Category:Inservice/Preservice Inspection and Test Report
MONTHYEAR2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 2CAN052202, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 12022-05-31031 May 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) - Revision 1 ML22126A0332022-05-10010 May 2022 Review of the Spring 2021 Steam Generator Tube Inspections During Refueling Outage 1R29 2CAN022201, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28)2022-02-0808 February 2022 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage (2R28) ML22034A8992022-02-0303 February 2022 Steam Generator Tube Inspection Reports in Support of TSTF-577 1CAN102104, Steam Generator Tube Inspection Report - 1R292021-10-22022 October 2021 Steam Generator Tube Inspection Report - 1R29 2CAN082103, Unit 2 - Fifth 10-Year Interval Snubber Program Plan2021-08-31031 August 2021 Unit 2 - Fifth 10-Year Interval Snubber Program Plan 1CAN072102, Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29)2021-07-19019 July 2021 Inservice Inspection Summary Report for the Twenty-Ninth Refueling Outage (1R29) 2CAN122001, Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection2020-12-0404 December 2020 Submittal of 40-Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval2020-11-24024 November 2020 Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval 2CAN072001, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27)2020-07-0808 July 2020 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (2R27) 1CAN012004, Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage2020-01-28028 January 2020 Inservice Inspection Summary Report for the Twenty-Eighth Refueling Outage 2CAN091901, Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program2019-09-0303 September 2019 Entergy Operations, Inc. - Request for Alternatives Subject to the Fifth 10-Year Interval of the Inservice Testing Program 2CAN021906, Steam Generator Tube Inspection Report2019-02-28028 February 2019 Steam Generator Tube Inspection Report 2CAN011903, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage2019-01-23023 January 2019 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage 1CAN101802, Submittal of 45th-Year Reactor Building Inspection Report2018-10-10010 October 2018 Submittal of 45th-Year Reactor Building Inspection Report 1CAN091802, Snubber Testing Program for Fifth Inservice Test Interval2018-09-24024 September 2018 Snubber Testing Program for Fifth Inservice Test Interval 1CAN081808, Inservice Testing Plan for the Fifth 10-Year Interval2018-08-27027 August 2018 Inservice Testing Plan for the Fifth 10-Year Interval 1CAN071802, Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27)2018-07-25025 July 2018 Inservice Inspection Summary Report for the Twenty-Seventh Refueling Outage (1R27) 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25)2017-10-0606 October 2017 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval2017-09-21021 September 2017 Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval 1CAN031703, Steam Generator Tube Inspection Report - 1R262017-03-22022 March 2017 Steam Generator Tube Inspection Report - 1R26 1CAN031702, Reactor Building Inspection Summary Report - 1R262017-03-14014 March 2017 Reactor Building Inspection Summary Report - 1R26 1CAN031705, Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26)2017-03-14014 March 2017 Inservice Inspection Summary Report for the Twenty-Sixth Refueling Outage (1R26) 1CAN111602, Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-12016-11-16016 November 2016 Fifth Ten-Year Interval Inservice Testing Program, Relief Request VRR-ANO1-2017-1 1CAN011602, Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2016-01-18018 January 2016 Amended Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 1CAN051502, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25)2015-05-28028 May 2015 Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (1R25) 2CAN011503, Year Containment Building Tendon Surveillance and Concrete Inspection2015-01-16016 January 2015 Year Containment Building Tendon Surveillance and Concrete Inspection 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23)2014-08-21021 August 2014 Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) 2CAN081404, Steam Generator Tube Inspection Report - 2R232014-08-18018 August 2014 Steam Generator Tube Inspection Report - 2R23 1CAN111301, Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-11-0505 November 2013 Revised Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101306, Unit 1, Steam Generator Tube Inspection Report - 1R242013-10-23023 October 2013 Unit 1, Steam Generator Tube Inspection Report - 1R24 1CAN101304, Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24)2013-10-21021 October 2013 Inservice Inspection Summary Report for the Twenty-Fourth Refueling Outage (1R24) 1CAN101301, Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-0232013-10-0808 October 2013 Request for Relief from Volumetric Examination Frequency Requirements, Request for Relief ANO1-ISI-023 1CAN041305, Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections2013-04-30030 April 2013 Unit 1, Response to Request for Additional Information Related to Fall 2011 Steam Generator Tube Inservice Inspections 2CAN121204, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22)2012-12-13013 December 2012 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (2R22) 1CAN031203, Unit 1, Steam Generator Tube Inspection Report - 1R232012-03-22022 March 2012 Unit 1, Steam Generator Tube Inspection Report - 1R23 2CAN051102, Inservice Inspection