ET 15-0022, Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0

From kanterella
Jump to navigation Jump to search
Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan, WCOP-29, Revision 0
ML15253A753
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/02/2015
From: Mccoy J
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ET 15-0022 WCOP-29, Rev. 0
Download: ML15253A753 (194)


Text

WLFCREEK ' NUCLEAR OPERATING CORPORATION Jaime H. McCoy Vice President Engineerirog September 2, 2015 ET 15-0022 U. S. Nuclear Rel*~-Cm so ATTN: Document Control Desk Washington, DC 20555

Reference:

Letter dated June 2, 2006 from D. Terao, USNRC, to R. A. Muench, WCNOC (ADAMS Accession No. ML061390135)

Subject:

Docket No. 50-482: Fourth Ten-Year Interval Submittal Snubber Program Plan and Inservice Testing Program Plan Gentlemen:

The purpose of this letter is to document Wolf Creek Nuclear Operating Corporation's (WCNOC) intent to comply with the requirements of 10 CFR 50.55a(b)(3)(v) for snubber visual examination and functional testing, as well as submitting the Inservice Testing (1ST) Program plan for the IST Program fourth ten year interval. Previously, the snubber program had been managed under alternative requirements as described in Relief Request 13R-03, approved by the Nuclear Regulatory Commission (NRC) in the Reference. The fourth ten year inspection interval begins on September 4, 2015.

Enclosure I provides the Wolf Creek Generating Station (WCGS) Snubber Program Plan for the fourth ten year interval. The WCGS Snubber Program is being revised to implement the requirements of American Society of Mechanical Engineers (ASME) Operations and Maintenance (OM) Code, Subsection ISTD, 2004 Edition through 2006 Addenda. WCNOC is providing a Snubber Inspection and Testing Program plan in accordance with Subsection ISTA-3200, for the dynamic restraints (snubbers) at WCGS for the fourth inspection interval.

Enclosure II provides the WCGS Inservice Testing plan for the fourth ten year interval. The WOGS Inservice Testing Plan will implement the requirements of ASME OM Code, Subsection ISTB, ISTC, Mandatory Appendix I and Mandatory Appendix II, 2004 Edition through 2006 Addenda. In addition, WCNOC will implement the requirements of ASME Code Case OMN-I.

WCNOC is providing an Inservice Testing Program plan in accordance with Subsection ISTA-3200, for the fourth inspection interval.

P.O. Box 411 / Burlington, KS 66839 / Phone: (620) 364-8831 i,.(

An Equal Opportunity Employer M/F/HCNVET

Letter ET 15-0022 Page 2 of 2 This letter contains no commitments. If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine (620) 364-4204.

Sincerely, Jaime H. McCoy JHM/rlt

Enclosures:

I Wolf Creek Generating Station Snubber Examination, Testing, and Service Life Monitoring Program Plan Fourth 10-Year Inservice Testing Interval II Wolf Creek Generating Station Inservice Testing Program for Pumps, Valves, and Snubbers cc: M. L. Dapas (NRC), w/e C. F. Lyon (NRC), wle N. H. Taylor (NRC), w/e Senior Resident Inspector (NRC), w/e

ENCLOSURE I Wolf Creek Generating Station Snubber Examination, Testing, and Service Life Monitoring Program Plan Fourth 10-Year Inservice Testing Interval (6 pages)

Wolf Creek GeneratingStation WCOP-29, Revision 0 Wolf Creek Generating Station Snubber Examination, Testing, and Service Life Monitoring Program Plan Fourth 10-Year Inservice Testing Interval Beginning September 4, 2015 Ending September 3, 2025 Wolf Creek Nuclear Operating Company PO Box 411 Burlington, KS 66839 Page 1 of 6 Revision 9/02/20 15 Date: 9/02/2015 Revision Date." Rev 00 Rev Page 1 of 6

Wolf Creek GeneratingStation Revision Log Effective Revision Description Prepared: Date Approved: Date Date IST Snubber Engineering Coordinator Manager 09/02/15 Revision 0 /* 09/02/15 *,'.******.* 09/02/15 Paul J. Herrman Page2of6 9/02/2015 Date: 9/02/2015 Revision Date: Rev 00 Rev Page 2 of 6

Wolf Creek GeneratingStation TABLE OF CONTENTS SECTION

1.0 INTRODUCTION

2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:

3.0 EXAMINATION and TESTING METHODS:

4.0 EXAMINATION and TESTING FREQUENCY:

5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:

6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:

7.0 SCHEDULING

8.0 REPORTS AND RECORDS:

Revision Date: 9/02/20 15Re0Pae3o6 Rev 0 Page 3 of 6

Wolf Creek Generating Station INTRODUCTION:

1.1 Purpose

To provide requirements for the performance and administration of assessing the operational readiness of those dynamic restraints (Snubbers) whose specific functions are required to ensure the integrity of the reactor coolant pressure boundary or any safety-related system.

1.2 Scope

The program plan was prepared to meet the requirements of the following subsections of the American Society of Mechanical Engineers (ASME) OM Code 2004 Edition with 2005 and 2006 Addenda.

  • Subsection ISTA, "General Requirements" ISTA contains the requirements directly applicable to inservice examination and testing including the Owner's Responsibility and Records Requirements.
  • Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants" ISTD establishes requirements for preservice and inservice examination and testing, and the service life monitoring of Dynamic Restraints (Snub bers) in light-water reactor nuclear power plants. The snubbers covered are required to support the systems and components that are required in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of an accident.

1.3 Discussion

In order to ensure the required operability of all safety related snubbers for Wolf Creek Generating Station (WCGS) during seismic or other events, initiating dynamic loads, the inspection, testing, and the service life monitoring of these snubbers shall be implemented and performed in accordance with the requirements of WCGS Snubber Program Document AP 29A-006.

The examination boundaries shall include the snubber assembly from pin to pin inclusive; however, the structural/piping attachments and fasteners may also be examined as described in the WCGS Snubber Program Document AP 29A-006. For supports containing snubbers that are selected for examination in the ISI program: The attachment hardware (Pin-to-Pipe and Pin-to-Building Structure) will be examined in accordance with ASME Section XI, subsection IWF.

The Snubber Program described in AP 29A-006 adheres to the requirements of the ASME OM Code, Subsection ISTD, 2004 Edition with 2005 and 2006 Addenda, as required by 10OCFR50.55a(b)(3)(v).

B3 1.1 Non-Seismic Category 1 Snubbers will also be monitored in accordance with plant procedure AP 29A-006, Snubber Program Document.

Page 4of6 9/02/20IS Date: 9/02/2015 Revision Date: Rev 0 Rev 0 Page 4 of 6

Wolf Creek GeneratingStation 2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:

2.1 Visual Examinations, Functional Testing, and Service Life requirements shall be performed to the extent specified within AP 29A-006 and referenced Surveillance Test Procedures.

2.2 Snubbers are grouped into Defined Test Plan Groups (DTPGs) in accordance with ISTD-5252. Each DTPG will be tested using the 10% sample plan per ISTD-5300. There are no active snubbers attached to the Steam Generators.

DTPG Population Description Sample Plan 1 Safety Related Size 1/4, 1/2 10%

2 Safety Related Size 1, 3, 10 10%

3 Safety Related Size 35, 100 10%

4 Safety Related Reduced Drag 10%

2.3 The service life of all snubbers shall be monitored and snubbers evaluated, replaced, or reconditioned in accordance with AP 29A-006, and ISTD-6200 to ensure that the service life is not exceeded between surveillance inspections. The replacement or reconditioning shall be documented and records retained in accordance with WCGS procedures.

3.0 EXAMINATION and TESTING METHODS:

3.1 Visual examinations shall be performed by individuals qualified in accordance with WCGS procedures. These examinations are conducted to ensure the mechanical and structural condition of the snubber support location and to observe conditions that could affect functional adequacy. Visual examinations and functional testing shall be performed to verify the requirements specified within AP 29A-006 are met in accordance with Subsection ISTD.

4.0 EXAMINATION and TESTING FREQUENCY:

4.1 Visual Examinations and Functional Testing shall be performed at the frequency specified within.

AP 29A-006 and ISTD-4250 and ISTD-5240. Snubbers are categorized as one population for visual examination according to the schedule determined by Table ISTD 4252-1.

4.2 Code Case OMN-13, which allows the extension of the visual examination interval, will be implemented for snubber inspections during this interval. Code Case OMN-13 is approved for use in Regulatory Guide 1.192 (June 2003). The Visual Examinations of Table ISTD 4252-1 may be extended in accordance with Code Case OMN-13 once the prerequisites of the code case have been satisfied.

4.3 Visual Examinations shall be performed whenever new snubbers are installed, reinstallation of existing or swapped snubbers that were functionally tested, or after repairs, replacements or modifications.

4.4 Functional testing requirements for new installations or spares shall be equal to or more stringent than that specified within AP 29A-006.

Rev 00 Page Sof6 Revision 9/02/2015 Date: 9/02/2015 Revision Date: Rev Page 5 of 6

Wolf Creek GeneratingStation 5.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING EVAUATION:

5.1 Snubbers that do not appear to conform to the Visual Examination requirements of AP 29A-006, shall be reported for evaluation and appropriate corrective action.

5.2 Snubbers that do not appear to conform to the visual examination acceptance requirements and are later confirmed as operable as a result of functional testing may be declared operable for the purpose of establishing the next visual inspection interval, providing that the unacceptable condition did not affect operational readiness for the snubber location.

5.3 Snubbers that do not meet the operability testing acceptance criteria in AP 29A-006 shall be evaluated to determine the cause of the failure and appropriate corrective action taken.

5.4 The service life of a snubber is evaluated using manufacturer's input and engineering information gained through consideration of the snubber service conditions and inservice functional test results.

A service life monitoring program is included in AP 29A-006.

6.0 REPAIR, REPLACEMENT, AND MODIFICATION REQUIREMENTS:

6.1 Repairs, Replacements and Modifications performed on snubbers under this program shall conform, as applicable, to the requirements specified within the ASME Code,Section XI.

7.0 SCHEDULING

7.1 The Visual Examinations, Functional Testing schedules, and Service Life Replacements shall be established, tracked and maintained in accordance with AP 29A-006, and Subsection ISTD by the Snubber Engineer.

7.2 TheSnubber Engineer shall identify and track expanded or additional testing and/or examinations as required by AP 29A-006 and Subsection ISTD.

8.0 REPORTS and RECORDS:

8.1 Reports and records for the Visual Examinations and Functional Testing shall be maintained for all snubbers included within the Snubber Program.

8.2 Applicable records and reports, as required for Repair and Replacements, shall be maintained.

8.3 Records of the service life of all snubbers listed in this program, including the date at which the service life commences or expires, and associated installation and maintenance records shall be maintained.

Page 6of6 9/02/20 IS Date: 9/02/2015 Revision Date: Rev 0 Rev 0 Page 6 of 6

ENCLOSURE II Wolf Creek Generating Station Inservice Testing Program for Pumps, Valves, and Snubbers (184 pages)

ISTProgramPlan Wolf Creek Generating Station WCOP-02 REVISION 15 Wolf Creek Generating Station Inservice Testing Program For Pumps, Valves, and Snubbers Commercial Service Date:

Date: September 3, 1985 Wolf Creek Generating Station P.O. Box 411 Burlington, KS 66839 APPROVALS:

Prepared By:

  • Date: /2/15L WCNOC 1ST Coordinator Approved By: -
  • Date: 9/2/15 WCNOC Programs Supervisor Approved By: PauI J:Herrm~n: *Date: 9/2/15 WCNOC Engineering Manager Revision Date: 9/02/15 Pg Page 1

1ST ProgramPlan Wolf Creek GeneratingStation TABLE OF CONTENTS SECTION

1.0 INTRODUCTION

1.1 Purpose 1.2 Scope 2.0 INSERVICE TESTING PLAN FOR PUMPS, 2.1 Pump Inservice Testing Plan Description 2.2 Pump Plan Table Description 2.3 Measurement of Test Quantities 2.4 Allowable Ranges of Test Quantities 2.5 Instrument Accuracy 2.6 Reference Value Accuracy 3.0 INSERVICE TESTING PLAN FOR VALVES.

3.1 Valve Inservice Testing Plan Description 3.2 Valve Plan Table Description 4.0 ATTACHMENTS

1. System and P&ID Listing
2. Pump Relief Request Index
3. Pump Relief Requests
4. Valve Relief Request Index
5. Valve Relief Requests
6. Cold Shutdown Justification Index
7. Cold Shutdown Justifications
8. Refuel Outage Justification Index
9. Refuel Outage Justifications
10. Check Valve Condition Monitoring Plans Index
11. Check Valve Condition Monitoring Plans
12. Technical Position Index
13. Technical Positions
14. Inservice Testing Pump Table
15. Inservice Testing Valve Table Revision Date: 9/02/1 5 Pg Page2

IST Program Plan Wolf Creek Generating Station

1.0 INTRODUCTION

1.1 Purpose To provide requirements for the performance and administration of assessing the operational readiness of those pumps and valves whose specific functions are required to either:

a. Shutdown the reactor to the safe shutdown condition,
b. Maintain the safe shutdown condition, and/or
c. To mitigate the consequences of an accident.

The Wolf Creek Generating Station was designed and licensed to operate with the Hot Shutdown condition defined as the "safe" shutdown condition [USAR Section 7.4, Systems Required for Safe Shutdown].

The Inservice Inspection (ISI) Classification Boundaries are identical to the Design Classification or Quality Group Boundaries shown on the plant Piping and Instrument Diagrams (P&IDs) listed in Attachment 1. Some valves within the 1SI Boundaries are identified as non-ASME Code Class (NC). This Inservice Testing (1ST) Program was developed using the ISI Classification Boundaries and the following documents:

  • Title 10, Code of Federal Regulations, Part 50, Paragraph 50.55a
  • Standard Review Plan 3.9.6, "Inservice Testing of Pumps and Valves"
  • Safety Analysis Report, Wolf Creek Generating Station

- Technical Specifications, Wolf Creek Generating Station

  • NUREG-1482, Rev.2 "Guidelines for Inservice Testing at Nuclear Power Plants" 1.2 Scope The IST program plan has been prepared to meet the requirements of the American Society of Mechanical Engineers (ASME) OM Code 2004 Edition through 2006 Addenda (ASME OM Code 2004/2006b). Mandatory Appendix II of the ASME OM Code 2004 Edition through 2006 Addenda will be used for check valve condition monitoring activities. Motor operated valve testing is based on the requirements of ASME Code Case OMN-l.

This program plan provides a complete listing of those pumps and valves included in the program per the requirements of the following:

a. ASME OM Code 2004/2006b, Subsection ISTA, "General Requirements" ISTA contains the requirements directly applicable to inservice testing including 1ST scope the Owner's Responsibility and Records Requirements.
b. ASME OM Code 2004/2006b, Subsection ISTB, "Inservice Testing of Pumps in Light- Water Reactor Nuclear PowerPlants" ISTB establishes the requirements for inservice testing of pumps in light-water reactor nuclear power plants. The pumps covered are those provided with an Revision Date." 9/02/1 5 Pg Page 3

1ST Program Plan Wolf Creek GeneratingStation emergency power source, that are required in the shutting down the reactor to the safe shutdown condition, in maintaining the safe shutdown condition, and/or in mitigation of the consequences of an accident.

c. ASME OM Code 2004/2006b, Subsection ISTC, "Inservice Testing of Valves in Light- Water ReactorNuclear Power Plants" ISTC establishes the requirements for inservice testing of valves in light-water reactor nuclear power plants. The valves covered include those which provide overpressure protection and those which are required to perform a specific function, either actively through the changing of valve obturator position or passively by maintaining required obturator position in shutting down a reactor to the safe shutdown condition, in maintaining the safe shutdown condition, or in mitigating the consequences of an accident.
d. ASME OM Code 2004/2006b, Subsection ISTD, "Preservice and Inservicee Examination Testing of Dynamic Restraints (Sn ubbers) in Light-Water ReactorNuclear Power Plants" Snubber testing shall be performed in accordance with the requirements of OM Code Subsection ISTD "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants".

In addition to any requirements specified in Subsection ISTA "General Requirements". The scope of snubber testing as well as applicable test requirements shall be defined in the WCGS Snubber Program, WCOP-29 "Snubber Examination, Testing, and Service Life Monitoring Program Plan -

Fourth Ten-Year Interval ".

e. ASME OM Code 2004/2006b, Mandatory Appendix I, "Inservice Testing of PressureRelief Devices in Light- Water Reactor Nuclear Power Plants" Provides the requirements for performance testing and monitoring of nuclear plant pressure relief devices. Methods, intervals, and record requirements for monitoring and testing are established, as well as guidelines for the evaluation of results. The Appendix applies to safety valves, safety relief valves, thermal relief valves, pilot-operated pressure relief valves, power-actuated pressure relief valves, non-reclosing pressure relief devices and vacuum relief devices, including all accessories and appurtenances.

f ASME OM 2004/2006b, Mandatory Appendix II, "Check Valve Condition MonitoringProgram" Provides an alternative to the testing or examination requirements of ISTC-3520, 3540 and ISTC-5221. The purpose of this program is both to improve valve performance and to optimize testing, examination, and preventive maintenance activities in order to maintain the continued acceptable performance of a select group of check valves.

The Wolf Creek Generating Station fourth 120-month interval Pump and Valve Inservice Testing Plan will be in effect as follows:

Begin 09/04/20 15 End 09/03/2025 Revision Date: 9/02/1 5 Pg Page 4

1ST ProgramPlan Wolf Creek Generating Station 2.0 INSERVICE TESTING PLAN FOR PUMPS 2.1 Pump Inservice Testing Plan Description This testing program for valves meets the requirements of the ASME OM Code 2004 edition with Addenda through 2006, Section ISTB "Inservice Testing of Pumps in Light-Water Reactor Nuclear Power Plants". Where these requirements have been determined to be impractical, specific requests for relief were written and are included in Attachment 3. NRC Generic Letter 89-04 and NUJREG 1482, Revision 2 have been used as guidance in the development of the IST Program.

2.2 Pump Plan Table Description The pumps included in the Wolf Creek Generating Station 1ST Plan are listed in Attachment 14. The information contained within these tables identifies those pumps which are to be tested to the requirements of Subsection ISTB of the ASME OM Code 2004 Edition through 2006 Addenda, the testing parameters and frequencies, and associated relief requests. The headings for the pump tables are delineated below.

Pump Number Unique pump identification number P&ID Number The Wolf Creek Drawing Number that the pump is indicated P&IID Coord The drawing coordinate location of the pump on the P&1D 1ST Group Pump group as defined in ISTB-2000 Group A Continuous or routinely operated pumps Group B Standby pumps not operated routinely ISI Class ASME ISI Code classification of the pump 1ST Reciuirements PUMP SPEED. DIFFERENTIAL PRESSURE. FLOW RATE.

VIBRATION: When the letter "Y" for "YES" appears in a particular test quantity column, that quantity will be measured or observed during Inservice Testing in accordance with ASME OM Code ISTB. If a modified test is planned or a test is being waived, a request for relief number will appear in the test quantity column, referencing the pump's relief request.

Requests for relief are identified as 4PR-X, where X is the sequential number of the relief. The requests for relief are included in Attachment 3.

2.3 Measurement of Test Quantities Speed (SPD) Per ASME OM Code ISTB-3530, rotational speed measurement of variable speed pumps shall be taken by a method, which meets the requirements of paragraph ISTB-35 10.

Differential Pressure Differential pressure will be calculated from inlet and discharge pressure measurements or by direct differential pressure measurement.

Revision Date: 9/02/15 Page 5

1ST Program Plan Wolf Creek Generating Station 2.3 Measurement of Test Quantities (continued)

Flow Rate Flow rate will be measured using a rate or quantity meter installed in the pump test circuit.

Vibration (VIBR TEST) Pump vibration will be measured with a digital vibration meter in accordance with the applicable section of ASME OM Code ISTB-3540.

2.4 Allowable Ranges of Test Quantities The applicable allowable ranges specified in ASME GM Code ISTB, Tables ISTB-5 121-1, ISTB-5221-1, ISTB-5321-1, and ISTB-5321-2, as applicable, will be used for differential pressure, flow, and vibration measurements. Should a measured test quantity fall outside the allowable range, corrective action per ASME GM Code ISTB-6200 shall be followed and records maintained in accordance with ASME GM Code ISTB-9000.

2.5 Instrument Accuracy Allowable instrument accuracy's are provided in ASME GM Code Table ISTB-3510-1.

If the accuracies of the station's instruments do not meet the requirements of this table/section, temporary instruments meeting those requirements in Table ISTB-3510-1 will be used.

2.6 Reference Value Accuracy ASME OM Code ISTB requires that reference conditions be established prior to the commencement of testing. ASME GM Code ISTB-3510(b)(1) states that the range of analog instruments can be no more than 3 times the reference value. The allowable accuracy of the reference condition instruments is 2%. To be within Code Accuracy requirements, a variance from the reference condition up to 2% of the reference value minus the accuracy of the flow gauge may be allowed.

Revision Date: 9/02/15 Pg Page 6

1ST ProgramPlan Wolf Creek Generating Station 3.0 INSERVICE TESTING PLAN FOR VALVES 3.1 Valve Inservice Testing Plan Description This testing program for valves meets the requirements of the ASME GM Code 2004 edition with addenda through 2006, Section ISTC "Inservice Testing of Valves in Light-Water Reactor Nuclear Power Plants"; Mandatory Appendix I "Inservice Testing of Pressure Relief Devices in Light-Water Reactor Nuclear Power Plants"; Mandatory Appendix II "Check Valve Condition Monitoring Program"; and ASME Code Case OMN-1, Rev.0, "Alternative Rules for Preserviceand Inservice Testing of certainElectric Motor Operated Valve Assemblies in Light- WaterReactor Nucl earPower Plants ". Where these requirements are determined to be impractical, specific requests for relief have been written and are included in Attachment 5.

3.2 Valve Plan Table Description The table in Attachment 15 list all ASME Class 1, 2, 3, and NC Valves that have been scoped to be within the 1ST Program, and have been assigned Valve Categories. Valves exempt per ASME GM Code ISTC-1200 are not listed. The following information is included for each valve.

Valve Number The Valve Identification Number P&ID Number The Identification Number of the drawing on which the valve can be located P&ID Coordinate The drawing coordinate location on the P&ID for the valve 1ST Class The ASM!E Classification of the valve (NC=Non ASME Code Class) 1ST Category The category(s) assigned to the valve based on the definitions per ASME GM Code ISTC-1 300. The following categories are defined in the Code:

Category A - Valves for which seat leakage is limited to a specific maximum amount in the closed position for fulfillment of their function.

Category B - Valves for which seat leakage in the closed position is inconsequential for fulfillment of their function.

Category C - Valves, which are self-actuating in response to some system characteristic, such as pressure (relief valves) or flow direction (check valves).

Category D - Valves, which are actuated by an energy source capable of only one operation, such as rupture disks or explosive-actuated valves.

Valve Size "The nominal size of the valve in inches Revision Date: 9/02/15 Page 7

1ST Program Plan Wolf Creek GeneratingStation 3.2 Valve Plan Table Description (continued)

Valve Type The Valve Body Design as indicated by the following abbreviations:

ANGLE ANG BALL BAL BUTTERFLY BTF CHECK CK DIAPHRAGM DIA GATE GA GLOBE GL RELIEF RV RUPTURE DIAPHRAGM RPD SAFETY SV STOP CHECK SCK THREE WAY TWY ACT Type The type of Valve Actuator as indicated by the following abbreviations:

MOTOR OPERATION MO AIR OPERATOR AO SOLENOID OPERATOR SO HYDRAULIC OPERATOR HO MANUAL M SELF ACTUATED SA SAFETY POS The normal position of the valve during regular plant operation, specified as follows:

0 OPEN C CLOSED L LOCKED T THROTTLED ACTIVE/PASS This field identifies the Active or Passive classification as defined by ISTA-2000 TEST ROMT The test(s) that will be performed to fulfill the requirements of ASME OM Code ISTC. The definitions and abbreviations are identified below:

AT-1 Type C Leak Test Containment Isolation Valves will be Seat Leak Tested in accordance with WCGS Technical Specification Requirements and Appendix J, 10 CFR 50. (ISTC-3 620)

Revision Date: 9/02/15SPg Page 8

IST Program Plan Wolf Creek GeneratingStation 3.2 Valve Plan Table Description (continued)

AT-2 Pressure Isolation Valve Leak Test Those valves so designated will be Leak Tested in accordance with WCGS Technical Specification SR 3.4.14.1. (ISTC-3630)

AT-3 Accumulator Check Valve Test Check valves designed to maintain air-accumulator charge upon loss of normal plant service or Instrument Air will be subjected to air pressure drop. (ISTC-3 630)

AT-4 Other Analyzed Valves Leak Test AT-i, AT-2, or AT-3, but for which seat leakage is required to be limited to a specific maximum amount will be leak tested. (ISTC-3630)

BT-O Full-Stroke Exercise Test to the Open Position for power operated valves exercise testing in the open direction verified by Stroke Time Measurement, will be performed to confirm the full stroke capability of each valve. The stroke direction tested and timed (OPEN) is based on the direction the Valve Disk must travel to fulfill a safety function. (ISTC-3521, 5000)

BT-C Full-Stroke Exercise Test to the Closed Position for power operated valves exercise testing in the closed direction, verified by Stroke Time Measurement, will be performed to confirm the full stroke capability of each valve. The stroke direction tested and timed (CLOSE) is based on the direction the Valve Disk must travel to fulfill a safety function. (ISTC-3521, 5000)

BT-E Full Stroke Exercise (No timing required)

Exercise in both the open and closed direction will be performed to confirm the full stroke capability of each valve during the period of time between MOV Operability and Functional.

Margin determination tests. (OMN- 1)

CVT-O Check Valve Exercise Test to Open Position.

Check Valves will be verified in the full OPEN Position. Verification of Safety Basis System Flow through a check valve shall be an adequate demonstration the valve is full OPEN. (ISTC-3522, 5221)

Revision Date: 9/02/1 5 Pg Page 9

1ST Program Plan Wolf Creek Generating Station 3.2 Valve Plan Table Description (continued)

CVT-C Check Valve Exercise to the Closed Position.

If a check valve performs a safety function in only the closed direction it shall be exercised by initiating flow and observing that the obturator has traveled at least the partially open position, and verify that on cessation or reversal of flow, the obturator has traveled to the seat. If the check valve performs a safety function in the closed position, the normal position for the valve is closed, and position can be verified during normal plant operation, then quarterly documentation will be performed to meet ASME Code requirements. If a valve performs a safety function in both the open and closed position, the valve will be exercised to the open position and then be verified to close. (ISTC-3522, 5221)

RVT Relief Valve Setpoint Verification Test Relief and Safety Valve set point will be verified.

(ASME Mandatory Appendix I)

FST Fail-Safe Test Valves with fail-safe actuators will be tested to verify proper fail-safe operation upon loss of actuator power. (ISTC-35 60)

OMN1-O Code Case OMIN-1 Test in the Open Direction Exercise Test in the OPEN direction used to gather information for the determination of a MOVs functional margin in the OPEN direction.

OMN 1-C Code Case OMN- 1 Test in the Closed Direction Exercise Test in the CLOSED direction used to gather information for the determination of a MOVs functional margin in the CLOSED direction.

PIT Position Indication Verification Test Valves with remote position indicators will be tested to verify the indicator accurately reflects valve position. (ISTC-3700)

RPL Replacement Non-reclosing pressure relief devices will be replaced on a periodic basis. (I-1360)

Revision Date: 9/02/15Pae1 Page 10

1ST Program Plan Wolf Creek GeneratingStation 3.2 Valve Plan Table Description (continued)

TEST FREO The frequency at which the "identified", or "applicable" test will be performed. The definitions and abbreviations are identified below:

Test Operational Frequency Frequency Condition (1) of Testing Q (3) At least once per 92 days M (3) At least once per 31 days CS (2) Cold Shutdown RC (3) Once per Refueling Cycle or Year (whichever is greater)

RR (4) .Each Reactor Refueling Outage APP J (3) In accordance with 10CFR50 Appendix J (not to exceed 60 Months)

CM (3) Check Valve Condition Monitoring Program frequency 1.5Y (3) At least once per 18 months 2Y (3) Every two years 5Y (3) Every five years 10Y (3) Every ten years JOG (3) Per the MOV Program, not to Exceed 10 years SDE (3) Sample Disassembly And Examination at refueling Operation Conditions:

(1) Operational conditions are defined in the WCGS Technical Specifications (2) Inservice valve testing will commence within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of reaching the Cold Shutdown conditions as defined in the WCGS Technical Specifications. Testing not completed before Startup may be completed during subsequent Cold Shutdowns. Valve testing need not be performed more often than once every three months. In the case of extended Cold Shutdowns, the testing need not be started within the 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> limitation. However, in these instances, all valve testing must be completed prior to Startup.

(3) Specific operational conditions are stated in the Surveillance Procedure directing the test.

(4) All valve testing required to be performed during a refueling outage shall be completed before returning the plant to operation at power.

Revision Date: 9/02/15 PgeI Page 11

IST Program Plan Wolf Creek G enerating Station Page 12 Revision Revision Date: 9/02/1 5 Date: 9/02/15 Page 12

1ST Program Plan Wolf Creek GeneratingStation

4.0 ATTACHMENTS

Attachment 1 System and P&ID Listing Attachment 2 Generic and Pump Relief Request Index Attachment 3 Generic and Pump Relief Requests Attachment 4 Valve Relief Request Index Attachment 5 Valve Relief Requests Attachment 6 Cold Shutdown Justification Index Attachment 7 Cold Shutdown Justifications Attachment 8 Refuel Outage Justification Index Attachment 9 Refuel Outage Justifications Attachment 10 Check Valve Condition Monitoring Plan Basis Index Attachment 11 Check Valve Condition Monitoring Plan Basis Attachment 12 Technical Positions Index Attachment 13 Technical Positions Attachment 14 Inservice Testing Pump Table Attachment 15 Inservice Testing Valve Table Page 13 Revision Date: 9/02/155 Date: 9/02/1 Page 13

1ST ProgramPlan Wolf Creek GeneratingStation ATTACHMENT 1 SYSTEM AND P&ID LISTING SystemLName AB Main Steam M-I2AB01, 02 AE Main Feedwater M-1 2AE02 AL Auxiliary Feedwater (AFW) M-1 2AL01 AP Condensate Storage and Transfer M-1 2AP01 BB Reactor Coolant M-12B801, 02, 03, 04 BG Chemical & Volume Control (CVCS) M-12BG01, 02, 03, 04, 05 BL Reactor Make-Up Water M-12BL01 BM Steam Generator Blowdown M-1 2BM01 BN Borated Refueling Water Storage M-12BN01 EC Fuel Pool Cooling and Clean-Up M-12EC01, 02 EF Essential Service Water (ESW) M-K2EF01, M-12EF01, 02 EG Component Cooling Water M-12EG01, 02, 03 EJ Residual Heat Removal (RHR) M-12EJ01 EM High Pressure Coolant Injection M-12EM01, 02 EN Containment Spray M-1 2EN01 EP Accumulator Safety Injection M-I2EP01 FC Auxiliary Turbine - Auxiliary Feedwater M-12FC02 GS Containment Hydrogen Control M-1 2GS01 GT Containment Purge M-1 2GT01 HB Liquid Radwaste M-I2HB01 HD Decontamination M-I2HD01 JE Emergency Fuel Oil M-12JE01 KA Compressed Air M-12KA01, 02, 05 KB Containment Breathing Air M-1 2KB01 KC Fire Protection M-1 2KC02 KJ Standby Diesel Generator M-12KJ01, 02, 03, 04, 05, 06 LF Reactor Building and Hot Machine Shop Floor and Equipment Drain M-12LF03, 09 SJ Nuclear Sampling M-12SJ01, 04 Page 14 Revision Date: 9/02/15S Date: 9/02/1 Page l4

IST Program Plan Wolf Creek GeneratingStation ATTACHMENT 2 GENERIC AN]) PUMP RELIEF REQUEST INDEX ReliefDeritoNR Aprvlae Request No. Decipin...ppoalDt 4GR- 11ST Frequency Grace 8/10/2015 Letter 15-00695 4PR-l Ranges for Pump Reference Values per Code 5/15/2015 Case OMN-21 Letter 15-00547 4PR-2 Centrifugal Charging Pump Suction Pressure 5/15/2015

_______Gauge Range Requirements Letter 15-00547 Revision Date: 9/02/15PaeS Page 15

1ST Program Plan Wolf Creek GeneratingStation ATTACHMENT 3 GENERIC and PUMP RELIEF REQUESTS Page 16 Revision Jjate:

Revision 9/02/1 S Date: 9/02/15 Page 16

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Relief Request 4GR-1 IST Frequency Grace Proposed Alternative In Accordance with 10 CFR 50.55a(z)(2)

Hardship or Unusual Difficulty Without Compensating Increase in Level of Quality and Safety

1. ASME Code Component(s) Affected All Pumps and Valves contained within the Inservice Testing Program scope.

2. Applicable Code Edition and Addenda

ASME OM Code-2004 Edition, with Addenda through OMb-2006

3. Applicable Code Requirement(s)

This request applies to the frequency specifications of the ASME OM Code. The frequencies for tests given in the ASME OM Code do not include a tolerance band.

