CP-201600869, Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report

From kanterella
Jump to navigation Jump to search
Submittal of Eighteenth Refueling Outage (1RF18) Inservice Inspection Summary Report
ML16253A002
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/31/2016
From: Hope T
Luminant Generation Co, Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CP-201600869, TXX-16103
Download: ML16253A002 (5)


Text

Timothy A. Hope Luminant Power II Manager, Regulatory Affairs Timothy.Hope@Luminant.com P 0 Box 1002 6322 North FM 56 Glen Rose, TX 76043 Luminant T 254 897 6370 c 817 360 6882 F 254 897 6573 CP-201600869 Ref. # 10CFR50.55a TXX-16103 August 31, 2016 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT DOCKET NO. 50-445 SUBMITTAL OF UNIT 1 EIGHTEENTH REFUELING OUTAGE (1RF18)

INSERVICE INSPECTION (ISI)

SUMMARY

REPORT (2007 EDITION OF ASME CODE, SECTION XI, 2008 ADDENDA THIRD INTERVAL START DATE: AUGUST 13, 2010 THIRD INTERVAL END DATE: AUGUST 12, 2020)

Dear Sir or Madam:

In accordance with 10CFR50.55a, Luminant Generation Company LLC (Luminant Power) transmits the Inservice Inspection Summary Report for the eighteenth refueling outage of Comanche Peak Unit 1. The enclosed report is being provided to you pursuant to the ASME Boiler and Pressure Vessel Code,Section XI, paragraph IWA-6240(b). A copy of this report is also forwarded to the Chief Inspector in accordance with the Texas Boiler Law & Rules and Regulations, paragraph 65.100.g.4.

This communication contains no new licensing basis commitments regarding Comanche Peak Unit 1.

Should you have any questions, please contact Mr. Aaron Thomas at (254) 897-6637.

Sincerely, Luminant Generation Company LLC

~~**

Timothy A. Hope

U. S. Nuclear Regulatory Commission TXX-16103 Page2 of2 08/31/2016 Enclosure - Inservice Inspection Summary for Unit 1 Eighteenth Refueling Outage c- Kriss Kennedy, Region IV Margaret M. Watford, NRR Resident Inspectors, Comanche Peak Robert Free, TDLR Jeremy Shaffer, ANII, Comanche Peak

ENCLOSURE WITH TXX-16103 INSERVICE INSPECTION

SUMMARY

REPORT FOR UNITl EIGHTEENTH REFUELING OUTAGE

FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number CPNPP U11RF18 Plant Comanche Peak Nuclear Power Plant P.O. Box 1po2 Glen Rose, Texas 76043 Unit No. 1 Commercial service Ausust 13, 1990 Refuellns outage 18 Current Inspection Interval 3rd

~------~~~---.(1~a~,2~~~.~3"'~.~4m~,-o~th-er~)----~~------~~~----~-----

2nd Current tnspectfon period (11&, 2 I ]'d)

Edition and Addenda of Section XI applicable to the inspection plan 2.007 Edltf on, 2008 Addenda Date and revision of tnspectf on plan CPNPP Unit 1 ISi Program Plan. Interval 3, Rev. 1._August 13. 2014 Edition and Addenda of Section XI applicable to repairs and replacements, If different than the Inspection plan. Same Code Cases Used N-532*4 (Jf applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the st~tements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section IX; and (c) the repair/replacement activities and evaluations supporting the completion of 1RF18 conform to the requirements of Section XI.

Signed Date Owner or owner's Deslgnee, Tiiie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holdlns a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State of Province of~ and employed by Hartford Steam Boller Inspection and Insurance Company of Connecticut, have Inspected the Items described In this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/replacement actMtles and evaluation described In this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.

Commissions National Board, State, Province and Endorsements OAl?-1 Page 1 of2

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Evaluallon Deacrlpllon Examination Item Descrlpllon category and Item Number Strut SW-1-AB-001-H1found EV-CR-2016-003811-3 evaluated F-A F1.30B bent. to be acceptable for service.

TABLE 2 ABSTRACT OF REPAIRS, REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE .

Code Item Description Date Repair/

Class Description of Work Completed Replacement Plan Number None OAIM Page 2of2