Summary Report for the Twenty-First Refueling Outage2011-05-25025 May 2011 Inservice Inspection Summary Report for the Twenty-First Refueling Outage 2CAN011105, Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program2011-01-25025 January 2011 Program Section SEP-ISI-105 for ASME Section XI, Division 1, Arkansas Nuclear One, Unit 2, Inservice Inspection Program ML1036305792010-12-29029 December 2010 Notification of Inspection (NRC Inspection Report 050-368/2011002) and Request for Information ML1022504182010-07-29029 July 2010 Steam Generator Tube Inspection Report - 1R22 1CAN061004, Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22)2010-06-29029 June 2010 Inservice Inspection Summary Report for the Twenty-Second Refueling Outage (1R22) 2CAN031006, Inservice Testing Plan for the Fourth 10-Year Interval2010-03-25025 March 2010 Inservice Testing Plan for the Fourth 10-Year Interval 1CAN021002, Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests2010-02-0909 February 2010 Response to Second Set of Requests for Additional Information on the Third 10-Year Inservice Inspection Interval Relief Requests 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20)2009-12-0707 December 2009 Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) 1CAN030907, Steam Generator Tube Inspection Report - 1R212009-03-30030 March 2009 Steam Generator Tube Inspection Report - 1R21 1CAN030902, Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21)2009-03-0404 March 2009 Inservice Inspection Summary Report for the Twenty-First Refueling Outage (1R21) CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval 2CAN070802, Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19)2008-07-0101 July 2008 Inservice Inspection Summary Report for the Nineteenth Refueling Outage (2R19) 2023-08-10
[Table view] Category:Letter type:CNRO
MONTHYEARCNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00007, Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2013-04-26026 April 2013 Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2013-00008, Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-04-16016 April 2013 Arkansas, Units 1, 2 & ISFSI, Grand Gulf, ESP and ISFSI, River Bend, Unit 1 and ISFSI and Waterford 3 and ISFSI, Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00002, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments2013-01-29029 January 2013 Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License and ESP Amendments CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications CNRO-2012-00007, Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc2012-10-15015 October 2012 Grand Gulf Nuclear Station & Waterford 3 Steam Electric Station Status of Decommissioning Funding - Entergy Operations, Inc CNRO-2012-00004, Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications2012-05-21021 May 2012 Request for Additional Information Regarding Changes to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Plant Technical Specifications Regarding Staff Qualifications CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00006, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications2011-12-13013 December 2011 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) and Associated Plant Technical Specifications Regarding Staff Qualifications CNRO-2011-00007, 2011 Recertification of Foreign Ownership Control or Interest2011-10-0606 October 2011 2011 Recertification of Foreign Ownership Control or Interest CNRO-2011-00005, Response to Request for Additional Information on 2011 Decommissioning Fund Status Report2011-07-0505 July 2011 Response to Request for Additional Information on 2011 Decommissioning Fund Status Report CNRO-2011-00004, Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2011-04-29029 April 2011 Entergy - Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G CNRO-2011-00001, Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc2011-03-31031 March 2011 Status of Decommissioning Funding for Plants Operated by Entergy Operations, Inc CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2011-03-31031 March 2011 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2010-00002, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2010-04-29029 April 2010 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G 2021-10-06
[Table view] |
Text
Entergy Operations, Inc.
Entergy 1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 John F. McCann Director Nuclear Safety & Licensing CNRO-2007-00033 August 22, 2007 U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Request ISI-2007-1 Use of Later ASME Section Xl Code Edition and Addenda for Repair and Replacement, Pressure Testing, and Non Destructive Examination Activities Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a(g)(4)(iv), Entergy Operations, Inc. (Entergy) requests permission to use the 2001 Edition/2003 Addenda of ASME Section XI for the performance of ISI related activities associated with repair/replacements, pressure testing, and NDE. The NRC has approved these editions and addenda of Section Xl as documented in 10 CFR 50.55a(b)(2).
Regarding performance demonstration of ultrasonic examinations, Entergy requests permission to use the 2001 Edition of ASME Section Xl as specified in 10 CFR 50.55a(b)(2)(xxiv). This request, ISI-2007-1, is applicable to Arkansas Nuclear One*
Unit 2 (ANO-2) and is provided in the enclosure to this letter.
Entergy is seeking approval of ISI-2007-1 in order to maintain a standard program among its southern facilities for repair/replacement, pressure testing, and NDE activities.