ISTA-3120(a) - "The frequency for inservice testing shall be in accordance with the requirements of Section IST."

ISTB-3400 - Frequency of Inservice Tests; "An inservice test shall be run on each pump as specified in Table ISTB-3400-1" Table ISTB-3400-1 lists two frequencies -

quarterly and biennially.

ISTC-3510 - Exercising Test Frequency; "Active Category A, Category B, and Category C check valves shall be exercised nominally every 3 months,....

ISTC-3540 - Manual Valves; "Manual Valves shall be full-stroke exercised at least once every 2 years, except where adverse conditions may require the valve to be tested more frequently to ensure operational readiness."

ISTC-3630(a) - Frequency; "Tests shall be conducted at least once every 2 years."

ISTC-3700 - Position Verification Testing; "Valves with remote position indicators shall be observed locally at least once every 2 years to verify that valve operation is accurately indicated."

ISTC-5221(c)(3) - "At least one valve from each group shall be disassembled and examined at each refueling outage; all valves in a group shall be disassembled and examined at least once every 8 years."

Appendix I, 1-1320 - Test Frequencies, Class 1 Pressure Relief Valves; "Class 1 pressure relief valves shall be tested at least once every 5 years..."

Appendix 1, 1-1340 - Test Frequency, Class 1 Pressure Relief Valves that are used for Thermal Relief Application; Refers to I-1320 for test frequency.

Revision Date: 9/02/15 Page 17

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Relief Request 4GR-1 IST Frequency Grace (Continued)

Appendix I, 1-1350 - Test Frequency, "Classes 2 and 3 Classes pressure 2relief and valves, 3 Pressure Relief with the Valves; exception of PWR main steam safety valves, shall be tested every 10 years,..

Appendix 1, 1-1360 - Test Frequency, Classes 2 and 3 Nonreclosing Pressure Relief Devices; "Classes 2 and 3 nonreclosing pressure relief devices shall be replaced every 5 years, ..

Appendix I, 1-1 370 - Test Frequency, Classes 2 and 3 Primary Containment Vacuum Relief Valves; "Tests shall be performed on all Classes 2 and 3 containment vacuum relief valves at each refueling outage or every 2 years, ..

Appendix I, 1-1 380 - Test Frequency, Classes 2 and 3 Vacuum Relief Valves Except for Primary Containment Vacuum Relief Valves; "All Classes 2 and 3 vacuum relief valves shall be tested every 2 years, ... "

Appendix I, 1-1390 - Test Frequency, Classes 2 and 3 Pressure Relief Devices that are used for Thermal Relief Application; "Tests shall be performed on all Classes 2 and 3 relief devices used in thermal relief application every 10 years ... "

Appendix II, 11-4000(a)(1)(e) - Performance Improvement Activities; Subparagraph (1)(e) requires the identification of the interval for each activity.

Appendix II, 11-4000(b)(1 )(e) - Optimization of Condition Monitoring Activities; Subparagraph (1 )(e) requires the identification of the interval for each activity.

4. Reason for Request

Pursuant to 10 CFR 50.55a(z)(2), an alternative is requested to the frequency specifications of the ASME OM Code. The basis of this request is that the Code requirements present an undue hardship without a compensating increase in the level of quality or safety.

Revision Date: 9/02/15Pge1 Page 18

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Relief Request 4GR-l IST Frequency Grace (Continued)

ASME OM Code Section IST establishes the inservice test frequencies for all components within the scope of the Code. The frequencies (e.g., quarterly) have always been interpreted as "nominal" frequencies (generally as defined in Table 3.2 of NUREG 1482, Revision 2) and Owners routinely applied the surveillance extension time period (i.e., grace period) contained in the plant Technical Specifications (TS)

Surveillance Requirements (SRs). The TS typically allow for a less than or equal to 25 percent extension of the surveillance test interval to accommodate plant conditions that may not be suitable for conducting the surveillance (SR 3.0.2). However, regulatory issues have been raised concerning the applicability of the TS "Grace Period" to ASME OM Code required inservice test frequencies irrespective of allowances provided under TS Administrative Controls (i.e., TS 5.5.8, "lnservice Testing Program," invokes SR 3.0.2 for various OM Code frequencies of 2 years or less).

The lack of a tolerance band on the ASME OM Code inservice test frequencies restricts operational flexibility. There may be a conflict where a surveillance test is required (i.e., its Frequency could expire), but where it is not possible or not desired that the test be performed until sometime after a plant condition or associated Limiting Condition for Operation (LCO) is within its applicability. Therefore, to avoid this conflict, the surveillance test should be performed when it can be and should be performed.

The NRC recognized this potential issue in the TS by allowing a frequency tolerance as described in TS SR 3.0.2. The lack of a similar tolerance applied to OM Code testing places an unusual hardship on the plant to adequately schedule work tasks without operational flexibility.

As with TS required surveillance testing, some tolerance is needed to allow adjusting OM Code testing intervals to suit the plant conditions and other maintenance and testing activities. This assures operational flexibility when scheduling surveillance tests that minimize the conflicts between the need to complete the surveillance and plant conditions.

5. Proposed Alternative and Basis for Use The ASME OM Code establishes component test frequencies that are based either on elapsed time periods (e.g., quarterly, 2 years, etc.) or on the occurrence of plant conditions or events (e.g., cold shutdown, refueling outage, upon detection of a sample failure, following maintenance, etc.).
a. Components whose test frequencies are based on elapsed time periods shall be tested at the frequencies specified in OM Code Section IST with a specified time period between tests as shown in Table 1, The specified time period between tests may be reduced or extended as follows:

Page 19 Date: 9/02/IS Revision Date: 9/02/15 Page 19

1ST ProgramPlan Wolf Creek Generating Station 10 CFR 50.55a Relief Request 4GR-1 IST Frequency Grace (Continued)

1) For periods specified as less than 2 years, the period may be extended by up to 25% for any given test.
2) For periods specified as greater than or equal to 2 years, the period may be extended by up to 6 months for any given test.
3) All periods specified may be reduced at the discretion of the owner (i.e., there is no minimum period requirement).

Period extension is to facilitate test scheduling and considers plant operating conditions that may not be suitable for performance of the required testing (e.g.,

performance of the test would cause an unacceptable increase in the plant risk profile due to transient conditions or other ongoing surveillance, test or maintenance activities). Period extensions are not intended to be used repeatedly merely as an operational convenience to extend test intervals beyond those specified.

Period extensions may also be applied to accelerated test frequencies (e.g., pumps in Alert Range) and other fewer than two year test frequencies not specified in Table 1.

Period extensions may not be applied to the test frequency requirements specified in Subsection ISTD, Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants, as Subsection ISTD contains its own rules for period extensions.

b. Components whose test frequencies are based on the occurrence of plant conditions or events (e.g., cold shutdown, refueling outage, upon detection of a sample failure, following maintenance, etc.) may not have their period between tests extended except as allowed by ASME OM Code-2004 Edition through 0Mb-2006 Addenda and earlier editions and addenda of the ASME OM Code.

Table 1 Specified Test Frequencies Frequency Specified Time Period Between Tests Quarterly92dy (or every 3 months)92dy Semiannually (or every 6 months) 184 days Annually (or every year) 366 days x Years x calendar years

________________________where 'x' is a whole number of years _>2 Revision Date: 9/02/15 Page 20

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Relief Request 4GR-1 IST Frequency Grace (Continued)

This proposed alternative is consistent with ASME approved Code Case OMN-20.

Using the provisions of this request as an alternative to the specific frequency requirements of the OM Code identified above will provide operational flexibility and still continue to provide an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(z)(2) WCGS requests approval of the alternative to the specific ASME OM Code frequency requirements identified in this request

6. Duration of Proposed Alternative The proposed alternative identified will be utilized during the fourth IST interval which is scheduled to begin September 4, 2015 and conclude on September 3, 2025.
7. Precedents A similar request (RV-01) was approved for Quad Cities Nuclear Power Station (NRC Docket Nos. 50-254 and 50-265), as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated February 14, 2013 (ML13042A348)

A similar request (VR-02) was approved for Three Mile Nuclear Station, Unit I (NRC Docket No. 50-289), as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated August 15, 2013 (TAC Nos. MF0046, MF0047, and MF0048)

8. References WCGS TS Section 1.4- Frequency WCGS TS Section 3.0.2 - Limiting Conditions for Operations (LCO) Applicability WCGS TS Section 5.5.8 - Inservice Testing Program Page 21 Revision Date: 9/02/155 Date: 9/02/1 Page 21

1ST Program Plan Wolf Creek Generating Station 10 CFR 50.55a* Reauest 4PR-1 Ranges for Pump Reference Values per Code Case OMN-21 Proposed Alternative In Accordance with 10 CFR 50.55a(z)(1)

Alternative Provides Acceptable Level of Quality and Safety

1. ASME Code Comn onentts* Affected Pump Description Pump Type ASME OM Code Number Code Category Class PBG02A/B Boric Acid Pumps Centrifugal 3 Group A PEGOIAIBIClD Component Cooling Centrifugal 3 Group A Water Pumps PEJ01IA/B Residual Heat Removal Centrifugal 2 Group A Pumps PEC01AIB Fuel Pool Cooling Pumps Centrifugal 3 Group A PAL01AIB Motor Driven Auxiliary Centrifugal 3 Group B Feedwater Pumps PAL02 Turbine Driven Auxiliary Centrifugal 3 Group B Feedwater Pumps PBG05AIB Centrifugal Charging Centrifugal 2 Group B Pumps PEF01AIB ... Essential Service Water Vertical Line 3 Group B Pumps Shaft PEM01A/B Safety Injection Pumps Centrifugal 2 Group B PEN01AIB Containment Spray Centrifugal 2 Group B Pumps

2. Applicable Code Edition and Addenda

ASME OM Code 2004 Edition through 2006 Addenda Revision Date: 9/02/15 Page 22

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.,55a Reauest 4PR-1 Ranges for Pump Reference Values per Code Case OMN-21 (Continued)

3. Appnlicable Code Requirements ISTB-5121, "Group A Test Procedure", para. (b) states, in part, that; The system resistance shall be varied until flow rate or alternatively, differential pressure reaches the reference point.

ISTB-5122, "Group B Test Procedure", para. (c) states that; The system resistance may be varied as necessary to achieve the reference point.

ISTB-51 23, "Comprehensive Test Procedure", para. (b) states, in part, that; For centrifugal and vertical line shaft pumps, the system resistance shall be varied until flow rate or alternatively, differential pressure reaches the reference point.

ISTB-5221, "Group A Test Procedure", para. (b) states, in part, that; The system resistance shall be varied until flow rate or alternatively, differential pressure reaches the reference point.

ISTB-5222, "Group B Test Procedure", para. (c) states that; The system resistance may be varied as necessary to achieve the reference point.

ISTB-5223, "Comprehensive Test Procedure", para. (b) states, in part, that; The system resistance shall be varied until flow rate or alternatively, differential pressure reaches the reference point.

4. Reason for Request; Pursuant to 10 CFR 50.55a, "Codes and Standards," paragraph (z)(1), an alternative is proposed to the pump testing reference value requirements of the ASME OM Code. The basis of the request is that the proposed alternative would provide an acceptable level of quality and safety. Specifically, this alternative is requested for all inservice testing of IST Program pumps identified above.

For pump testing, there is difficulty adjusting system throttle valves with sufficient precision to achieve exact flow reference values during subsequent IST exams.

Section ISTB of the ASME OM Code does not allow for variance from a fixed reference value for pump testing. However, NUREG-1482, Revision 2, Section 5.3, acknowledges that certain pump system designs do not allow for the licensee to set the flow at an exact value because of limitations in the instruments and controls for maintaining steady flow.

Revision Date: 9/02/1 5Pae2 Page 23

IST ProgramPlan Wolf Creek GeneratingStation 10 CFR 50.55a Request 4PR-1 Ranges for Pump Reference Values per Code Case OMN-21 (Continued)

4. Reason for Reauest (Cont)

ASME OM Code Case OMN-21 provides guidance for adjusting reference flow/AP to within a specified tolerance during Inservice Testing. The Code Case states "It is the opinion of the Committee that when it is impractical to operate a pump at a specified reference point and adjust the resistance of the system to a specified reference point for either flow rate, differential pressure or discharge pressure, the pump may be operated as close as practical to the specified reference point with the following requirements. The Owner shall adjust the system resistance to as close as practical to the specified reference point where the variance from the reference point does not exceed plus 2% or minus 1% of the reference point when the reference point is flow rate, or plus 1% or minus

5. Prop~osed Alternative and Basis for Use Wolf Creek Nuclear Operating Corporation (WCNOC) prefers to perform future Inservice Pump testing in a manner consistent with the requirements as stated in ASME OM Code Case OMN-21. Specifically, testing of all pumps will be performed such that flow rate is adjusted as close as practical to the reference value and within proceduralized limits of plus 2% / minus 1% of the reference value.

WCNOC plant operators will still strive to achieve the exact test flow reference values during testing. Typical test guidance will be to adjust flow to the specific reference value with additional guidance that if the reference value cannot be achieved with reasonable effort the test will be considered valid~ if the steady state flow rate is within the proceduralized limits of plus 2% I minus 1% of the reference value.

Code Case OMN-21 was approved by the ASME Operations and Maintenance Standards Committee on April 20, 2012, with an NRC representative voting in the affirmative. The applicability of Code Case OMN-21 is the ASME OM Code 1995 Edition through 2011 Addenda. The language from Code Case OMN-21 has been included in the ASME OM Code 2012 Edition.

Using the provisions of this request as an alternative to the specific requirements of ISTB-5121, ISTB-5122, ISTB-5123, ISTB-5221, ISTB-5222 and ISTB-5223 as described above will provide adequate indication of pump performance and continue to provide an acceptable level of quality and safety.

Page 24 Revision Date: 9/02/155 Date: 9/02/1 Page 24

IST ProgramPlan Wolf Creek GeneratingStation

.10 CFR 50.55a Reauest 4PR-1 Ranges for Pump Reference Values per Code Case OMN-21 (Continued)

6. Duration of Proposed Alternative This proposed alternative will be utilized for the entire 4* 120 month interval which will begin September 4, 2015 and conclude on September 3, 2025.
7. Precedents Callaway Plant, Unit 1 - Safety Evaluation - Requests for Relief PR-01 through PR-6, Alternatives to ASME OM Code Requirements for Inservice Testing for the Fourth Program Interval (TAO Nos. MF2784, MF2785, MF2786, MF2787, MF2788 and MF2789) July 15, 2014 Page 25 Revision Date: 9/02/155 Date: 9/02/1 Page 25

1ST ProgramPlan Wolf Creek GeneratingStation 10 CFR 50.55a Request 4PR-02*

Centrifugal Charging Pump Suction Pressure Gauge Range Requirements Proposed Alternative In Accordance with 10 CFR 50.55a(z)(1)

Alternative Provides Acceptable Level of Quality and Safety

1. ASME Code Comoonent~s) Affected PBGO5A Centrifugal Charging Pump A PBG05B Centrifugal Charging Pump B

2. Applicable Code Edition and Addenda

ASME OM Code 2004 Edition through 2006 Addenda

3. Aimlicable Code Requirement ISTB-3510(b)(1) - The full-scale range of each analog instrument shall be not greater than three times the reference value.
4. Reason for Reauest Pursuant to 10 CFR 50.55a, "Codes and Standards", paragraph (a)(3)(i), relief is requested from the requirement of ASME OM Code ISTB-3510(b)(1). The basis of the request is that the proposed alternative would provide an acceptable level of quality and safety.

The installed suction pressure gauge range of the Centrifugal Charging Pumps is 0 -

150 psig. The reference values for suction pressure during Inservice Testing are between 30 and 40 psig. As a result, the instrument range exceeds the requirement of ISTB-351 0(b)(1)....

5. Pro~osed Alternative and Basis for Use Pump suction pressure is used along with pump discharge pressure to determine pump differential pressure. Reference values for the Centrifugal Charging Pumps during Inservice Testing are between 30 psig and 40 psig. Based on ISTB-3510(b)(1), this would require as a maximum, a gauge with a range of 0 to 90 psig (3 X 30 psig) to bound the lowest reference value for pressure. Applying the accuracy requirement of + 2 % for the quarterly Group B pump test, the resulting inaccuracies due to pressure effects would be + 1.8 psig (0.02 X 90 psig).

Revision Date: 9/02/15 Pge2 Page 26

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Reauest 4PR-02 Centrifugal Charging Pump Suction Pressure Gauge Range Requirements (Continued)

5. Prop~osed Alternative and Basis for Use (Cont*

As an alternative, for the Group B quarterly test, Wolf Creek Nuclear Operating Corporation (WCNOC) will use the installed suction pressure gauge (0 to 150 psig) calibrated to less than _+1 .2 % such that the inaccuracies due to pressure will be less than that required by the Code (+ 1.8 psig). Use of the installed pressure gauge calibrated to less than + 1.2 % is equivalent in terms of measuring differential pressure.

Although the permanently installed discharge pressure gauges are above the maximum range limits of ASME OM Code ISTB-3510(b)(1), they are within the accuracy requirements and are therefore suitable for the test. Reference NUREG 1482 Revision 2, Section 5.5.1.

Using the provisions of this relief request as an alternative to the specific requirements of ISTB-3510(b)(1) identified above will provide adequate indication of pump performance and continue to provide an acceptable level of quality and safety.

Therefore, pursuant to 10 CFR 50.55a(z)(1), we request relief from the specific ISTB requirements identified in this request.

6. Duration of Proposed Alternative This proposed alternative will be utilized for the entire 4th 120 month interval which will begin September 4, 2015 and conclude on September 3, 2025.
7. Precedents Wolf Creek Generating Station - Safety Evaluation - Relief Requests for the Third 10-Year Pump and Valve Inservice Testing Program (TAC Nos. MC8210, MC8212, MD0383, and MD0384) 3/21/2006 Revision Date: 9/02/15SPge2 Page 2 7

1ST Program Plan Wolf Creek GeneratingStation ATTACHMENT 4 VALVE RELIEF REQUEST INDEX Relief NRC Approval Date Request No. Description 8/10/2015 4VR-01 Set Pressure Measurement Accuracy Letter 15-00695 Page 28 Revision Date: 9/02/15 Date: 9/02/15 Page28

1ST Program Plan Wolf Creek GeneratingStation ATTACHtMENT 5 VALVE RELIEF REQUESTS Revision Date: 9/02/15SPge2 Page29

1ST Program Plan Wolf Creek GeneratingStation 10 CFR 50.55a Rea;uest 4VR-01 Set Pressure Measurement Accuracy Proposed Alternative In Accordance with 10 CFR 50.55a(z)(1)

Alternative Provides Acceptable Level of Quality and Safety

1. ASME Code CornDonent~sl Affect~ed Valve No, Class Cateaorv ENV0058 2 C ENV01O6 2 C
2. ADDlicable Code Edition and Addenda ASME OM Code 2004 Edition through OMb-2006 Addenda
3. Awlicable Code Reauirement Appendix I, 1-1410 - Set-Pressure Measurement Accuracy. Test equipment (e.g.,

gages, transducers, load cells, calibration standards) used to determine valve set-pressure, shall have an overall combined accuracy not to exceed

+/-1% of the indicated (measured) set-pressure.

4. Reason for Reauest Pursuant to 10 CFR 50.55a, "Codes and Standards", paragraph (z)(1), relief is requested from the requirement of ASME OM Code Appendix 1, 1-1410. The basis of the relief request is that the proposed alternative would provide an acceptable level of quality and safety.

ENV0058 and ENV01 06 - These vacuum relief valves must open to provide vacuum protection of the spray additive tank. This function prevents the tank from collapsing in the event of a failure of the discharge isolation valves to close while the tank is empty and the pumps are operating. This condition could cause a vacuum to be created within the tank. The valve is set to relieve vacuum at 0.98 psig vacuum.

Typically, vacuum relief valves are designed to relieve at significantly low differential pressures. For the subject valves, the set pressures are as follows:

Spray Additive Vacuum Relief Valves 2" Hg (0.98 psig)

Revision Date: 9/02/15 Page30

IST ProgramPlan Wolf Creek GeneratingStation

,1.0 CFR 50.55a Reauest 4MR-01 Set Pressure Measurement Accuracy (Continued)

Instrument accuracies to meet the Code requirements would therefore be 0.0098 psig.

Pressure instrumentation that provides this level of accuracy for this application is not commercially available and not typically maintained by a power plant facility. As a result, the instrument accuracy range will exceed the requirements of Appendix I, 1 1410.

5. Proposed Alternative and Basis for Use The functional requirement of a vacuum relief valve is only relevant in the opening direction. The closure function is generally irrelevant or passive - the valve remains closed to maintain the system boundary (e.g. loss of system inventory). For these subject valves, there is not a concern for premature opening since during normal operations the valves are closed with system pressure tending to maintain the valve closed.

Therefore, Wolf Creek Nuclear Operating Corporation (WCNOC) will establish a set point range such that the lower limits for opening of the valves will allow considerable margin without affecting the valve's performance with respect to the system requirements. The instrument accuracy and target setpoint for these valves will be established such that the overall combined accuracy specified in the test procedures will limit the actual set pressure to 1% above the stamped set pressure.

Using the provisions of this relief request as an alternative to the specific requirements of Appendix I, 1410, as identified above, will provide adequate assurance of valve set pressure performance with respect to system functional requirements. Therefore, pursuant to 10 CFR 50.55a(z)(1) we request relief from the specific Appendix I requirements identified in this request.

6. Duration of Proposed Alternative This proposed alternative will be utilized for the entire 4t 120 month interval which will begin September 4, 2015 and conclude on September 3, 2025.
7. Precedents Wolf Creek Generating Station - Safety Evaluation - Relief Requests for the Third 10-Year Pump and Valve Inservice Testing Program (TAC Nos. MC8210, MC8212, MD0383, and MD0384) 3/21/2006 Revision Date: 9/02/15SPge3 Page31

1ST Program Plan Wolf Creek Generating Station ATTACHMENT 6 COLD SHUTDOWN JUSTIFICATION INDEX Cold Shutdown Description Justification No.

CSJ-0 1 Main Steam Isolation Valves (ABHV001 1,14,17,20)

CSJ-02 Steam Generator Feedwater Isolation Valves (AEFV0039,40,4 1,42)

CSJ-03 Not Used CSJ-04 Auxiliary Feedwater to SG Check Valves (AEV0 124,125,126,127)

CSJ-05 Auxiliary Feedwater Pump Discharge Check Valves (ALV0030,33,36,42,45,48)

CSJ-06 Not Used CSJ-07 Pressurizer Power Operated Relief Valves (BBPCV0455A/456A)

CSJ-08 Not Used CSJ-09 Not Used CSJ- 10 Letdown System Isolation Valves (BGHV8152/8160)

CSJ-1 1 RCS Letdown to Regenerative HX Isolation Valves (BGLCV0459/460)

CSJ- 12 Boric Acid Pumps Discharge Check Valve (BGV0 174)

CSJ-1 3 SI Accumulator Vent Valves (EPHV8950A,B,C,D,E,F)

CSJ-14 Not Used CSJ-15 SG Feedwater Regulating Valves (AEFCV05 10,520,530,540)

Page 32 Revision Date: 9/02/155 Date. 9/02/1 Page 32

1ST Program Plan Wolf Creek GeneratingStation ATTACHMENT 7 COLD SHUTDOWN JUSTIFICATIONS Page 33 Revision Date: 9/02/155 Date: 9/02/1 Page 33

IST Program Plan Wolf Creek Generating Station Cold Shutdown Justification CSJ-01 Valve Numer SystemClass Ctar ABHV0011 AB 2 B ABHV0014 AB 2 B AB HV00I7 AB 2 B ABHV0020 AB 2 B Functin These normally open, hydraulically operated valves must close to isolate the Steam Generators from the non-safety related portion of the Main Steam header. These valves are not considered a containment isolation valves for Penetration P-I1/2/3/4. These valves are a secondary system barrier since the Steam Generators are closed loop inside containment. Therefore, these valves are exempt from Appendix J Type C leakage testing. These valves are required to close in the event of a Main Steam Line Break or Steam Generator Tube Rupture. These valves are required to close within 5 seconds in response to a steam line isolation signal (SLIS). A SLIS is automatically generated due to: I) high steam line negative pressure rate, 2) high containment pressure, 3) low steam line pressure.

These valves are open during normal operation to provide a flow path from the Steam Generator to the main steam power conversion system. The open function does not support safe shutdown or accident mitigation.

Justification It is impracticable to exercise these valves closed during normal power operations since exercising these valves may result in a plant transient and subsequent reactor trip.

Closing these valves for testing during normal power operations would interrupt steam flow from the Steam Generator to the main steam/turbine systems and result in a severe transient. Testing by isolating each main steam header is also possible but would cause a power reduction, which is also unacceptable from an operational viewpoint. Partial stroke exercising these valves is also impracticable since even a part-stroke exercise increases the risk of a valve closure when the unit is generating power.

Alternative Test These valves will be exercised closed during cold shutdowns when the main steam system is not required to be operational.

Page 34 Date: 9/02/15 Revision Date: 9/02/15 Page34

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-02 Vale umer ysemClass Cateaorv AEFV0039 AE 2 B AEFV0040 AE 2 B AEFV0041 AE 2 B AEFV0042 AE 2 B Function These normally open hydraulically operated valve must close automatically on a Feedwater Isolation Signal (FWIS) during accident conditions requiring feedwater isolation. A FWIS is generated by either a Safety Injection signal, high-high level in any Steam Generator, low-low level in any Steam Generator, or a reactor trip coincident with reactor coolant low average temperature. These valves are required to close within 5 seconds upon receipt of an isolation signal to isolate a faulted Steam Generator or to prevent diversion of Auxiliary Feedwater flow away from the Steam Generator. These valves may also be operated by remote manual operations. The containment penetrations associated with the Steam Generators are not subject to GDC-57, since the containment barrier integrity is not breached. These valves fail closed on loss of hydraulic supply or electrical power.

These valves open to provide feedwater flow from the feedwater system to the Steam Generators during normal power operation. This function is not required for safe shutdown or accident mitigation since the supply of normal feedwater is not safety related.

It is impracticable to exercise these valves closed during normal power operations since exercising these valves may result in a plant transient and subsequent reactor trip.

Exercising these valves closed during normal power operations requires isolating normal feedwater flow to the Steam Generators. This testing could result in a severe transient (i.e. level) in the associated Steam Generator and subsequent trip to the reactor. Partial stroke exercising these valves is also impracticable since even a part-stroke exercise increases the risk of a valve closure when the unit is generating power.

These valves will be exercised closed and fail safe tested during cold shutdowns when the Steam Generators and feedwater system are not required to be in service.

Page 35 Revision Date:

Revision 9/02/15S Date: 9/02/I Page 35

1ST ProgramPlan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-03 Not Used Page 36 Revision Date: 9/02/IS Date: 9/02/15 Page 36

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-04 Vave NmberSyte Class Ctar AEV0124 AE 2 C AEV0125 AE 2 C AEV0126 AE 2 C AEV0127 AE 2 C Function These check valves must open to provide a flow path from the Auxiliary Feedwater (AFW) pumps to the Steam Generators during accident conditions requiring Auxiliary Feedwater system initiation. These valves must open to provide a minimum flow of 250 gpm during Auxiliary Feedwater operation.

These valves must close to prevent steam binding of the Auxiliary Feedwater pumps.

These valves are not considered a containment isolation valves. The containment penetrations associated with the Steam Generators are not subject to GDC-57, since the containment barrier integrity is not breached. These valves are closed during normal power operation to isolate AFW such that the normal feedwater system flow is routed to the Steam Generators.

It is undesirable to exercise these valves open or closed during normal power operations since exercising these valves would result in establishing a cold water flow to the Steam Generators.

The introduction of cold water into the system during normal operation would result in subjecting the Steam generator feed water nozzles to an unnecessary, and possibility detrimental thermal shock, which could result in system pressure boundary failure.

Altrat~ivees These valves will be exercised open and closed during cold shutdowns when the Steam Generators are not required to be in service.

Page 37 Revision Date: 9/02/155 Date: 9/02/1 Page 37

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-05 VaveNumber SytmClass Ctar ALV0030 AL 3 C ALV0033 AL 2 C ALV0036 AL 2 C ALV0042 AL 3 C ALV0045 AL 2 C ALV0048 AL 2 C Function These check valves must open to provide a flow path from the Auxiliary Feedwater pump discharge to the Steam Generators for emergency cool down of the Reactor Coolant System. This function ensures that the Auxiliary Feedwater pumps maintain sufficient water level in the Steam Generators to ensure adequate heat transfer and continuation of the decay heat removal process.

These check valves closes to prevent diversion of flow through an idle Auxiliary Feedwater pump to ensure adequate flow is delivered to the Steam Generators by the operating pumps. This function is not required for safe shutdown or accident mitigation since downstream isolation valves isolate the AFW pump discharge piping from the opposite pumps. These valves remain closed and do not open unless the associated Auxiliary Feedwater pump is started. Therefore backflow through an idle pump discharge check valve is not credible.

Justification It is impracticable to exercise these valves open or closed during normal power operations since exercising these valves would result in establishing cold water flow to the Steam Generators.

Exercising these valves open during normal power operations requires injection of cold water into the Steam Generators to verify the open full flow position of the valves. This type of test places the plant in an undesirable condition since flow through these valves would unnecessarily thermally shock the Steam Generator feedwater nozzles. Since the closure testing of these valves can only be performed during the open testing, it is also impracticable to test these valves closed during normal power operations.

Alternative Test These valves will be exercised open and closed during cold shutdowns when the Steam Generators are not required to be in service.

Page 38 Revision Date:

Revision 9/02/1 S Date: 9/02/15 Page38

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-06 Not Used Revision Date: 9/02/1 5Pae3 Page 39

1ST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-07 VaveNumknbr SytmCasaeor BBPCVQ455A BB 1 B BBPCVO456A BB 1 B Functin These normally closed solenoid operated valves are Pressurizer Power Operated Relief Valves (PORV), which open to provide a flow path from the pressurizer to the pressurizer relief tank to reduce Reactor Coolant System (RCS) pressure during low temperature operation. These two PORV's are supplied with actuation logic to ensure that a redundant and independent RCS pressure control back-up feature is provided for the operator during low temperature operations. The logic system continuously monitors RCS temperature and pressure whenever plant conditions are at low temperatures.

These valves are not required upon to prevent over-pressurization of the Reactor Coolant System, that function is performed by the pressurizer safety valves. These PORV's do however function to relieve system pressure to limit the undesirable opening of the Pressurizer Safety Valves. These PORV's are also relied upon for depressurizing the RCS to cold shutdown. These valves are set to open automatically at 2335 psig.

