MONTHYEARML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML22209A0602022-07-28028 July 2022 2022 Inservice Inspection Summary Report GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2017/00039, Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages2017-06-30030 June 2017 Steam Dryer Visual Inspection Results for the First Two Scheduled Refueling Outages GNRO-2016/00033, Submittal of 2016 Inservice Inspection Summary Report2016-06-20020 June 2016 Submittal of 2016 Inservice Inspection Summary Report GNRO-2014/00043, Inservice Inspection Summary Report2014-06-12012 June 2014 Inservice Inspection Summary Report GNRO-2012/00110, Submittal of Inservice Inspection Summary Report2012-09-11011 September 2012 Submittal of Inservice Inspection Summary Report GNRO-2009/00070, Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing2009-12-14014 December 2009 Supplement to Request to Use Portion of Later Edition to the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants for Main Steam Safety Relief Valve Inservice Testing CNRO-2009-00002, Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval2009-03-0404 March 2009 Relief Request CEP-ISI-011 for Third 120 Month Inservice Inspection Interval GNRO-2009/00004, Inservice Inspection Summary Report2009-01-19019 January 2009 Inservice Inspection Summary Report GNRO-2008/00071, Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 02008-10-29029 October 2008 Inservice Inspection (ISI) Program Third 10-Year Interval, Rev. 0 GNRO-2008/00057, Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 02008-07-31031 July 2008 Transmittal of Inservice Inspection Program Third 10-Year Interval, Revision 0 ML0815700022008-06-27027 June 2008 Relief Request GGNS-ISI-004 to Extend 2nd 10-Year Inservice Inspection Interval 4 Months Beyond 1-year Extension Allowed by ASME Code CNRO-2008-00016, Relief Requests for Third 120 Month Inservice Testing Interval2008-05-20020 May 2008 Relief Requests for Third 120 Month Inservice Testing Interval 1CAN030804, Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 12008-03-13013 March 2008 Revised Relief Request for 10 Year Update to the 120 Month Inservice Testing Interval, Arkansas Nuclear One, Unit 1 CNRO-2007-00044, Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan2007-11-30030 November 2007 Unit 1 and Arkansas Nuclear One, Units 1 & 2 - Inservice Testing Plan CNRO-2007-00042, Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals2007-11-29029 November 2007 Entergy Operations, Inc. - Relief Requests for 10 Year Updates to the 120 Month Inservice Testing Intervals GNRO-2007/00046, Inservice Inspection Summary Report2007-07-10010 July 2007 Inservice Inspection Summary Report GNRO-2006/00044, Corrections to Inservice Inspection Summary Report2006-08-10010 August 2006 Corrections to Inservice Inspection Summary Report GNRO-2006/00002, Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 12006-01-13013 January 2006 Lnservice Inspection Summary Report for Grand Gulf Nuclear Station Unit 1 GNRO-2004/00019, Transmittal of Inservice Inspection Summary Reports2004-03-0808 March 2004 Transmittal of Inservice Inspection Summary Reports ML0404901792003-12-18018 December 2003 to CEP-IST-2, Inservice Testing Plan, Entergy Nuclear South Central Engineering Programs GNRO-2003/00022, Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station2003-04-0202 April 2003 Boiling Water Reactor (BWR) Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station CNRO-2003-00009, Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-6632003-03-14014 March 2003 Entergy Operations, Referenced Paper for Request to Use ASME Code Case N-663 2024-06-11
[Table view] Category:Letter type:GNRO
MONTHYEARGNRO-2013/00079, 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013)2023-10-11011 October 2023 2013-10-13 (GNRO-2013-00079) Response to RAI Set 49 (Dated Sep-12-2013) GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2021/00037, 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 12021-11-30030 November 2021 2021 Annual Report of Changes and Errors to 10 CFR 50.46 Analysis Grand Gulf Nuclear Station, Unit 1 GNRO-2021/00017, Notification of Readiness for Supplemental Inspection2021-06-22022 June 2021 Notification of Readiness for Supplemental Inspection GNRO-2021/00014, Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency2021-06-0101 June 2021 Inservice