GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report

From kanterella
Jump to navigation Jump to search
Submittal of 2018 Inservice Inspection Summary Report
ML18290A537
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/16/2018
From: Franssen R
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2018/00047
Download: ML18290A537 (9)


Text

AE* ..

~* .ntergy Entergy Operations, Inc.

P.O. Box756 Port Gibson, Mississippi 39150 Robert J. Franssen General Manager Plant Operations Grand Gulf Nuclear Station Tel: 601-437-2129 10 CFR50.55(a)

. GNR0-2018/00047 October 16, 2018 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

2018 lnservice Inspection Summary Report

  • Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Dear Sir or Madam:

Entergy Operations Incorporated is submitting the lnservice Inspection Summary Report, OAR-1-00014, as required by Section XI of the American Society of Mechanical Engineers (ASME) Code. The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-5 as authorized by the Nucl,ear Regulatory Commission (NRC). The attached report contains an overalJ summary of lnservice Inspections perform_ed from March 2016 to July 2018 which encompasses the Third Period of the Third Interval, as well as the First Period of the Fourth Interval. The Third Period of the Third Interval began in June of 2014 and ended in November of 2017. The First Period of the Fourth Interval began in December of 2017 and ends in November of 2020.

This letter contains no new Regulatory Commitments.

Should you have any questions concerning the content of this letter, please contact Douglas A. Neve, Manager Regulatory Assurance, at 601-437-2103.

GNR0-2018/00047 Page 2 of 2 Sincerely, Robert J. Franssen RJFYrws

Attachment:

lnservice Inspection Summary Report Number OAR-1-00014 cc: NRG Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission ATTN: Ms. Jennifer Bridges 1600 East Lamar Boulevard Arlington, TX 76011-4511

REPORT NUMBER OAR-1-00014 INSERVICE INSPECTION

SUMMARY

REPORT FOR

(

GRAND GULF NUCLEAR STATION UNIT 1 BALD HILL ROAD PORT GIBSON, MS. 39150 COMMERCIAL OPERATION DATE: JULY 1, 1985 OWNER/OPERATOR ENTERGY OPERATIONS,' INC.

ECHELON ONE P.O. BOX 31995 JACKSON, MS. 39286-1995 PREPARED BY

~!NEER APPROVED BY DOCUMENT COMPLETION 10 -/(&;-If DATE

FORM OAR-1 OWNER'S ACTIVITY REPORT Plant Grand Gulf Nuclear Station, Bald Hill Road, Port Gibson, MS 39150 Unit No._~_ _Commercial Service Date July l, 1985 Refueling Outage No.__g1_

Current Inspection lnterval~~~~~~~~~4~~-*-*~~~~~~~~~~~~~~~~~~~

Current Inspection Period~~~~~~~~~~1-~~**~~~~~~~~~~~~~~~~~~-

Edition and Addenda of Section XI applicable to the inspection plans 2007 Edition I 2008 Addenda **

Date and revision of Inspection plans SEP-ISI-GGN-001, Rev. 7, Effective Date 7/18/2018; SEP-CISl-102 1 Rev. 2, Effective Date 12/1 /2018.

Edition and Addenda of Section XI applicable to the repair/replacement activities, if different'than the inspection plans i1 **Current Interval/Period started on 12/01/17. This OAR-I includes R/R activities performed in the 3rd Interval I 3r Period in accordance with ASME Section XI 200 I Edition I 2003 Addenda.

Code Cases used: N-532-5, N-416-2 N-240 N-241 1516-2, 1567 1 1 1 CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of RF21 conform to the requirements of Section XI.

  • The NIS-2A form for R/R Plan number GG-502335 could not be signed as documented in CR-GGN-2018-11080.
  • The NIS-2A form for R/R Plan number GG-441834 could not be signed as documented in CR-GGN-2018-11081.
  • The NIS-2A form for AIR Plan number GG-450214 could not be signed as documented in CR-GGN-2018-11082.
  • The NIS-2A form for R/R Plan number GG-488532 could not be signed as documented in CR-GGN~201B-11083.

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by HSBCT of Hartford CT , have inspected the items c;iescribed_in this Owners Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all the activities represented by this report in accordance with the requirements of Section XI. .

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or co ~i with this_inspection.

ANII Signature: l"~ (Inspectors Signature)

Commissions: _,__..L../.....~'-'-7_'.3_2-=-__/_'&;...ic;...:;.~_._---- (National Board and Endorsement)

Date: ffa/!'&?'.'