These valves must also be able to close to maintain the Reactor Coolant System pressure and prevent loss of RCS inventory via the pressurizer relief tank. These valves close automatically when pressurizer pressure is below 2185 psig. These valves fail closed upon loss of electrical power.

Justification It is impracticable to full or partial stroke exercise these valves open and closed during normal power operations since exercising these valves would result in an RCS pressure transient and subsequent reactor trip.

Exercising these valves open and closed during normal power operations would result in a rapid depressurization of the Reactor Coolant System which would cause a pressure transient and subsequent trip of the reactor. Additionally, exercising these valves quarterly at power would eventually lead to unnecessary valve seat damage.

Alternative Test These valves will be exercised open, closed, and fail safe tested during cold shutdowns when the Reactor Coolant System is depressurized.

Page 40 Revision Date: 9/02/15S Date: 9/02/1 Page 40

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-08 Not Used Revision Date: 9/02/15SPge4 Page 41

1ST ProgramPlan Wolf Creek Generating Station Cold Shutdown Justification CSJ-O9 Not Used Page 42 Revision Date: 9/02/155 Date: 9/02/1 Page 42

1ST"Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-1lO ValveNumber SytmClass Ctar BGHV8152 BG 2 A BGHV8160 BG 2 A Functin These normally open air operated valves must close upon receipt of a Phase A containment isolation signal to isolate containment from the chemical and volume control system. These valves are classified as containment isolation valves. These valves also fail closed upon loss of air or electrical power.

These valves are normally open to provide a letdown flow path from the letdown orifice header to the letdown heat exchanger. This function is not required for safe shutdown or accident mitigation.

It is impracticable to full or partial stroke exercise these valves closed during normal power operations since closing these valves places the plant in an undesirable condition, since failure may cause a loss of pressurizer level control and subsequent trip of the reactor.

Atrnatv Ts These valves will be exercised closed and fail safe tested during cold shutdowns when the Reactor Coolant System is depressurized.

Revision Date: 9/02/15SPge4 Page 43

1ST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-11I Valv*Numbr System CassCtar BGLCVO459 BG 1 B BGLCV0460 BG 1 B Function These normally open air operated valves must close automatically upon receipt of a pressurizer low level signal to isolate the letdown line and regenerative heat exchanger from the Reactor Coolant System thus preventing further loss of reactor coolant. These valves are interlocked such that they cannot be opened if any orifice valves (i.e.

BGHV8I49A, B, or C) are open. These valves also fail closed upon loss of air or electrical power.

These valves open to provide a letdown flow path from the Reactor Coolant System to the regenerative heat exchanger during normal power operation. This function is not required for safe shutdown or accident mitigation.

Justification It is impracticable to full or partial stroke exercise these valves closed during normal power operations since closure would isolate the normal letdown flow path which places the plant in an undesirable condition.

Closure of these valves at power may cause a voiding effect which could lead to water hammer. Additionally, closure of these valves during normal power operation could adversely affect pressurizer level control and result in a trip of the reactor.

These valves will be exercised closed and fail safe tested during cold shutdowns when the normal Reactor Coolant System letdown flow path is not required.

Page 44 Revision Date: 9/02/15S Date: 9/02/I Page 44

1ST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-12 VaYlve Nmbekyteals Ctar BGV0174 BG 3 C Function This check valve must open to provide a flow path from the discharge of the boric acid transfer pumps to the charging pump suction header when emergency boration is required. This check valve must open to provide 30 gpm.

This valve must also close to prevent suction flow from either the RHR Heat Exchanger discharge or Refueling Water Storage Tank (RWST) from being diverted from the suction of the Centrifugal Charging Pumps. The closing of this valve will ensure that these other charging pump suction sources will be diverted to the Centrifugal Charging Pumps, which is required during accident conditions.

Justification It is impracticable to exercise this valve open during normal power operations as in doing so would result in the injection of a substantial amount of boron into the Reactor Coolant System in order to verify full flow. Boration of the Reactor Coolant System to perform this test would cause a power transient due to the negative reactivity addition and could result in a trip of the reactor.

AlternaieTs This valve will be exercised open and closed during cold shutdowns when the chemical and volume control and Reactor Coolant Systems are not required.

Revision Date: 9/02/15SPge4 Page 45

1ST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-1 3 VYlve NmberSyte Class Ctar EPHV8950A EP 2 B EPHV8950B EP 2 B EPHV8950C EP 2 B EPHV8950D EP 2 B EPHV8950E EP 2 B EPHV8950F EP 2 B Funto~n These normally closed solenoid operated valves must open to provide a flow path from the safety injection accumulator to atmosphere. This function is required to depressurize the safety injection accumulator tank during emergency shutdown conditions, since the accumulator tank outlet valves (EPHV8808A-D) cannot be closed. This function prevents the injection of accumulator water to the RCS as well as preventing the injection of nitrogen in to the RCS. Closure of these valves, once opened, would not be required to support any accident analysis.

These valves are initially closed and are required to remain closed in order to isolate the safety injection accumulator tank vent to containment atmosphere, thereby assuring sufficient pressure within the accumulator for injection purposes. Since this valve is not required to change positions to perform this function, it is considered passive in the closed position. Additionally, the accumulator level and pressure is continuously monitored and alarmed in the control room. If excessive leakage is detected, Operator Action would then be required to maintain the plants operation within the requirements of Technical Specifications or to bring the plant to a safe shutdown condition. These valves fail closed upon loss of electrical power.

It is impracticable to full or partial stroke exercise these valves open during normal power operations since exercising these valves places the plant in an undesirable configuration, rendering the respective safety injection accumulator inoperable. The Technical Specification action statement may not allow adequate time to test the valves and restore the accumulator. Additionally, should one of the valves fail to close, insufficient time is allowed to repair/replace/retest prior to shutting down the plant.

Altrnatie es These valves will be exercised open and closed and fail safe tested during cold shutdowns when the safety injection accumulators are not required to be in service.

Page 46 Revision Date: 9/02/15S Date: 9/02/1 Page46

IST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-1 4 Not Used Page 47 Revision Date:

Revision 9/02/155 Date: 9/02/1 Page 47

1ST Program Plan Wolf Creek GeneratingStation Cold Shutdown Justification CSJ-15 ValveNumber Sse lasCtar AEFCV0510 AE 3 B AEFCV0520 AE 3 B AEFCV0530 AE 3 B AEFCV0540 AE 3 B Function These normally open air operated feedwater regulating valves must close automatically on a Feedwater Isolation Signal (FWIS) during accident conditions. A FWlS is generated by either a Safety Injection signal, high-high level in any Steam Generator, low-low level in any Steam Generator, or a reactor trip coincident with reactor coolant low average temperature. In the event of a secondary cycle pipe rupture inside containment, the main feedwater control valves (and associated bypass valves) provide a diverse backup to the MFIV to limit the quantity of high energy fluid that enters the containment through the broken loop. These valves fail closed on loss of hydraulic supply or electrical power.

These regulating valves open to provide feedwater flow from the feedwater system to the Steam Generators during normal power operation. This function is not required for safe shutdown or accident mitigation since the supply of normal feedwater is not safety related.

It is impracticable to exercise these valves closed during normal power operations since exercising these valves may result in a plant transient and subsequent reactor trip.

Exercising the regulating valves (AEFCV0510-0540) closed during normal power operations requires isolating normal feedwater flow to the Steam Generators. This testing could result in a severe transient (i.e. level) in the associated Steam Generator and subsequent trip or the reactor. Partial stroke exercising these valves is also impracticable since even a part-stroke exercise increases the risk of a valve closure when the unit is generating power.

.AlterativeIest" These valves will be exercised closed and fail safe tested during cold shutdowns when the Steam Generators and feedwater system are not required to be in service.

Page 48 Date: 9/02/IS Revision Date: 9/02/15 Page 48

1ST Program Plan Wolf Creek Generating Station ATTACHMENT 8 REFUELING OUTAGE JUSTIFICATION INDEX Refueling Outage Description Justification NO, RJ-01 SiS Boron Injection Tank to RCS Check Valves (BBV0001 ,22,40,59)

RJ-02 Normal/Alternate Charging to RCS Check Valves (BB8378A/B,8379A/B)

R J-03 Volume Control Tank Outlet Check Valve (BG8440)

R J-04 Centrifugal Charging Pumps Discharge Check Valves (BG8481A, B)

R J-05 RWST to Charging Pump Suction Check Valves (BG8546A, B)

R J-06 Containment Recirc Sump Isolation Valves (EJHV8811IA,B)

R J-07 Boron Injection Tank to RCS Cold Leg Injection Check Valve (EM8815)

RJ-08 Safety Injection Pump Discharge Check Valves (EM8922A, B)

RJ-09 ESW Water Hammer Vacuum Relief Valves (EFV0476, 478, 482, 484)

RJ-10 Reactor Vessel Head Vent Valves (BBHV8001A/B,8002A/B)

RJ-11I RCP Seal Injection Check Valves (BV0120,121,1 50,151,180,181,210,211)

R J-1 2 CCW to RCP Thermal Barrier Check Valves

__________(BBV0443, 444, 445, 446,447, 448,449, 450)

R J-1 3 Reactor Building Instrument Air Isolation Valve (KAFV0029)

Revision Date: 9/02/]15Pae4 Page 49

1ST Program Plan Wolf Creek Generating Station ATTACHMENT 9 REFUELING OUTAGE JUSTIFICATIONS Revision Date: 9/02/1 5Pae5 Page 50

1ST Program Plan Wolf Creek Generating Station Refueling Outage Justification R J-01 VaveNubryse ClssCaeaor BBV0001 BB 1 A/C BBV0022 BB 1 N/C BBV0040 BB 1 NC BBV0059 BB 1 N/C Functin These check valves must open to provide a flow path from the charging pumps via the boron injection tank to the reactor coolant system when safety injection is initiated by a SIS.

These valves must close or remain closed to isolate the Reactor Coolant System from the Boron Injection Tank. These check valves are considered as pressure isolation valves, required to maintain the RCS pressure boundary.

Justification It is impracticable to exercise these valves open and closed during normal power operations or cold shutdowns since exercising these valves requires injection of borated water into the RCS and would cause a plant transient and subsequent reactor trip.

Exercising these valves open and closed during normal power operations or during cold shutdowns would require injection of borated water by the Centrifugal Charging Pump into the RCS. The increase boration would cause a power decrease and thermal transient to the Reactor Coolant piping.

Altern tivTs These valves will be exercised open and closed during refueling outages when the Reactor Coolant System is not required to be in service.

Revision Date: 9/02/15Pae5 Page 51

1ST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-02 ValvMNmberSyte Class ator BB8378A BB 1 C BB8378B BB I C BB8379A BB 1 C BB8379B BB I C These check valves must close to isolate the Reactor Coolant System from the lower pressure charging system in the event of a pipe break in the CVCS system.

Valves BB8378A/B open to provide a flow path for normal charging flow from the Centrifugal Charging Pumps to the RCS. Valves BBV8379A/B open to provide a flow path for alternate charging flow from the Centrifugal Charging Pumps to the RCS. The normal charging flow path maintains the required water inventory in the RCS during normal operation, power changes, startup, and shutdown. The alternate charging provides backup to the normal charging flow path. These flow paths are also identified as emergency boration flow paths. These flow paths provide a diverse means of borating the RCS to a concentration that exceeds the requirement for safe shutdown of the reactor from any operating condition, assuming that the control rod cluster with the highest reactivity worth is stuck in its fully withdrawn position and the unlikely event that safe shutdown is initiated from peak xenon conditions (USAR 9.3.4.1.1/SOB Eight).

It is impracticable to exercise these check valves closed during normal power operations or cold shutdown since interrupting charging flow to the RCS places the plant in an undesirable configuration. Access to these valves requires entry behind the reactor bioshield wall inside containment, which is not practicable from a radiation exposure standpoint during normal plant operations and is not practical during cold shutdowns when the area is highly radioactive and the valve body is insulated at a temperature that exceeds non-intrusive equipment adhesive ratings.

Alternative Test These valves will be exercised open and closed during refueling outages when the Charging System is not required and radiation levels permit entry into the containment area that needs to be accessed for testing.

Page 52 Revision Date: 9/02/15S Date: 9/02/I Page 52

IST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-03 ValveNumber Systm Class Ctar BG8440 BG 2 C Functin This check valve must open during the injection mode of ECCS to provide a minimum flow recirculation flow path through the Seal Water Heat Exchanger to protect the Centrifugal Charging Pumps while they are in recirculation operation. The valve must open to provide a minimum 120 gpm (2 pumps @ 60 gpm each) for recirculation. This mode of operation will occur when the RWST is still the suction source and a safety injection signal is present.

Additionally, this check valve opens to provide a flow path from the volume control tank to the charging pump suction during normal plant operations. This function is not required for safe shutdown or accident mitigation.

This valve must close to prevent backflow and isolate the seal water heat exchanger piping during recirculation modes of ECCS. Valves BGLCVI112B/C close to isolate the volume control tank and check valves BG8546A/B close to isolate the refueling water storage tank during hot and cold recirculation modes of ECCS while the Centrifugal Charging Pumps are supplied by the residual heat removal pumps. BG8440 must close to prevent diversion of the residual heat removal flow and potentially lifting the seal water heat exchanger relief valve BG81 23.

It is impracticable to exercise this valve closed during normal power operation or during cold shutdowns. Exercising the valve requires the performance of a leakage or reverse flow test to verify the closed position.

To perform a leakage test or reverse flow test to verify closure during normal operations or during cold shutdowns requires temporary test equipment to be installed to establish a differential pressure across the valve to verify closure. This test is impracticable to be performed during normal power operations or during cold shutdowns since the charging and residual heat removal systems would be required to be drained/vented and out of service to perform a leakage test.

Alternat~ive Test This valve will be exercised closed during refueling outages when the BG and EJ systems are not required to be in service. The open direction function of this valve is verified using normal system flow during normal power operations.

Revision Date: 9/02/15 Pge5 Page 53

1ST ProgramPlan W Creek GeneratingStation Volf Refueling Outage Justification RJ-04 Valve Numer SystemClass (tar BG8481A BG 2 C BG8481B BG 2 C Functin These check valves must open to provide a flow path from the Centrifugal Charging Pumps to the Reactor Coolant System cold legs during injection and to the Reactor Coolant System hot or cold legs during the recirculation mode of ECCS operation.

These valves must open to provide 538 gpm each to the Reactor Coolant System during injection and recirculation modes.

The valves must close to prevent backflow through an idle pump during ECCS injection and recirculation modes of operation. Closure of the valves ensure adequate flow to the Reactor Coolant System in the event of a failure of the respective Centrifugal Charging Pump to start.

jJusiiain It is impracticable to exercise these check valves open during normal power operations or cold shutdowns since injection into the Reactor Coolant System during normal operations or cold shutdowns would cause a plant transient and potential trip of the reactor.

Exercising these valves open requires injection of borated water into the Reactor Coolant System. Performance of this test during normal plant operations would cause an increase in the reactor coolant boron inventory resulting in a potential trip of the reactor.

Performing this test during cold shutdowns may result in a cold over- pressurization of the Reactor Coolant System.

AltrnaieTs These valves will be exercised opened and closed during refueling outages when the Reactor Coolant System is not required to be in service.

Revision Date: 9/02/15SPge5 Page 54

1ST ProgramPlan Wolf Creek GeneratingStation Refueling Outage Justification RJ-05 Valve Numer SystemClass (tar BG8546A BG 2 C BG8546B BG 2 C Funto~n These check valves must open to provide a flow path from the refueling water storage tank to the charging pump suction during the injection mode of ECCS [USAR 6.3.2.1/6.3.2.2]. These valves must also open to provide a flow path from the refueling water storage tank to the Centrifugal Charging Pumps for automatic makeup to the Reactor Coolant System in the event of a minor leak when valves BNLCVO112D/E open automatically upon receipt of a volume control tank Low-Low Level signal. The valves must open to provide 419 gpm to the charging pump suction during the injection mode.

These valves must also close to prevent back flow of the residual heat removal pumps discharge to the refueling water storage tank during the recirculation phase of ECCS operation. Closure of the valves ensure an adequate suction source for the charging and safety injection pumps.

Justification It is impracticable to exercise these check valves open during normal power operations or cold shutdowns since doing so would result in the injection of borated water into the Reactor Coolant System. Performance of this test during normal plant operations would cause an increase in the reactor coolant boron inventory resulting in a potential trip of the reactor. Performing this test during cold shutdowns may result in a low temperature over- pressurization of the Reactor Coolant System.

These valves will be exercised opened and closed during refueling outages when the Reactor Coolant System is not required to be in service.

Page 55 Revision Date:

Revision 9/02/I S Date: 9/02/15 Page 55

IST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-06 Valv Nuberystm CasCtar EJHV8811A EJ 2 B EJHV8811B EJ 2 B Functio These normally closed motor operated valves must open to provide a flow path from the Containment Recirculation Sump to the suction of the RHR Pump when the Emergency Core Cooling System (ECCS) shifts from Injection to Recirculation modes. These valves open automatically when two of the 4 level transmitters on the RWST indicate a low-low-I level in conjunction with a Safety Injection Signal. The opening of these valves function to support the safe shutdown and accident mitigation by providing a recirculation flow path from the Containment Sump when the RWST is exhausted following the Injection mode.

These valves are considered to be Containment Isolation valves for Penetration P-I14/15 and may be closed by remote manual operation to isolate Containment and the Containment Recirculation Sumps from the Residual Heat Removal System. These valves do not receive an automatic Containment Isolation signal since they must remain open during the Recirculation mode of ECCS. These valves are exempt from Appendix J Type C testing due to a closed system outside containment. During normal operations these valves are interlocked such that they cannot be opened unless the RHR suction valves from both the RWST and RCS are closed. Since the valves are not required to change positions to perform the closed function, they are considered passive in the closed position [ISTC-2000]. Once open, these valves are not required to close again to support any accident analysis.

These valves are included in the WCNOC OMN-1 Program.

It is impracticable to exercise these valves open or closed (full or partial) during normal power operations since opening the valves places the plant in an undesirable configuration.

Exercising these valves open and closed during normal power operations places the plant in an undesirable configuration since opening these valves requires defeating the interlocks on the RHR suction isolation valves from the RWST and RCS. This test would require placing both trains of RHR in an inoperable status.

Altenaive es These valves will be exercised open/closed during refueling outages when RHR is not required and the suction isolation valves from the RWST and RCS may be opened.

Page S6 9/02/1 S Date: 9/02/15 Revision Date: Page 56

1ST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-07 EM8815 EM 1 A/C Functin This check valve must open to provide a flow path from the Centrifugal Charging Pumps to the Reactor Coolant System cold legs during injection and recirculation modes of ECCS. This check valve must open to provide a minimum flow of 460 gpm.

This check valve must close to isolate containment from the chemical and volume control system. This valve is considered a containment isolation valve for penetration P-88 however it is exempt from Appendix J Type C leakage testing due to a closed system outside containment. This valve is also considered a Pressure Isolation Valve and must close to isolate the Reactor Coolant System from the chemical and volume control system.

Jutiiato It is impracticable to exercise this valve open or closed during normal power operations or cold shutdowns since exercising the valve requires injection by the Centrifugal Charging Pumps into the RCS to verify full flow. This test cannot be performed during power operations since injection of borated water into the RCS cold legs would result in a decrease in reactor power resulting in a power transient and subsequent reactor trip.

Additionally, injection during power operations would thermally shock the Reactor Coolant System piping. During cold shutdown this valve cannot be exercised since injection into the RCS could result in low temperature over-pressurization of the Reactor Coolant System.

This valve will be exercised open and closed during refueling outages when the Reactor Coolant System is depressurized and injection by the Centrifugal Charging Pumps into the RCS is possible.

Revision Date: 9/02/15SPge5 Page 57

IST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-08 Valve Numer SystemClass Ctar EM8922A EM 2 C EM8922B EM 2 C Fuwncto These check valves must open to provide a flow path from the safety injection pump to the Reactor Coolant System during ECCS injection and recirculation modes of operation.

These valves must close to prevent backflow through an idle pump during ECCS injection and recirculation modes of operation. Closure of these valves ensures adequate flow to the Reactor Coolant System in the event of a failure of the respective safety injection pump to start.

Jlustification It is impracticable to exercise these valves open or closed during normal power operations or cold shutdowns since exercising the valves requires injection by the safety injection pumps into the RCS to verify full flow. This test cannot be performed during power operations since the safety injection pump cannot overcome Reactor Coolant System pressure. During cold shutdown these valves cannot be exercised since injection into the RCS could result in low temperature over-pressurization of the Reactor Coolant System.

Aleraiv Ts These valves will be exercised open and closed during refueling outages when the Reactor Coolant System is depressurized and injection by the safety injection pumps into the RCS is possible.

Revision Date: 9/02/15 Pge5 Page 58

1ST ProgramPlan Wolf Creek Generating Station Refueling Outage Justification RJ-09 VaveNumberSyte Class Ctar EFV0476 EF 3 B EFV0478 EF 3 B EFV0482 EF 3 B EFV0484 EF 3 B Function Valves EFV0476, EFV0478, EFV0482, and EFV0484 are normally closed check valves that are being utilized as vacuum breakers/pressure relief devices for the ESW System.

These valves are classified as check valves per table ISTC-3500-1 note (4) since they are not capacity certified.

These valves are normally closed to help maintain a continuous water column throughout the ESW System at all points upstream of the Vertical Loop and to maintain the ESW System pressure boundary during system operation. They must open to allow air to enter the ESW Vertical Loop to allow drain down of the downstream piping without pulling a vacuum in the upstream piping thus creating voids in the system during a Loss of Off Site Power (LOOP) event.

It is impracticable to exercise these valves open during normal power operations or cold shutdowns since exercising the valves would require a train of ESW to be taken out of service. Since these valves are in a vacuum breaker configuration, the only way to effectively open test them is to remove from service and bench test.

Two of these valves will be removed from service and exercised open and closed during a bench test every refuel outage to meet the requirements of ISTC-5221(c)(3).

Revision Date: 9/02/15Pge5 Page 59

1ST ProgramPlan Wolf Creek GeneratingStation Refueling Outage Justification RJ-1O VaveNu~mber SytmClass (tar BBHV8001A BB 2 B BBHV8001B BB 2 B BBHV8002A BB 2 B BBHV8002B BB 2 B Eunto~n These normally closed solenoid operated valves must open to vent the Reactor Vessel Head during post-accident conditions.

The valves must close to maintain the reactor coolant pressure boundary and isolate RCS pressure from the containment atmosphere. These valves fail closed upon loss of power.

Justification It is impracticable to full or partial exercise these valves open and closed during normal power operations since exercising these valves would place the plant in an undesirable configuration along with an increase in personnel radiation exposure to perform testing.

Exercising these valves open and closed during normal power operations would require venting of the Reactor Coolant System directly to containment. During normal power operations this test would result in a potential Loss of Coolant Accident since only one valve would remain to establish the Reactor Coolant System boundary. Stroke testing, if attempted at cold shutdown, could extend the length of plant shutdown due to extensive preparatory work in establishing the proper RCS conditions. Containment entry is required to install the necessary vent test rig to perform this test. This would result in an increase in personnel radiation exposure.

These valves will be exercised open and closed and fail safe tested during refueling outages when the Reactor Coolant System is depressurized and radiation levels permit entry into containment.

Revision Date: 9/02/15Pge6 Page60

IST Program Plan Wolf Creek GeneratingStation Refueling Outage Justification RJ-11I Valve umber SytmClass Ctar BBV0120 BB 1 C BBV0I2I BB 1 C BBV0150 BB 1 C BBV0151 BB 1 C BBV0180 BB I C BBV0181 BB 1 C BBV02I0 BB 1 C BBV02II BB 1 C Funto~n These check valves must open to provide a flow path from CVCS Centrifugal Charging Pumps through the Reactor Coolant Pump (RCP) seals for emergency boration. A portion of the charging flow is directed through the Seal Water Filter and the RCPs to borate the Reactor Coolant System in order to achieve and maintain a safe shutdown.

These check valves must open to provide a flow rate of 5 gpm each. Seal water injection also provides cooling and lubrication to the RCP seals, preventing RCP seal damage. This cooling/lubrication water function is not required for safe shutdown or accident mitigation since the reactor coolant pumps are not relied upon for safe shutdown.

These valves must close to isolate the Reactor Coolant System from the charging system thereby maintaining the Reactor Coolant System pressure boundary. These valves are not considered containment isolation valves. The containment isolation function is assigned to a separate upstream check valve and motor operated valve pair.

It is impracticable to exercise these check valves closed during normal power operations since interrupting seal injection flow would damage the reactor coolant pump seals, and ultimately the pumps. Therefore, testing would require removing the associated reactor coolant pump from service.

To verify valve closure requires a backflow/leakage test. This testing requires entry into containment for test alignment and performance. During normal power operations this testing would result in an increase in personnel radiation exposure.

In addition, per NUREG-1482, Rev.2, Section 3.1.1.4, the NRC staff recommends that licensees should test these valves on a refueling outage schedule and during plant outages when the reactor coolant pumps are stopped for a sufficient period of time. The NRC staff has determined that licensees need not schedule valve testing that requires stopping and restarting reactor coolant pumps each cold shutdown solely to allow for testing these valves. This repetitive cycling would increase pump wear and stress, as well as the number of cycles related to plant equipment, and could extend the length of cold shutdown outages.

Revision Date: 9/02/15 Paged1

IST Program Plan Wolf Creek Generating Station Refueling Outage Justification RJ-11 (Continued)

Alternative Test; These valves will be exercised closed during refueling outages when the reactor coolant pumps are not required to be in service and radiation levels permit entry into containment.

Revision Date: 9/02/15Pae6 Page62

IST Programn Plan Wolf Creek GeneratingStation Refueling Outage Justification R J-12 Vale umber SytmClass Ctar BBV0443 BB 3 C BBV0444 BB 3 C BBV0445 BB 3 C BBV0446 BB 3 C BBV0447 BB 3 C BBV0448 BB 3 C BBV0449 BB 3 C BBV0450 BB 3 C Functio These check valves must close to isolate the Reactor Coolant System from the component cooling water system in the event of a cooling coil tube leak, and thus maintaining the reactor coolant pressure boundary.

These valves provide a cooling water supply flow path from the component cooling water system to the RCP thermal barrier cooling coil. This supplied cooling prevents RCP pump damage and degradation of the pump seals. The supply of CCW to the RCP thermal barrier is not required for safe shutdown or accident mitigation since the reactor coolant pumps are not relied upon.

Justificat~ion It is impracticable to exercise these check valves closed during normal power operations since closure testing would require interrupting seal injection flow possibly resulting in damage to the reactor coolant pump seals, and ultimately the pump. Therefore, testing would require removing the associated reactor coolant pump from service.

To verify valve closure requires a backflow/leakage test. This testing requires entry into containment for test alignment and performance. During normal power operations this testing would result in an increase in personnel radiation exposure.

In addition, per NUREG-1482, Rev.2, Section 3.1.1.4, the NRC staff recommends that licensees should test these valves on a refueling outage schedule and during plant outages when the reactor coolant pumps are stopped for a sufficient period of time. The NRC staff has determined that licensees need not schedule valve testing that requires stopping and restarting reactor coolant pumps each cold shutdown solely to allow for testing these valves. This repetitive cycling would increase pump wear and stress, as well as the number of cycles related to plant equipment, and could extend the length of cold shutdown outages.

Altrnatie es These valves will be exercised closed during refueling outages when the reactor coolant pumps are not required to be in service and radiation levels permit entry into containment.

Revision Date: 9/02/15 Page 63

1ST ProgramPlan Wolf Creek GeneratingStation Refueling Outage Justification RJ-13 KAFV002g KA 2 A This normally open, air operated valve must close to isolate containment from the non-safety related instrument air system. This valve is considered a containment isolation valve for penetration P-30. The valve receives a Phase A Containment Isolation Signal (ClS), and is required to close upon receipt of that signal within 5 seconds.

This valve is normally open during operation to supply instrument air to various air operated valves within the reactor building. This function is not required for safe shutdown or accident mitigation.

Exercising this valve closed during normal power operations would interrupt the instrument air supply to the valves and equipment necessary for system control and operation. Closure of the valve would affect the normal letdown flow path and isolation of the pressurizer spray feature.

Likewise, exercising this valve to the closed position during cold shutdowns would interrupt the actuating air supply to components necessary for system control when maintaining a cold shutdown condition. Interrupting the actuating air supply may cause the valves and components to fail in a non-conservative position.

Alternative Test This valve will be exercised closed and fail safe tested during refueling outages when the instrument air system is not required by important plant components.

Revision Date: 9/02/15Pae6 Page64

1ST ProgramPlan Wolf Creek GeneratingStation ATTACHMENT 10 CHECK VALVE CONDITION MONITORING PLANS BASIS INDEX CVCM No. Description CVCM-01 RHR to SI Accumulator Injection Check Valves EP881 8A/B/C/D CVCM-02Appendfix CVCM-2BG381,EGV0204, Check Valves BBV01 18/0148/0178/0208, BGV01 35, J Option BKAV0204 CVCM-03 RHR Heat Exchanger Outlet Check Valves EJ8730A/B CVCM-04 RHR to SI Hot Leg Recirculation Outlet Check Valves BB8949A/B/C/D CVCM-05 Safety Injection Pump Suction Check Valves EM8926A/B CVCMy-Ijecionto Accumulator Line Injection Check Valves CVCM-07 Residual Heat Removal Pump Suction Check Valves EJ8958A/B CVCM-08 RHR Charging/Safety Injection Pumps Check Valves EJ8969A/B CVCM-09 Accumulator Tank Discharge Check Valves EP8956A/B/C/D CVCM-1 0 Charging to Seal Injection Check Valve BGV0591 CVCM-1 -Auxilary Feedwater Check Valves ALVO001/54/57/621671721161 CVCM-1 2 Post-Accident Sampling Return Check Valves GSV0054/59 CVCM-13 Safety Injection to RCS Hot Leg Check Valves EMV0001/2/3/4 CVCM-14 Safety Injection Accumulator Loop Check Valves BB8948A/B/C/D CVCMidualHeat Removal to Safety Injection System Check Valves Revision Date: 9/02/15 Pge6 Page 65

IST ProgramPlan Wolf Creek GeneratingStation ATTACHMENT 11 CHECK VALVE CONDITION MONITORING PLANS BASIS Revision Date: 9/02/15Pae6 Page 66

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-01 VaveNube SstmClass Cateaor EP8818A EP 1 ANC EP8818B EP 1 NC EP8818C EP 1 A/C EP8818D EP I NC Functior These check valves must open to provide a flow path from the RHR pumps to the Reactor Coolant System cold legs during the injection phase of an accident [USAR 6.3.2]. During the injection phase, these check valves must open to provide a flow rate of 961 gpm each. Additionally, these check valves must open to provide a flow path from the residual heat removal system to the RCS during the cold leg recirculation phase of an accident

[USAR 6.3.2].

These check valves must close to isolate the Reactor Coolant System from the lower pressure RHR system. These valves are considered pressure isolation valves, required to maintain the RCS pressure boundary [ITS 3.4.14, B 3.4.14]. The valves are also considered containment isolation valves however they are exempt from Appendix J Type C leakage testing due to a closed system outside containment

[USAR Figure 6.2.4-1]. These valves must also close during cold leg recirculation to prevent reverse flow when the SI pumps are required to deliver recirculated water to the cold legs [USAR 6.3.2].

Justfc~in In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping these valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. These check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 109. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 109 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Revision Date: 9/02/15 Pge6 Page 67

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-01 (Continued)

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004, Appendix II, section 11-4000(b), Optimization of Condition Monitoring Activities. The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-01:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAK RATE TESTING Leak rate data trend - documented once for each cycle.