Testing Program Relief Request VRR-GGNS-2021-1 Pressure Isolation Valve Testing Frequency GNRO-2021/00015, Annual Radioactive Effluent Release Report2021-04-28028 April 2021 Annual Radioactive Effluent Release Report GNRO-2021/00011, Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 20202021-04-19019 April 2021 Revision of Original Report of 10CFR50.59 and Commitments Change Evaluations - July 1, 2018 Through May 21, 2020 GNRO-2021/00012, Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.22062021-04-13013 April 2021 Annual Report of Individual Monitoring - NRC Form 5 for 2020 Per 10 CFR 20.2206 GNRO-2020/00045, 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis2020-12-16016 December 2020 2020 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2020/00034, Notification of Spent Fuel Cask Use2020-10-0808 October 2020 Notification of Spent Fuel Cask Use GNRO-2020/00033, Response to NRC Integrated Inspection Report 05000416/20200022020-09-10010 September 2020 Response to NRC Integrated Inspection Report 05000416/2020002 GNRO-2020/00029, Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 20202020-08-18018 August 2020 Report of 10 CFR 72.48 Evaluations July 1, 2018 Through June 30, 2020 GNRO-2020/00022, Report of Technical Specification Bases Changes2020-07-21021 July 2020 Report of Technical Specification Bases Changes GNRO-2020/00027, Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-07-16016 July 2020 Core Operating Limits Report (COLR) Cycle 23 Revision 1 for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2020/00020, Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS)2020-05-0505 May 2020 Core Operating Limits Report (COLR) Cycle 23, and Pressure and Temperature Limits Report (PTLR) Update for Grand Gulf Nuclear Station, Unit 1 (GGNS) GNRO-2020/00018, Annual Radiological Effluent Release Report2020-04-30030 April 2020 Annual Radiological Effluent Release Report GNRO-2020/00016, Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.22062020-04-16016 April 2020 Annual Report of Individual Monitoring -NRC Form 5 for 2019 Per 10 CFR 20.2206 GNRO-2020/00015, Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test2020-04-0707 April 2020 Response to Request for Additional Information - License Amendment Request for One-Cycle Extension of Appendix J Type a Integrated Leakage Rate Test and Drywell Bypass Leakage Rate Test GNRO-2020/00007, Spent Fuel Storage Radioactive Effluent Release Report for 20192020-02-20020 February 2020 Spent Fuel Storage Radioactive Effluent Release Report for 2019 GNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020 License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies GNRO-2019/00052, Report of Changes and Errors to 10 CFR 50.46 Analysis2019-12-13013 December 2019 Report of Changes and Errors to 10 CFR 50.46 Analysis GNRO-2019/00051, Notification of Readiness of 92723 Inspection2019-12-11011 December 2019 Notification of Readiness of 92723 Inspection GNRO-2019/00045, Emergency Plan, Revision 792019-10-29029 October 2019 Emergency Plan, Revision 79 GNRO-2019/00037, Notification of Spent Fuel Cask Use2019-09-20020 September 2019 Notification of Spent Fuel Cask Use GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 782019-08-0808 August 2019 Correction to Gnro 2019-00017 Emergency Plan Revision 78 GNRO-2019/00027, Notification of Readiness of 95001 Supplemental Inspections2019-07-0303 July 2019 Notification of Readiness of 95001 Supplemental Inspections GNRO-2019/00031, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report2019-06-25025 June 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 - Corrected Report GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.2019-06-13013 June 2019 Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation. GNRO-2019/00026, Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval2019-05-0606 May 2019 Response to Requests for Additional Information Regarding Relief Request Number GG-ISI-023, Inservice Inspection Impracticality - Limited Coverage Examinations During the Third 10-Year Inservice Inspection Interval GNRO-2019/00020, Annual Radiological Operating Report (AREOR)2019-04-30030 April 2019 Annual Radiological Operating Report (AREOR) GNRO-2019/00024, Annual Radioactive Effluent Release Report2019-04-30030 April 2019 Annual Radioactive Effluent Release Report