Entergy is providing this request in accordance with NRC Regulatory Issue Summary 2004-16, Use of Later Editions and Addenda to ASME Code Section X1 for Repair/ReplacementActivities.
Entergy requests approval of this request on or before January 31, 2008. Should you have any questions regarding this submittal, please contact Bill Brice at (601) 368-5076.
Aosv7
CNRO-2007-00033 Page 2 of 2 This letter contains no commitments.
Very truly yours, JFM/GHD/ghd
Enclosure:
Request ISI-2007-1 cc: Mr. 0. Limpias (ECH)
Mr. T. Mitchell (ANO)
Dr. Bruce S. Mallett Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 U. S. Nuclear Regulatory Commission Attn: Mr. A. B. Wang (ANO)
MS O-7D1 Washington, DC 20555-0001 NRC Senior Resident Inspector Arkansas Nuclear One P. 0. Box 310 London, AR 72847
ENCLOSURE CNRO-2007-00033 ISI-2007-1 REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(4)(iv) FOR INSERVICE INSPECTION ITEMS
CNRO-2007-00033 ENTERGY OPERATIONS, INC.
10 CFR 50.55a Request ISI-2007-1 REQUEST IN ACCORDANCE WITH 10 CFR 50.55a(g)(4)(iv) FOR INSERVICE INSPECTION ITEMS
- 1. ASME Code Components Affected All Class 1, 2, 3, MC, and CC components, component supports, and welds in the ASME Section XI pressure boundary at Arkansas Nuclear One, Unit 2 (ANO-2).
2. Applicable Code Edition and Addenda
Inservice inspection (ISI) related activities such as repair/replacements, pressure testing, and non-destructive examination (NDE) are currently performed at ANO-2 in accordance with the 1992 Edition of ASME Section XI with the exceptions listed below.
" Pressure testing, is performed in accordance with the 1992 Edition with portions of the 1993 Addenda. (Ref: NRC SER dated December 12, 1996 - TAC No. M94471)
- Ultrasonic examinations are performed in accordance with the 1995 Edition, 1996 Addenda. (Ref: NRC SER dated January5, 2006 - TAC No. MC8046)
- ISI of Class MC (including metallic liners) and Class CC containments are performed in accordance with the 1992 Edition/1 992. Addenda with portions of the 1998 Edition/2000 Addenda. (Ref: NRC SER dated December21, 2004 - TAC No. MC5026)
The above information is detailed in a tabular format in Attachment 1. The start date of the next 10-Year ISI interval for ANO-2 is March 26, 2010.
- 3. Proposed Subsequent Code Edition and Addenda (or Portion)
A. Background ASME Section XI activities at Arkansas Nuclear One, Unit 1 (ANO-1) and Unit 2 (ANO-2), Grand Gulf Nuclear Station (GGNS), River Bend Station (RBS), and Waterford Steam Electric Station, Unit 3 (WF3) are currently performed in accordance with the Editions/Addenda of ASME Section Xl identified in Section 2.0, above.
However, as of May 31, 2008, ANO-1, GGNS, RBS, and WF3 will update to the 2001 Edition/2003 Addenda of Section XI in accordance with the 10-year update requirements of 10 CFR 50.55a(g)(4)(ii). Also, to comply with the NRC restriction in paragraph (xxiv) of 10 CFR 50.55a(b)(2), performance demonstration of ultrasonic examinations will be in accordance with the 2001 Edition (no addenda) of Appendix VIII. Because ANO-2 is only in the eighth year of its third 10-Year ISI interval, it is not scheduled to update until March 26, 2010.
ASME Section XI activities at ANO-1, ANO-2, GGNS, RBS, and WF3 are standardized and corporately administered by Entergy. While ISI Program Plans - based on IWB-,
1 of 3
CNRO-2007-00033 IWC-, IWD-, IWE-, IWF-, and IWL-2500 - are contained in site specific ISI documents, the repair/replacement, pressure testing, and NDE programs are contained in common programs that are corporately implemented at all five of the subject Entergy facilities.
Therefore, if ANO-2 continues to perform repair/replacement, pressure testing, and NDE activities in accordance with its current code of record after implementing the update at ANO-1, GGNS, RBS, and WF3, then Entergy will be required to maintain two different repair/replacement, pressure testing, and NDE programs for its southern fleet.
Furthermore, ANO personnel will have to implement two versions of each of these programs at their site (i.e. updated programs at ANO-1 and existing programs ANO-2).
