------ ----- ---... ------ ----------÷ . .- ___


-------- . . . ..÷.----- . . . . ----. .÷ _

--..-... ----------- ....÷ ... -- ST max Page 14 of 15

SG - D Attachment 1 - Service Induced Degradation produced from ST Max database Catawba 1 1EOC21 DCP 20140501 09/03/2014 11:1


----------- ----------- 4


-. ------ ---------------- ------ -- +-----------4-----4-----------------

I INSPOATE ROW COL VOLTS DEG IND PER CHN LOCN INCHI INCH2 BEGT UTIL1 UTIL2 CRLEN CRWID CEG ENDT PDIA PTYPE CAL L IDXI 4- .. .. . .. .--- I --- I I - ----........---..-.....---

÷-.........---.........---....------ ------- -------------------------..-.-. ÷ ... ..---. ------ ..- I 2014/05/01 77 78 .33 0 PCT 13 P2 FBS 1.53 TEH WAR TEC .560 ZBAZ1 35 C 101l I I 2014105/01 52 79 .45 0 PCT 18 P2 FB5 -. 82 TEH WAR TEC .560 ZBAZ1 35 C 621 1

2014/05101 101 80 .39 0 PCT 16 P2 FB6 -. 97 TEH WAR TEC .560 ZSAZl 35 C 971 1

2014105101 85 84 .40 0 PCT 1 P2 FB5 -1.11 TEH WAR TEC .560 ZSAZI 33 C 2081 2014/05(01 66 85 .48 0 PCT 17 P2 FP4 1.48 TEH WAR TEC .560 ZSAZ1 35 C 1491 2014/05/01 109 88 .30 0 PCT 13 P2 F85 .68 TEH WAR TEC .560 ZBAZ1 35 C 1771 1

2014/05/01 63 90 .21 60 PCT 13 P34 04H 29.52 05H WAR .19 .41 67 04H .560 ZYAXP 16 H 1i1 2014/05/01 52 91 .36 0 PCT 13 P2 FP4 -. 76 TEH WAR TEC .560 ZSAZ1 37 C 181 I I 2014/05/01 62 95 .38 0 PCT 14 P2 FB4 -. 83 TEH WAR TEC .560 ZSAZI 37 C 351 4--------4---------- -----I-- I ----I -------- 4


--- 4- ----------------------- 4I---------4---- -------- 4------*---------- --------------- -------- ------------------------------------- -------------------- 4-----4--- 4--------

INSPDATE ROW COL VOLTS DEG IND PER CHN LOCN INCH1 INCH2 BEGT UTILl UTIL2 CRLEN CRWID CEG ENDT PDIA PTYPE CAL L IDXI

......---------- 4-.-----.-- . .-----.-----.-----------.----- 4--4----........ -- - 4--------------- ---... -------------------------- ------- - - --- I --

Tubes: 56 Records: 69 6 ST Max Page 15 of 15