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE I

Examination Category and Item Number Item Description Evaluation Description

~- None None None

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Date Repair/Replacement Code Class Item Description Description of Work Completed 'Plan Number AHR Valves 1E12F018B I 2 1E12F046B Replace valves 4-6.-17 GG-449574 01 P41 G01 OR03 3 Pipe Support Replace strut barrel --*-

9-27-18 GG -448241-09 01 P41G011 C02 01 P41 G01 OR03 Q1P41G011C01

  • 3 Pipe. Suoports Replace deqraded pins 9-27-18 GG - 448241-02 1B33C001B Decon Flange 1 Bolting Replace nuts and studs 4-17-18 GG-318755 1 P41 F068A SSW Outl FM RHR HX

- 3 . A (Loop A) Replace valve 9-19 I GG-52583096 Cut out and reinstall valve 2 1G36F106 RWCU (weldinq) 9-20-18 GG-440352-01 2 1G36F106 RWCU Beplacetnent of valve 9-20-18 GG-440352-21 IE J 2C002A RHR Replace cap screws and 2 Pump nuts on suction flange 10-4-18 GG-483308 IE12FI03B/ Delete valves I install bar 2 - -

IE12FI04B stock in place of valves 10-4-18 --t,-***-***

GG - 455804 IEI 2FI03A/ Delete valves I install bar 2 !El2Fl04A stock in place of valves -

9-19-18 GG - 479466

\

I B33F023A RECIRC PMP A \ Seal weld body to bonnet 1 Suclion Valvt! per vendor manual 10~3-18 GG - 365147 1E12F036 AHR Replace valve with blind

2. Valve fitting 10-3-18 GG - 471203 1 P41 F001 B SSW Pumps 3 Discharqe Valve Replace valve 10-3-18 GG - 479968 1 821 F016 Inboard Main Steam Line Drain Inboard 1 Drain Valve Cut-out and replace valve 9-26-18 GG - 376662 1P41 F012 Check .)

3 Valve Replace check valve 9-20-18 GG - 467875

5

)

1P41F185A HPCS Diesel Water Cooler 3 Inlet Valve Replace valve and bolting 10-4-18 GG - 369242 1T48D001A Standby Gas Weld conduit support Treatment plate to the 1T 48N014A 2 Charcoal Filter exterior. 7-27-17 GG - 465516 1T48D0018 Standby Gas Weld conduit support Treatment plate to the 1T 48N014B 2 Charcoal Filter exterior. 6-29-17 GG - 465517 Replaced u-bolts and nuts on sparger piping 3 SP418001B supports 9-20-18 GG - 266394 Replaced u-bolts and nuts on sparger piping 3 SP4180018 supports 9-20-18 GG-266395 MSRV Serial # Replaced studs and 1 160841 installed helical coils 12-1-16 G G - 403234/1 O MSRV Serial # Replaced studs and 1 160808 installed helical coils 12-1-16 GG - 403234/12 Replaced studs and nuts 2 1G36F101 Valve due to incorrect material 11-30-16 GG - 455785 1B33G265C01 2 -

Snubber Replaced snubber 9-17-18 GG - 472107 1P53F002 Check

.,.._._ 2 Valve Replaced valve 9-19-18 GG - 500229 1821 G490R03 3 Snubber Replaced snubber 9-14-18 GG - 472082 1821 G372R01 3 Snubber Replaced snubber 9-18-18 GG - 471765 1821 G355R01 3 Snubber Replaced Snubber 9-18-18 GG-470702 1833G322RO 1 2 Snubber Replace Snubber 9-17-18 GG - 472460 01821 G369R01 3 Snubber Replace snubber 9-18-18 GG -471626 1821 G024R07 .

3 Snubber Replace snubber 9-14-18 GG - 472742

6 Q 1821 G026C02 1 Snubber Replace snubber 9-14-18 GG - 470642 1B33G337R02 2 Snubber Replace snubber 9-14-18 GG - 472479 1

1821 G423R01 3 - Snubber Replace Snubber 9-14-18 GG-472077 1E12G012R18 1 Snubber ~lace snubber 8-22-18 GG - 473697 01821 G311R01 3 Snubber Replace snubber 9-18-18 'GG-456678 1E12F046C RHR Removed defects 2 Min Flow Valve identified on valve body 9-20-18 GG - 450207-16 1E12F046C AHR Performed weld repair of 2 Min Flow Valve' defect on bodv -

9-20-18 GG - 450207-17 1E12F018C AHR Removed defects 2 Min Flow Valve identified on valve body 9-20-18 GG - 450208-12 Replaced 4" piping and 4"-HBB-115 RHR elbow downstream of I 2 Pipinq 1E12F018C 9-20-18 .. GG - 499493-01 1E12F018C AHR 2 Min Flow Valve Replace valve ' 9-20-18 GG - 499493-11 1E12F046C AHR 2 Min Flow Valve Replace valve 9-20-18 GG - 499493-12 1E12F046C AHR 2 Min Flow Valve Reassemble valve 9-20-18 GG - 499493-22 1E12F018C RHR 2 Min Flow Valve Reassemble valve 9-20-18 GG - 499493-23 4"-HBB-115 RHR 2 Pipinq Replace weld-o-let 9-20-18 GG - 499493-27 Mechanically remove 1E 12F046C AHR excessive root 2 Min Flow Valve penetration in weld 9-20-18 GG - 499493-34

7 Mechanically remove 2 1E12F018C RHR defects identified in the 1 2 Min Flow Valve radioaraph of weld. 9-20-18 GG - 49 9493-35 1P41F001A SSW Pump A 3 Discharge Valve Replace valve 10-4-18 GG - 407083