Submittal of Unit 1 Fifteenth Refueling Outage (1RF15) Inservice Inspection (ISI) Summary Report (Unit 1: 1998 Edition of ASME Code Section XI Through 2000 Addenda, Interval Start Date - August 13, 2010, Third Interval)
ML12026A244
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 01/17/2012
From: Flores R, Madden F
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201200045, TXX-12007
Download: ML12026A244 (5)


Text

Rafael Flores Luminant Power Senior Vice President P 0 Box 1002

& Chief Nuclear Officer 6322 North FM 56 Rafael.Flores@Luminant.com Glen Rose, TX 76043 Luminant T 254 897 5550 C 817 559 0403 F 254 897 6652 CP-201200045 Ref. # 10CFR50.55a Log # TXX-12007 January 17, 2012 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-445 SUBMITTAL OF UNIT 1 FIFTEENTH REFUELING OUTAGE (1RF15) INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (UNIT 1: 1998 EDITION OF ASME CODE SECTION XI THROUGH 2000 ADDENDA, INTERVAL START DATE - AUGUST 13, 2010, THIRD INTERVAL)

Dear Sir or Madam:

In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) transmits the Inservice Inspection Summary Report for the fifteenth refueling outage of Comanche Peak Unit 1. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new commitments regarding Comanche Peak Unit 1.

Should you have any questions, please contact Mr. Jack Hicks at (254) 897-6725.

Sincerely, Luminant Generation Company LLC Rafael Flores By: * "/ /,,,*..

Fred W. Madden Director, Oversight & Regulatory Affairs A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre - South Texas Project
  • Wolf Creek 746~47

U. S. Nuclear Regulatory Commission TXX-12007 Page 2 of 2 01/17/2012 Enclosure c- E. E. Collins, Region IV B. K. Singal, NRR Resident Inspectors, Comanche Peak Luis Ponce, TDLR Jack Ballard, ANII, Comanche Peak

ENCLOSURE TO TXX-12007 INSERVICE INSPECTION

SUMMARY

FOR UNIT 1 FIFTEENTH REFUELING OUTAGE

FORM OAR-I OWNER'S ACTIVITY REPORT Report Number CPNPPU1 1RF15 Plant Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, Texas 76043 Unit No. 1 Commercial service August 13, 1990 Refueling outage 15 Current inspection interval 3 (1`, 2 nd, 3 rd 4th, other)

Current inspection period 1 (1t, 2 nd, 3 td)

Edition and Addenda of Section XI applicable to the inspection plan 1998 Edition, 2000 Addenda Date and revision of inspection plan CPNPP ISI Program Plan. Interval 3. Rev. 0. July 28. 2011 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan. Same Code Cases Used None (If applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the inspection Plan as required by the ASME Code,Section IX; and (c) the repair/replacement activities and evaluations supporting the completion of 1RF15 conform to the requirements of Section XI.

Signed P&P )-Zy,ýz Date I /Iý/Z-

, Vl ýwner O or Owner's Desigt, "ifle CERTIFICATE OF INSERVICE INSPECTION 1,the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Province of Texas and employed by Hartford Steam Boiler Inspection and Insurance Company of Connecticut, have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

__ _ _ __ _ _ __ _ _Commissions IV I1L3/ 0 -'27 N*j - *- IL 0"- 9 -7 4 Inspector's Signature National Board, State, Province and Endorsements Date / /J 4 /

OAR-1 Page 1 of 2

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Evaluation Description Examination Item Description Category and Item Number None TABLE 2 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/

Class Description of Work Completed Replacement Plan Number None OAR-1 Page 2 of 2