GNRO-2019/00022, Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.22062019-04-22022 April 2019 Annual Report of Individual Monitoring - NRC Form 5 for 2018 Per 10 CFR 20.2206 GNRO-2019/00017, Emergency Plan, Revision 782019-03-14014 March 2019 Emergency Plan, Revision 78 GNRO-2019/00014, Snubber Testing Program for Fourth Inspection Interval2019-03-13013 March 2019 Snubber Testing Program for Fourth Inspection Interval GNRO-2019/00012, Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2019-03-0606 March 2019 Internal Events Probabilistic Risk Assessment (PRA) Sensitivity Study Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program GNRO-2019/00016, Spent Fuel Storage Radioactive Effluent Release Report for 20182019-02-21021 February 2019 Spent Fuel Storage Radioactive Effluent Release Report for 2018 GNRO-2019/00003, Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation2019-01-23023 January 2019 Application to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation GNRO-2018/00057, Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan2018-12-0404 December 2018 Submittal of Revision 17 to the Grand Gulf Nuclear Station Physical Security, Safeguards Contingency, and Training and Qualification Plan GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval2018-11-30030 November 2018 Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval GNRO-2018/00055, Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ...2018-11-30030 November 2018 Response to Request for Additional Information for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a ... GNRO-2018/00052, License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information2018-10-24024 October 2018 License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis - Partial Response to Request for Additional Information and Extension of Response to Request for Additional Information GNRO-2018/00051, Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-10-23023 October 2018 Supplement to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control GNRO-2018/00047, Submittal of 2018 Inservice Inspection Summary Report2018-10-16016 October 2018 Submittal of 2018 Inservice Inspection Summary Report GNRO-2018/00046, Submittal of 2018 Report of Changes and Errors to 10CFR50.462018-10-16016 October 2018 Submittal of 2018 Report of Changes and Errors to 10CFR50.46 GNRO-2018/00048, Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 62018-10-10010 October 2018 Response to Request for Additional Information License Amendment Request, Adoption of Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6 GNRO-2018/00042, Core Operating Limits Report Cycle 22, Revision 12018-09-18018 September 2018 Core Operating Limits Report Cycle 22, Revision 1 GNRO-2018/00043, Revised Offsite Dose Calculation Manual2018-09-18018 September 2018 Revised Offsite Dose Calculation Manual GNRO-2018/00039, Report of Technical Specification Bases Changes2018-08-20020 August 2018 Report of Technical Specification Bases Changes 2023-06-06
[Table view] |
Text
Entergy Operations, Inc.
Waterloo Road
` Entergy P.O. Box 756 Port Gibson, MS 39150 Tel 601 437 6299 Charles A. Bottemiller Manager Plant Licensing GNRO-2006/00044 August 10, 2006 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Subject:
Corrections to Inservice Inspection Summary Report Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 Ucense No. NPF-29
Reference:
GNRO-2006/00002 dated January 13, 2006
Dear Sir or Madam:
The reason for this submittal is to make the following corrections to the above referenced letter:
- correct the Insurance Company name listed In the OAR-1 Owners Activity Report Form, and
- correct a typographical error made in TABLE 3.
Attached is the Owner's Activity Report, OAR-1 -00007 as required by Section XI of the ASME Code (Code). The report was prepared and submitted in accordance with the requirements of ASME Code Case N-532-1 as authorized by the NRC.
The report contains an overall summary of Inservice Inspections performed to date, during the Third Period of the Second Interval. The Third Period of the Second Interval started June 2004 and will end June 2007. The report has been certified in accordance with Code requirements.
ýVtfl
GNRO-2006/00044 Page 2 There are no new commitments contained in this submittal. If you have any questions or require additional information, please contact Donald W. Watt at (601) 437-6785.