B. Proposed Subsequent Code Edition and Addenda Pursuant to 10 CFR 50.55a(g)(4)(iv), Entergy requests permission to utilize the 2001 Edition/2003 Addenda of ASME Section XI at ANO-2 for the performance of repair/replacements, pressure testing, and NDE.: To comply with the NRC restriction in paragraph (xxiv) of 10 CFR 50.55a(b)(2), the 2001 Edition/No Addenda of Appendix VIII will be used for performance demonstration of Ultrasonic examinations. It is important to note that this request does not apply to the selection, planning, or scheduling of 11S examinations and tests as defined in IWB-, IWC-, IWD-, IWE-, IWF-, and IWL-2500. ISI examinations and tests at ANO-2 will continue to be selected, planned, and scheduled in accordance with its present code of record as described in Section 2.0, above. See Attachment 2 for specific details regarding this proposal.
In implementing this proposal, Entergy will also comply with all NRC conditions, limitations, and restrictions specified in 10 CFR 50.55a.
- 4. Related Requirements Entergy is requesting permission to use the 2001 Edition/2003 Addenda of ASME Section XI for the performance of repair/replacements, pressure testing, and NDE and the 2001 Edition of Appendix Vill for performance demonstration of ultrasonic examinations. In making this request, Entergy will comply with all related requirements in ASME Section XI as described below:
Entergy has proposed to utilize all "Articles" (e.g. IWA-1000, IWA-2000, etc) from every "Subsection" (e.g. IWA, IWB, etc.) of the 2001 Edition/2003 Addenda that could be used or referenced for the performance of repair/replacement, pressure testing, and NDE activities. Entergy has also stated that it will comply with all "Mandatory Appendices" of the 2001 Edition/2003 Addenda.
Entergy will only use Appendix VIII from the 2001 Edition of ASME Section XI in accordance with the NRC restriction in paragraph (xxiv) of 10 CFR 50.55a(b)(2).
However, this appendix includes all pertinent requirements for performance demonstration of ultrasonic examination systems.
With regard to the performance of ISI examinations and tests, Entergy will continue to select, plan, and schedule these ISI inspection activities - as specified in IWA-, IWB-,
IWC-, IWD-, IWE-, IWF-, and, IWL-2500 - in accordance with its current code of record.
To ensure that all related requirements are met, ANO-2 will also continue to comply with applicable portions of IWA-2000 and all provisions of IWB-, IWC-, IWD, IWE-, IWF-, and IWL-1 000 and 2000 from its original code of record. See Attachment 2 for more details.
2 of 3
CNRO-2007-00033
- 5. Duration of Proposed Request The duration of this request will be from approval by the NRC staff until the end of the third, (3 rd) ISI interval for ANO-2, which is scheduled to end on or about. March 25, 2010.
3 of 3
CNRO-2007-00033 REQUEST ISI-2007-1 ATTACHMENT 1 PRESENT ASME SECTION XI CODE OF RECORD AT ANO-2
CNRO-2007-00033 PRESENT ASME SECTION XI CODE OF RECORD AT ANO-2 ASMESec toion XI AppIhca6e Editib and Addenda of ASME Sect on X1 00 1WA-200difi./1 900 Add.
<Sub q,#c 0 ( 192Edition Editidn9/
ANith, Po-rfio o 19922 192dtif -W195Eition/fr,ýo F Idi i-
& d
~ . N Addena s~ction~
______________19
~ 193~Jdd-? 1992Addenda WtEdh ibn/OO Udd 1,998 19 Adde IWA-4000 X1 X2
-70 IWA-2000 IWA-3000 X1 Xz
.8 X1 1 Xz S2 IWA-4000 X1 IWA-5000 X1 Xz a) IWA-6000 X1 "
_ IWA-9000 X
/-) IWB-1000 X1 0-U)
_ IWB-2000 a IWB-3000 X_
o 0- IWB-4000 0 IWB-5000 U- IWB-7000 X' E IWC-2000 X_
6 0 o IWC-3000 IWC-4O000 X_
X
-0 En3 IWC-5000 X1 0* IWD-7000 X" 0C) IWD-1000 X1_____
_ 'E IWD-2000 SIWD-4000
_ o IWD-5000 'X__._-.
