CP-200900008, Submittal of Unit 1 Thirteenth Refueling Outage (1RF13) Inservice Inspection (ISI) Summary Report (Unit 1:1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/13/2000, Second Interval

From kanterella
Jump to navigation Jump to search
Submittal of Unit 1 Thirteenth Refueling Outage (1RF13) Inservice Inspection (ISI) Summary Report (Unit 1:1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - 08/13/2000, Second Interval
ML090220035
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/08/2009
From: Blevins M
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TXX-09003, CP-200900008
Download: ML090220035 (8)


Text

Mike Blevins Luminant Power M Senior Vice President

& Chief Nuclear Officer mike.blevins@luminant.com P O Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 5209 C 817 559 9085 F 254 897 6652 CP-2009000 08 Ref. # 10CFR50.55a TXX-09003 January 8, 2009 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NO. 50-445 SUBMITTAL OF UNIT 1 THIRTEENTH REFUELING OUTAGE (1RF13) INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 1:1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE - AUGUST 13, 2000, SECOND INTERVAL)

Dear Sir or Madam:

In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) transmits the Inservice Inspection Summary Report for the thirteenth refueling outage of Comanche Peak Unit 1. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new licensing basis commitments regarding Comanche Peak Unit 1.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance U Callaway Comanche Peak

  • Diablo Canyon
  • Palo Verde San Onofre South Texas Project Wolf Creek

U. S. Nucdear Regulatory Commission TXX-09003 Page 2 January 8, 2009 If you have any questions or need additional information regarding this matter, please contact Jack Hicks at (254) 897-6725.

Sincerely, Luminant Generation Company LLC Mike Blevins By: ,L W"2c

/ Fred W. Madden Director, Oversight & Regulatory Affairs Enclosure c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak A. Jones, Chief Inspector, TDLR B. Welch, ANII, Comanche Peak

ENCLOSURE to TXX-09003 FORM OAR-I OWNER'S ACTIVITY REPORT Report Number CPSESUl 1RF13 Owner Luminant Power P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)

Plant Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, Texas 76043 (Name and Address of Plant)

Unit No. I Commercial service date August 13, 1990 Refueling outage no. 13 Current inspection interval 2 (1st, 2 nd, 3 rd, 4 th, other)

Current inspection period 3 (1st 2 nd, 3 rd)

Edition and Addenda of Section Xl applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPSES ISI Program Plan, Interval 2, Rev. 5. February 22, 2007 Edition and Addenda of Section Xl applicable to repairs and replacements, if different than the inspection plan. Same CERTIFICATE OF CONFORMNCE I certify that the statements made in this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements, evaluations, and corrective measures represented by this report conform to the requirements of Section Xl.

Certificate of Authorization N/A Expiration Date N/A if applicable Signed jp-o  %-,,/.t,-0,,, , Date / 7 Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in this Owner's Activity Report, during the period of July 1, 2007 to January 1, 2009, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any, warranty, expressed or implied, concerning the examinations, tests, repairs, replacement, evaluations and corrective measures described in this report.

Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a toss of any kind arising from or connected with this inspection.

Commissions fY- 11lil- AM0

.Inspec!.9r>'gnature National Board, State, Province and Endorsements Date This form (E00127) may be obtained from the Order Dept., ASME, 22 Law Drive, Box 2300, Fairfield, NJ 07007-2300 OAR- I Page 1 of 5

TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Total Total Total Total Examinations Examinations Examinations Examinations Credited (%) to Examination Required For The Credited for This Credited (%) for Date for the Category Interval Period* The Period** Interval Remarks B-A 24 0 0 4 NOTE 3 B-B 8 2 67 75 NOTE 9 B-D 36 0 0 47 NOTE 10 B-F 4 0 0 100 B-G-1 166 2 50 99 NOTE 4 B-G-2 30 10 83 93 NOTE4 B-J 30 0 0 100 B-K 14 5 83 93 NOTE 7 B-L-1 1 1 100 100 NOTES 1, 3 B-L-2 1 0 0 0 NOTES 1, 4 B-M-2 4 0 0 25 NOTES 1, 4 B-N-1 3 0 0 67 NOTE 2 B-N-2 1 0 0 0 NOTE 3 B-N-3 1 0 0 0 NOTE 3 B-0 4 0 0 0 NOTE 3 B-P NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTES 2, 5 B-Q NOTE 8 NOTE 8 NOTE 8 NOTE 8 NOTE 8 C-A 19 0 0 58 C-B 8 0 0 50 C-C 101 1 3 62 C-D 1 0 0 100 C-F-1 17 0 0 100 C-F-2 1 0 0 100 C-G 6, 0 0 66 C-H NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 D-A 171 27 47 97 D-B NOTE 5 NOTE 5 NOTE 5 NOTE 5 NOTE 5 F-A F1.10 62 27 93 97 F-A F1.20 106 2 3 41 F-A F1.30 132 28 41 87 OAR-1 Page 2 of 5

TABLE I ABSTRACT OF EXAMINATIONS AND TESTS Examination Total Total Total Total Examinations Category Examinations Examinations Examinations Credited (%) to Required For The Credited for This Credited (%) for Date for the Interval Period* The Period- Interval Remarks F-A r1.40 49 1 8 78 F-B 139 0 0 100 F-C 442 0 0 100 R-A 88 46' .71 82 NOTE 6 This column is interpreted to represent the cumulative number of exams performed to date in this period.

This column Isinterpreted to represent the cumulative percentage of scheduled exams for the interval which have been completed to date in this period.

NOTES:

1. Examinations for pumps and valves are limited to components selected for examination under Examination Categories B-L-i, B-L-2, and B-M-2.
2. Examination Categories B-N-l, B-P, and B-Q do not have to follow the required percentages of Table IWB-2412-1.
3. Examinations for Examination Categories B-A. B-L-1, B-N-2, B-N-3, and B-O may be deferred to the end of the inspection interval.
4. Examinations for Examination Categories B-G-1, B-G-2, B-L-2, and B-M-2 may be deferred until disassembly of a component for maintenance, repair/replacement, or volumetric examination.
5. Visual Examinations (VT-2) for system leakage tests are performed each fuel cycle, period, and interval, according to the requirements of IWA-2212 and IWA-5240. Al required VT-2 examinations have been completed for this fuel cycle, except for portions of the CH system in package 1-CH-2-3-1 (a) and work order 3533774 and the CT system in pacakge 1-CT-2-3-1 (a) and work order 3533843, which are scheduled for 2009,
6. Examination Category R-A includes previous Examination Categories B-F, B-J, C-F-i, and C-F-2.
7. Examination Category B-K for the second period includes one Category B-K-1 examinations that was completed in 1RF10.
8. Examination Category B-Q, Steam Generator Tubing,is reported per the requirements of the Plant Technical Specifications.
9. Replacement of the four Steam Generators with four new Steam Generators in 1RF1 2 removed six Steam Generator Category B-B welds, which were scheduled for examination in the second period. Refer to EVAL-2005-001089-02-00. Two Pressurizer Category B-B welds were rescheduled and examined in 1 RF12 and the second period.
10. Replacement of four Steam Generators with four new Steam Generators in 1RF 12 removed six Steam Generator Category B-D welds, which were scheduled for examination in the second period. Refer to EVAL-2005-001089-02-00. Two Pressurizer B-D welds were rescheduled and examined in 1RF12 and the second period.

OAR-1 Page 3 of 5

TABLE 2

' ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Flaw Flaw or Relevant Condilion Found Examination Item Item Description Characterization During Scheduled Section XA Category Number (IWA-3300) Examination or Test (Yes or No)

No Items

___ .1

___ 1

______ 1 ____ .1 OAR-1 Page 4 of 5

TABLE 3 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Flaw or Relevant Condition Found Repair, During Scheduled Repair/

Replacement Section Xl Replacemen Code or Corrective Item Description Examination or Date t Class Measure Description of Work Test (Yes/No) Complete Plan Number No Items OAR-1 Page 5 of 5