ET 06-0011, CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval

From kanterella
Jump to navigation Jump to search

CFR 50.55a Requests I2R-34, I2R-35, I2R-36, I2R-37, and I2R-38 for the Second Inservice Inspection Program Interval
ML060720056
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/02/2006
From: Garrett T
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ET 06-0011
Download: ML060720056 (37)


Text

W~bLF CREEK 'NUCLEAR OPERATING CORPORATION Terry J. Garrett Vice President Engineering March 2, 2006 ET 06-0011 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

References:

1) Letter ET 05-0023, dated November 10, 2005, from T.J.

Garrett, WCNOC, to USNRC

2) Letter ET 05-0027, dated November 22, 2005, from T.J.

Garrett, WCNOC, to USNRC

Subject:

Docket 50482: 10 CFR 50.55a Requests 12R-34, 12R-35, 12R-36, 12R-37, and 12R-38 for the Second Inservice Inspection Program Interval Gentlemen:

Wolf Creek Nuclear Operating Corporation (WCNOC) Letter ET 05-0023, Reference 1, submitted the Owner's Activity Reports for the Inservice Inspection (ISI) Program Second Interval, Third Period, and also committed to issuing 10 CFR 50.55a requests for seven (7) Category B-D, two (2) Category B-A, one (1) Category C-A, and twelve (12) Risk Informed - Inservice Inspection (RI-ISI) components in which the examinations performed did not achieve greater than 90 percent total coverage of the ASME Code required volume. This submittal, in conjunction with WCNOC Letter ET 05-0027, Reference 2, completes the commitments made in Letter ET 05-0023 to submit 10 CFR 50.55a requests for the identified components, and is also the final submittal of 10 CFR 50.55a requests required for the Second Ten-Year Interval of WCNOC's ISI Program.

Pursuant to 10 CFR 50.55a(g)(5)(iii), Wolf Creek Nuclear Operating Corporation (WCNOC) hereby requests NRC approval of the following five (5) 10 CFR 50.55a Requests (Attachments 1, 2, 3, 4 and 5) for the Second Ten-Year interval of WCNOC's ISI Program, which ended on September 2, 2005.

P.O. Box 411 / Burlington, KS 66839/ Phone: (620) 364-8831 An Equal Opportunity Employer M/FIHCIVET

ET 06-0011 Page 2 of 3 provides 10 CFR 50.55a Request Number 12R-34, which requests relief from the examination requirements of ASME Section Xl for Class I Pressurizer Pressure-retaining Nozzle-to-Vessel welds and the Nozzle Inside Radius section. The basis for use of these alternatives is that they provide the maximum examination coverage possible within the limitations of the current design configuration. This 10 CFR 50.55a request is similar to a request previously approved by the NRC for the McGuire Nuclear Station Unit 1 in NRC Safety Evaluation Report dated March 28, 2001 (TAC No.

MA9034). provides 10 CFR 50.55a Request Number 12R-35, which requests relief from the examination requirements of ASME Section Xl for the Reactor Vessel Lower Head to Shell Weld and the Reactor Vessel Lower Head to Dollar Plate Weld, respectively. The basis for use of these alternatives is that they provide the maximum examination coverage possible within the limitations of the current design configuration.

A similar request was previously submitted by PG&E Letter, dated December 22, 2005, Docket No. 50-275, for Diablo Canyon Unit 1, "ASME Section Xl Insevice Inspection Program Relief Request NDE-SLH". It is believed that this request is still undergoing review by the NRC. This precedent is applicable only to the Reactor Vessel Lower Head to Shell Weld. provides 10 CFR 50.55a Request Number 12R-36, which requests relief from the examination requirements of ASME Section Xl for the Bonnet Flange to Channel Weld of the Residual Heat Removal (RHR) Heat Exchanger. The basis for use of this alternative is that it provides the best examination coverage practical within the limitations of the current configuration. This 10 CFR 50.55a request is similar to a request previously approved by the NRC for the Comanche Peak Steam Electric Station in NRC Safety Evaluation Report dated July 8, 2005 (TAC No. MC6405). (Only the B-12 portion of the safety evaluation is applicable to this document.) provides 10 CFR 50.55a Request Number 12R-37, which requests relief from the examination requirements of ASME Section Xl for Class I pressure-retaining piping (safe-end) welds examined from the inside of the reactor vessel. The basis for use of these alternatives is that they provide the best examination coverage practical within the limitations of the current configuration. provides 10 CFR 50.55a Request Number 12R-38, which requests relief from the examination requirements of ASME Section Xl for certain Class I and 2 Risk-Informed ISI piping welds. The basis for use of these alternatives is that they provide the best examination coverage possible within the limitations of the current configuration.