-0 IWD-7000 X1
" O" IWE-1000 0 " IWE-2000 X__
A 2t IWE-3000 Xz c IWE-4000 0E Xz LL 0. IWE-4000QO 0, IWE-5000 XT SWE-5OOO IWE-7000 IWF-1000 X1 2 n IWF-2000 IWF-3000 c 0 IWF-50I LL _ UC) . 9 IWF-4000 IWF-5000 X1 0 c6 c IWF-7000 X 11 IWL-1000 XL Ur 0 0cz IWL-2000., X (n c: X2 JOE o
o IWL-5000 IWL-7000 Xz Xj I
,6 -0 III VIIX xx' Xxz C (1 c _ Vl X1 z VII X*
VIII X3 1 of 2
CNRO-2007-00033 PRESENT ASME SECTION XI CODE OF RECORD AT ANO-2 Notes:
- 1. This note is intended to identify the Edition/Addenda of ASME Section Xl applicable to ISl related activities such as inservice examinations/tests, repair/replacements, pressure testing, and NDE. However, it does not identify the Edition/Addenda of ASME Section Xl applicable to: ISI ofClass MC or Class CC components.
- 2. This note is intended to identify the Edition/Addenda of ASME Section XI applicable to the Class MC or Class CC components.
- 3. This note is intended to identify the Edition/Addenda of ASME Section Xl that are used to perform ultrasonic examinations at ANO-2.
2 of 2
CNRO-2007-00033 REQUEST ISI-2007-1 ATTACHMENT 2 PROPOSED ASME SECTION XI CODE OF RECORD FOR ANO-2
CNRO-2007-00033 PROPOSED ASME SECTION XI CODE OF RECORD FOR ANO-2 A. ME. Section '....... ' .. .. Ap cabe'Edtion andAddendaofFASME Section XI-' .
~Sub - - 1**9i2:Al Eio
,d. ." i1992 Edlitid2n/'l - diti 1i992, Editio2/01992 .
lI°id0A 1998 ,200Edition/ 2001 Addenda EditionP "
§.section Ar" WithoPorins "1 992 Add8TE be* of-dden*dd1993 Ad..Etiol992 With Portin/,,of .. NQ'Addenda 2003 IWA-1000 -
E IWA-3000 IWA-4000 XX IWA-5000 X
_ IWA-6000 X IWA-9000 X
,,-
- E IWB-2000 X C IWB-3000 X n (D IWB-4000 D
.L
_) o IWB-5000 IWB_-000X X 0 IWC-5000 X 0 IWC-3000 X 6 4 "C ,)Cý wc-10ooo IWC-2000 X_ _ _ _ _ _ _ x _ _
- . IWC-7000 D C IWD-1000 X 0- IWD-4000" IWD-2000X 0 IWD-3000 X
_ 0 IWD-5000 X (n IWD-2000 WE-3000
,C x_
rr
- c IWE-000 C- C IWE-4000 _
CE 00 IWE-5000 X C) IWE-7000" IWF-1000 X co- IWF-2000 _ _
-O0 X'_ __
X cr o IWF-3000
, . IWF-4000 _
lio-0. o, IWE-5000 X1 X__
2L) c- IWF-2000 IWF-7000 _
IWL-1000 X1 S- 0 IWL-3000 X S') IWL-5000 X
" - .4 IWL-1000 X1X_1 L0 IWL_7000 C ID 0 IWL50V oa IWL_400 _ ____X VII _ __ _ _ X__
VIII __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _X IX X 1 of 2
CNRO-2007-00033 PROPOSED ASME SECTION XI CODE OF RECORD FOR ANO-2 Notes:
(1) These ASME Section XI articles (e.g. IWB-1 000 and 2000) apply to the selection, planning, and scheduling of ISI examinations and tests and have not been changed by this request. Therefore, as shown above, Entergy will continue to comply with its original code of record when using these ASME Section XI articles.
(2) Entergy is only proposing to use IWA-2100, 2200, and 2300 from the 2001 Edition, 2003 Addenda. However, Entergy will continue to comply with its original code of record when using IWA-2400, 2500, 2600 for the selection, planning, and scheduling of ISI examinations and tests.
(3) All repair/replacement rules were consolidated into IWA-4000. Therefore, as of the 1992 Edition/1 994 Addenda, the following articles were deleted from ASME Section XI: IWB-4000, IWB-7000, IWC-4000, IWC-7000, IWD-4000, IWD-7000, IWE-4000, IWE-7000, IWF-4000, and IWF-7000.
(4) As of the 1995 Edition/ 1995 Addenda, IWL-7000 was consolidated into IWL-4000 and deleted.
(5) When implementing the various Editions/Addenda of ASME Section Xl as shown in the table, Entergy will also comply with all NRC conditions, limitations, and restrictions specified in 10 CFR 50.55a.
2 of 2