FLOW TESTING Normal system operation, in-service operator walk-downs

- documented once for each cycle MONITORING SYSTEM Monitoring the RHR system pressure and the number PRESSURE of times during a fuel cycle the operators vent the RHR system - system health reports evaluate quarterly,

_________________________documented once for each cycle VISUAL - GASKET Boron crystallization or leaks - walk-downs performed every outage for RCS Category I pressure boundary

_________________________req's. - documented once for each cycle HOURS OF OPERATION Hours and flow can be estimated to assess bearing block

_________________________or hinge pin wear - documented once for each cycle UT REULTSMin wall, valve body wear rate - evaluation and actions determined by Flow Accelerated Corrosion (FAC)

________________________- program In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Compliance, This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 109 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 109 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 109 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 109 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15 Page 68

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-02 Valve Number System Class Ctar BBV0118 BB 2 N/C BBV0148 BB 2 NC BBV0178 88 2 NC BBV0208 BB 2 ANC BGV0135 BG 2 NC BG8381 BG 2 N/C EGV0204 EG 2 NC KAV0204 KA 2 NC Funto~n BBV01 18/0148/0178/0208 (grouped valves)

These check valves must open to provide a flow path from CVCS Centrifugal Charging Pumps to the RCP seals for emergency boration. A portion of the charging flow is directed to the RCPs through a seal water filter, to borate the Reactor Coolant System to achieve and maintain a safe shutdown. These check valves must open to provide a flow rate of 5 gpm each [USAR 9.3.4]. Additionally, these valves open to provide a flow path for RCP seal injection water from CVCS Centrifugal Charging Pumps the RCP seals. This seal injection flow provides cooling in an effort to prevent degradation and damage of the RCP and it's seals. This cooling water function is not required for safe shutdown or accident mitigation since the reactor coolant pumps are not relied upon for safe shutdown.

These valves must close to isolate containment from the CVCS system. These valves are required to provide containment isolation [USAR Figure 6.2.4-1].

BGV01 35 (not in a group)

This check valve must close to isolate the containment from the CVCS system. This check valve is a containment isolation valve for penetration P-24.

This check valve must open to provide a flow path from the section of piping that exist between the normally closed inboard and outboard containment isolation valves (BGHV8100/81 12) on penetration P-24. When these motor operated containment isolation valves are closed, the water trapped in this isolated section of piping can become pressurized due to heating and subsequent expansion of the water. This check valve opens to provide a flow path upstream of the penetration which allows the pressure and expanding water to routed back to the piping upstream of the inboard isolation valve, therefore preventing pipe damage.

Revision Date: 9/02/15SPge6 Page 69

1ST Program Plan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-02 (Continued)

BG8381 (not in a group)

This check valve must close to isolate containment from the normal charging return flow path [USAR 6.3.2]. This valve is considered a containment isolation valve for penetration P-80. [USAR Table 6.2.4-1].

This check valve is open during normal operation to provide a flow path from the Centrifugal Charging Pumps, through the regenerative heat exchanger tubes to recover heat from the letdown flow, then to the Reactor Coolant System. This function is not required for safe shutdown or accident mitigation [USAR 9.3.4].

EGVO2O4 (not in a group)

This check valve must close to isolate the containment from the Component Cooling Water (CCW) system. This valve is considered a containment isolation valve for penetration P-74 [USAR Figure 6.2.4-1].

This valve opens to provide a flow path from the component cooling water system to the various equipment coolers inside containment during normal plant operating modes and emergency conditions [USAR 9.2.2]. The function of supplying cooling flow to the supported equipment is not required for safe shutdown or accident mitigation.

KAV02O4 (not in a group)

This check valve must close to isolate containment from the non-safety related instrument air system. This valve is considered a containment isolation valve for penetration P-30.

[USAR Figure 6.2.4-1]

This valve is open during normal operation to supply instrument air to the reactor building primarily for use in the operation of various valves. This function of supplying instrument air to the supported equipment is not required for safe shutdown or accident mitigation.

Julstificationl In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. Valves BBVOI118/0148/0178/0208 have the same design characteristics, are installed in the same application, and experience similar service conditions. The other Appendix J valves described in this justification are not in a group, but stand alone.

Revision Date: 9/02/15 Page 70 Pge7

IST Programn Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-02 (Continued)

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 114. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 114 also documents the maintenance history and industry review along with the failure modes expected for these valves.

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004, Appendix II, section 11-4000(b), Optimization of Condition Monitoring Activities. The Appendix J leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-02:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAK RATE TESTING Leak rate data trend - documented on a frequency in accordance with Appendix J Option B.

FLOW TESTING With the exception of BGVOI135,normal system operation satisfies flow testing. BGVOI135 will be forward exercised at the Option B frequency.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Comolance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 114 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 114 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 114 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 114 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15SPge7 Page 71

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-03 Valv Numer ystm Class Ctar EJ8730A EJ 2 C EJ8730B EJ 2 C Function These check valves must open to provide a flow path from the Residual Heat Removal (RHR) Pumps to the Reactor Coolant (RCS) System. These valves are located on the discharge header for their associated RHR Pump. Each valve isolates one train of RHR and must open to allow flow during the Injection and Recirculation phases of ECCS

[USAR 6.3.2].

These valves must close to prevent diverting Residual Heat Removal flow when the associated pump is secured but the opposite trains pump is running. The RHR System is designed to be a redundant (two train) system. [USAR 5.4.7] Therefore, one train of RHR could be required in an accident while the other train is secured or inoperable

,,M*sifictin In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, maintenance/testing history, and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 118. This change package documents the analysis performed to determine the groupings, specifies inservice testing and preventive maintenance activities, and identifies activity intervals and attributes for trending.

Change 118 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Revision Date: 9/02/1 5Pae7 Page72

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-03 (Continued)

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-03:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY ACOUSTIC MONIT'ORING Acoustically monitor the valive disc for exc'essive turbulence to determine ifthe valve disc is fluttering DISASSEMBLY AND Disassemble and examine the valve to inspect for worn, EXAMINATION loose, or deformed parts and verify the open and closed capability UT RESULTS Wall thickness will be monitored to establish the Corrosion life/margin of this valve. Ifthese measurements indicate a wall thickness less than 0.61 inches then further evaluation by Engineering is required In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Compliance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 118 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 118 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 118 documents the failure and maintenance history patterns for the subject Valves.
e. This Plan Basis and WCOP-02 Program Plan Change 118 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 73 Revision Date: 9/02/15S Date: 9/02/I Page 73

1ST ProgramPlan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-04 Valve Number System Class Cateaorv BB8949A BB 1 A/C BB8949B BB I NC BB8949C BB 1 A/C BB8949D BB 1 NC

,Functin Valves BB8949B/C are the Residual Heat Removal to Safety injection System Hot Leg Recirculation Outlet check valves. Valves BB8949A/D are the Safety injection System Hot Leg Recirculation Outlet check valves. These valves perform an open safety function to allow flow to the hot leg of the RCS during post loss of coolant accident cool-down. Additionally these valves perform a closed safety function as the primary hot leg RCS pressure boundary.

For valves BB8849A and 0, the accident condition flow rate is 250 gpm each. For valves BB8849B and C, the accident condition flow rate is 661 gpm each.

,,ustifiqation In accordance with ASME OM Code-2004 Edition, Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer:

to wcoP-02 Program Plan Change 120. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 120 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Revision Date: 9/02/15Pae7 Page74

1ST Program Plan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-04 (Continued)

Condition Monitoring Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with this valve group CVCM-04:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAKAGE RATE TESTING Leak rate data trend - documented once for each cycle.

FLOW TESTING Flow verification - documented once for each cycle.

NON-INTRUSIVE TESTING Periodic non-intrusive testing performed on a sampling basis to verify the open capability.

UT RESULTS (BB8949A only) This valve will be examined to determine minimum wall thickness during refuel 11, 13, and 15. After wall thickness and wear rates have been determined from the UT data and evaluated, the need for additional measures, if any, will be determined and incorporated into the

__________________________ appropriate procedures.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 120 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 120 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 120 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 120 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15Pae7 Page 75

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-05 Valve NumerSystemClass Ctar EM8926A EM 2 C EM8926B EM 2 C Functio These valves are the Safety Injection Pump Suction check valves. These valves perform an open safety function to allow flow to the Safety Injection pump suctions during the injection mode following a post Loss of Coolant Accident (LOCA). These valves perform a closed safety function to prevent back flow of highly contaminated water into the RWST during the post LOCA recirculation phase in the event that either BNHV8806A or BNHV8806B and EMHV8923A&B fail to close. When the RWST low level limit is reached, the suction of the EGGS is aligned to the containment sumps. This scenario could result in the transportation of failed fuel particles, if present, from the containment sump into the ECCS. Closure of these valves would ensure that the potentially highly contaminated water does not flow back to the RWST (which is a tank vented to atmosphere), thus preventing the release of radioactive material to the atmosphere.

Justifictin In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 123. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 123 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Revision Date: 9/02/15SPge7 Page 76

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-05 (Continued)

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities. The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-05:

ASSESSMENT TECHNIQUES: jTREND PARAMETER AND FREQUENCY LEAKAGE RATE TESTING Leak rate data trend - documented 100% of the group to be tested within a 4 refueling outage cycles.

FLOW TESTING Flow verification - documented once each quarter.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 123 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 123 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 123 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 123 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 77 Revision Date: 9/02/155 Date: 9/02/1 Page 77

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-06 Valve Number SvtmClass Ctar EPV0010 EP 1 A/C EPV0020 EP 1 A/C EPV0030 EP 1 A/C EPV0040 EP 1 A/C These valves are the Safety Injection to Accumulator Injection Line check valves. These valves perform an open safety function to allow flow from the Safety Injection pumps to the Reactor Coolant System loops following the initiation of a Safety Injection Signal.

The close safety function of these valves is to serve as the Reactor Coolant System pressure boundary to protect the EM system from RCS pressure.

Justiflcation In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 124. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 124 also documents the maintenance history and industry review along with the failure .

modes expected for this valve group.

C*ondition Monitoring Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities. The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-06:

Revision Date: 9/02/15 Page 78

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-06 (Continued)

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAKAGE RATE TESTING Leak rate data trend - documented once for each 'cycle....

FLOW TESTING Flow verification - documented once for each cycle.

NON-INTRUSIVE TESTING Periodic non-intrusive testing performed on a sampling

__________________________basis to verify the open capability.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, iSTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Comolance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 124 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 124 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 124 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 124 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15SPge7 Page 79

IST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-07 Va~lveumbe yteals Ctar EJ8958A EJ 2 C EJ8958B EJ 2 C Functin These valves are the Residual Heat Removal Pump Suction check valves. These valves perform an open safety function to allow flow from the RWST to the Residual Heat Removal pumps during the injection mode following a Loss of Coolant Accident (LOCA). The accident condition flow for these valves is 3860 gpm each. These valves perform a close safety function to prevent back flow of highly contaminated water into the RWST during normal cool-down and during the post-LOCA recirculation phase in the event BNHV8812A or BNHV8812B fail to close. When the RWST low level limit is reached, the suction of the EGOS is aligned to the containment sumps. This scenario could result in the transportation of failed fuel particles, if present, from the containment sump into the EGCS. Closure of these valves would ensure that the potentially highly contaminated water does not flow back to the RWST (which is a tank vented to atmosphere), thus preventing the release of radioactive material to the atmosphere.

In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 125. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 125 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Page 80 Revision Date: 9/02/15S Date: 9/02/1 Page 80

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-07 (Continued)

Condition Monitorina Activities The information in this section satisfies the requirements of the ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-07:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAKAGE RATE TESTING Leak rate data trend - documented 100% of the group* to be tested within 2 refueling outage cycles.

FLOW TESTING Flow verification - documented once each quarter.

In accordance with ASME OM Code ISTC-5222, iffor any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Complance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 125 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 125 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 125 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 125 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 81 Revision Date: 9/02/155 Date: 9/02/1 Page 81

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-08 Vaxlveumker SytmClass Ctar EJ8969A EJ 2 C EJ8969B EJ 2 C Function Valve EJ8969A is the RHR A to Centrifugal Charging Pumps Check Valve. Valve EJ8969B is the RHR B to SI Pumps Check Valve. These valves open to provide a flow path for water which has been taken from the Containment Sump, through the RHR Pumps and Heat Exchanger, to the suction of either the Centrifugal Charging Pumps or the Safety Injection Pumps (as required) during the recirculation phase following a Loss of Coolant Accident (LOCA).

Justifcain In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 126. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 126 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Page 82 Revision Date: 9/02/1 5 Date: 9/02/15 Page82

1ST Program Plan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-08 (Continued)

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-08:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY FLOW TESTING Flow verification - documented in accordance with

__________________________sampling plan.

RADIOGRAPHY Closure verification - documented in accordance with

__________________________sampling plan.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

(*muliance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 126 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 126 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 126 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 126 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/1 5Pae8 Page 83

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-09 Valve NumerSystemClass Ctar EP8956A EP 1 A/C EP8956B EP 1 A/C EP8956C EP I A/C EP8956D EP 1 A/C Function These valves are the Accumulator Tank Discharge Check Valves. The open safety function of these valves is to provide a flow path for the discharge of the contents of the SI Accumulator TEP01A/B/C/D into the RCS in the event of a decrease in pressure (e.g., a LOCA). The closed safety function is to act as an RCS pressure boundary valve preventing loss of RCS inventory and over-pressurization of the SI Accumulator.

Justificat~ion In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan was written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 127. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 127 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Condition Monitorina Activities The information in this section satisfies the requirements of the ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-09:

Revision Date: 9/02/15 Page 84

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-09 (Continued)

SASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY LEAKAGE RATE TESTING Leak rate data trend - documented once for each cycle.

FLOW TESTING Flow verification - documented once for each cycle.

In accordance with ASME OM Code ISTC-5222, iffor any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 127 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 127 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 127 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 127 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/1 5Pae8 Page 85

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-10 ValveNumbar SytmCasaeor BGV0591 BG 2 C FuDncto This check valve must open to provide a flow path from the Centrifugal Charging Pumps to the reactor coolant pumps seals following a safety injection actuation [UFSAR 9.3.4].

This flow path provides a source of borated water to the RCS via the reactor coolant pump labyrinth seals during accident conditions. During normal power operation this valve provides a flow path from the normal charging to the reactor coolant pump seals.

This valve will also close to prevent reverse flow from the reactor coolant pump seals in the event of a seal failure, however downstream check valves are relied upon for this closure function .... .

~Jusiicto In accordance with ASME OM Code Appendix II, this valve is included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan was written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities.

Analysis Reference For the Condition Monitoring analysis and justification details for this valve, refer to WCOP-02 Program Plan Change 133. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 133 also documents the maintenance history and industry review along with the failure modes expected for this valve.

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with BGV0591:

Revision Date: 9/02/15SPge8 Page 86

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-10 (Continued)

SASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY FLOW TESTING Flow verification - documented during normal operation.

RADIOGRAPHY Closure verification - documented every other cycle.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this valve group is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve.

Comlince This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 133 documents the date and basis for inclusion of this valve in condition monitoring.
c. WCOP-02 Program Plan Change 133 documents the analysis and basis for the check valve condition monitoring program for this valve.
d. WCOP-02 Program Plan Change 133 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 133 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/1 5Pae8 Page 87

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-11I Valve Number System Class Cateaorv ALV0001 AL 3 C ALV0030 AL 3 C ALV0042 AL 3 C ALV0054 AL 3 C ALV0057 AL 2 C ALV0062 AL 2 C ALV0067 AL 2 C ALV0072 AL 2 C ALV0161 AL 3 C FCV0001 FC 2 C FCV0002 FC 2 C FCV0024 FC 2 C FCV0025 FC 2 C Function ALV0001 (not in a group)

Valve ALV0001 is the Turbine Driven Auxiliary Feed Water (TDAFW) pump suction l i n e check valve. The Condensate Storage Tank is the source of purified water for the Auxiliary Feed Water system, but is not the source credited in the safety analysis. The Essential Service Water (EF) System is credited as the safety- related water source for the Auxiliary Feed Water system with it's supply of raw lake water. As the injection of raw lake water into the feedwater system has the potential of resulting in the degradation of the Steam Generator tubes, valve ALV0001 performs a close function so as to isolate the Condensate Storage Tank from the potential addition of lake water from the EF System, and performs a closed safety function so as to not allow flow from the ESW system to be diverted from the Aux Feed Water Pump to the condensate storage system. ALVO001 performs an open function to allow the preferred source of water to be injected into the feedwater system for long term reliability of the Steam Generators. While the open function is important, it is not considered a safety- related function as described under the ASME OM Code scope statement. This valve does not have seat leakage limits.

ALV0030; ALV0042 (Grouped)

ALV0030 and ALV0042 are the Motor-Driven Auxiliary Feedwater Pumps PAL01 B and PAL01A discharge check valves, respectively. These valves have an open safety function to permit flow to the Steam Generators for normal and emergency cool down. These valves have no closed safety function as described under the ASME OM Code scope statement and do not perform an important closing function. These valves do not have seat leakage limits.

Page 88 Revision Date: 9/02/15S Date: 9/02/I Page 88

IST ProgramPlan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-11 (Continued)

ALV0054 (not in a group)

Valve ALV0054 is the TDAFW pump discharge check valve. This valve performs an open safety function to allow injection of Auxiliary Feedwater from the TDAFW pump to the Steam Generators for normal and emergency cool down. This valve has no close safety function as described under the ASME OM Code scope statement and does not perform an important close function. This valve does not have seat leakage limits.

ALV0057/62/67/72 (grouped)

Valves ALVO057/62/67/72 perform an open safety function to allow injection of Auxiliary Feedwater from the TDAFW pump to each Steam Generator. These valves have no close safety function as described under the ASME OM Code scope statement and do not perform an important close function. These valves do not have seat leakage limits.

Valve ALV0161 (not in a group)

Valve ALV016I is a Turbine Driven Auxiliary Feed Water (TDAFW) pump Condensate Storage Tank (CST) suction check valve. The CST is the source of purified water for the AFW system, but is not credited in the safety analysis. The Essential Service Water (EF)

System is credited as the safety related water source for the AFW system with it's supply of raw lake water. Valve ALV016I performs a closed safety function so as to prevent backflow from the TDAFWP standby tanks, TAL01A, TALO01B and TALO01C to the CST.

ALV0161 performs an open function to allow the preferred source of water to be injected into the feedwater system for long term reliability of the Steam Generators. While the open function in important, it is not considered a safety related function as described under the ASME OM Code scope statement (ISTA-1 100). This valve does not have seat leakage limits.

FCVO00112124/25 (grouped)

Valves FCV0001 ;2;24;25 perform an open function to provide a flow path for steam to be used as the motive force in driving the turbine of the Auxiliary Feedwater Pump, PAL02, for both normal and emergency cool down conditions. Valves FCV0001 and FCV0024 are installed in series in the flow path from Steam Generator EBB01 B. Valves FCV0002 and FCV0025 are installed in series in the flow path from Steam Generator EBB01C.

The series configuration was designed to mitigate the consequences of a single valve failure to close in Steam Generator failure event scenarios. In the event either EBB01B or EBB01C is faulted or the applicable steam line has failed, the check valves from the subject line will perform a closed safety function to isolate and maintain steam inventory in the functioning Steam Generator. These valves do not have seat leakage limits due to the series configuration.

In summary, the safety significant functions of ALV0001, ALV0161, and FCV0001, 2, 24, 25 are to both open and close. The safety significant functions of ALV0054, 57, 62, 67, 72 are to open Revision Date: 9/02/]15Pge8 Page 89

/ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-11I (Continued)

Justification In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history, and planned condition monitoring activities. This plan was written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. The groupings of check valves in this justification have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 138 and 168. This change documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 138 also documents the maintenance history and industry review along with the failure modes expected for this valve group. A change in system performance resulted in the ability to test ALV0054 more often. Refer to WCOP-02 change 154 for details about the change in test methods for ALV0054.

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-1 1:

ASSESSMENT TECHNIQUES: TREND PARAMETER AND FREQUENCY FLOW TESTING Exercised during quarterly pump testing at minimum flow conditions and full flow during refueling outages.

DISASSEMBLY AND Sample disassembly and examination to inspect for EXAMINATION worn, loose, or deformed parts and to verify the open and

_________________________closed capability (FCV000 1/2/24/25).

RADIOGRAPHY Closed position verification on a refueling outage frequency for valves which cannot be readily verified

_________________________closed by other practical means (ALV0030;42)

Page 90 9/02/IS Date: 9/02/15 Revision Date: Page90

1ST ProgramPlan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-11I (Continued)

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 138 and 168 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 138 and 168 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 138 and 168 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 138 and 168 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 91 Revision Revision Date: 9/02/155 Date. 9/02/1 Page91

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-12 Valve NumerSystemClass Ctar GSV0054 GS 2 C GSV0059 GS 2 C These check valves must close to isolate the post-accident sampling system from the hydrogen analyzer. Valve closure ensures that during post LOCA conditions, samples may be returned to the containment atmosphere [USAR 6.2.5]. These valves are not considered a containment isolation valves since downstream valves, GSHV0008/9 are relied upon to isolate containment [USAR Figure 6.2.4-1].

These valves open to provide a return flow path from the post- accident sampling system to the containment atmosphere. This function is not required for safe shutdown or accident mitigation since the post-accident sampling system is not required.

In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analvsis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 145. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 145 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Cogndition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The following details the condition monitoring activities and their implementation frequencies associated with valve group CVCM-12:

Revision Date: 9/02/15 Page92

1ST ProgramPlan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-12 (Continued) rASSESSMENT DISASSEMBL'Y AND TECHNIQUES: [REND PARAMETER AND FREQUENCY

... Sample disassembly and examination to inspect for IEXAMINATION worn, loose, or deformed parts and to verify the I. _______________________ open and closed capability.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Compliance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 145 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 145 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 145 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 145 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15SPge9 Page 93

IST ProgramPlan Wolf Creek Generating Station Check Valve Condition Monitoring Plan Basis CVCM-13 Valve Nmber Ss;mClass Cateaorv EMV0001 EM 1 A/C EMV0002 EP 1 A/C EMV0003 EP 1 A/C EMV0004 EP 1 A/C These check valves are the Safety Injection System (SIS) to RCS Hot Leg check valves.

These valves perform an open safety function to provide a flow path to the hot leg of the RCS following a loss of coolant accident. These valves perform a closed safety function as the secondary hot leg RCS pressure boundary isolation.

In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 122. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities, and identify activity intervals and attributes for trending. Change 122 also documents the maintenance history and industry review along with the failure modes expected for this valve group . ..

C.ondition Monitoring Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities. The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with this valve group CVCM-13:

Revision Date: 9/02/15SPge9 Page 94

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-13 (Continued)

The accident condition flow for these valves is 250 gpm each. The hot leg injection flow path is rarely used during normal shutdown conditions; therefore the majority of flow through these valves has been generated by the Inservice Testing Program.

Because of the infrequent use of these flow paths, it would be very difficult to determine if abnormal conditions exist under normal operating conditions.

A credible failure mode for all of these valves is a failure to seat. A periodic seat leakage test is sufficient to determine the condition of the valves with respect to their ability to perform their intended safety functions. The test frequency of this periodic test will be every refueling. This is within the requirements of the test frequency limitations.

STS CV-1 04 and the procedures referenced therein will be used to ensure that these valves are flowed through every refueling cycle to satisfy the bi-directional flow restrictions of the ASME OM Code. A periodic non-intrusive test will be performed on one of the four valves every refueling outage to demonstrate open function capability.

This additional flow verification is being performed to compensate for the fact that the hot leg flow paths are rarely used and flow originates from divergent sources. The sampling plan and frequency for each valve is identified in STS CV-1 04.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-351 0, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 122 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 122 documents the analysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 122 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 122 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Revision Date: 9/02/15SPge9 Page 95

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-14 ValveNumber Systm CasCta BB8948A BB 1 A/C BB8948B BB I A/C BB8948C BB 1 A/C BB8948D BB 1 A/C Function Valves BB8948A/B/C/D are the SI/Accumulator Loop Check Valves. The open safety function of these valves is to provide a flow path to allow for the discharge of the contents of the SI Accumulator TEP01A/B/C/D into the RCS in the event of a sudden decrease in pressure (e.g., a LOCA). This is also the discharge flow path from the Safety Injection and Residual Heat Removal cold leg injection. The closed safety function is to act as an RCS pressure boundary valve preventing loss of RCS inventory and over-pressurization of the SI Accumulator, Safety Injection System, and Residual Heat Removal (RHR) System.

In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference, For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 128. This change package documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending. Change 128 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Condition Monitorina Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with this valve group CVCM-14:

Revision Date: 9/02/15 Page 96

IST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-14 (Continued)

As these valves receive the highest amount of accident flow from their respective Accumulator, which varies throughout their discharge, they do not have a constant accident condition flow. Instead operating acceptably is determined through the measurement of L/D (equivalently a measurement of line friction). The open acceptance criteria for these valves is an L/D of less than 600. The leak test acceptance criteria is less than or equal to 5.0 GPM per Technical Specification SR 3.4.14.1. Flow through these valves is generated primarily by the RHR system during shutdown.

A credible failure mode for all of these valves is a failure to seat. The Technical Specification seat leakage test is sufficient to determine the condition of the valves with respect to their ability to perform their intended safety functions. The frequency of this periodic test will be every refueling. This is within the requirements of the ASME OM Code test frequency limitations.

STS EP-210 and the procedures referenced therein will be used to ensure that these valves are flowed through every refueling cycle to satisfy the bi-directional flow restrictions. The flow in STS EP-210 will be sufficient to demonstrate that the valve opens prior to leak testing.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

Comoliance This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

a. This Plan Basis documents the valves included in the group for Condition Monitoring
b. WCOP-02 Program Plan Change 128 documents the date and basis for inclusion of these valves in condition monitoring.
c. WCOP-02 Program Plan Change 128 documents the ana~lysis and basis for the check valve condition monitoring program for these valves.
d. WCOP-02 Program Plan Change 128 documents the failure and maintenance history patterns for the subject valves.
e. This Plan Basis and WCOP-02 Program Plan Change 128 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 97 Revision Date: 9/02/i 5 Date: 9/02/15 Page 97

1ST"Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-15 Valve NumerSystemClass Ctar EJ8841A EJ 1 A/C EJ8841B EJ 1 A/C Functin Valves EJ8841A&B are the Residual Heat Removal (RHR) to Safety Injection System (SIS) Hot Leg Recirculation Outlet check valves. These valves perform an open safety function to allow flow from RHR Pump and RHR HX to the hot leg of the RCS post LOCA in order to satisfy cool-down requirements. These valves perform a closed safety function to protect the RHR system from RCS pressure.

Justf~ifcation In accordance with ASME OM Code Appendix II, these valves are included in the station Check Valve Condition Monitoring Program. The following describes the basis for grouping the valves, failure analysis, 'maintenance and testing history', and planned condition monitoring activities. This plan is written to meet the requirements of Appendix II of the ASME OM Code 2004 Edition.

The intended purpose of the condition monitoring activities for the subject valves is the optimization of testing, examination, and preventive maintenance activities. An analysis of the test and maintenance history has determined that the grouping of these valves is justified. This group of check valves have the same design characteristics, are installed in the same application, and experience similar service conditions.

Analysis Reference For the Condition Monitoring analysis and justification details for this group of valves, refer to WCOP-02 Program Plan Change 119. This change procedure documents the analysis performed to determine the groupings, specify inservice testing and preventive maintenance activities and identify activity intervals and attributes for trending.

Change 119 also documents the maintenance history and industry review along with the failure modes expected for this valve group.

Condition Monitorinq Activities The information in this section satisfies the requirements of ASME OM Code-2004 Edition, Appendix II section 11-4000(b), Optimization of Condition Monitoring Activities.

The Technical Specification leakage test strategy is proven in industry to be very effective in identifying the credible failure mode of excessive seat leakage. The following details the condition monitoring activities and their implementation frequencies associated with this valve group CVCM-15:

Page 98 Revision Date.

Revision 9/02/15 Date: 9/02/15 Page 98

1ST Program Plan Wolf Creek GeneratingStation Check Valve Condition Monitoring Plan Basis CVCM-15 (Continued)

A credible failure mode for these valves is a failure to seat. A periodic seat leakage test is sufficient to determine the condition of the valves with respect to their ability to perform their intended safety functions. The frequency of this periodic test will be every refueling. These valves normally do not see flow unless they are tested. STS CV-1 02 and the procedures referenced therein will be used to ensure that these valves are flowed through every refueling cycle to satisfy the bi-directional flow restrictions.

In accordance with ASME OM Code ISTC-5222, if for any reason the condition monitoring plans for this group of valves is discontinued, then the testing or examination requirements of paragraphs, ISTC-3510, ISTC-3520, ISTC-3530, ISTC-3550, and ISTC-5221 shall apply to the applicable valve(s).

This plan meets the documentation requirements of Appendix II of the ASME OM Code as follows:

f. This Plan Basis documents the valves included in the group for Condition Monitoring
g. WCOP-02 Program Plan Change 119 documents the date and basis for inclusion of these valves in condition monitoring.
h. WCOP-02 Program Plan Change 119 documents the analysis and basis for the check valve condition monitoring program for these valves.
i. WCOP-02 Program Plan Change 119 documents the failure and maintenance history patterns for the subject valves.
j. This Plan Basis and WCOP-02 Program Plan Change 119 document the condition monitoring activities, attributes and bases for the intervals for each of the valves included in this Plan Basis.

Page 99 Revision Date.'

Revision 9/02/155 Date: 9/02/1 Page 99

IST ProgramPlan Wolf Creek GeneratingStation ATTACHMENT 12 TECHNICAL POSITION INDEX Technical Description Position No.

TP-01 Bi-directional Testing of Check Valves TP-02 Testing of Power Operated Valves with Both Active and Passive Safety TP-03 Passive Valves without Test Requirements TP-04 Fail Safe Testing of Valves TP-05 Classification of Skid Mounted Components TP-06 Not Used TP-07 Method for Establishing Acceptance Criteria for Power Operated Valves TP-08 Check Valves in Regular Use TP-09 Categorization of IST Pumps (Group A or B)

TP-1 0 Check Valves Tested Using Disassembly and Examination TP-11I Motor Operated Valve OMN-1 Code Case Position TP-12 Classification of Check Valves KCV0478 and SJV0111I as Passive Page 100 Date: 9/02/15 Revision Date: 9/02/15 Page 1 O0

IST Program Plan Wolf Creek GeneratingStation ATTACHMENT 13 TECHNICAL POSITIONS Revision Date: 9/02/1 5 Pg 101 Page 0

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-01 (Page 1 of 3)

Bi-directional Test;ina of Check Valves with Non-Safety Positions, Purose The purpose of this Technical Position is to establish the station position for the verification of the non-safety direction exercise testing of check valves by normal plant operations.

Auliabilitv This Technical Position is applicable to those valves which are included in the Inservice Testing Program that are required to be exercise tested in their non-safety related direction of flow. This position applies to those check valves required to be tested in accordance with Subsection ISTC (ASME OM Code 2004 Edition through 2006 Addenda) and Appendix I1. This Technical Position does not apply to testing of the safety function (direction) of check valves included in the Inservice Testing Program.

Backaround The ASME OM Code 2004 through 2006 Addenda section ISTC-3550, "Valves in Regular Use", states:

"Valves that operate in the course of plant operation at a frequency that would satisfy the exercising requirements of this Subsection need not be additionally exercised, provided that the observations otherwise required for testing are made and analyzed during such operation and recorded in the plant record at intervals no greater than specified in ISTC-351 0."

Section ISTC-3510 requires that check valves shall be exercised nominally every 3 months with exceptions (for extended periods) referenced. Section ISTC-5221(a)(2) states:

"Check valves that have a safety function in only the open direction shall be exercised by initiating flow and observing that the obturator has traveled to either the full open position or to the position required to perform its intended function(s)

(see ISTA-1 100), and verify closure."

Section ISTC-5221(a)(3) states:

"Check valves that have a safety function in only the close direction shall be exercised by initiating flow and observing that the obturator has traveled [to] at least the partially open position, 3 and verify that on cessation or reversal of flow, the obturator has traveled to the seat."

