CP-201800086, Submittal of Unit 1 Nineteenth Refueling Outage (IRF19) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code, Section XI, 2008 Addenda Unit 1 Third Interval Start Date: August 13, 2010 Unit 1 Third ..

From kanterella
Jump to navigation Jump to search
Submittal of Unit 1 Nineteenth Refueling Outage (IRF19) Inservice Inspection (ISI) Summary Report (2007 Edition of ASME Code,Section XI, 2008 Addenda Unit 1 Third Interval Start Date: August 13, 2010 Unit 1 Third ..
ML18058A744
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 02/07/2018
From: Hope T
Luminant Power, TXU Energy, Vistra Operations Company
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201800086, TXX-18008
Download: ML18058A744 (4)


Text

V!S'?!?.'\

ENERGY

~~rxu

't* energy I m Luminant Timothy A. Hope Manager, Regulatory Affairs Luminant P.O. Box 1002 6322 North FM 56 Glen Rose, TX 76043 o 254.897.6370 m 817.360.6882 CP-201800086 TXX-18008 U.S. Nuclear Regulatory Commission Ref: 10 CFR 50.55a ATIN: Document Control Desk Washington, DC 20555-0001 02/07/2018

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-445 SUBMITIAL OF UNIT 1 NINETEENTH REFUELING OUTAGE (1RF19}

INSERVICE INSPECTION (ISi}

SUMMARY

REPORT (2007 EDITION OF ASME CODE, SECTION XI, 2008 ADDENDA UNIT 1 THIRD INTERVAL START DATE: AUGUST 13, 2010 UNIT 1 THIRD INTERVAL END DATE: AUGUST 12, 2020}

Dear Sir or Madam:

In accordance with the requirements of 10CFR50.55a, Vistra Operations Company LLC (Vistra OpCo}, the operator of Comanche Peak Nuclear Power Plant Units 1 and 2 (herein referred to as CPNPP}, herewith submits the lnservice Inspection (ISi) Summary Report for the nineteenth refueling outage of Comanche Peak Unit 1 (1RF19}.

The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new licensing basis commitments regarding CPNPP Unit 1.

Should you have questions concerning this submittal, please contact Jack C. Hicks at 254-897-6725, or e-mail atjack.hicks@luminant.com.

Sincerely,

~4-~

Timothy A. Hope 1601 BRYAN STREET DALLAS, TEXAS 75201 o 214-812-4600 VISTRAENERGY.COM

TXX-18008 Page 2 of 2 Enclosure lnservice Inspection Summary Report for Unit 1 Nineteenth Refueling Outage 1RF19 C- Kriss Kennedy, Region IV Balwant Singal, NRR Resident Inspectors, Comanche Peak Brandon Kneupper, ANII, Comanche Peak

FORM OAR*l OWNER'S ACTMTY REPORT Report Number CPNPP Untt 1 1RF19 Plant Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, Texas 76043 Unit No. 1 Commercial service August 13, 1990 Refueling outage 19 Current inspection Interval 3rd (1' , 2 , 3' , 4 , other)

Current Inspection period 3rd (1", 2 , 3 )

Edition and Addenda of Section XI applicable to the inspection plan 2007 Edition, 2008 Addenda Date and revision of inspection plan CPNPP Unit 1 ISi Program Plan, Interval 3 Rev 11 8/13/14 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the Inspection plan.

/

Code Cases U~d N-532-4 (If appli6ibleJ CERTIFICATE OF CONFORMANCE I certify that (a) the statements made In this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section IX; and (c) the repair/replacement actMtles and evaluations supporting the completion a11RF19ccnfarmta~7~5acttonXI.

mun*d ~ ° " ' " ~ 1 4 . &,.of;'" ~ ~ It CERTIFICATE OF INSERVICE INSPECTION

~

I, the understsned, holdtns a valid commission issued by the National Board of Boller and Pressure Vessel Inspectors 11nd the State of Province of J!!!! and employed by Hartford Steam Boller Inspection and Insurance Company of Connecticut, have Inspected the items ,described fn this Owner's ActMty Report, and state that, to the best of my knowledae and belief, the Owner has performed all activities represented by this report tn aic:cordance with the requirements of Section XI.

By signln1 this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concernlns the repair/replacement activities and evaluation described In this report. Furthermore, neither the inspector nor hfs employer shall be Hable in any manner for any personal injury or property damase or a loss of any kind arisint from or connected with thfs inspection. ,

National Board, State, Province and Endorsam*nts OAR-I Page I of2 Scanned by CamScanner

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Evaluation Description Examination Item Description Category and Item Number 815.20 Pressure Retaining Components EV-CR-2017-012392-3 TABLE 2 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE Code Item Description Dale Repair/

Class Description of Work Completed Replacement Plan Number NONE OAR-1 Page 2of2