Sincerely, CABNVBA
Attachment:
Summary Report OAR-1-00007 cc: NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 U. S. Nuclear Regulatory Commission ATTN: Dr. Bruce S. Mallet (w/2)
Regional Administrator, Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 U. S. Nuclear Regulatory Commission ATTN: Mr. Bhalchandra Vaidya, NRR/DORL (w/2)
ATTN: ADDRESSEE ONLY ATTN: U. S. Postal Delivery Address Only Mail Stop OWFN/O-7D1A Washington, DC 20555-0001 Mr. D. E. Levanway (Wise Carter)
Mr. L J. Smith (Wise Carter)
Mr. N. S. Reynolds Mr. J. N. Compton
ATTACHMENT REPORT NUMBER OAR- 1-00007 INSERVICE INSPECTION
SUMMARY
REPORT FOR GRAND GULF NUCLEAR STATION UNIT 1 BALD HILL ROAD PORT GIBSON, MS. 39150 COMMERCIAL OPERATION DATE: JULY 1, 1985 OWNER/OPERATOR ENTERGY OPERATIONS, INC.
ECHELON ONE P.O. BOX 31995 JACKSON, MS. 39286-1995 PREPARED BY P RESPONSIBLE ENGINEER ANIl INSPECTOR APPROVED BY DOCUMENT COMPLETION SUPERVOOR, CODE PROGRAMS DATE
FORM OAR-I OWNER'S ACTIVITY REPORT 0mw E%=t~w OEmitsIc.. chop Qwe P.0. Box 31995. hacso hh39, -19 XM. adA&kýMdO~m.
mat~ GmmI Oizlfbiudcl Stoiniu Bald MHi 1koq& Podt OL~mbko s 3910 Unit NO, I CaiacwwuI Service Dsk dy 1JJ6. lteimlihafap ?o. 14 K 54344k,ad=
coventu m ?etiod J" Ediio and Adwdaendsoectionc wi ahIouiaohe hrbipeaionIM~19 EdiinW ftutrieso 99 ded Edidioanud Amdaw4 dfectionX(I spo~Iceibk iofqm wAmplaq~cemmnw &ffwudtinowi*Apecjof pln NIA OWNWRS CERTIFCATE OF CONFORMANCE I ceiaifjhgt asamade hta 0w, 'A~llvkylofl tut,ewr.82 i" da uiniaatsiouulad rIlw intuwI r-carwS, avabxabcM wd ameamem n iuvbctd bytoi "Ponm DOO&b10*0rqufremama 0(Zctm n Caloucae of Aushorn lbN. WAEvis~tm Duet WA RAX*i~VA zskomim C42&wp Dile 2,4 0w~orw.', csw~o Thk CERTIFCATZ Ov mNERVcE iNspxCTION Suite or Provi=of 19998Wj mad eqm&ayedby~ M05ipaaad ww seogamdwid into owne Aaivily Rqpcwt ann sh penod U~ 21.2004 lo Odobe IL 200 all mage aitt to dw bee da y kwwtodg mad WKE do Ownmrhu poeitmed &Iladtivitec represened by di pit in dacordnoe uit dot rqtiueVrsw of By uiving I*a "i~mam bamw dot Jap or kithemployera~Anksw aaty. uiprw d or MV64ad sonewag 9wt adnabaaim%loo repukum raphooneoft w-lostia, widemyaliwv 1nmaeda w-- 1,mcdut hit mjout.Pw-kupedwur beo~ In izy zumw flor may imishile persond o k~yjM aawydmaap orJo aa kindkaiinhg
__ _ _ _ _ __cc/8 o 7#~,3A
~~.at~~ta~Z&u N~~u A AdInd.
MPt~
Dmid ______P.._sd od.
Table 1 Limited Examinations Item # Item ID Description Coverage Reason for Limitation C0601 EBe% __ naccessible __
C06.010 E12CO02B SB2 Pump Casing Weld 19.99% Inaccessible C06.010 E21CO01 SB2 Pump Casing Weld 0% Inaccessible C06.010 E22C001 SB32 Pump Casing Weld 00/0 Inaccessible B01.030 B13-AE Shell to Flange 75% Configuration Circumferential Weld Access B01.040 B13-AG Head to Flange 77.2% Configuration Circumferential Weld Access Note: Approval for partial coverage inspections have been documented through the PCN process and will be achieved through the relief request process.