Page 102 Revision Date: 9/02/15S Date: 9/02/1 Page 102

1ST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-01 (Page 2 of 3)

"3The partially open position should correspond to the normal or expected system flow."

Normal and/or expected system flow may vary with plant configuration and alignment.

Wolf Creek Nuclear Plant Operations staff is trained in recognizing normal plant conditions. For check valves that have a non-safety function in the open position, Operator judgment has been deemed acceptable in determining whether or not the normal or expected flow rates for plant operation has been obtained. For check valves that have a non-safety related function in the closed position, Operator judgment is also deemed acceptable in determining whether or not flow has occurred at a normal or expected flow rate, in order to cause obturator travel.

Wolf Creek Generating Station will verify the non-safety position of check valves included in the Inservice Testing Program using the plant surveillance program. In lieu of a dedicated surveillance to perform the non-safety direction testing, the following alternate verifications may be performed as follows:

1. An appropriate means shall be determined which establishes the method for determining the open/closed non-safety function of the check valve during normal operations. The position determination may be by direct indicator, or by other positive means such as changes in system pressure, flow rate, level, temperature, seat leakage, etc. This determination shall be documented in the respective Condition Monitoring Plan for the specific check valve group. For check valves included in the Inservice Testing Program and not included in the Condition Monitoring Plan, this determination shall be documented in the IST Bases Document for the specific check valve group.
2. Observation and analysis of plant processes that a check valve is satisfying its non-safety direction function may b e used. For an example, consider a check valve that has a safety function only in the closed direction and normally provides a flow path to maintain plant operations. If this check valve does not open to pass flow when required, an alarm or indication would identify a problem to the operator. The operator would respond by taking the appropriate actions. A Condition Report would then be generated for the abnormal plant condition which would identify the check valve failure.
3. Observation and analysis of plant logs and other records may be an acceptable method for verifying a check valves non-safety direction function verification during normal plant operations.

Page 103 Date: 9/02/IS Revision Date: 9/02/15 Page 103

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-01 (Page 3 of 3)

The open/closed non-safety function shall be recorded at a frequency required by ISTC-3510, nominally every 3 months, (with exceptions as allowed), in plant records such as Wolf Creek Generating Station Operating Logs, Electronic Rounds, chart recorders, automated data loggers, etc. The safety function direction testing requires a Quality Record in the form of a surveillance test. Records as indicated above in 1 through 3 are satisfactory for the non-safety direction testing. A condition action report shall be generated for any issues regarding check valve operability.

This Technical Position establishes the acceptability of the methods used in determining the ability of a valve to satisfy its non-safety function. Through normal plant system operation and Operator actions, a valves non-safety function is verified through either observation or analysis of plant records and logs. Additionally, the recording of parameters which demonstrate valve position is satisfied at a frequency in accordance with ISTC-351 0. These actions collectively demonstrate the non-safety position of Inservice Testing Program check valves in regular use as required by ISTC-3550.

Page 104 Revision Date: 9/02/15 Date: 9/02/15 Page 104

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-02 (Page 1 of 2)

Testing of Power Operated Valves with Both Active and Passive Safety Functions Pumose The purpose of this Technical Position is to establish the testing requirements for power operated valves which have both an active and passive safety function.

This Technical Position is applicable to power operated valves which have an active safety function in one direction while performing a passive safety function in the other direction.

Backaround The IST Program requires valves to be exercised to the position(s) required to fulfill their safety function(s). In addition, valves with remote position indication shall have their position indication verified. The Code does not restrict position indication to active valves.

Several valves included in the plant are designed to perform passive safety functions during accident conditions, and then based on plant accident response, are designed to change positions to perform another (active) function. Once in their final position, there exist no conditions (for certain valves) in which they would be required to be placed in their original passive position.

These valves are typically emergency core cooling system valves, which require changing position during different phases of the accident. After the original passive safety function (e.g. provide flow path) is performed, the valves are repositioned to perform the active safety function (e.g. provide containment isolation or to allow injection from another water source). These valves are not required to return to their original position.

Power operated valves with passive functions. in one direction and active in the other, will be exercised and stroke timed to only their active position. If these valves have position indication, the position indication verification will include verification of both positions.

Page lOS Revision Date: 9/02/15S Date: 9/02/1 Page 105

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-O2 (Page 2 of 2)

Justification, Code Interpretation 01-02 (response to inquiry OMI 99-07) addressed this issue, and is presented below:

Question: If a valve has safety functions in both the open and closed positions and is maintained in one of these positions, but is only required to move from the initial position to the other and is not required to return to the initial position, is stroke timing in both directions required?

Reply: No Revision Date: 9/02/1 5 Pg 0 Page 106

1ST Program Plan Wolf Creek Generating Station Technical Position TP-03 (Page 1 of 1)

Passive Valves Without Test Requirements PuLose The purpose of this Technical Position is to establish the station position for valves which perform a passive safety function. However, no testing is required in accordance with ISTC.

Annlicabilitv This Technical Position is applicable to valves that perform a passive function in accordance with ISTC-2000 and do not have inservice testing requirements per Table ISTC-3500-1. This position is typical of Category B, passive valves that do not have position indication.

'An example is a manual valve which must remain in its normal position during an accident, to perform its intended function.'

Typically, manual valves that perform a safety function are locked in their safety position and administratively controlled by Wolf Creek procedures. These valves would be considered passive. If they do not have remote position indicating systems and categorized as B, they would not be subjected to any test requirements in accordance with Table ISTC-3500-1.

Position The Wolf Creek Generating Station Inservice Testing Program, Valve Tables - Attachment 15, will not list valves that meet the following criteria.

  • The valve is categorized B (seat leakage in the closed position is inconsequential for fulfillment of the valves' required function(s)) in accordance with ISTC-1 300.
  • The valve is considered passive (valve maintains obturator position and is not required to change obturator position to accomplish the required function(s) in accordance with ISTA-2000.
  • The valve does not have a remote position indicating system which detects and indicates valve position.

Valves that meet this position will not be listed in the Wolf Creek Generating Station Inservice Testing Program, Valve Tables - Attachment 15, however, the basis for categorization and consideration of active/passive functions shall be documented in the IST Program Basis Document.

Revision Date: 9/02/15SPg 0 Page 107

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-04 (Page 1 of 1)

Fail Sate Testing of Valves

purpose, The purpose of this Technical Position is to establish the station position for fail safe testing of valves in conjunction with stroke time exercising or position indication testing.

AnDlicabilitv This Technical Position is applicable to valves with fail-safe actuators required to be tested in accordance with ISTC-3560.

Bakaround The ASME OM Code 2004 through 2006 Addenda section ISTC-3560 requires; "Valves with fail-safe actuators shall be tested by observing the operation of the actuator upon loss of valve actuating power in accordance with the exercising frequency of ISTC-351 0."

Section ISTC-351 0 states; "Active Category A, Category B, and Category C check valves shall be exercised nominally every 3 months..."

In cases where the valve operator moves the valve to the open or closed position following de-energizing the operator electrically, by venting air, or both, the resultant valve exercise will satisfy the fail safe test requirements and an additional test specific for fail safe testing will not be performed.

Wolf Creek Generating Station will also use remote position indication as applicable to verify proper fail-safe operation, provided that the indication system for the valve is periodically verified in accordance with ISTC-3700.

Justification Fail Safe Testing tests the ability of the fail safe mechanism of the valves to go to its fail safe condition. Whether or not the actuation of this fail safe mechanism is due to Operator Action of failure of either the valves air or electric power source, the resultant action of the valve will be the same. Therefore, the verification of a valve fail safe ability can be taken credit for with the performance of either a stroke time exercising or position indication test.

Revision Date: 9/02/15Pae 0 Page 108

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-05 (Page 1 of 3)

Classification of Skid Mounted Components Puroose The purpose of this technical position is to clarify requirements for classification of various skid mounted components, and to clarify the testing requirements of these components.

Bakarou~nd The ASME Code allows classification of some components as skid mounted when their satisfactory operation is demonstrated by the satisfactory performance of the associated major components. Testing of the major component is sufficient to satisfy Inservice Testing requirements for skid mounted components. In section 3.4 of NUREG 1482 Rev 2, the NRC supports the designation of components as skid mounted:

"The staff has determined that the testing of the major component is an acceptable means for verifying the operational readiness of the skid-mounted and component subassemblies if the licensee documents this approach in the 1ST Program. This is acceptable for both Code class components and non-Code class components tested and tracked by the 1ST Program."

In the 1996a addenda to the ASME OM Code (endorsed by 10CFR50.55(a) in October 2000), the term skid-mounted was clarified by the addition of ISTA paragraph 1.7:

ISTA 1.7 Definitions Skid mounted components and component sub-assemblies - components integral to or that support operation of major components, even though these components may not be located directly on the skid. In general, these components are supplied by the manufacturer of the major component. Examples include: diesel skid-mounted fuel oil pumps and valves, steam admission and trip throttle valves for high-pressure coolant injection or Auxiliary Feedwater turbine-driven pumps, and solenoid-operated valve provided to control the air-operated valve.

Revision Date: 9/02/15 Pg 0 Page 109

IST Program Plan Wolf Creek Generating Station Technical Position TP-05 (Page 2 of 3)

This definition was further clarified in later Editions of the OM Code-2004:

ISTA-2000 DEFI NITIONS Skid mounted pumps and valves - pumps and valves integral to or that support operation of major components, even though these pumps and valves may not be located directly on the skid. In general, these pumps and valves are supplied by the manufacturer of the major component. Examples include:

(a) diesel fuel oil pumps and valves; (b) steam admission and trip throttle valves for high-pressure coolant injection pumps; (c) steam admission and trip throttle valves for Auxiliary Feedwater turbine driven pumps; (d) solenoid-operated valves provided to control an air-operated valve.

Additionally the Subsections pertaining to pumps (ISTB) and valves (ISTC) includes exclusions/exemptions for skid mounted components; ISTB-1 200(c) Exclusions Skid-mounted pumps that are tested as part of the major component and are justified by the Owner to be adequately tested.

ISTC-1 200 Exemptions Skid-mounted valves are excluded from this Subsection provided they are tested as part of the major component and are justified by the Owner to be adequately tested.

Position The 2004 ASME OM Code definition of skid mounted will be used for classification of components in the Wolf Creek Generating Station Inservice Testing Program. In addition, for a component to be considered skid mounted:

  • The major component associated with the skid mounted component must be surveillance tested at a frequency sufficient to meet ASME Code test frequency for the skid mounted component.
  • Satisfactory operation of the skid mounted component must be demonstrated by satisfactory operation of the major component.

The 1ST Bases Document should describe the bases for classifying a component as skid mounted, and the IST Program Plan should reference this technical position for the component.

Revision Date: 9/02/15SPg 1 Page 110

1ST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-05 (Page 3 of 3)

Jutiictin Recognition and classification of components as skid mounted eliminates the need for the redundant testing of the sub component(s) as the testing of major (parent) component satisfactory demonstrates operation of the "skid mounted" component(s).

Page 111 Revision Date: 9/02/15S Date: 9/02/I Page 111

1ST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-06 Not Used Page 112 Revision Date.

Revision 9/02/15S Date: 9/02/1 Page 112

IST ProgramPlan Wolf Creek Generating Station Technical Position TP-07 (Page 1 of 2)

Method for Establishing Acceptance Criteria for Power Operated Valves The purpose of this Technical Position is to establish the station position for establishing the stroke time acceptance criteria for power operated valves, including the Limiting Stroke time.

Power Operated Valves Requiring Stroke Time Testing Bac;kqround The 1ST Program requires that a valves stroke time reference value be established in accordance with ASME OM Code 2004 through 2006 Addenda section ISTC-3300. In accordance with the definition in ISTA-2000, reference values are defined as follows:

"one or more values of parameters as measured or determined when the equipment is known to be operating acceptably."

Acceptable ranges are then determined based on these reference values in accordance with ISTC-51 14 for Power Operated Relief Valves, ISTC-51 32 for Pneumatically Operated Valves, ISTC-5142 for Hydraulically Operated Valves, and ISTC-5152 for Solenoid Operated Valves.

In accordance with the Valve Stroke Testing requirements for the various operator types, the limiting value(s) for full-stroke time of each valve shall be specified by the Owner.

Subsection ISTC does not provide specific guidance on determining the limiting value(s).

In accordance with NRC Generic Letter 89-04, "Guidance on Developing Acceptable Inservice Testing Programs"

"...the limiting value should be a reasonable deviation from this reference stroke time based on the valve size, valve type, and actuator type. The deviation should not be so restrictive that it results in a valve being declared inoperable due to reasonable stroke time variations. However, the deviation used to establish the limit should be such that corrective action would be taken for a valve that may not perform its intended function."

When the calculated limiting value for a full-stroke is greater than a Technical Specification (TS) or safety analysis limit, the TS or safety analysis limit should be used as the limiting value of full-stroke time.

Revision Date: 9/02/15SPg 1 Page 113

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-07 (Page 2 of 2)

Position Wolf Creek Generating Station will use Table TP-07-1 to establish Acceptable Ranges in accordance with ISTC-51 14 for Power Operated Relief Valves, ISTC-5132 for Pneumatically Operated Valves, ISTC-5142 for Hydraulically Operated Valves, and ISTC-5152 for Solenoid Operated Valves. Table TP-07-l will also be used as general guidance to establish the Limiting Value(s) for power- operated valves.

Establishment of Acceptable Ranges and Limiting Value(s) will be as follows:

  • TRef is the reference value in seconds of a valve when it is known to be operating acceptably o Reference values may be rounded off to the nearest tenth of a second.
  • Acceptable Ranges may be rounded off to the nearest tenth of a second

- Calculated 1ST Limiting Values may be rounded off to the nearest whole number.

Standard rounding techniques are used when rounding (e.g., 10.45 rounds to 10.5, and 10.44 rounds to 10.4).

  • The most conservative limiting value between the 1ST calculated limit (as determined from Table TP-07-1), UFSAR limit, or Technical Specification limit should be used as the Maximum/Limiting stroke time. Any deviations from this criteria will be evaluated.
  • When a valve or its control system has been replace, repaired, or has undergone maintenance 1 that could affect the valve's performance, a new reference value shall be determined or the previous value reconfirmed by an inservice test run before the valve is returned to service, or immediately if the valve had not been removed from service.

Table TP-07-1 Reference Stroke Acceptable Range Limiting Stroke Time Time TRef > 10.0 0. 7 5TRef - 1.2 5TRef 1.50TRef TRef < 10.0

.................. ........... O.5-o-T-R f- -l-. OT- f O-T 7............. . ....

27.........-

TRef < 2.0 _12.0 2.0_______

1 Examples of maintenance included the adjustment of stem packing, limit switches, or control system valves, as well as either the removal of the bonnet, stem assembly, actuator, obturator, or control system components.

Revision Date: 9/02/15 Pg 1 Page 114

1ST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-08 (Page 1 of 2)

Check Valves in Regular Use Purpose The purpose of this Technical Position is to establish the station position for check valves that are in regular use during normal plant operations.

Applicability This Technical Position is applicable to check valves that are capable of being demonstrated to be open during routine operations.

Backround The ASME OM Code 2004 through 2006 Addenda section ISTC-3550, "Valves in Regular Use", states:

'Valves that operate in the course of plant operation at a frequency that would satisfy the exercising requirements of this Subsection need not be additionally exercised, provided that the observations otherwise required for testing are made and analyzed during such operation and recorded in the plant record at intervals no greater than specified in ISTC-351 0."

Section ISTC-351 0 requires that check valves shall be exercised nominally every 3 months with exceptions (for extended periods) referenced.

Normal and/or expected system flow may vary with plant configuration and alignment.

The open "safety function" of a check valve typically requires a specified design accident flow rate. For these subject valves, the normal system flow is above the design accident flow rates. Since the Wolf Creek Generating Station Operations staff is trained so as to be able to recognize normal plant conditions, Operator judgment has been deemed acceptable for the purpose of determining check valve open demonstration by observing either normal or expected flow rates for the plant operating condition.

Position Wolf Creek Generating Station will verify the open position of these subject check valves by observing plant logs, computer systems, strip chart recorders, etc., during normal plant operations. The open/closed safety function shall be recorded at a frequency required by ISTC-3510, nominally every 3 months, (with exceptions as provided), in plant records such as Wolf Creek Generating Station Operating Logs, Electronic Rounds, chart recorders, automated data loggers, etc.

Revision Date: 9/02/1 5 Pg 1 Page 115

1ST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-08 (Page 2 of 2)

Justification Normal plant systems operation and operator actions provide for the observations and analysis that these subject valves are capable of satisfying their open safety function.

Additionally, the recording of parameters which demonstrate valve position is satisfied at a frequency in accordance with ISTC-3510. These actions collectively demonstrate the open safety function of Inservice Testing Program check valves in regular use as required by ISTC-3550.

Revision Date: 9/02/15Pae 1 Page 116

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-09 (Page 1 of 2)

Categorization of IST Pumps (Group A or B)

Position Wolf Creek Generating Station has categorized the pumps required to be included in the lnservice Testing Program as either Group A or B in accordance with the requirements of ISTB-1 300 as defined in ISTB-2000.

Group A pumps are pumps that are operated continuously or routinely during normal operation, cold shutdown, or refueling operations. The following pumps are categorized as Group A pumps at Wolf Creek Nuclear Operating Corporation:

Pump Number Class Group Type Function PBGO2A 3 A Centrifugal Boric Acid Transfer PBG02B 3 A Centrifugal Boric Acid Transfer PEG01A 3 A Centrifugal Component Cooling PEG01 B 3 A Centrifugal Component Cooling PEG01 C 3 A Centrifugal Component Cooling PEG01D0 3 A Centrifugal Component Cooling PEJ01A 2 A Centrifugal Residual Heat Removal PEJ01B 2 A Centrifugal Residual Heat Removal PEC01A 3 A Centrifugal Fuel Pool Cooling PEC01 B 3 A Centrifugal Fuel Pool Cooling Group B pumps are those pumps in standby systems that are not operated routinely except for testing. The following pumps are categorized as Group B pumps at Wolf Creek Nuclear Operating Corporation:

Pump Number Class Group Type Function PAL01A 3 B Centrifugal Auxiliary Feedwater PAL01 B 3 B Centrifugal Auxiliary Feedwater PAL02 3 B Centrifugal Auxiliary Feedwater PBG05A 2 B Centrifugal Charging PBG05B 2 B Centrifugal Charging PEF01A 3 B Vertical Essential Service Water PEF01 B 3 B Vertical Essential Service Water PEM01A 2 B Centrifugal Safety Injection PEM01B 2 B Centrifugal Safety Injection PEN01A 2 B Centrifugal Containment Spray P°EN01B ...... 2 B Centrifugal Containment Spray Page 117 9/02/15 Date: 9/02/15 Revision Date: Page 117

IST ProgramPlan Wolf Creek GeneratingStation

.Technical Position TP-09 (Page 2 of 2)

The following summarizes the Group A, B, and Comprehensive Pump Test requirements as specified by the ASME OM Code Subsection ISTB.

Group A Pump Tests - Group A tests are performed quarterly for each pump categorized as A. The following inservice test parameters are measured for each Group A pump test:

  • Speed (if pump is variable speed)
  • Differential Pressure
  • Discharge Pressure, (for positive displacement pumps)
  • Flow Rate
  • Vibration Group B Pump Tests - Group B tests are performed quarterly for each pump categorized as B. The following inservice test parameters are measured for each Group B pump test.
  • Speed (if pump is variable speed)
  • Differential Pressure( 1 )
  • Flow Rate( 1 )

(1) For positive displacement pumps, flow rate shall be measured or determined, for all other pumps, differential pressure or flow rate shall be measured or determined.

Comprehensive Pump Tests - Comprehensive pump tests are performed biennially for all pumps in the Inservice Testing Program. The following inservice test parameters are measured for each Comprehensive pump test:

  • Speed (if pump is variable speed)
  • Differential Pressure
  • Discharge Pressure, (for positive displacement pumps)
  • Flow Rate - The ISTB Design Flow for the comprehensive pump test is the System's Accident Condition Flow for a single pump
  • Vibration The following instrument accuracy requirements apply to each test type:

Parameter Group A ___Group B___ Comprehensive Pressure +/- 2.0% +/- 2.0% +/- 0.5%

Flow Rate I +/- 2.0% +/- 2.0% +/- 2.0%

Speed i +/- 2.0% +/-2.0% +/- 2.0%

Vibration +/-5.0% +/-5.0% +/- 5.0%

Differential Pressure i +/- 2.0% +/- 2.0% +/-0.5%

Page 118 Revision Date: 9/02/15S Date: 9/02/1 Page 118

IST ProgramPlan Wolf Creek Generating Station Technical Position TP-10 (Page 1 of 3)

Check Valves Tested Usinq Disassembly and Examination The purpose of this Technical Position is to establish the station position for the testing of check valves using disassembly and examination.

AooUlcblitv This Technical Position is applicable to testing check valves that are included in the Inservice Testing Program, which cannot be tested with flow or backflow using practicable means. This position applies to the following check valves required to be tested in accordance with Subsection ISTC (ASME OM Code 2004 Edition through 2006 Addenda).

Valve Number System Class Category ENV0002 EN 2 C ENV0003 EN 2 A/C ENV0004 EN 2 C ENV0008 EN 2 C ENV0009 EN 2 A/C ENV0010 EN 2 C ENV0013 EN 2 C ENV0017 EN 2 C AEV0420 AE 2 C AEV0421 AE 2 C AEV0422 AE 2 C AEV0423 AE 2 C The ASME OM Code 2004 through 2006 Addenda section ISTC-5221(c), states:

"If the test methods in ISTC-5221(a) and ISTC-5221(b) are impractical for certain check valves, or if sufficient flow cannot be achieved or verified, a sample disassembly examination program shall be used to verify valve obturator movement. If maintenance is performed on one of these valves that could affect its performance, the post maintenance testing shall be conducted in accordance with ISTC-5221 (c)(4).

The sample disassembly examination program shall group check valves of similar design, application, and service condition and require a periodic examination of one valve from each group..."

Revision Date: 9/02/15 ag 119 Page 1

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-10 (Page 2 of 3)

(1) Grouping of check valves for the sample disassembly examination program shall be technically justified and shall consider, as a minimum, valve manufacturer, design, service, size, materials of construction, and orientation.

(2) During the disassembly process, the full-stroke motion of the obturator shall be verified. Full-stroke motion of the obturator shall be reverified immediately prior to completing reassembly. Check valves that have their obturator disturbed before full stroke motion is verified shall be examined to determine if a condition exists that could prevent full opening or reclosure of the obturator.

(3) At least one valve from the group shall be disassembled and examined at each refueling outage; all valves in each group shall be disassembled and examined at least once every 8 years (4) Before return to service, valves that were disassembled for examination or that received maintenance that could affect their performance, shall be exercised full- or part-stroke, if practicable, with flow in accordance with ISTC-3520. Those valves shall also be tested for other requirements (e.g., closure verification or leak rate testing) before returning them to service" Check valves which fail to meet the full stroke requirements of ISTC-5221 (c) shall have corrective actions performed in accordance with ISTC-5224 which states in part:

".Check valves in a sample disassembly program that are not capable of full stroke movement (i.e., due to binding) or have failed or have unacceptably degraded internals, shall have the cause of the failure analyzed and the condition corrected. Other check valves in the sample group that may also be affected by this failure mechanism shall be examined or tested during the same refueling outage to determine the condition of internal components and their ability to function.

Postio Sample Disassembly Examination ENV0002/3/8/9: For valves ENV0O02/8, stroke open testing of -these valves would require installing temporary piping and flooding the containment recirculation sump with contaminated water. It is not practical to test these valves except during refueling outages, due to the potential radiation exposure and the amount of time necessary to perform this testing would not be allowed by Technical Specification 3.5.2. Valves ENVO003/9 are partial flow tested during associated pump testing and closed/leaked tested each refueling outage. Closed testing of valves ENV0002/8 is impractical due to system design which provides no means to perform reverse flow or leak testing. For all four valves, the minimum full flow is 3615 gpm based on one train being operational during post-LOCA recirc with a Sump temperature of 240 F. It is not practical to achieve this flow without spraying down containment with contaminated water.

Revision Date: 9/02/15 Page 120

IST Program Plan Wolf Creek GeneratingStation Technical Position TP-10 (Page 3 of 3)

One of these four check valves will be disassembled, inspected, and manually full stroked during each refueling outage in accordance with ASME OM Code ISTC-5221(c). A different valve will be disassembled, inspected, and manually full stroked during each refueling. If the full stroke capability of the disassembled valve is in question, the other valves will be disassembled, inspected and manually full stroked during the same outage per ASME OM Code ISTC-5224.

Sample Disassembly Examination ENVO004IIO113117:

For ENV001 3/17, full stroke open testing of these valves would result in spraying down containment with contaminated water. Closed testing of these valves is impractical due to system design which provides no means to perform reverse flow or leak testing.

Valve ENV0004/1 0 are partial flow tested during their associated quarterly pump test and are full flow tested (3615 gpm) every 2 years. However, close testing of these valves is impractical due to system design which provides no means to perform reverse flow or leak testing. One of these four check valves will be disassembled, inspected, and manually full stroked during each refueling outage in accordance with ASME OM Code ISTC-5221(c). A different valve will be disassembled, inspected, and manually fully stroked during each refueling. If the full stroke capability of the disassembled valve is in question, the other the other three valves will be disassembled, inspected and manually full stroked during the same outage per ASME OM Code ISTC-5224.

Sample Disassembly Examination AEV0420/0421 /0422/0423:

For AEV0420/0421/0422/0423, partial flow is documented real time by computer point records. Closed testing of these valves is impractical due to the necessity of providing feedwater flow to the steam generators. Also closure testing of these valves during shutdown due to the drain piping configuration and lack of proper delta pressure does not provide a proper leakage volume for testing the valves. One of these four check valves will be disassembled, inspected, and manually full stroked during each refueling outage in accordance with OM Code ISTC-5221(c). A different valve will be disassembled, inspected, and manually full stroked during each refueling. If the full stroke capability of the disassembled valve is in question, the other three valves will be disassembled, inspected, and manually full stroked during the same outage per OM Code ISTC-5224.

This Technical Position is in compliance with the requirements of the ASME OM Code for disassembly and examination of certain check valves per ISTC-5221(c).

Page 121 Date: 9/02/IS Revision Date: 9/02/15 Page 121

IST ProgramPlan Wolf Creek GeneratingStation Technical Position TP-11 (Page 1 of 3)

Motor Onerated Valve OM N-1 Code Case Position The purpose of this Technical Position is to establish the station position for the testing of motor operated valves which are included in the lnservice Testing Program.

All motor operated valves included in the Wolf Creek Generating Station Inservice Testing Program.

American Society of Mechanical Engineers (ASME) OM Code 2004 through 2006 Addenda, Subsection ISTC, requires periodic testing of motor operated valves (MOVs).

In lieu of the ASME OM Code ISTC-5120, MOV testing of those valve identified in the 1ST Program, Wolf Creek Nuclear Operating Corporation will utilize Code Case OMN-1, "Alternative Rules for Preservice and Inservice Testing of Certain Electric Motor-Operated Valve Assemblies in Light Water Reactor Power Plants" for stroke time testing and position indication testing.

The implementation of Code Case OMN-1 will reconcile and consolidate the Wolf Creek MOV testing program developed under Generic Letters (GL) 89-10, "Safety Related Motor Operated Valve Testing and Surveillance," and 96-05, "Periodic Verification of Design Basis Capability of Safety Related Motor Operated Valves," with the IST program and eliminate unnecessary testing that provides minimal information about MOV operational readiness. As part of Wolf Creek's commitment on MOV Periodic Verification Testing made in response to GL 96-05, Wolf Creek is participating in the Joint Owners Group (JOG) Program for MOV Periodic Verification. This program is described in Topical Report MPR-1807, Rev. 2 and endorsed by the NRC in an October 1997 Safety Evaluation.

The Nuclear Regulatory Commission (NRC) in a September 22, 1999 Federal Register Notice (64 FR 51370), issued a Final Rule on 10 CFR Part 50, "Industry Codes and Standards; Amended Requirements." The Federal Register Notice revised, in part, the IST requirements for MOVs. In the final rule, the NRC amended its regulations to incorporate by reference the 1995 Edition and 1996 Addenda of the ASME Code for Operation and Maintenance of Nuclear Power Plants. The final rule also permits the use of alternate rules for IST of MOVs asdescribed in ASME Code Case OMN-1 in lieu of certain provisions of Subsection ISTC.

Page 122 Revision Date: 9/02/1 5 Date: 9/02/15 Page 122

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-11 (Page 2 of 3)

The final rule publication noted that the NRC will favorably consider a request by a licensee to apply Code Case OMN-1 for MOVs provided the following commitments are met.

1. The adequacy of the diagnostic test interval for each valve must be evaluated and adjusted as necessary but not later than 5 years or three refueling outages (whichever is longer) from initial implementation of ASME Code Case OMN-I.
2. When extending the exercise test intervals for high risk MOVs beyond a quarterly frequency, licensees shall ensure that the potential increase in core damage frequency and risk associated with the extension is small and consistent with the intent of the Commission's Safety Goal Policy Statement.
3. When implementing Code Case OMN-1, the benefits of performing a particular test should be balanced against the potential adverse effects placed on the valves or systems caused by this testing. For example, potential component (valve or pump) damage or system availability concerns may outweigh benefits of dynamic testing for some MOVs.

pgsitio Wolf Creek Generating Station will use the requirements of Code Case OMN-1 in lieu of MOV stroke time testing and position indication testing. The testing requirements of Code Case OMN-1 have been approved by the NRC for use by licensees provided certain commitments are met. Wolf Creek's implementation and compliance with the above-identified commitments (Items 1-3) of Code Case OMN-1 are detailed below. Exceptions and clarifications to OMN-1 are also provided below.

A. Wolf Creek meets the above-identified commitments (Items 1-3) as follows.

A.1 Wolf Creek evaluates the adequacy of the test interval following each test within the designated surveillance frequency. Since this evaluation is included as part of the surveillance test that determines functional margin, it is impracticable to exceed the maximum interval.

A.2 Wolf Creek will exercise medium and low safety significant MOVs at least once every refuel cycle as required in Code Case OMN-1 Section 3.6.1. Initially, Wolf Creek committed to continue testing high risk MOVs quarterly where practical.

(Where it is not practicable to exercise a valve during plant operations, the valve will be exercised in either cold shutdown or in refuel outages per OMN-1 Section 3.6.3.) After sufficient performance data have been obtained and evaluated for medium and low safety significant MOVs exercised at the extended frequency of at least once every refuel cycle, that data will be used in evaluating the same exercise frequency for high risk MOVs. When extending the exercise test intervals for high risk MOVs beyond a quarterly frequency, Wolf Creek shall ensure that the potential increase in core damage frequency and risk associated with the extension is small and consistent with the intent of the Commission's Safety Goal Revision Date: 9/02/15 ag 123 Page 2

IST Program Plan Wolf Creek Generating Station Technical Position TP-11 (Page 3 of 3)

Policy Statement. Upon extension of these frequencies, the IST Program will be appropriately revised.

A.3 Wolf Creek Station has performed differential pressure testing practicability reviews for GL 89-10 that evaluated the benefits of performing a particular test against the potential adverse effects placed on the valves or systems caused by this testing. This evaluation included an assessment of potential component (valve or pump) damage or system availability concerns that may outweigh benefits of dynamic testing for some MOVs. As a result, some MOVs are not subject to differential pressure testing, but are justified for design basis performance by static diagnostic testing and analysis.

Revision Date: 9/02/15SPg 2 Page 124

1ST Program Plan Wolf Creek GeneratingStation Technical Position TP-I2 (Page 1 of 2)

Classification of Check Valves KCV0478 and SJV01 11 as Passive The purpose of this Technical Position is to establish the station position for the classification of certain check valves (KCV0478 and SJV011 I) as passive.

This Technical Position is applicable to the following check valves at Wolf Creek:

Valve Number System Class Cateaorv KCV0478 KC 2 A/C SJV0111 SJ 2 A/C The ASME OM Code 2004 through 2006 Addenda section ISTA-2000 provides a definition of passive valves.