ET 06-0011 Page 3 of 3 There are no commitments contained within this letter. If you have any questions, please contact me at (620) 364-4084 or Mr. Kevin Moles at (620) 364-4126.

Terry J. Garrett TJG/rlt : 10 CFR 50.55a Request Number 12R-34 : 10 CFR 50.55a Request Number 12R-35 : 10 CFR 50.55a Request Number 12R-36 : 10 CFR 50.55a Request Number 12R-37 : 10 CFR 50.55a Request Number 12R-38 cc: J. N. Donohew (NRC), w/a W. B. Jones (NRC), w/a B. S. Mallett (NRC), w/a Senior Resident Inspector (NRC), w/a

- 10 CFR 50.55a Request No. 12R-34 Attachment I to ET 06-0011 Page 1 of 6 10 CFR 50.55a Request Number 12R-34 Relief Requested In Accordance with 10 CFR 50.55a(g)(5)(iii)

-Inservice Inspection Impracticality--

1. ASME Code Component(s) Affected Class 1 Pressurizer Pressure-retaining Nozzle-to-Vessel welds and Nozzle Inside Radius section as listed.

NOZZLE WELDS CODE CATEGORY B-D Code Description Weld No.

Item _

B3.1 10 Pressurizer Surge Nozzle to Bottom Head Weld TBB03-10A-W B3.1 10 Pressurizer Spray Nozzle to Top Head Weld TBB03-10C-W B3.120 Pressurizer Spray Nozzle Inside Radius Section TBB03-1OC-IR

2. Applicable Code Edition and Addenda

The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the "Code")

edition and addenda is ASME Section Xl, 'Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.

3. Anplicable Code Requirement ASME Section Xl, Figure IWB-2500-7 (b) 1989 Edition with no addenda requires volumetric examination of a minimum volume of base material on each side of the weld equal to a distance of tJ/2 (one half of the Pressurizer shell thickness adjacent to the weld) for the nozzle to shell welds (Code Item B3.1 10). The same figure requires volumetric examination of a volume /2" thick on the inner radius of the nozzle, extending from a point that is the beginning of the radius of the nozzle on the head side to a point equal to the thickness of the shell up the nozzle towards the piping connection for the nozzle inner radius section (Code Item B3.120).

The Wolf Creek Nuclear Operating Corporation (WCNOC) second ten-year interval inservice inspection program plan also implements Code Case N-460, which is endorsed by the NRC in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section Xl, Division 1." Code Case N-460 states in part, uwhen the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10 percent."

NRC Information Notice (IN) 98-42, "Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements," termed a reduction in coverage of less than 10 percent to be "essentially 100 percent." IN 98-42 states in part, 'The NRC has adopted and further refined the definition of "essentially 100 percent" to mean "greater than 90 percent"... has been applied to all examinations of welds or other areas required by ASME Section XI.'

to ET 06-0011 Page 2 of 6 10 CFR 50.55a Request Number 12R-34

4. Impracticality of Compliance The examination of the Code Item B3.1 10 components is limited by the geometry of the nozzle design. As shown on the attached figures 1 and 2, the configuration of the nozzle to vessel welds limits the scans from the vessel head. The proximity of the pressurizer heaters to the weld also limits the scan of the surge nozzle to bottom head weld. The examination of the Code Item B3.120 components is also limited by the geometry of the nozzle design. As shown on the attached figure 3, the configuration of the nozzle limits the scan from the vessel head. See Table 1 for a breakdown of the beam angle coverage's for these components.
5. Burden Caused by Compliance The design configuration restrictions of the subject nozzles at Wolf Creek Generating Station (WCGS) make the Code required examination coverage requirements impractical. Plant modifications or the replacement of components designed to allow for complete coverage would be needed to meet the Code requirements. This would impose a considerable burden to WCNOC.
6. Proposed Alternative and Basis for Use Proposed Alternative The following alternatives are proposed in lieu of the required examination coverage of essentially 100 percent:
1. Ultrasonic Testing (UT) of the subject components was performed to the maximum extent practical, as listed in Table 1, due to design configuration restrictions during the second ten-year interval.
2. Pressure test VT-2 visual examinations were performed as required by Code Category B-P during the second ten-year interval. No evidence of leakage was identified for these components.