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS Examination Total TOt Total Total Remarks Category Examinations Examinations Examinations j Examinations Required For Credited For Credited (%) Credited (%)
The Interval This Period For The To Date For Period - The Interval B-A 28 10 83% 96% None B-D 70 0 0% 64% None B-F 28 0 0% 64% None B-G-1 45 4 11% 36% Note I B-G-2 50 2 5% 20% Note 2 B-J 265 21 24% 75% None B-H 1 0 0% 00h None B-K-I 9 0 0% 78% None B-L-2 2 0 0% 0% Note3 B-M-2 71 0 0% 6% Noe 3 B-N-I 3 0 0% 66% Now B-N-2 87 0 0% 0% None B-O 4 0 0% 0% Note 4 C-A 2 1 100% 100% None C-B 4 2 100% 100% None C-C 3 1 i10% 100% None C-D 1 1 100% 100% Noe C-F-I 3 0 0% 0% None C-F-2 72 24 92% 97% None C-0 45 16 88% 95% Note 5 D-A 19 4 33% 58% None F-A 147 40 75% 91% None X-AUG 277 0 0% 67% Note 3 Iof 2
TABLE 1 ABSTRACT OF EXAMINATIONS AND TESTS S-Examination Total Total Total Total Category Examinations Examinations Examinations Examinations Required For Credited For Credited (%) Credited (%)
The Interval This Period For The To Date For I Peri4nd M M MI* MIlI*
M I i a - -- --- _____________
B-P 7 1 50% 86% None Pressure Tt C-H 258 39 45% 75% Note 6 Pressunr Te.
DB 72 2 8% 69% None Preemitrn TmetI Notes:
Note 1- Numbers represent all B-G-I bolting, this includes bolting which requires inspection only when the connection is disassembled or bolting is removed.
Note 2- Numbers represent all B-G-2 bolting, this includes bolting which requires inspection only when the connection is disassembled or bolting is removed.
Note 3- Examination only required if pump and valve are disassembled for maintenance.
Note 4- Examination may be performed at the end of the 10 year interval.
Note 5- 2 components are inaccessible for exams, relief pending.
Note 6- Examination will be performed at the end of the period.
2of2
TABLE 2 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE F-A F01.030 IHanger/Support IDegradation due to No environment Note I1 Note 1:
The SSW Basin supports were inspected as part of an augmerted inspection program for the SSW Basin, Piping and Supports. This inspection program was instituted due to an ongoing corrosion problem to mitigate failures. The following supports were found to have degradation and mvquired a Engineering evaluation and/or was repaired (se Table 3) during this cycle.
QlP41G0I 1C03, QIP41001 1C04, Q1P41GO10CI 1, QSP41G013CO3, QIP41G01 IC08, QIP41G01I1R02, Q1P4G011C10, QSP4IG010H09, QIP41GO1 IC05, QIP41GO1IR07, QIP41GO5OR02, QSP4IG010C12, QIP4IG011(01, QIP4IG011R01, QIP4IGO10RO3 and Q1P4IG01 C104.
lof 1
TABLE 3 Abstract of Repaih Replacements, Or Corrective Measures Required For Continued Service Code Repair, item Description Of Work Flaw Or Daft Repair Clans Replaceent. Description ielevant Completed Iepl Or Corrective Coadtiom Plan Measure Found During Number Section Xl Examination Or Test (yes Or No)
Rzwodwdin 3 Replacemn Pipe Hangers accwdanoc with ER- No 09/2112004 WO-34000 Note I OG-2003-0138-000 3 Replceme Pipe Hagers accordance wiit ER- No 05t23/2005 WO-5179s NOW 2 oo _ _Gdt5_ _
3 Replacement Pipe Hangers accordance with ER- No O5t202005 WO-50417
_,_______ Note 3 016OI38-000 . ._..__'
Weld Repair of, 3 Repair Condenser Condenser End Dels No 07/16/2004 WO-50326790 QSZ51BO02B Note1- QIP41G0IIC0I, C02, C03, C04 and C06.
Note 2- QIP41G01IC0S.
Note 3 -QIP4l0011CO1, C03 and C04.
lofI