"passive valves: valves that maintain obturator position and are not required to change obturator position to accomplish the required function(s) in shutting down a reactor to a safe shut down condition, maintaining the safe shutdown condition, or mitigating the consequences of an accident.

The Code also provides valve category definitions as follows:

"Category A - valves for which seat leakage is limited to a specific maximum amount in the closed position for fulfillment of their required function(s), as specified in ISTC-1 100."

"Category C - valves that are self-actuating in response to some system characteristic, such as pressure (relief valves) or flow direction (check valves) for fulfillment of the required function(s), as specified in ISTC-1 100."

Check valve KCV0478 must close to isolate containment from the fire protection system.

This valve is considered a containment isolation valve for penetration P-

67. This valve is normally closed since the upstream motor operated valve (KCHVO253) is maintained in the closed position. Additionally, manual valve KCV0427 is normally closed to isolate the fire protection to containment piping. Therefore, since this check valve is not required to change positions to perform this function, it is considered passive in the closed position. This valve only opens to allow water from the Fire Protection system to be routed to the containment in event of a fire. This open function is not required for safe shutdown or accident mitigation.

Revision Date: 9/02/1 5 Pg 2 Page 125

1ST Program Plan Wolf Creek Generating Station Technical Position TP-12 (Page 2 of 2)

Check valve SJV01 11 must close to isolate containment from the nuclear sampling system. This valve is required to provide containment isolation for penetration P-57.

Flow is blocked by valves SJHV0131&132. Since this valve is not required to change positions to perform this function, it is considered passive in the closed position. The Post Accident Sampling System has been permanently removed from service. Therefore, this valve is not required to open for safe shutdown or accident mitigation. Note that the isolation valves are still required to maintain the safety/non-safety pressure boundary.

Wolf Creek classifies these valves as passive since they are not required to change position to perform their intended function. The subject valves are included in the Wolf Creek Inservice Testing Program as Category A/C, passive check valves. Table 3500-1 of ISTB does not address Category C, Passive valves, therefore Wolf Creek will apply the testing requirements for Category A valves since these have seat leakage test requirements.

Revision Date: 9/02/15 ag 126 Page 2

1ST Program Plan Wolf Creek GeneratingStation THIS PAGE INTENIONALLY LEFT BLANK Page 127 9/02/15 Date: 9/02/15 Revision Date: Page 127

1ST Program Plan Wolf Creek GeneratingStation ATTACHMENT 14 INSERVICE TESTING PUMP TABLE Page 128 Revision Date: 9/02/] 5 Date: 9/02/15 Page 128

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM PUMP P&ID P&ID IST 1SI 01FF FLOW VTBR RELIEF NUMBER NUMBER COORD GROUP CLASS SPD PRESS RATE TEST REQUEST REMARKS PAL0lA M-12ALO1(Q) E-4 B 3 N Y Y Y 4PR-l FAL01B M-12AL0i(Q) H1-4 B 3 N Y Y Y 4PR-i PALO2 M-i2AL01(Q) B-4 B 3 Y y y Y 4PR-i 4 PR-i PBGO2A M-12BG05(Q) B-6 A 3 N Y Y Y PBGO2B M-12B005(Q) A-6 A 3 N Y y y 4PR-1 PBGO5A M-12BGO3(Q) C-5 B 2 N Y Y y 4PR-2 4 PR-i PBGO5B M-12BG03(Q) B-S B 2 N Y y y 4PR-2 4PR-I PEC01A M-i2EC0i (Q) G-7 A 3 N Y y Y 4PR-I PEC01B M-i2EC0i (Q) E1-7 A 3 N Y Y Y 4PR-1 PEF01A M-K2EF01(Q) F-S B 3 N Y 4PR-PEF01B M-K2EF01(Q) C-5 B 3 N Y y 4PR-I PEG01A M-i2EG01(Q) G-4 A 3 N Y y y 4PR-I PEG01B M-i2EG01(Q) 0-4 A 3 N Y y 4PR-i PEG01C M-i2EG01(Q) E-4 A 3 N Y y 4PR-i PEG01D M-i2EG01(Q) B-4 A 3 N Y y y 4PR-i PEJ01A M-i2EJ01(Q) G-6 A 2 N Y y y 4PR-I PEJ01B M-i2EJ01(Q) C-6 A 2 N Y y y 4PR-I PEM01A M-i2EM01(Q) E-6 B 2 N Y y y 4PR-I PEM01B M-i2EM01(Q) D-6 B 2 N Y y y 4PR-I PEN01A M-12EN01(Q) G-6 B 2 N Y y y 4PR-1 PEN01B M-12EN01(Q) B-6 B 2 N Y y y 4PR-I Revision Date: 9/02/1 SPg 2 Page 129

1ST Program Plan Wolf Creek Generating Station ATTACHMENT 15 INSERVICE TESTING VALVE TABLE Page 130 9/02/I S Date. 9/02/15 Revision Date: Page 130

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS /PASS RQMT FREQ REFERENCE ABHVOOO5 M-12AB02 (Q) 0-4 2 B 4 GL AO O Active BT-O Q FEST Q TP-04 PIT 2Y ABHVOOOG M-12AB02 (Q) C-4 2 B 4 GL AC 0 Active BT-O Q FST Q TP-04 PIT 2Y ABEVO011 M-12AB02 (Q) H- 3 C B 28 GA HO C Active BT-C CS CSJ- 01 PIT 2Y ABHVOO12 M-12ABOV (Q) G-3 2 B 2 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y ABHVOO14 M-12AB02 (Q) F- 3 2 B 28 GA HO C Active BT-C CS CESJ- 01 PIT 2Y ABHV0015 M-12AB02 (Q) F- 3 2 B 2 GL AC C Active BT-C Q FST '2 TP-04 PIT 2Y ABHVOO17 M-12AB02 (Q) D-3 2 B 28 -GA HO C Active BT-C CS CSJ- 01 PIT 2Y ABEVOO18 M-12AB02 (Q) D-3 2 B 2 GL AC C Active BT-C '2 FET Q2 TP-04 PIT 2Y ABHVOO2O M-12AB02 (Q) C-3 3 B 39 GA HO C Active HT-C CS CSJ-01 PIT 2Y ABHVOC21 M-12AB02 (Q) C-3 2 B 2 GL AC C Active BT-C Q2 FET '2 TP-04 PIT 2Y Revision Date: 9/02/1 5 Pg 3 Page 131

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE!PROGRAM TESTING TEST WOLFTEST CORPORATION PUMP OPERATING NUCLEAR CREEK INSERVICE ATTACEMENT NUMBER NUMBER COORD ClLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ABHV0048 M-12AB02(CQ) D- 4 2 B 1 GL AO C Passive PIT 2Y ABEV0049 M-12AB02 (Q) C-4 2 B 1 GL AC 0 Passive PIT 2Y ABLV0 007 M-12AB02 (Q) B- 4 2 B 2 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y ABLV0008 M-12AB02 (Q) D- 5 2 B 2 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y AELV0009 M-12AB02 (Q) E- 4 2 B 2 CL AC C Active BT-C Q FST Q TP-04 PIT 2Y ABLV0010 M-l2ABO2 (Q) G-4 2 B 2 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y ABPSEOO0l M-12AB02 (Q) B-3 2 D 1 RPD SA C Active RPL ABPSEO002 M-12A302 (Q) F- 3 2 D 1 RPD SA C Active 5Y RPL ABPSEO0O3 M-12AB02 (Q) E-3 2 D 1 RPD SA O Active RPL SY ABPSEOOO4 M-12AB02 (Q) C-3 2 D 1 RPD SA O Active RPL ABPV0O01 M-12AB01 (Q) 0-3 2 B 8 GL AC C/C Active BT-C BT -C Q FST 2Y TP-04 PIT Q

ABPVOOO2 M-12AB01 (Q) D- 3 2 B 8 CL AC C/C Active 2Q BT-C 8T-C Q FST TP-04 PIT 2Y Revision Date: 9/02/15 Page 132 Pg 3

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID I £ST IST VALVE VALVE ACT SAFETY ACTIVE!PROGRAM TESTING PUMP TEST WOLFTEST INSERVICE CORPORATION OPERATING NUCLEAR CREEK ATTACHMENT NUMBER NUMBER COORD CILASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ RE FERENCE ABPV0003 M-12AB01(Q) D-6 2 B 8 GL AO 0/C Active BT-O Q BT-C Q FST Q TP-04 PIT 2Y ABPV0004 M-12AB01 (Q) 2 B 8 GL AO 0/C Active G- 6 BT-O Q BT-C Q FS T Q TP-04 PIT 2Y ABV0007 M-12AB01 (Q) G- 6 2 B 10 GA M 0/C Active BT-O 2Y BT-C 2Y ABV0018 M-12AB01 (Q) G- 3 2 ' B 10 GA M 0/C Active BT-O 2Y BT-C 2Y ABV0029 M-12AB01(Q) D- 6 2 B 10 GA M 0/C Active BT-O 2Y BT-C 2Y ABV0040 M-12AB01 (Q) D- 3 2 B 10 GA M 0/C Active BT-O 2Y BT-C 2Y ABV0045 M-12AB02 (Q) H- 7 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0046 M-12AB02 (Q) H- 7 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0047 M-12AB02 (Q) H- 6 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0048 M-12AB02 (Q) H- 5 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0049 M-12AB02 (Q) H-5 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0055 M-12AB02 (Q) F- 7 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0056 M-12AB02 (Q) F-7 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0057 M-12AB02 (Q) F- 6 2 C 6x8x8 RV BA 0/C Active RVT 5Y ABV0058 M-12AB02 (Q) F- 5 2 C 6x8x8 RV SA 0/C Active RVT 5Y Revision Date: 9/02/15SPg 3 Page 133

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P &ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER CCOORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE F-5 2 C 6x8x8 RV SA 0/C Active ABV0059 M-12AB02 (Q)

RVT 5Y ABV0065 M-12AB02 (Q) E-7 2 C 6x~x8 RV SA 0/C Active RVT 5Y ABV0066 M-12AB02 (Q) E-7 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0067 M-12AB02 (Q) E-6 2 C 6x8x8 RV SA O/C Active RVT 5Y ABV0068 M-12AB02 (Q) E-5 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV 0069 M-12AB02 (Q) E-5 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0075 M-12AB02 (Q) C-7 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV007 6 M-12AB02 (Q) C-7 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0077 M-12AB02 (Q) C-6 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0078 M-12AB02 (Q) C-S 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0079 M-12AB02 (Q) C-5 2 C 6x8x8 RV SA 0/C Active RVT 5Y ABV0345 M-12AB01 (Q) H3 NC A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C Q AT -3 2Y E-3 NC A/C 0.75 CK SA C Active ABV0346 M-12AB01(Q)

CVT-O Q TP-01 CVT-C Q AT- 3 2Y ABV0347 M-12AB01 (Q) E-5 NC A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C Q AT -3 2Y ABV0348 M-12AB01(Q) H-S NC A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C Q AT-3 2Y Revision Date: 9/02/15 ag 134 Page 3

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE PGS PASS RQMT FREQ REFERENCE ABV0349 M-12AB01(Q) H-3 NC C 0.75 CK SA 0 Active CVT-O Q CVT-C Q TP-OI ABV050 M-12AB01 (Q) E-3 NC C 0.75 CK SA 0 Active CVT-G Q CVT-C Q TP-OI ABV0351 M-12AB01 (Q) E-5 NC C 0.75 CK SA 0 Active CVT-G Q CVT-C Q TP-OI ABV0352 M-12AB01 (Q) E-7 NC C 0.75 CK SA 0 Active CVT-O Q CVT-C Q TP-OI AEFCV0510 M-12AE01 (Q) E-7 3 B 14 GL AG C Active BT-C cs CSJ-15 FS T CSJ-15, TP-04 PIT 2Y AEFCV0520 M-12AE01 (Q) D-7 3 B 14 GL AG C Active BT-C cs CS J-15 FS T CSJ-15, TP-04 PIT 2Y AEFCV0530 M-12AE01 (Q) B- 7 3 B 14 GL AG C Active BT-C cs CSJ- 15 FS T CSJ-15, TP-04 PIT 2Y AEFCV0540 M-12AE01 (Q) G- 7 3 B 14 GL AG C Active BT-C cs CSJ-15 FS T CSJ-15, TP-04 PIT 2Y AEFCV0550 M-12AE01 (Q) E-7 3 B 14 GL AG C Active BT-C Q FS T Q TP-04 PIT 2Y AEFCV0560 M-12AE01 (Q) C- 7 3 B 14 GL AG C Active BT-C Q FS T Q TP-04 PIT 2Y AEFCV0570 M-12AE01 (Q) B- 7 3 B 14 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y Revision Date: 9/02/15 Pg 3 Page 135

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE AEFCVO580 M-12AE01(Q) G-7 3 B 14 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y AEFV0039 M-12AE02 (Q) G- 3 2 B 14 GA HO C Active BT-C CS CS J-02 FST CS CSJ-02, TP-04 PIT 2Y AEFV0040 M-12AE02 (Q) C-3 2 B 14 GA HO C Active BT-C CS CS J-02 FST CS CSJ-02, TP-04 PIT 2Y AEFV0041 M-12AE02 (Q) C- 6 2 B 14 GA BO C Active BT-C CS CSJ-02 FS T CS CSJ-02, TP-04 PIT 2Y AEFV0042 M-12AE02 (Q) G- 6 2 B 14 GA HO C Active BT-C CS CSJ-02 FS T CS CSJ-02, TP-04 PIT 2Y AEFV0043 M-12AE02 (Q) G- 4 2 B 14 GA HO C Active BT-C Q FS T Q TP-04 PIT 2Y AEFV0044 M-12AE02 (Q) D- 4 2 B 14 GA HO C Active BT-C Q FS T TP-04 PIT 2Y AEFV0045 M-12AE02 (Q) D- 7 2 B 14 GA HO C Active BT-C Q FS T Q T P-04 PIT 2Y AEFV0046 M-12AE02 (Q) G- 7 2 B 14 GA HO C Active BT-C Q FS T Q TP- 04 PIT 2Y AEPSE0001 M-12AE02 (Q) H- 3 2 D 1 RPD SA O Active RPL 5Y AEPSE0002 M-12AE02 (Q) D- 3 2 D 1 RPD SA O Active RPL 5Y Revision Date: 9/02/15 Page Pg 136 3

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CL LASS CAT SIZE TYPE TYPE P0S PASS RQMT FREQ REFERENCE AEPSE0003 M-12AE02(Q) D-3 2 D 1 RPD SA 0 Active RPL 5Y AEPSE0004 M-12AE02 (Q) H- 6 2 D 1 RPD SA 0 Active RPL 5Y AEV0124 M-12AE02 (Q) C- 3 2 C 4 CK SA 0/C Active CVT-O CS CS J-04 CVT-C CS CS J-04 AEV0125 M-12AE02 (Q) F- 3 2 C 4 CK SA 0/C Active

CVT-O CS CS J-04 CVT-C CS CS J-04 AEV0126 M-12AE02 (Q) F- 6 2 C 4 CK SA 0/C Active CVT-O CS CS J-04 CVT-C CS CSJ- 04 AEV0127 M-12AE02 (Q) C- 6 2 C 4 CE SA 0/C Active CVT-O CS CS J-04 CVT-C CS CS J-04 AEV0420 M-12AE02 (Q) C- 3 2 C 14 CE SA 0/C Active CVT-O 0 CVT-C SUE TP-10 AEV0421 M-12AE02 (Q) F- 3 2 C 14 CK SA 0/C Active CVT-O 0 CVT-C S DE TP-10 AEV0 422 M-12AE02 (Q) F- 6 2 C 14 CK SA 0/C Active CVT-O 0 CVT-C SUE TP-10 AEV0423 M-12AE02 (Q) C- 6 2 C 14 CK SA 0/C Active CVT-O 0 CVT-C S DE TP-10 ALHV0005 M-12AL01 (Q) H-7 2 B 4 GL MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II G- 7 2 B 4 GL AO 0/C Active ALBV0006 M-12AL01 (0)

BT -C Q TP-02 FS T 0 TP-04 PIT 2Y ALBV0007 M-12AL01 (0) F-7 2 B 4 GL MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-11 BT-E RC TP-II Revision Date: 9/02/15SPg 3 Page 137

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ALHV0008 M-12AL01(Q) E-7 2 B 4 GL AO 0/C Active BT-C Q TP-02 FS T Q TP-04 PIT 2Y ALHV0009 M-12AL01 (Q) E-7 2 B 4 GL MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II ALHV0010 M-12AL01 (Q) D- 7 2 B 4 GL AO 0/C Active BT-C Q TP-02 FST Q TP-04 PIT 2Y ALBV0011 M-12AL01 (Q) C-7 2 B 4 GL MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II ALHV0012 M-12AL01 (Q) B-7 2 B 4 GL AO 0/C Active BT-C Q TP-02 FST Q T P-04 PIT 2Y ALHV0030 M-12AL01 (Q) F- 3 3 B 6 BTF MO 0 Active OMNI-O JOG TP-1I BT-E RC TP-11 ALHV0031 M-12AL01(Q) E- 3 3 B 6 BTF MO 0 Active OMNI-O JOG TP-1I BT-E RC TP-1I ALHV0032 M-12AL01 (Q) C- 3 3 B 6 BTF MO 0 Active OMNI-O JOG TP-II BT-E RC TP-II ALHV0033 M-12AL01 (Q) B- 3 3 B 6 BTF MO 0 Active OMNI-O JOG TP-1I BT-E RC TP-II ALHV0034 M-T2AL01 (Q) H- 4 3 B 8 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II ALHV0035 M-12AL01 (Q) D- 4 3 B 8 GA MO 0/C Active OMNI-O JOG TP-1I OMNI1-C JOG TP-II BT-E RC TP-II Revision Date: 9/02/15 Pg 3 Page 138

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ALHV0036 M-i2AL01(Q) B-4 3 B 8 GA MO 0/C Active OMN1-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II ALPSE0001 M-12AL01 (Q) A7 RP D SA 0 Active RPL ALPSE0002 M-12AL01 (Q) A-7 RPD SA 0 Active 5Y RPL ALV0001 M-12AL01 (Q) B- 4 CK SA 0/c Active CM CVT-O CVCM-II CM CVT-C CVCM-II ALV0 002 M-12AL01 (Q) D- 4 CK SA 0/c Active CM CVT-O Q

CVT-C ALV0003 M-12AL01. (Q) H-4 CK SA 0/c Active Q CVT-O Q

CVT-C ALV 0006 M-12AL01 (Q) F- 4 CK SA Active Q CVT-O Q TP-01 CVT-C ALV0 009 M-12AL01 (Q) E- 4 CK SA Active Q CVT-O Q TP-01 CVT-C ALV0 012 M-12AL01 (Q) C- 4 CK SA Active Q CVT-O Q TP-01 CVT-C ALV0 015 M-12AL01 (Q) B- 4 CE SA Active Q CVT-O CVT-C Q TP-01 ALV0 030 M-12AL01 (Q) H- 6 CK SA Active CM CVT-O CVCM-II CM CVT-C CVCM-II ALVO0033 M-12AL01 (Q) F-7 CK SA Active CVT-O CS CSJ-05 CVT-C 1.5Y TP-01 ALV0036 M-12AL01 (Q) H- 7 2 C 4 CE SA 0 Active CVT-O CS CSJ-05 CVT-C I.5Y TP-01 Revision Date: 9/02/15 Pg 3 Page 139

WOLF CRE~EK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE V2ALVE TEST ATTACHMENT ACT SAFETY ACTIVE! TEST NUMBER NUMBER COORD CLASS CAT SIZE TtYPE TYPE POS PASS RQMT FREQ REFERENCE CK SA 0 Actfive.

ALVO0042 M-12AL01 (Q) D-5 3 C 6 CVT-O CM CVCM-II CVT-C CM CVCM-lI1 AL V0 04 5 M-l2AL01 (Q) C-7 c 6 CK SA 0 Active CVT-O CS CSJ-05 CVT-C 1. 5Y TP-01 ALV0 048 M-12AL01 (Q) D-7 c 6 CK SA 0 Active CVT-O CS CSJ-05 CVT-C 1. 5Y TP-01 ALV0054 M-12AL01 (Q) B-5 c 8 CK SA 0 Active CVT-O CM CVCM-lI CVT-C CM CVCM-II1 ALV 0057 M-12ALO1 (Q) E-7 c 4 CK SA 0 Active CVT-O CM CVCM-II CVT-C CM CVCM-ll ALVO0062 M-12AL01 (Q) G-7 c 4 CK SA 0 Active CVT-O CM CVCM-II1 CVT-C CM CVCM-II ALV0067 M-l2AL01 (Q) D- 7 4 CK SA 0 Active CVT-O CM CVCM-II1 CVT-C CM CVCM-II1 ALV0072 M-12AL01 (Q) B- 7 4 CK SA 0 Active CVT-O CM CVCM-II1 CVT-C CM CVCM-II ALV0149 M-12AL01 (Q) G- 6 A/C CK SA C Active CVT-0 Q TP-01 CVT-C Q AT- 3 2Y F- 6 CK SA C Active ALV0150 M-12AL01 (Q) 3 A/C CVT-0 Q TP-01 CVT-C Q AT- 3 2Y ALV0151 M-12AL01 (Q) D- 6 3 A/C CK SA C Active CVT-0 Q TP-01 CVT-C Q AT -3 2Y ALV0152 M-12AL01 (Q) B- 6 3 A/C CK SA C Active CVT-0 Q TP-01 CVT-C Q AT -3 2Y Revision Date: 9/02/15S Page 140

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & lID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ALV0153 M-12AL01(Q) G-6 3 C CK SA C Active CVT-0 Q TP-01 CVT-C Q ALV0154 M-12AL01 (Q) G- 6 CK SA Active CVT-0 Q TP-01 c

CVT-C Q ALV 0155 M-12AL01 (Q) G- 6 CK SA Active CVT-0 Q TP- 01 CVT-C Q ALV0156 M-12AL01 (Q) G- 6 CK SA Active CVT-0 Q TP-01 CVT-C Q ALV0 161 M-12AL01 (Q) B- 3 CK SA Active 10 CVT-0 CM CVCM-11 CVT-C CM CVCM-II ALV0167 M-12AL01 (Q) A- 3 4 CK SA 0/c Active CVT-0 Q CVT-C Q BB8010GA M-12BB02 (Q) G- 7 6 RV SA Active RVT 5Y PIT 5Y BB8010B M-12BB02 (Q) G- 6 6' RV SA 0/c Active RVT 5Y PIT 5Y BB 8010CC M-12BB02(CQ) G- 5 6 RV SA 0/c Active RVT 5Y PIT 5Y BB8378A M-12BB01 (Q) E- 4 3 CK SA 0/c Active CVT-O RR RJ-02, TP-01 CVT-C RR RJ- 02 BB8378B M-12BB01 (Q) E- 4 3 CE SA 0/c Active CVT-O RR RJ-02, TP-01 CVT-C RR RJ-02 BB8379A M-12BB01 (Q) B- 6 3 CK SA 0/c Active CVT-O RR RJ-02, TP-01 CVT-C RR RJ-02 BB8 379B M-12BB01 (Q) E- 6 3 CK SA Active CVT-O RR RJ-02, TP-0l CVT-C RR RJ-02 Revision Date: 9/02/15SPg 4 Page 141

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BB8948A M-12BB01(Q) E-4 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-14 CVT-C CM CVCM-14 AT -2 1. 5Y CVCM-14 BB8948B M-12BB01 (Q) D-4 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-14 CVT-C CM CVCM-14 AT-2 1. 5Y CVCM-14 BB8948C M-12BB01 (Q) D- 6 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-14 CVT-C CM CVCM-14 AT-2 1 5Y CVCM-14 BB8948D M-12BB01 (Q) E- 6 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-14 CVT-C CM CVCM-14 AT-2 1. 5Y CVCM-14 BB8949A M-12BB01 (Q) E- 5 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-04 CVT-C CM CVCM-04 AT-2 1. 5Y CVCM-04 BB8949B M-12BB01 (Q) D-5 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-04 CVT-C CM CVCM-04 AT-2 1 5Y CVCM-0 4 BB8949C M-12BB01(CQ) C- 5 1 A/C 10 CK. SA 0/C Active CVT-O CM CVCM-04 CVT-C CM CVCM-04 AT-2 1. 5Y CVCM-04 BB8949D M-12BB01 (Q) G- 6 1 A/C 10 CK SA 0/C Active CVT-O CM CVCM-04 CVT-C CM CVCM-0 4 AT-2 1 5Y CVCM-0 4 BBHV0013 M-12BB03 (Q) C- 2 3 B 3 GA MO C Active OMNl-C JOG TB-lI BT-E RC TP-II BBHV0014 M-12BB03(Q) C- 2 3 B 3 GA MO C Active OMNl-C JOG TP-lI BT-E RC TP-il BBHV0015 M-12BB03(Q) C-2 3 B 3 GA MO C Active OMNI-C JOG TB-il BT-E RC TP-11 Revision Date: 9/02/15 Pg 4 Page 142

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BBHV0016 M-12BB03 (Q) C-2 3 B 3 GA MO C Active OMN1-C JOG TP-II BT-E RC VP-II BBHV8000A M-12BB02 (Q) E-7 1 B 3 GA MO 0/C Active OMNI-O JOG VP-Il OMN I-C JOG TP-II BT-E Q TP-II BBHV8000B M-12BB02 (Q) E-7 1 B 3 GA MO 0/C Active OMN1-O JOG VP-II OMNI1-C JOG VP-Il BT-E Q TP-II BBHV8001lA M-12BB04 (Q) F- 4 2 B 1 GL SO 0/C Active BT-O RR RJ-10 BT-C RR RJ-10 FST RR RJ-10, TP-04 PIT 2Y BBHV8001B M-12BB04 (Q) F- 4 2 B 1 GL SO 0/C Active BT-O RR RJ-10 BT-C RR RJ-10 FS T RR RJ-l0, TP-04 PIT 2Y BBHV8 002A M-12BB04 (Q) F- 3 2 B 1 GL SO 0/C Active BT -O RR RJ-10 BT-C RR RJ-l0 FST RR RJ-10, TP-04 PIT 2Y BBHV8002B M-12BB04 (Q) F- 3 2 B 1 GL SO 0/C Active BT-O RR RJ-10 PT-C RR RJ-10 FS T RR RJ-10, TP-04 PIT 2Y BBHV8026 M-12BP02 (Q) E- 3 2 A 1 DIA AO C Active BT-C Q FS T Q TP-04 PIT 2Y AT-I App J BBHV8 027 M-12BB02 (Q) E- 4 2 A 1 DIA AO C Active BT-C Q FS T Q TP- 04 PIT 2Y AT-i App J Revision Date: 9/02/15SPg 4 Page 143

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BBHV8157A M-12BB02(Q) E-2 2 B 1 GL MO 0 Active OMNI-O JOG TP-II BT-E RC TP-I1 BBHV8157B M-12BB02 CQ) E-2 2 B 1 GL MO 0 Active OMNI-O JOG TP-II BT-E RC TP-1I BBHV8351A M-12BB03 (Q) C- 5 2 A 2 GL MO 0/C Active OMN1-O JOG TP-II OMNI-C JOG TP-II AT-i App J BT-E RC TP-II BBHV8351B M-12BB03 (Q) C- 5 2 A 2 GL MO 0/C Active OMNI-O JOG TP-lI OMNI1-C JOG TP-II AT-I App J BT-E RC TP-II BBHV8351C M-12BB03 (Q) C- 5 2 A 2 .GL MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II AT-I App J BT-E TP-II BBHV8351D M-12BB03 (Q) C-S 2 A 2 GL MO 0/C Active JOG OMN1-O TP-II JOG OMNI-C TP-II AT-i App J BT -E RC TP-II BBPCV0455A M-12BB02 (Q) E-7 1 B 3 GL SO 0/C Active BT-O CS CS J-07 BT -C CS CSJ-07 FS T CS CSJ-07, TP-04 PIT 2Y BBPCV0456A M-12BB02(CQ) E- 8 1 B 3 GL SO 0/C Active BT -O CS CS J-07 BT-C CS CS J-07 FST CS CSJ-07, TP-04 PIT 2Y BBPV8702A M-12BB01 (Q) E-4 1 A 12 GA MO 0/C Active OMNI-O JOG TP-II 0MNI1-C JOG TP-II AT -4 1 .5Y BT-E RC TP-II Revision Date: 9/02/15 Pg 4 Page 144

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BBPV8702B M-12BB01(Q) H-5 1 A 12 GA MO 0/C Active OMNI-O JOG TP-1I OMNI-C JOG TP-II AT- 4 1.5Y BT -E RC TP-II BBV0001 M-12BB01 (Q) D-5 1 A/C 1.5 CK SA 0/C Active CVT-O RR RJ- 01 CVT-C RR RJ- 01 AT-2 1.5Y BBV0022 M-12BB01 (Q) D-4 1 A/C 1.5 CK SA 0/C Active CVT-O RR RJ-01 CVT-C RR RJ-01 AT -2 1.5Y BBV0040 M-12BB01(Q) D-6 1 A/C 1.5 CK SA 0/C Active CVT-O RR RJ-01 CVT-C RR RJ-01 AT -2 1.5 BBV0059 M-i2BB01 (Q) E- 6 1 A/C 1.5 CK SA 0/C Active CVT-O RR RJ- 01 CVT-C RR RJ- 01 AT-2 1 .5Y BBV0118 M-12BB03(Q) C- 5 2 A/C 2 CK SA 0/C Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J BBV0120 M-12BB03(Q) C- 4 1 C 2 CK SA 0/C Active CVT-O RR RJ-II CVT-C RR RJ-1I BBV0121 M-12BB03 (Q) C- 4 1 C 2 CK SA 0/C Active CVT-O RR RJ-1I CVT-C RR RJ-1I BBV0148 M-12BB03(CQ) C- 5 2 A/C 2 CK SA 0/C Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J BBV0150 M-12BB03 (Q) C- 4 1 C 2 CK SA 0/C Active RJ-1I CVT-O RR CVT-C RR RJ-1I Revision Date: 9/02/1 5 Page 145 Pg 4

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BBVO151 M-12BB03 (Q) C-4 1 C 2 CK SA 0/C Active CVT-O RR RJ-II CVT-C RR RJ-II BBV0 178 M-12BB03 (Q) C-5 A/C 2 CK SA o/c Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J BBV0180 M-12BB03 (Q) C- 4 C 2 CK SA 0/c Active CVT-O RR RJ-11 CVT-C RR RJ-II BBV0181 M-12BB03 (Q) C- 4 C 2 CK SA o/c Active CVT-O RR RJ-11 CVT-C RR RJ-11 BBV0208 M-12BB03 (Q) C- 5 A/C 2 CK SA 0/C Active CVT-O CM CVCM-02 CVT-C CM CVCM- 02 AT-I App a BBV0210 M-12BB03 (Q) C- 4 C 2 CK SA o/C Active CVT-O RR RJ-II CVT-C RR RJ-II BBV0211 M-12BB03 (Q) C- 4 C 2 CK SA 0/c Active CVT-O RR RJ-1I CVT-C RR RJ-II BBV0443 M-12BB03 (Q) C- 5 C 1.5 CK SA c Active CVT-O Q TP-08 CVT-C RR RJ- 12 BBV0444 M-12BB03 (Q) C-5 C 1.5 CK SA c Active CVT-O Q TP-08 CVT-C RR RJ- 12 BBV0445 M-12BB03 (Q) E- 6 C 1.5 CK SA c Active CVT-O Q TP-08 CVT-C RR RJ-12 BBV0446 M-12BB03 (Q) E- 6 C 1.5 CK SA C Active CVT-O 0 TP- 08 CVT-C RR RJ- 12 BBV0447 M-12BB03 (Q) E- 6 C 1.5 CK SA c Active CVT-O Q TP-01, TP-08 CVT-C RR RJ-12 Revision Date: 9/02/15Pae 4 Page 146