Basis for Use The basis for use of these alternatives is that they provide the maximum examination coverage possible within the limitations of the current design configuration.

7. Duration of Proposed Alternative The second ten year ISI interval which began September 3, 1995 and ended September 2, 2005.
8. Precedents a) Duke Energy Letter dated May 10, 2000, McGuire Nuclear Station Unit 1 Docket No. 50-369, "Relief Request 99-003", and the associated NRC Safety Evaluation Report dated March 28, 2001 (TAC No. MA9034) to ET 06-0011 Page 3 of 6 10 CFR 50.55a Request Number 12R-34 Table 1 Beam Angle Breakdown for Pressurizer Nozzle-to-Vessel Welds and Nozzle Inside Radius Section Component ID 0° 458 450 600 600 Composite Perpendicular Parallel Perpendicular Parallel TBB03-IOA-W 77.9 96.3 77.9 - 79.7 77.9 81.9%

TBB03-10C-W 70.7 93.1 70.7 96.2 70.7 80.3%

TBB03-10C-IR NA NA NA NA 52.5% 152.5%

TBB03-10A-W perpendicular scans are limited by the nozzle configuration for the inner portion (getting into the radius of the nozzle) and by the heater sleeves on the outer portion (not allowing the transducer to be backed up far enough). The 0 degree and parallel scans are limited only by the nozzle configuration for the inner portion (getting into the radius of the nozzle). See Figure 1.

TBB03-10C-W scans are limited by the nozzle configuration for the inner portion (getting into the radius of the nozzle). See figure 2.

TBB03-IOC-IR scan is limited by the nozzle configuration (getting into the radius of the nozzle).

Conducting further examination from the nozzle boss and OD blend is not practical, due to the complex beam angles that must be calculated and then maintained during manual scanning in order to achieve an effective examination. See figure 3.

to ET 06-0011 Page 4 of 6 10 CFR 50.55a Request Number 12R-34 Figure 1 TBB03-10OA-W PER som- to~zaL to ET 06-0011 Page 5 of 6 10 CFR 50.55a Request Number 12R-34 Figure 2 TBB03-1 0C-W I PZR SPRAY N)bZZLE to ET 06-0011 Page 6 of 6 10 CFR 50.55a Request Number 12R-34 Figure 3 TBB03-I OC-IR PZR SPRAY 10 I Lu I~

Request No. 12R-35 - 10 CFR 50.55a to ET 06-0011 Page 1 of 7 10 CFR 50.55a Request Number 12R-35 Relief Requested In Accordance with 10 CFR 50.55a(g)(5)(il)

-Inservice Inspection Impracticality-

1. ASME Code Component(s) Affected Class 1 Reactor Pressure Vessel Pressure-retaining welds as listed.

REACTOR VESSEL WELDS CODE CATEGORY B-A Code Description Weld No.

Item B1.1 1 Reactor Vessel Lower Head to Shell Weld RV-101-141 B1.21 Reactor Vessel Lower Head to Dollar Plate Weld RV-1 02-151

2. Applicable Code Edition and Addenda

The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the "Code")

edition and addenda is ASME Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda. In addition, as required by 10 CFR 50.55a, ASME Section Xl, 1995 Edition 1996 Addenda is used for Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems.

3. Applicable Code Requirement

ASME Section Xl, Figure IWB-2500-1 1989 Edition with no addenda requires volumetric examination of a minimum volume of base material on each side of the weld equal to a distance of 1/2t (one half of the shell thickness adjacent to the weld for the shell side, one half of the head thickness adjacent to the weld for the head side) for the vessel shell to head welds (Code Item B1.11). Figure IWB-2500-3 requires volumetric examination of a minimum volume of base material on each side of the weld equal to a distance of 1/2t (one half of the head thickness adjacent to the weld) for the vessel head welds (Code Item B1.21).

The Wolf Creek Nuclear Operating Corporation (WCNOC) second ten-year interval inservice inspection program plan also implements Code Case N-460, which is endorsed by the NRC in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section Xl, Division 1." Code Case N-460 states in part, "when the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class I or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10 percent."