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BBV0448 M-12BB03(Q) E-6 3 C 1.5 CK SA C Active CVT-O Q TP-01, TP-08 CVT-C RR RJ-12 BBV0449 M-12BB03 (Q) E- 6 c 1.5 CK SA c Active CVT-O 0 TP-01, TP-08 CVT-C RR RJ- 12 BBV0 450 M-12BB03 (Q) E- 6 c 1.5 CK SA Active CVT-O Q TP-01, TP-08 CVT-C RR RJ- 12 BG8121 M-12BG01 (Q) D-3 c 2x3 RV SA 0/c Active RVT 1IOY BG8 123 M-12BG01 (Q) H- 4 2x3 RV SA o/C Active RVT IOY BG8 124 M-12BG01 (Q) C- 7 2 x3 RV SA 0/c Active RVT icY BG 8381 M-12BG01 (Q) F- 4 A/C 3 CK SA Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT -1 App J BG8440 M-12BG03 (Q) E- 6 C 4 CK SA 0/c Active CVT-O 0 CVT-C RR RJ-03 BG8481A M-12BG03 (Q) C- 4 C 4 CK SA 0/c Active CVT-O RR RJ-04 CVT-C CS B08 481lB M-12BG03 (Q) B-4 C 4 CK SA 0/c Active CVT-O RR RJ-04 CVT-C CS BG8497 M-12BG03 (Q) D-4 C 3 CK SA Active CVT-O Q TP-01, TP-08 CVT-C 0 BG8546A M-12BG03 (Q) C-7 A/C 8 CK SA 0/C Active CVT-O RR RJ-05 CVT-C RR RJ-05 AT- 4 2Y B-7 2 A/C 8 CK SA 0/C Active BG8546B M-12BG03 (Q)

CVT-O RR RJ-05 CVT-C RR RJ-05 AT -4 2Y Revision Date: 9/02/15SPg 4 Page 147

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE P0S PASS RQMT FREQ REFERENCE BGHV8I00 M-12BG01(Q) D-2 2 A 2 GL MO C Active OMNI-C JOG TP-II AT-I App J BT-E RC TP-II BGHVSI04 M-i2BG05(Q) A- 4 2 B 2 GL MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II BGHVSI05 M-i2BG01 (Q) D-2 2 A 2 GL MO C Active OMNI-C JOG TP-II AT-I App J BT-E RC TP-II BGHVSI06 M-12BG03 (Q) D-2 2 B 3 GA MO C Active OMNI-C JOG TP-II BT-E RC TP-II BGEVSII0 M-12BG03 (Q) E- 4 2 B 2 GL MO 0/C Active OMNI-O JOG TP-II OMN 1-C JOG TP-II BT-E RC TP-I1 BGHVSIII M-12BG03 (Q) E- 4 2 B 2 GL MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II BGHV1II2 M-12BG01 (Q) D-2 2 A 2 GL MO C Active OMNI-C JOG TP-II AT-I App J BT-E RC TP-II PIT 2Y BGBV8152 M-i2BG0i1(Q) G- 3 2 A 3 GL AO C Active BT-C CS CSJ-10 FS T CS CSJ-10, TP-04 PIT 2Y AT -1 App J BGBVSI53A M-i2BG01 (Q) D-7 1 B 1 GL SO 0/C Active BT-O Q BT-C Q FST Q TP-04 PIT 2Y Revision Date: 9/02/I1Pae54 Page 148

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BGHV8153B M-12BG01(Q) D-7 1 B 1 GL SO O/C Active BT-O Q BT-C Q FS T Q TP-04 PIT 2Y BGHVSI54A M-12BG01 (Q) D- 8 1 B 1 GL SO 0/C Active BT-O Q BT-C Q FS T Q TP-04 PIT 2Y BGHV8154B M-12BG01 (Q) D-8 1 B 1 GL SO 0/C Active BT-O Q BT-C Q FS T Q "TP- 04 PIT 2Y BGHV8160 M-12BG01 (Q) F- 3 2 A 3 GL SO C Active BT-C CS CSJ-10 FST CS CSJ-10, TP-04 PIT 2Y AT-I AppJ BGHV8357A C- 4 2 B 1 GL MO 0/C Active M-12BG03 (Q)

OMN1-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II BGHV8357B M-12BG03 (Q) B- 4 2 B 1 GL MO 0/C Active OMN1-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II BGLCV0112B M-12BG03 (Q) F- 6 2 B 4 GA MO C Active OMNI-C JOG TP-II BT-E RC TP-II BGLCV0112C M-12BG03 (Q) F- 6 2 B 4 GA MO C Active OMNl-C JOG TP-1I BT-E RC TP-11 BGLCV0459 M-12BG01 (Q) H-7 1 B 3 GL AO C Active BT-C CS CS J-11 FS T CS CSJ-1I, TP-04 PIT 2Y Revision Date: 9/02/1 5 Pg 4 Page 149

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BGLCV0460 M-12BG01 (Q) H-7 1 B 3 GL AO C Active BT-C CS CSJ-II1 FS T CS CSJ-II, TP-04 PIT 2Y BGV0 091 M-12BG03 (Q) E- 4 C 2 CK SA 0 Active CVT-O Q CVT-C Q TP-01 BGV0 095 M-12BG03 (Q) E- 4 C 2 CK SA Active CVT-O Q CVT-C Q TP-01 BGV0 135 M-12BG01 (Q) D-2 A/C 0.75 CK SA 0/C Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J BGV0 147 M-12BG05 (Q) B- 6 C 3 CK SA 0/C Active CVT-O Q CVT-C Q BGV0 155 M-12BG05 (Q) B- 6 C 0.75 CE SA Active CVT-O Q CVT-C Q TP-01 BGV0 165 M-12BG05 (Q) A- 6 C 3 CE SA 0/C Active CVT-O Q CVT-C Q BGV0 167 M-12BG05 (Q) B- 6 C 0.75 CE SA Active CVT-O Q CVT-C Q TP-01 BGV0 174 M-12BG05 (Q) A- 4 C 3 CK SA 0/C Active CVT-O CS CS J-12 CVT-C CS CSJ-12 BGV0589 M-12BG03 (Q) B- 4 C 1 CK SA 0/C Active CVT-O Q CVT-C Q BGV0590 M-12BG03 (Q) C- 4 C 1 CK SA 0/C Active CVT-O Q CVT-C Q BGV0591 M-12BG03 (Q) D- 3 C 2 CK SA 0 Active CVT-O CM CVCM-1 0 CVCM-1 0 CVT-C CM A-5 2 C .75xi RV SA BGV0850 M-12BG05 (Q) 0/C Active RVT IOY Revision Date: 9/02/15 Page Pg 150 5

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BGV0851 M-12BG05(Q) E-2 2 C .75xi RV SA 0/C Active RVT 1IOY BL8046 M-12BL01 (Q) B- 4 2 A/C 3 CK AC C Active CVT-C Q TP-01 CVT-C Q AT-i AppJ BLHV8047 M-12BL01 (Q) B-4 2 A 3 DIA AC C Active BT-C Q EST Q TP-04 PIT 2Y AT-i AppJ BMHV0001 M-12BM01 (Q) F- 5 2 B 4 GL AC C Active BT-C Q FS T Q TP-04 PIT 2Y BMHV0002 M-12BM01 (Q) D-5 2 B 4 GL AC C Active BT-C Q FSTI C TP-04 PIT 2Y BMHV0003 M-12BM01 (Q) C-5 2 B 4 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y BMHV0004 M-12BM01 (Q) A-5 2 B 4 GL AC C Active BT-C 0 FS T 0 TP-04 PIT 2Y BMHV0019 M-12BM01 (Q) G- 7 Active 2 B i GL SC BT-C 0 FSTI Q TP-04 PIT 2Y BMHV0020 M-12BM01 (Q) E- 7 2 B 1 GL SC Active BT-C 0 FST Q TP-04 PIT 2Y BMHV0021 M-12BM01 (Q) D-7 2 B 1 GL SO Active BT-C Q FST 0 TP-04 PIT 2Y Revision Date: 9/0 2/1 5 Pg 5 Page 151

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE 20S PASS RQMT FREQ REFERENCE BMHVOO22 M-12BMO1(Q) B-7 2 B 1 CL SO Active BT-C Q FST Q TP-04 PIT 2Y BMEV0O35 M-12BMO1 (Q) C- 7 2 B 1 CL SO Active BT-C Q FS T Q TP-04 PIT 2Y BMHVOO36 M-12BM01(Q) E-7 2 B 1 CL SO Active BT-C Q FST Q TP-04 PIT 2Y BMHVO037 M-12BM01 (Q) C-7 2 B 1 CL SO Active BT -C C FST C TP-04 PIT 2Y BMEVOO38 M-12BM01 (Q) B-7 2 B 1 GL SO Active BT -C Q FS T C TP-04 PIT 2Y BMHVOO65 M-i2BMO1 (Q) C- 6 2 B 1 GL SO Active BT -C C FS T C TP-04 PIT 2Y BMHVOO66 M-12BM01 (Q) E- 6 2 B 1 CL SO Active BT-C Q FS T Q TP-04 PIT 2Y BMHVOO67 M-12BM01 (Q) D- 6 2 B 1 GL SO Active BT-C C FS T C TP- 04 PIT 2Y BMHV0O6S M-12BMOT1(Q) B- 6 2 B 1 CL SO Active BT-C Q FST Q TP- 04 PIT 2Y BMV0045 M-12BM01(Q) A- 4 2 A 3 CA M C Passive AT-I App J BMVOO46 M-12BMO1 (Q) A-3 2 A 3 CA M C Passive AT-I App J Revision Date: 9/02/15 Pg 152 Page 5

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BN8717 M-12BN01(Q) B-5 2 A 8 GA M C Passive PIT 2Y AT- 4 2Y BNHCV8800A M-l2BN01 (Q) E- 5 2 B 3 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y BNHCV8800B M-12BN01 (Q) E-5 2 B 3 GL AO C Active BT -C Q FS T Q TP-04 PIT 2Y BNHV0003 M-12BN01 (Q) C-3 2 B 12 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-11 BT-E RC TP-I11 BNHV0004 M-12BN01 (Q) A- 3 2 B 12 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II BNHV8806A M-l2BN01 (Q) B-5 2 A 8 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-11 AT -4 2Y BNHV8806B M-12BN01 (Q) D- 3 2 A 8 GA MO 0/C Active OMNI-O JOG TP-I11 OMN1-C JOG TP-II BT-E RC TP-11 AT- 4 2Y BNHV8 812A M-12BN01 (Q) B-3 2 B 14 GA MO 0/C Active OMNI1-0 JOG TP-I1 OMNI1-C JOG TP-11 BT -E RC TP-II BNHV8812B M-12BN01 (Q) D-3 2 B 14 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-1I Revision Date: 9/02/15 Pg 5 Page 153

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORID CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE BNHV8813 M-12BN01(Q) B-7 2 A 2 GL MO 0/C Active OMN1-O JOG TP-1I OMNI-C JOG TP-II BT-E RC TP-II AT-4 2Y BNLCV0112D M-i2BN01 (Q) A- 5 2 A 8 GA MO 0/C Active OMNI-O JOG TP-1I OMNI-C JOG TP-II BT-E RC TP-II AT- 4 2Y BNLCV0112E M-i2BN01 (Q) E-3 2 A 8 GA MO 0/C Active OMNI-O JOG TP-II OMN1-C JOG TP-II BT-E RC TP-II AT- 4 2Y BNV0011 M-12BN01 (Q) F- 4 2 B 24 GA M 0 Passive PIT 2Y ECI-V0011 M-12EC01 (Q) H- 5 3 B 12 BTF MO C Active OMNI-C JOG TP-1I BT-E RC ECHV0012 M-12EC01(Q) E- 5 3 B 12 BTF MO C Active OMNI-C JOG TP-II BT-E RC ECV0004 M-12EC01(Q) H- 6 3 C 10 CK SA 0/C Active CVT-O Q CVT-C Q ECV0013 M-12EC01 (Q) E- 6 3 C 10 CK SA 0/C Active CVT-O Q

CVT-C Q ECV0025 M-i2EC01 (Q) F- 4 3 H 6 GL M C Active BT-E 2Y ECV0033 M-12EC01 (Q) D- 5 3 B 6 GL M C Active BT-E 2Y ECV0076 M-i2EC01 (Q) E- 4 3 B 6 GL M C Active BT-E 2Y ECV0083 M-12EC02(CQ) C- 5 2 A 6 GA M C Passive AT-I App J ECV0084 M-12EC02(CQ) C- 6 2 A 6 GA M C Passive AT-I App J Revision Date: 9/02/15 Pg 154 Page 5

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID I [ST TEST ATTACHMENT 1ST VALVE VALVE ACT SAFETY ACTIVE! TEST NUMBER NUMBER COORD CL LASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ECV0 087 M-12EC02 (Q) D- 7 2 A 6 GA M C Passive AT-I App J ECV0 088 M-12EC02 (Q) D-7 2 A 6 GA M C Passive AT-I App J ECV0 095 M-12EC02 (Q) B-5 2 A 3 GA M C Passive AT -1 App J ECV0 096 M-12EC02 (Q) B-5 2 A 3 GA M C Passive AT-I App J EFHV0023 M-i2EF01 CQ) F- 7 3 B 30 BTF MO C Active OMNI-C JOG TP-II BT-E RC F- 7 3 B 30 BTF MO

  • C Active EFBV0024 M-i2EF0i1(Q)

OMN I-C JOG TP-II BT-E RC EFHVOO2B M-i2EF0i1(Q) F- 7 3 B 30 BTF MO C Active OMNI-C JOG TP-II BT-E RC TP-II EFHV0026 M-12EF01 (Q) F- 7 3 B 30 BTF MO C Active OMN I-C JOG TP-II BT-E RC TP-II EFEV0O31 M-12EF02 (Q) G- 8 2 A i4 BTF MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II AT-i App J BT -E RC TP-ii EFBVO032 M-12EF02 (Q) 0-8 2 A 14 BTF MO 0/C Active OMNI-O JOG TP-ii OMN I-C JOG TP-II AT -I App J BT-E RC TP-II EFHV0O33 M-12EF02 (Q) G-7 2 A 14 BTF MO O/C Active OMNI1-0 JOG TP-II OMNI-C JOG TP-II AT-I App J BT -E RC TP-II EFBVOO34 M-i2EFO2 (Q) 0-7 2 A 14 BTF MO 0/C Active OMNI-O JOG TP-II OMN i-C JOG TP-II AT -I App J BT-E RC TP-II Revision Date: 9/02/iSPae55 Page 155

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID I [ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CL LASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EFHV0 037 M-12EF02 (Q) G- 3 3 B 30 BTF MO 0 Active OMN1-O JOG TP-1I BT -E RC TP-1I EFHV0 038 M-12EF02 (Q) 0-3 3 B 30 BTF MO 0 Active OMNI-O JOG TP-II BT-E RC TP-II EFHV0039 M-12EF02 (Q) F- 3 3 B 30 BTF MO C Active OMNI-C JOG TP-II BT-E ,RC TP-1I E FH-V 004 0 M-12EF02(CQ) D-3 3 B 30 BTF MO C Active OMNI1-C JOG TP-II BT -E RC TP-II EFBV0O41 M-12EF02 (Q) E-3 3 B 30 BTF MO C Active OMN1-C JOG TP-11 BT-E RC TP-II EFHVO0042 M-12EF02 (Q) D-3 3 B 30 BTF MO C Active OMN1-C JOG TP-II BT-E RC TP-II E FHV0 043 M-12EF02 (Q) E-7 3 B 2 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y EFH-V0044 M-12EF02 (Q) B-7 3 B 2 GL AO C Active BT-C Q FS T 0 TP-04 PIT 2Y EFHVOO45 M-12EF02 (Q) 2 A 14 BTF MO O/C Active OMN1-O JOG TP-lI OMNI1-C JOG TP-iI AT-I App J BT-E RC TP-II EFHVOO46 M-12EF02 (Q) C-6 2 A 14 BTF MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-11 AT-I App J BT-E RC TP-II Revision Date: 9/02/15 Pg 5 Page 156

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EFHVO049 M-12EF02(Q) G-6 2 A 14 BTF MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II AT-I App J BT-E RC TP-II EFHV0050 M-12EF02 (Q) C- 6 2 A 14 BTF MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-I1 AT-i App J BT-E RC TP-1I EFHV0051 M-12EF02 (Q) G-5 3 B 24 BTF MO 0 Passive PIT 2Y EFHV0052 M-12EF02 (Q) D- 5 3 B 24 BTF MO 0 Passive PIT 2Y EFHV0059 M-12EF02 (Q) G- 3 3 B 24 BTF MO 0/C Active OMNI-O JOG TP-II OMN1-C JOG TP-lI BT-E RC TP-II EFHV0060 M-12EF02 (Q) C- 3 3 B 24 BTF MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II EFHV0091 M-12EF01 (Q) F- 6 3 B 3 GA MO 0 Active OMNI-O JOG TP-II BT-E RC TP-1I EFHV0092 M-12EF01 (Q) B- 6 3 B 3 GA MO 0 Active OMNI-O JOG TP-II BT-E RC TP-11 EFHV0097 M-12EF01 (Q) E-5 3 B 3 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II EFHV0098 M-i2EF01 (Q) B- 5 3 B 3 GA MO 0/C Active OMNI-O JOG TP-ii OMN i-C JOG TP-II BT-E RC TP-II EFPDV0019 M-i2EF01(CQ) E- 4 3 B 3 GA MO 0/C Active OMNi-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II Revision Date: 9/02/1 5 Pg 5 Page 157

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE/ TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EFPDV0020 M-12EF01(Q) B-4 3 B 3 GA MO 0/C Active OMNI-O JOG TP-II OMN 1-C JOG TP-1I BT-E RC TP-II E FV0 001 M-12EF01 (Q) F- 4 30 CK SA 0 Active CVT-O Q CVT-C Q TP-01 E FVO0004 M-12EFO1 (Q) C- 4 30 CK SA 0 Active CVT-O Q CVT-C 0 TP-01 E FV0 046 M-12EF01 (Q) E- 6 30 CK SA 0 Active CVT-O 0 CVT-C 0 TP-01 EFV0076 M-i2EF01 (Q) B- 6 30 CK SA 0 Active CVT-O Q CVT-C Q TP-01 E FV0 470 M-12EF01 (Q) F- 7 30 CK SA 0 Active CVT-O -Q CVT-C Q T P-01 E FV0 471 M-12EF01 (Q) E-7 30 CK SA 0 Active CVT-O Q CVT-C Q TP-01 E FV0 476 M-12EF02 (Q) F- 4 4 CK SA o/C Active CVT-O RR RJ-09 CVT-C RR RJ-09 EFV0 478 M-12EF02 (Q) F- 4 4 CK SA 0/c Active CVT-O RR RJ-09 CVT-C RR RJ-09 E FV0 482 M-12EF02 (Q) B-2 4 CK SA 0/c Active CVT-O RR RJ-09 CVT-C RR RJ-09 EEV0 484 M-12EF02 (Q) B- 2 4 CK SA 0/c Active CVT-O RR RJ-09 CVT-C RR RJ-09 EGHV0011 M-12EG01 (Q) F- 8 1.5 GL MO 0 Active OMNI-O JOG TP-11 TP-II BT-E RC EGHV0012 M-12EG01(Q) C- 8 3 B 1.5 GL MO 0 Active OMN1-O JOG TP-1I BT -E RC TP-1I Revision Date: 9/02/15 Page Pg 158 5

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EGHV0013 M-12EG01 (Q) F-7 3 B 1.5 GL MO 0 Active OMNI-O JOG TP-II BT-E RC TP-II EGHV0014 M-12EG01 (Q) C- 7 3 B 1.5 GL MO 0 Active OMNI-O JOG TP-1I BT-E RC TP-11 EGHV0015 M-i2EG01 (Q) D- 6 18 BTF MO 0/C Active 3 B OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-1I EGHV0016 M-i2EGO1 (Q) C- 6 3 B 18 BTF MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-I1 BT-E RC TP-11 EGHV0053 M-12EG02 (Q) G-5 3 B 18 BTF MO C Active OMNI-C JOG TP-11 BT-E RC TP-II EGHV0054 M-12EG02 (Q) E-5 3 B 18 BTF MO C Active OMNI-C JOG TP-II BT-E RC TP-II EGHV0058 M-12EG03 (Q) H- 5 2 A 12 GA MO C Active OMNI-C JOG TP-11 AT-I App J BT-E RC TP-11 EGHV0059 M-12EG03(Q) C- 5 2 A 12 GA MO C Active OMNI -C JOG TP-II AT-i App J BT -E RC TP-II EGHV0060 M-12EG03 (Q) B- 5 2 A 12 GA MO C Active OMNI-C JOG TP-II AT-i App J BT-E RC TP-11 EGHV0061 M-12EG03(Q) C- 4 2 A 4 GA MO C Active OMNI-C JOG TP-II AT-I App J BT-E RC TP-II EGHV0062 M-12EG03 (Q) B- 4 2 A 4 GA MO C Active OMNI-C JOG TP-1I AT-I App J BT-E RC TP-1I Revision Date: 9/02/15SPg 5 Page 159

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTILVE/ TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EGHV0069A M-12EG03 (Q) G-8 3 B 14 BTF AO C Active BT-C Q FST Q TP-04 PIT 2Y EGHV0069B M-12EG03 (Q) G- 6 3 B 14 BTF AO C Active BT-C Q FST Q TP-04 PIT 2Y EGHVO0070CA M-12EG03 (Q) F- 8 3 B 14 BTF AO C Active BT-C Q FST Q TP-04 PIT 2Y EGHV0 070GB M-12EG03 (Q) F- 6 3 B 14 BTF AO C Active BT-C Q FST Q TP-04 PIT 2Y G- 2 3 B 2 GL MO C Active EGHV0072 M-12EG02 (Q)

OMNI-C JOG TP-II BT-E RC TP-II EGHV0073 M-12EG02 (Q) G- 2 3 B 2 GL MO C Active OMNI-C JOG TP-II BT-E RC TP-II EGBV0074 M-12EG02 (Q) G-I1 3 B 2 GL MO C Active OMNI-C JOG TP-II BT-E RC TP-II EGHV0075 M-12EG02 (Q) G-I1 3 B 2 GL MO C Active OMNI-C JOG TP-II BT-E RC TP-II EGHV0101 M-12EG02 (Q) G- 4 3 B 18 BTF MO 0/C Active OMNI-O JOG TP-1I OMNI-C JOG TP-II BT-E RC TP-II EGHV0102 M-12EG02 (Q) C- 4 3 B 18 BTF MO 0/C Active OMNI1-0 JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-1I EGHV0127 M-12EG03(Q) G- 5 2 A 12 GA MO C Passive OMNI-C JOG TP-II AT-I App J Revision Date: 9/02/15 Pg 6 Page 160

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD C:LASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EGHV0130 M-12EG03(Q) B-5 2 A 12 GA MO C Passive OMN1-C JOG TP-I1 AT-i App a EGHV0131 M-12EG03 (Q) C- 5 2 A 12 GA MO C Passive OMNI-C JOG TP-II AT-I App J EGHV0 132 M-12EG03 (Q) B- 4 2 A 4 GA MO C Passive OMNI-C JOG TP-II AT-I App J EGHV0 133 M-12EG03 (Q) C-S 2 A 4 GA MO C Passive OMN1-C JOG TP-lI AT-i App J EGLV0 001 M-12EG01 (Q) G- 7 3 B 3 Gb AO C Active B T-C Q FST Q TP- 04 PIT 2Y EGLV0002 M-12EG01(Q) B- 7 3 B 3 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y EGRV0009 M-12EG01 (Q) G- 6 3 B 2 CL AO C Active BT-C Q FS T Q TP- 04 PIT 2Y EGRV0010 M-12EG01 (Q) C- 6 3 B 2 Gb AO C Active BT-C Q FS T Q TP- 04 PIT 2Y EGVOOO3 M-12EG01 (Q) G-3 3 C 20 CK SA 0/C Active CVT-O Q CVT-C Q EGV0007 M-12EG01 (Q) E- 3 3 C 20 CK SA 0/C Active CVT-O Q CVT-C Q EGV0012 M-12EG01 (Q) D-3 3 C 20 CK SA 0/C Active CVT-O Q CVT-C Q EGV0016 M-12EG01 (Q) B-3 3 C 20 CK SA 0/C Active CVT-O Q CVT-C Q Revision Date: 9/02/]15ag 6 Page 161

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID TEST ATTACHMENT IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST NUMBER NUMBER COORD CILASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EGV0024 M-12EG02 (Q) G- 6 3 C .75xi RV SA 0/C Active RVT icY EGV0 027 M-12EG02 (Q) G- 6 3 C .75xi RV SA 0/C Active RVT icy EGV0 049 M-12EG02 (Q) G- 6 3 C .75xi RV SA 0/C Active RVT icY EGV0 052 M-12EG02 (Q) G- 6 3 C .75xi RV SA 0/C Active RVT icY EGV012~24 M-12EG03 (Q) D- 4 3 C 4 CK SA 0 Active CVT-O Q TP-08 CVT-C RR TP-0i EGV0i29 M-i2EG03(Q) D- 5 3 C 4 CK SA 0 Active CVT-O Q TP-08 CVT-C RR TP-01i EGV0130 M-i2EG03(CQ) D- 6 3 C 4 CK SA 0 Active CVT-O Q TP-08 CVT-C RR TP-c1 EGV0i3i M-i2EG03(Q) 3 C 4 CK SA 0 Active CVT-O Q TP-08 CVT-C RR TP-0i EGV0ci59 M-i2EG0i (Q) 3 C 2x3 RV SA 0/C Active G- 6 RVT icy EGV01i70c M-12EG01 (Q) C- 6 3 C 2x3 RV BA 0/C Active RVT icy EGV0204 M-i2EG03 (Q) H- 4 2 A/C 12 CK BA C Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J EGV 030c5 M-i2EG0i (Q) G- 6 3 C xix RV BA 0/C Active RVT 2Y EGV0306 M-i2EG0i CQ) C- 6 3 C lil RV BA 0/C Active RVT 2Y EGV0448 M-12EG03 (Q) F- 6 3 C 8 CK BA C Active CVT-O Q CVT-C Q EGV0449 M-i2EG03 (Q) F- 6 3 C 8 CK BA C Active CVT-O Q CVT-C Q Revision Date: 9/02/15SPg 6 Page 162

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EJ8708A M-12EJ01(Q) G-8 2 C 3x4 RV SA 0/C Active RVT 1lOY EJ8708B M-12EJ01 (Q) C- 8 2 C 3x4 RV SA O/C Active RVT EJ8730A M-12EJ01 (Q) C- 4 2 C 10 CK SA 0/C Active CVT-O CM CVCM-03 CVT-C CM CVCM-03 EJ8730B M-12EJ01 (Q) C- 4 2 C 10 CK SA 0/C Active CVT-O CM CVCM-03 CVT-C CM CVCM-03 EJ8841A M-12EJ01(Q) E-2 1 A/C 6 CK SA 0/C Active CVT-O CM CVCM-15 CVT-C CM CVCM-15 AT -2 1. 5Y CVCM-1 5 EJ8841B M-12EJ01(Q) D-2 1 A/C 6 CK SA 0/C Active CVT-O CM CVCM-15 CVT-C CM CVCM-15 AT-2 1.5 CVCM-15 EJ8842 M-12EJ01(Q) D-3 2 C .75xi RV SA 0/C Active RVT icy EJ8856A M-12EJ01(Q) G-3 2 C .75xi RV SA 0/C Active RVT icY EJ8856B M-12EJ01(Q) B-3 2 C .75xi RV SA 0/C Active RVT icy EJ8958A M-12EJ01 (0) F- 6 2 A/C 14 CK SA 0/C Active CVT-O CM CVCM-07 CVT-C CM CVCM-07 AT- 4 2Y CVCM-07 EJ8958B M-12EJ01 (Q) B- 6 2 A/C 14 CK SA 0/C Active CVT-O CM CVCM-07 CVT-C CM CVCM-07 AT-4 2Y CVCM-07 EJ8969A M-12EJ01 (Q) G- 4 2 C 8 CK SA 0 Active CVT-O CM CVCM-0 8 CVT-C CM CVCM-08 EJ8969B M-12EJ01 (Q) A- 4 2 C 8 CK SA 0 Active CVT-O CM CVCM-08 CVT-C CM CVCM-08 Revision Date: 9/02/15 Pg 6 Page 163

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&IID TEST TEST ATTACHMENT EST 1ST VALVE VALVE ACT SAFETY ACTIVE!

NUMBER NUMBER COORD C]LASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EJFCVO61O M-12EJ01(Q) 8-6 2 B 3 GA MO 0/C Active OMN1-O JOG TP-1I OMI-C JOG TP-11 BT-E RC TP-1I 2 B 3 GA MO 0/C Active EJFCV0611 M-12EJ01 (Q) A- 6 OMN1-O JOG TP-II 0M1-C JOG TP-11 BT-E RC TP-II EJFCV0 613 M-12EJ01 (Q) F-S 2 B 8 BTF AG C Passive PIT 2Y EJECV0 619 M-12EJ01 (Q) B-S 2 B 8 BTF AG C Passive PIT 2Y EJI-CV0606 M-12EJ01 (Q) G- 4 2 B 10 BTF AO C Passive PIT 2Y EJHCVO0607 M-12EJ01 (Q) 0-4 2 B 10 BTF AG C Passive PIT 2Y EJHCVS8825 M-12EJ01 (Q) E-2 2 B 0.7S GL AG C Passive PIT 2Y EJHCV8890A M-12EJ01 (Q) F-3 2 B 0.75 GL AG C Active BT-C Q FS T Q TP-04 PIT 2Y EJBCV8890B M-12EJ01 (Q) 0-2 2 B 0.75 GL AG C Active BT-C Q FST Q TP-04 PIT 2Y EJHV0 014 M-12EJ01 (Q) H-S 2 B 1 GL SO C Passive PIT 2Y EJHV0015 M-12EJ01 (Q) A-S 2 B 1 GL SO C Passive PIT 2Y EJBV87O1A M-12EJ01 (Q) F-8 1 A 12 GA MO C Active OMNI-C JOG TP-1I AT -4 1. SY BT-E RO TP-11 F-8 1 A 12 GA MO C Active EJHVS7O1B M-12EJ01 CQ)

OMN1-C JOG TP-1I AT-4 1 .5Y BT-E TP-II Revision Date: 9/02/1SPae56 Page 164

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EJHV8716A M-12EJ01(Q) F-8 2 B 10 GA MO 0/C Active OMNI-O JOG TP-11 OMNI-C JOG TP-II BT-E RC TP-II EJHV8716B M-12EJ01(CQ) D-4 2 B 10 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II EJHV8804A M-12EJO1 (Q) G-4 2 B 8 GA MO 0/C Active OMNI-O JOG TP-1I OMNI-C JOG TP-II BT-E RC TP-II EJHV8804B M-12EJ01 (Q) A- 4 2 B 8 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-11 BT-E RC TP-1I EJHV8809A M-12EJ01 (Q) G- 3 2 B 10 GA MO 0/C Active OMN1-O JOG TP-1I OMN1-C JOG TP-1I BT-E RC TP-II EJHV8809B M-12EJO1 (Q) F- 8 2 B 10 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-11 EJHV8811A M-12EJ01 (Q) E-7 2 B 14 GA MO 0/C Active OMN1-O JOG TP-1I OMNI1-C JOG TP-II BT-E RJ- 6 EJH-V8811B M-12EJ01 (Q) D-7 2 B 14 GA MO 0/C Active JOG OMNI-O TP-1I JOG OMNI1-C TP-II BT-E RC RJ- 6 EJHV8840 M-12EJ01 (Q) E-3 2 B 10 GA MO 0/C Active OMN1-O JOG TP-II OMNI1-C JOG TP-11 BT-E RC TP-II EM8815 M-12EM02 (Q) D-3 1 A/C 3 CK SA 0/C Active CVT-O RR RJ- 07 CVT-C 1.5Y RJ- 07 AT-2 1.5Y Revision Date: 9/02/15SPg Page 165 6

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EM8851 M-12EM01(Q) C-4 2 C .75x1 RV SA 0/C Active RVT i0Y EM8853A M-12EM01(Q) F- 5 2 C .75xi RV SA 0/C Active RVT 10Y EM8853B M-12EM01 (Q) E-5 2 C .75xi RV SA 0/C Active RVT 10Y EMBO58A M-12EM01 (Q) E- 7 2 C .75xi RV SA 0/C Active RVT 10DY EM8858B M-12EM01 (Q) D-7 2 C .75xi RV SA 0/C Active RVT 10DY EM8922A M-12EM01 (Q) E- 6 2 C 4 CK SA 0/C Active CVT-O RR RJ-08 CVT-C RR RJ- 08 EM8922B M-12EM01 (Q) D-5 2 C 4 CK SA 0/C Active CVT-O RR RJ-08 CVT-C RR RJ-08 EM8926A M-12EM01 (Q) E-7 2 A/C 8 CK SA 0/C Active CVT-O CM CVCM-05 CVT-C CM CVCM-05 AT -4 2Y EM8926B M-12EM01{(Q) D-7 2 A/C 8 CK SA 0/C Active CVT-0 CM CVCM-05 CVT-C CM CVCM-05 AT -4 2Y EMHV8801A M-12EM02 (Q) D- 4 2B 4 GA MO 0/C Active OMN1-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II D-4 2B 4 GA MO 0/C Active EMHV8801B M-12EM02 (Q)

OMN1-O JOG TP-1I OMNI-C JOG TP-II BT-E RC TP-II EMHV8 802A M-12EM02 (Q) E- 4 2 B 4 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT -E RC TP-II EMHV8802B M-12EM02 CQ) D-4 2 B 4 GA MO 0/C Active OMNI1-C JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II Revision Dale: 9/02/15 Pg 6 Page 166

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST 1ST VALVE VALVE ACT SAFETY ACTIVE/ TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EMHV8803A M-12EM02(Q) C-7 2 B 4 GA MO 0 Active OMNI-O JOG TP-II BT-E RC TP-II EMHV8803B M-12EM02 (Q) A- 7 2 B 4 GA MO 0 Active OMNI-O JOG TP-II BT-E RC TP-II EMHV8 807A M-12EM01 (Q) G- 7 2 B 6 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II EMHV8807B M-12EM01 (Q) F- 7 2 B 6 GA MO 0/C Active OMNI-0 JOG TP-II OMNI1-C JOG TP-II BT -E RC TP-II EMHV8814A M-12EM01 (Q) B- 6 2 A 1.5 GL MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II AT- 4 2Y BT-E RC TP-II1 EMHV8814B M-12EM01 (Q) B- 5 2 A 1.5 GL MO 0/C Active OMNI-O JOG TP-II OMN1-C JOG TP-1I AT- 4 2Y BT-E RC TP-II EMHV8821A M-12EM01(Q) E- 4 2 B 4 GA MO 0/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-11 BT-E RC TP-11 EMHV8821B M-12EM01 (Q) D- 4 2 B 4 GA MO 0/C Active OMN1-O JOG TP-II OMN1-C JOG TP-II BT-E RC TP-lI EMHV8823 M-12EM01 (Q) C- 4 2 B 0.75 GL AO C Active BT-C Q FST Q TP-04 PIT 2Y EMHV8824 M-12EM01 (Q) D-3 2 B 0.75 GL AO C Active BT-C Q FST Q TP-04 PIT 2Y Revis~ion Date: 9/02/15 Pg 6 Page 167

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 2IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CISASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EMI-V8835 M-12EM01(Q) B-4 2 B 4 GA MO C/C Active OMNI-O JOG TP-II OMNI1-C JOG TP-II BT-E RC TP-II EMHV8843 M-12EM02 (Q) C-4 2 B 0.75 GL AO C Active BT-C Q FST Q TP-04 PIT 2Y EMHV8871 M-12EM01 (Q) H- 5 2 A 0.75 GL AC C Active BT-C Q FST Q TP-04 PIT 2Y AT-I App J EMNV88S1 M-12EM01 (Q) 2 B 0.75 GL AC C Active BT-C Q FS T Q TP-04 PIT 2Y EMHV8882 M-12EM02 (Q) C- 3 2 B 0.75 GL AO C Passive PIT 2Y EMHV 8888 M-12EM01 (Q) F- 6 2 A 1 GL AO C Active BT-C Q FS T Q TP-04 PIT 2Y AT-I App J EMHV8889A M-12EM01 (Q) G-2 2 B 0.75 GL AO C Passive PIT 2Y EMHV8889B M-12EM01 (Q) C-3 2 B 0.75 GL AO C Passive PIT 2Y EMHV8889C M-12EM01 (Q) G-2 2 B 0.75 GL AC C Passive PIT 2Y EMHV8 88 9D M-12EM01 (Q) G- 2 2 B 0.75 GL AO C Passive PIT 2Y EMHV8 92 3A M-12EM01 (Q) E-7 2 B 6 GA MO Passive PIT 2Y EMHV8923B M-12EM01 (Q) D-7 2 B 6 GA MO C Passive PIT 2Y Revision Date: 9/02/15 Page 168 Pg 6

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EMHV8964 M-12EM01(Q) H-5 2 A 0.75 GL AO C Active BT-C Q FST Q TP-04 PIT 2Y AT-I App J EMV0001 M-12EM01 (Q) F-3 1 A/C 2 CK SA 0/C Active CVT-O CM CVCM-1 3 CVT-C CM CVCM-13 AT -2 1. 5Y CVCM-13 EMVO002 M-12EM01 (Q) E-3 1 A/C 2 CK SA 0/C Active CVCM-13 CVT-O CM CVT-C CM CVCM-13 AT-2 1.5Y CVCM-13 EMV0003 M-12EM01 (Q) D- 3 1 A/C 2 CK SA 0/C Active CVT-O CM CVCM-13 CVT-C CM CVCM-13 AT-2 1. 5Y CVCM-1 3 EMV0004 M-12EM01(CQ) C-3 1 A/C 2 CK SA 0/C Active CVT-O CM CVCM-13 CVT-C CM CVCM-13 AT-2 1 .5Y CVCM-13 EMV0005 M-12EM01 (Q) A- 6 2 C 1.5 CK SA 0 Active CVT-O Q CVT-C Q TP-01 EMV0006 M-12EM01(CQ) F- 6 2 A/C 1 CK SA 0 Active TP-01 CVT-O RR CVT-C Q AT-I App J EMV0007 M-12EM01 (Q) A- 5 2 C 1.5 CK SA 0 Active CVT-O Q CVT-C Q TP-01 EMV0251 M-12EM01 (Q) H- 4 3 C .75xi RV SA 0 Active RVT 10Y ENHV0001 M-12EN01 (Q) G-7 2 B 12 GA MO 0/C Active OMNI-O JOG TP-1I OMN1-C JOG TP-I1 BT-E RC TP-11 Revision Dale: 9/02/15Pae 6 Page 169

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE P03 PASS RQMT FREQ REFERENCE ENHVO000 M-12EN01(Q) G-4 2 B 10 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II ENHV0007 M-12EN01 (Q) B-7 2 B 12 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-11 BT-E RC TP-11 ENBV0012 M-12EN01 (Q) B- 4 2 B 10 GA MO 0/C Active OMNI-O JOG TP-II OMNI-C JOG TP-II BT-E RC TP-II ENBV0015 M-12EN01 (Q) E- 6 2 B 3 GA MO 0/C Active OMNI-O JOG TP-II OMN1-C JOG TP-II BT-E RC TP-II ENHV0016 M-12EN01(Q) D- 6 2 B 3 GA MO 0/C Active OMNI-O JOG TP-I1 OMNI1-C JOG TP-1I BT-E RC TP-11 ENV0002 M-12EN01(Q0) G-7 2 C 12 CK SA 0 Active CVT-O SDE TP-10 CVT-C SDE TP-10 ENV0003 M-12EN01 (Q) G-7 2 A/C 12 CK SA 0/C Active CVT-O S DE TP- 10 CVT-C 2Y/SDE TP-10 AT-4 2Y ENV0004 M-12EN01 (Q) 0-5 2 C 10 CK SA 0 Active CVT-O SDE TP-10 CVT-C SDE TP-10 ENV0008 M-12EN01 (Q) B- 7 2 C 12 CK SA 0 Active CVT-O SDE TP-10 CVT-C SDE TP-10 ENV0009 M-12EN01 (Q) B- 7 2 A/C 12 CK SA 0/C Active CVT-O S DE TP-10 CVT-C 2 Y/ SDE TP-10 AT- 4 2Y ENV0010 M-12EN01 (Q) B- 5 2 C 10 CK SA 0 Active CVT-O SDE TP-10 CVT-C SDE TP-10 Revision Date: 9/02/15SPg 7 Page 170

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE ENV0013 M-12EN01(Q) G-4 2 C 10 CK SA 0 Active CVT-O SDE TP-lO CVT-C SDE TP-lO ENV0017 M-12EN01 (Q) B- 4 2 C 10 CK SA 0 Active CVT-0 SDE TP-IO CVT-C SDE TP-IO ENV0057 M-l2EN01 (Q) F- 5 2 C .75xi RV SA 0 Active RVT laY ENV0058 M-12EN01 (Q) F- 5 2 C xix RV SA 0 Active RVT 2Y 4VR-01 ENV0097 M-l2EN01(Q) D- 5 2 B 3 GA M 0 Passive PIT 2Y ENV0099 M-12EN01 (Q) F- 6 2 C 3 CK SA 0 Active CVT-0 Q CVT-C Q TP-01 ENV0101 M-12EN01 (Q) C- 6 2 C 3 CK SA 0 Active CVT-O Q CVT-C Q TP-01 ENV0106 M-12EN01 (Q) F- 5 2 C lix RV SA 0 Active RVT 2Y 4 VR- 01 EP8818A M-l2EP01 (Q) G- 3 1 A/C 6 CK BA 0/C Active CVT-0 CM CVCM-01 CVT-C CM CVCM-01 AT -2 1.5Y CVCM-01 EP8818B M-12EP01 (Q) F- 3 1 A/C 6 CK BA 0/C Active CVT-0 CM CVCM-01 CVT-C CM CVCM-01 AT-2 1.5Y CVCM-01 EP8818C M-12EP01(Q) D-3 1 A/C 6 CK BA 0/C Active CVT-O CM CVCM-0 1 CVT-C CM CVCM-0 1 AT-2 1.5SY CVCM-01 EP8818D M-12EP01(Q) C- 3 1 A/C 6 CK BA 0/C Active CVT-0 CM CVCM-01 CVT-C CM CVCM-01 AT-2 1.5Y CVCM-0 1 EP8855A M-12EP01 (Q) H- 7 2 C ix2 RV BA 0/C Active RVT l0y R~evision Date: 9/02/1 5 Pg 7 Page 171

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CJLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EP8855B M-12EP01 (Q) F- 7 2 C ix2 RV SA O/C Active RVT 10OY EP8855C M-12EP01 (Q) D- 7 2 C ix2 RV SA 0/C Active RVT 10Y EP8855D M-12EP01 (Q) C-7 2 C 1x2 RV SA O/C Active RVT 10Y EP8956A M-12EP01 (Q) G- 4 1 A/C 10 0K SA O/C Active CVT-O CM CVCM-09 CVT-C CM CVCM-0 9 AT-2 1.5Y CVCM-0 9 EP8956B M-12EP01 (Q) 1 A/C 10 0K SA 0/C Active E- 4 CVT-O CM CVCM-0 9 CVT-C CM CVCM-0 9 AT-2 1. 5Y CVCM-09 EP8956C M-12EP01(CQ) 0-4 1 A/C 10 CK SA O/C Active CVT-O CM CVCM-0 9 CVT-C CM CVCM-09 AT-2 1. 5Y CVCM-0 9 EP8956D M-12EP01 (Q) B- 4 1 A/C 10 CK SA O/C Active CVT-O CM CVCM-0 9 CVT-C CM CVCM-0 9 AT-2 1.5Y CVCM-09 EPHV8808A G- 5 1 B 10 GA MO 0 Passive M-12EP01 (Q)

PIT 2Y EPHV8808B M-12EP01 (Q) E-5 1 B 10 GA MO 0 Passive PIT 2Y E PHV8 808 C M-12EP01 (Q) 0-5 1 B 10 GA MO 0 Passive PIT 2Y E PHV 8808 D M-12EP01 (Q) B- 5 1 B 10 GA MO 0 Passive PIT 2Y EPHV8875A M-12EP01 (Q) H- 6 2 B 1 GL AO C Passive PIT 2Y EPHV8875B M-12EP01 (Q) F- 6 2 B 1 GL AO C Passive PIT 2Y EPHV8 87 50 M-12EP01 (Q) D- 6 2 B 1 GL AO C Passive PIT 2Y EPHV8875D M-12EP01 (Q) C-6 2 H 1 GL AO C Passive PIT 2Y Revision Date: 9/02/15 Pg 172 Page 7

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID I [ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CL LASS CAT SIZE TYPE TYPE PCS PASS RQMT FREQ REFERENCE EPHV8877A M-12EP01 (Q) 2 B 0.75 GL AC C Passive F- 4 PIT 2Y EPHV8877B M-12EP01 (Q) E- 4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8877C M-12EP01 (Q) C-4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8877D M-12EP01 (Q) B- 4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8878A M-12EP01 (Q) G- 5 2 B 1 GL AC C Passive PIT 2Y EPHV8 878 B M-12EP01 (Q) E-5 2 B 1 GL AO C Passive PIT 2Y E PHV8 878 C M-12EP01 (Q) D- 5 2 B 1 GL AO C Passive PIT 2Y BEPHV8 878 D M-12EP01 (Q) B-5 2 B 1 GL AC C Passive PIT 2Y EPHV8879A M-12EP01 (Q) C- 4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8879B M-12EP01 (Q) E- 4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8879C M-12EP01 (Q) D- 4 2 B 0.75 GL AC C Passive PIT 2Y EPHV8879D M-12EPO1 (Q) C-2 2 B 0.75 GL AC C Passive PIT 2Y EPHV8880 M-12EP01 (Q) A- 4 2 A 1 GL AC C Active BT-C Q FS T Q TP-04 PIT 2Y AT-I App J EPHV8950A M-12EP01 (Q) H- 7 2 B 1 CL SC C/C Active BT-C CS CS J-13 BT-C CS CS J-13 FST CS CSJ-13, TP-04 PIT 2Y EPHV8 950OH M-12EP01 (Q) F- 8 2 B 1 GL SC C/C Active BT-C CS CS J-13 BT-C CS CS J-13 FS T CS CSJ-13, TP-04 PIT 2Y Revision Date: 9/0 2/15 Pg 7 Page 173

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER C00RD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE EPHV895OC M-12EPO1(Q) F-7 2 B 1 GL SO 0/C Active BT-O CS CS J-13 BT-C CS CS J-13 FST CS CSJ-13, TP-04 PIT 2Y EPHV8950D M-12EP01(Q) D- 8 2 B 1 GL SO 0/C Active BT-O CS CS J-13 BT -C CS CSJ-13 FS T CS CSJ-13, TP-04 PIT 2Y EPHV8950E M-12EP01 (Q)

D- 7 2 B 1 GL SO O/C Active BT-O CS CS J-13 BT-C CS CSJ-13 FS T CS CSJ-13, TP-04 PIT 2Y EPHV8950F M-12EP01 (Q) C-8 2 B 1 GL SO 0/C Active BT-O CS CS J-13 BT-C CS CS J-13 FS T CS CSJ-13, TP-04 PIT 2Y EPV0010 M-12EP01 (Q) G- 3 1 A/C 2 CK SA O/C Active CVT-O CM CVCM-06 CVT-C CM CVCM-06 AT-2 1.5 CVCM-0 6 EPV002O M-12EP01 (Q) F- 3 1 A/C 2 CK SA 0/C Active CVT-O CM CVCM-0 6 CVT-C CM CVCM-06 AT-2 1. 5Y CVCM-06 EPV0030 M-l2EP01 (Q) D- 3 1 A/C 2 CK SA 0/C Active CVT-0 CM CVCM-0 6 CVT-C CM CVCM-O06 AT -2 1.5Y CVCM-06 EPV0040 M-12EP01 (Q) C-36 1 A/C 2 CK SA 0/C Active CVT-O CM CVCM-0 6 CVT-C CM CVCM-0 6 AT- 2 1. 5Y CVCM-06 EPV0046 M-12EP01(Q) A- 5 2 A/C 1 CK SA C Active CVT-O Q TP-01, TP-08 CVT-C Q AT-I App J Revision Dale: 9/02/ISPae57 Page 174

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IIST IST VALVE VALVE ACT SAFETY ACTIVE TEST TEST ATTACHMENT NUMBER NUMBER COORD CILASS CAT SIZE TYPE TYPE POS /PASS RQMT FREQ REFERENCE FCHV0312 M-12FC02(Q) B-5 3 B 4 GA MO 0 Active OMNI-O JOG TP-1I BT-E Q TP-II FCV0001 M-12FC02 (Q) 2 C 4 CK SA 0/C Active G- 6 CVT-0 CM CVCM-II1 CVT-C CM CVCM-II1 FCV0002 M-12FC02 (Q) G- 6 2 C 4 CK SA 0/C Active CVT-O CM CVCM-II CVT-C CM CVCM-l 1 FCV0024 M-12FC02 (Q) G- 6 2 C 4 CK SA 0/C Active CVT-O CM CVCM-1I CVT-C CM CVCM-II1 FCV0025 M-12FC02 (Q) G- 6 2 C 4 CK SA 0/C Active CVT-O CM CVCM-II CVT-C CM CVCM-II1 GKPSV0004AA M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT 10OY GKPSV0004AB M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT i0Y GKPSV0004BA M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT i0Y GKPSVO004BB M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT 10CY GKPSV0005AA M-12GK01 (Q) 3 C .75x1 RV SA 0/C Active RVT i0Y GKPSVO005AB M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT 10CY GKPSV0005BA M-12GK01 (Q) 3 C .75xi RV SA 0/C Active RVT 10YV GKPSV0005BB M-12GK01 (Q) 3 C .75x1 RV SA 0/C Active RVT iCY GSHV0003 M-12GS01 (Q) E- 6 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FS T Q PIT 2Y TP-04 AT-I App J Revision Date: 9/02/1 5 Pg 7 Page 175

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST 1ST VALVE VALVE ACT SAFETY ACTIVE TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE P0S /PASS RQMT FREQ REFERENCE GSHVOOO4 M-i2GS0i(Q) E-6 2 A 1 GA S0 0/C Active BT-O Q BT-C Q FS T Q PIT 2Y TP-04 AT-I App J GSHVOOO5 M-12GS01 (Q) D-6 2 A 1 GA S0 0/C Active BT-0 Q BT-C Q PS T Q PIT 2Y TP-04 AT-I App J GSH-VOOOS M-i2GS0i1(Q) B- 6 2 A 1 GA S0 0/C Active BT-O Q ST-C Q FS T C PIT 2Y TP-04 AT-I AppJ GSHVOOO9 M-12GS0i1(Q) B- 6 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FST Q PIT 2Y TP-04 AT-i AppJ GSHVO0i2 M-i2GS01 (Q) E- 4 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FST Q PIT 2Y TP-04 AT-I App J GSBV0013 M-i2GS0i1(Q) E-5 2 A 1 GA SO 0/C Active BT-O C BT-C FST PIT 2Y T P-04 AT-I App J Revision Date: 9/02/ISPae57 Page 176

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&TD IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COOED CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE GSHVO0l4 M-12GS01(Q) D-5 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FST Q PIT 2Y TP-04 AT-i App J GSHVO0i7 M-12GS01 (Q) B- 4 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FST Q PIT 2Y TP-04 AT-I1 AppJ GSH-V0018 M-i2GS0l1(Q) B-S 2 A 1 GA SO 0/C Active BT-O Q BT-C Q FS T Q PIT 2Y TP- 04 AT-I Ampp GSHVOO2O M-12GS0i1(Q) F- 4 2 A 6 BTF MO C Passive PIT 2Y AT-I AppJ GSHVOO21 M-12GS01 (Q) F- 4 2 A 6 BTF MO C Passive PIT 2Y AT-I AppJ GSHVOO3O M-12GS01 (Q) E-3 2 B 1 GA SO C Passive PIT 2Y GSHVOO31 M-i2GS0i1(Q) D- 4 2 A 1 GA SO C Active BT-C Q FST Q T P-04 PIT 2Y AT-I AppJ GSHVOO32 M-12GS01 (Q) 0-3 2 A 1 GA SO C Active BT-C Q FST Q TP- 04 PIT 2Y AT-l App J GSHVOO33 M-12GS01 (Q) C- 4 2 A 1 GA SO C Active BT-C Q FST Q T P-0 4 PIT 2Y AT-I App J Revision Date: 9/02/15 ag 7 Page 177

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE/ TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE GSHV0034 M-12GS01(Q) C-4 2 A 1 GA SO C Active BT-C Q FS T Q T P-04 PIT 2Y AT-i AppJ GSHV0035 M-12GS01 (Q) E-8 2 B 1 GA SO C Passive PIT 2Y GSHV0036 M-12GS01 (Q) D- 6 2 A 1 GA SO C Active BT-C Q FST Q TP-04 PIT 2Y AT-I AppJ GSHV0037 M-12GS01 (Q) D-7 2 A 1 GA SO C Active BT-C Q FS T Q TP- 04 PIT 2Y AT-I1 AppJ GSHV0038 M-12GS01 (Q) C- 6 2 A 1 GA SO C Active BT-C Q ES T Q T P-04 PIT 2Y AT-I AppJ GSHV0039 M-12GS01 (Q) C- 6 2 A 1 GA SO C Active BT-C Q FST Q TP-04 PIT 2Y AT-i App J GSV0054 M-12GS01(Q) B-3 2 C 0.75 CK SA C Active CVT-O CM CVCM-12 CVT-C CM CVCM-12 GSV0059 M-12GS01 (Q) B- 8 2 C 0.75 CK SA C Active CVT-O CM CVCM-12 CVT-C CM CVCM-12 GTHZ0004 M-l2GT01 (Q) D- 4 2 A 18 BTF AO C Active BT-C Q FST Q T P-04 PIT 2Y AT-I AppJ Revision Date: 9/02/15 Pg 7 Page 178

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID 1ST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE GTHZ0005 M-12GT01 (Q) A-5 2 A 18 BTF AC C Active BT-C Q FST Q TP- 04 PIT 2Y AT-I App J GTHZ0006 M-i2GT01 (Q) C- 4 2 A 36 BTF AC C Active BT-C Q FST Q TP- 04 PIT 2Y AT-I App J GTHZOOO7 M-i2CT0i1(Q) C-5 2 A 36 ETF AC C Active BT-C Q FST Q TP-04 PIT 2Y AT-I AppJ CTHZ0008 M-i2GT0i1(Q) C- 6 2 A 36 BTF AC C Active BT-C Q FST Q TP- 04 PIT 2Y AT-I AppJ GTHZOO09 M-i2GT0i1(Q) C-7 2 A 36 BTF AC C Active ET-C Q FST Q TP-04 PIT 2Y AT-i App J GTHZ00ii M-i2GT01 (Q) A- 6 2 A 18 BTF AC C Active BT-C Q FST Q TP- 04 PIT 2Y AT-I AppJ CTHZO0i2 M-i2GT0i1(Q) A- 7 2 A 18 BTF AC C Active BT-C Q FS T Q TP-04 PIT 2Y AT-I Ampp HBHV7i26 M-l2HB01 (Q) H-7 2 A 0.75 DIA AC C Active BT-C Q TP- 04 FST Q PIT 2Y AT-I App J Revision Date: 9/02/ISPae57 Page 179

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE PCS PASS RQMT FREQ REFERENCE HBHV7136 M-12HB01(Q) F-3 2 A 3 DIA AC C Active BT-C Q FST Q TP- 04 PIT 2Y AT-I App J HBHV7150 M-12HB01(Q) H- 6 2 A 0.75 DIA AO C Active BT-C Q T P- 04 FST Q PIT 2Y AT-I App J HBHV7l76 M-12HB01 (Q) E-3 2 A 3 DIA AC C Active BT-C Q T P-0 4 FST Q PIT 2Y AT-I App J HDV0016 M-12HD01 (Q) B- 7 2 A 2 GL M C Passive AT-i App J HDV0017 M-12HD01 (Q) B-7 2 A 2 GL M C Passive AT-I App J KAFV0029 M-12KA01 (Q) D-2 2 A 2 GL AO C Active BT-C RR RJ- 12 FST RR RJ-12, TP-04 PIT 2Y AT-I App J KAV0039 M-12KA02(Q) C- 6 2 A/C 4 CK SA C Passive AT-I App J KAV0118 M-12KA02 (Q) D- 6 2 A/C 4 GL M C Passive AT-I App J KAV0204 M-12KA01(Q) C-2 2 A 1.5 CK SA C Active CVT-O CM CVCM-02 CVT-C CM CVCM-02 AT-I App J KAV0648 M-12KA05(Q) G- 6 3 A/C 0.75 CK SA C Active CVT-O Q CVT-C Q AT- 3 2Y KAV0649 M-12KA05(Q) F- 5 3 A/C 0.75 CK SA C Active CVT-O Q CVT-C Q AT- 3 2Y Revision Date: 9/02/15 Pg 8 Page 180

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID I IST ATTACHMENT IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST NUMBER NUMBER COORD CL LASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE KAV0650 M-12KA05(Q) D-6 3 A/C 0.75 CK SA C Active CVT-O Q CVT-C Q AT-3 2Y KAV0651 M-12KA05(Q) B-5 3 A/C 0.75 CK SA C Active CVT-O Q CVT-C Q AT-3 2Y KAV 0703 H-7 3 C .75xi RV SA 0/C Active M-12KA05 (Q)

RVT iCY KAyV0704 M-12KA05 (Q) F- 6 3 C .75xi RV SA 0/C Active RVT 10OY KAV0705 M-12KA05 (Q) D-7 3 C .75xi RV SA 0/C Active RVT 10OY KAV0 706 M-12KA05 (Q) 0-6 3 C .75xi RV SA 0/C Active RVT l0Y KAY0 710 M-12KA05 (Q) H- 8 3 C .75xi RV SA 0/C Active RVT i0Y KAV0 711 M-12KA05 (Q) F-7 3 C .75xi RV SA O/C Active RVT 10GY KAV0 712 M-12KA05 (Q) D- 8 3 C .75xi RV SA 0/C Active RVT i0Y KAV0 713 M-12KA05 (Q) B-7 3 C .75xi RV SA 0/C Active RVT i0Y KBV0 001 M-12KB01 (Q) H- 6 2 A 2 GL M C Passive AT-I App CI KBV0002 M-12KB01 CQ) H- 6 2 A 2 GL M C Passive AT-I App CI KCHV0253 M-12KC02 (Q) B- 6 2 A 4 GA MO C Passive AT-I App CI KCV0 478 M-12KC02 (Q) B- 6 2 A/C 4 CK SA C Passive AT-I App CF TP- 12 KJPV0001lA M-12KJ02 (Q) F- 3 3 B 0.375 TWY S0 0 Active BT-O Q TP- 05 KJPV0001B M-12KJ02 (Q) F- 3 3 B 0.375 TWY S0 0 Active BT-O Q TP-05 KJPV0101A M-12KJ05 (Q) F- 3 3 B 0.375 TWY SO 0 Active BT-O Q TP-05 KJPV0101B M-12KJ05 (Q) F-3 3 B 0.375 TWY S0 0 Active BT-O Q TP- 05 Revision Date: 9/02/15 Pg 8 Page 181

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE KJV07liA M-12KJ02(Q) B-2 3 A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C 0 AT- 4 2Y KJV0711B M-l2KJ02 (Q) B-2 3 A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C Q AT- 4 2Y KJV07i2A M-12KJ02 (Q) D- 5 3 A/C 0.75 CK SA C Active CVT-O Q TP-01 CVT-C 0 AT-4 2Y KJV07l2B M-12KJ02 (Q) D- 5 3 A/C 0.75 CK SA C Active CVT-O 0 TP- 01 CVT-C 0 AT-4 2Y KJV0716A M-12KJ02 (Q) C-2 3 C .75xi RV SA 0/C Active RVT i0Y KJV0716B M-12KJ05 (Q) C-2 3 C .75xi RV SA 0/C Active RVT 10Y KJV0717A M-12KJ02 (Q) C- 4 3 C .75xi RV SA 0/C Active RVT i0Y KJV0717B M-12KJ05 (Q) C- 4 3 C .75xi RV SA 0/C Active RVT 10y LFFV0095 M-12LF09 (Q) F-2 2 A 6 GA MO C Active OMNI-C JOG TP-ii AT-I App J BT-E RC TP-II LFFV0096 M-12LF09(Q) 2 A 6 GA AO C Active F-i BT-C Q TP- 04 FST 0 PIT 2Y AT-I App J LFHV0105 M-12LF03(Q) C-5 3 B 6 GA MO C Active OMNI-C JOG TP-II BT-E RC TP-II LFHV0106 M-12LF03(Q) C- 4 3 B 6 GA MO C Active OMNi-C JOG TP-II BT-E RC TP-II Revision Date: 9/02/1 5 Pg 8 Page 182

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST IST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE SJHVOOO5 M-i2SJ04(Q) F-7 2 A 1 GL SO C Active BT-C Q TP-04 FST Q PIT 2Y AT-I App J SJHV000 M-i2SJ04 (Q) C- C 2 A 1 CL SO C Active BT-C Q T P-c04 FST Q PIT 2Y AT-I App J SJHVO012 M-i2SJ0i1(Q) F-7 2 A 1 GL SO C Active BT-C Q TP-04 FST C PIT 2Y AT-I AppJ 5J8V0013 M-i2SJ0i1(Q) E- 7 2 A 1 GL SO C Active BT-C Q TP- 04 FST Q PIT 2Y AT-I Ampp SJHV00i8 M-i2SJ0i1(Q) F- 3 2 A 1 GL SO C Active BT-C C TP-04 ES T C PIT 2Y AT-I AppJ SJHVO019 M-i2SJ01 (Q) E-3 2 A 1 GL SO C Active BT-C C TP-04 ES T C PIT 2Y AT-I App J SJHV0i27 M-12SJ04 (Q) F- 6 2 A 1 GL SO C Passive BT-C C ES T C T P-c04 PIT 2Y AT-I App J 5JHV0128 M-i2SJ04 (Q) H- 6 2 A 1 CL SO C Active BT-C C ES T C TP- 04 PIT 2Y AT-I App J Revision Date: 9/02/15 Pg 8 Page 183

WOLF CREEK NUCLEAR OPERATING CORPORATION INSERVICE PUMP TESTING PROGRAM VALVE P & ID P&ID IST 1ST VALVE VALVE ACT SAFETY ACTIVE! TEST TEST ATTACHMENT NUMBER NUMBER COORD CLASS CAT SIZE TYPE TYPE POS PASS RQMT FREQ REFERENCE SJHV0i29 M-12SJ04(Q) H-5 2 A 1 GL SO C Active BT-C Q EST Q TP- 04 PIT 2Y AT-I App J SJHV0i3O M-125J04(CQ) C-5 2 A 1 GL SO C Active BT-C Q ES T Q TP-04 PIT 2Y AT-I App J SJHV0i3i M-12SJ04 (Q) B- 6 2 A 1 GL SO C Active BT-C C FS T Q TP- 04 PIT 2Y AT-I App J SJl-V0132 M-12SJ04 (Q) A- 6 2 A 1 GL SO C Active BT-C C FST C TP-04 PIT 2Y AT-I App J SJV0111 M-12SJ04 (Q) A-7 2 A/C 1 CK SA C Passive BT-C C TP-12 PIT 2Y AT-I App J Revision Date: 9/02/I1Pae58 Page 184