NRC Information Notice (IN) 98-42, "Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements," termed a reduction in coverage of less than 10 percent to be 'essentially 100 percent." IN 98-42 states in part, 'The NRC has adopted and further refined the definition of "essentially 100 percent" to mean "greater than 90 percent"... has been applied to all examinations of welds or other areas required by ASME Section Xl.'

to ET 06-0011 Page 2 of 7 10 CFR 50.55a Request Number 12R-35

4. Impracticality of Compliance The examination of the lower shell to lower head weld is limited by the proximity of the six core support lugs. During the Cycle 14 refueling outage in the spring of 2005 the subject weld was examined by remote tool (automated examination). As shown on the attached figure 1, the proximity of the core support lugs to the lower shell to lower head weld limits the scan path of this component. Scanning was conducted between and below the obstructing lugs with the scan boundaries maximized by visually assisted positioning of the exam head so that scan starts and stops were as close to the support lugs as tool configuration allowed. The combined perpendicular coverage is estimated at 74.44%, the combined parallel coverage is estimated at 77.56% resulting in a combined average of 76.00%. See Table 1 for a breakdown of the beam angle coverages.

The examination of the lower head to dollar plate weld is limited by proximity of the bottom mounted instrument (BMI) tubes. During the Cycle 14 refueling outage in the spring of 2005 the subject weld was examined by remote tool (automated examination). As shown on the attached figures 2 and 3, the lower head to dollar plate weld is positioned at about the same elevation as the peripheral BMI tubes. Scanning was conducted between the obstructing penetrations with the scan boundaries maximized by visually assisted positioning of the exam head so that scan starts and stops were as close to the tubes as tool configuration allowed. The combined perpendicular coverage is estimated at 73.30%, the combined parallel coverage is estimated at 69.49% resulting in a combined average of 71.39%. See Table 2 for a breakdown of the beam angle coverages.

Note: The coverage estimates were calculated by the vendor utilizing conservative values.

5. Burden Caused by Compliance The design configuration restrictions of the subject welds at Wolf Creek Generating Station (WCGS) make the Code required examination coverage requirements impractical. Plant modifications or the replacement of components designed to allow for complete coverage would be needed to meet the Code requirements. This would impose a considerable burden to WCNOC.
6. Proposed Alternative and Basis for Use Proposed Altemative The following alternatives are proposed in lieu of the required examination coverage of essentially 100 percent:
1. Ultrasonic Testing (UT) of the subject welds was performed to the maximum extent practical, as listed in Tables 1 and 2, due to design configuration restrictions during the second ten-year interval.
2. Visual examinations were performed as required by Code Category B-N-1 during the second ten-year interval. No degradation was identified during this examination.

to ET 06-0011 Page 3 of 7 10 CFR 50.55a Request Number I2R-35

3. Pressure test VT-2 visual examinations were performed as required by Code Category B-P during the second ten-year interval. No evidence of leakage was identified for these components.

Basis for Use The basis for use of these alternatives is that they provide the best examination coverage possible within the limitations of the current design configuration. The volumetric examination was performed using a system (procedures, personnel, and equipment) qualified in accordance with Appendix Vill, Supplements 4 and 6. The partial volumetric examinations, combined with the visual examinations provide continued assurance of weld integrity.

7. Duration of Proposed Alternative The second ten year ISI interval which began September 3, 1995 and ended September 2, 2005.
8. Precedents a) PG&E Letter, dated December 22, 2005, Docket No. 50-275, Diablo Canyon Unit 1, "ASME Section Xl Insevice Inspection Program Relief Request NDE-SLH". It is believed that this request is still undergoing review by the NRC. This precedent is applicable only to the Reactor Vessel Lower Head to Shell Weld.

Attachment 2 to ET 06-0011 Page 4 of 7 10 CFR 50.55a Request Number I2R-35 Table I Beam Angle Breakdown for the Lower Shell to Lower Head Weld Beam Direction 45 Shear 45 L Single 45 L Dual Weld Volume Weld Volume Weld Volume Weld Volume Perpendicular 74.00 75.93 74.00 74.00 74.00 74.68 S can_ _ _ _ _ _ _ _ _ __ _ _

Parallel 81.65 73.50 63.30 71.41 96.72 78.75 S ca n _ _ _ _ _ _ _ I___ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Average 76.27 58.55 81.04 The scans are limited due to the 6 Core Support Lugs located on the vessel ID.

Combined Perpendicular 74.44%

Combined Parallel: 77.56%

Combined Average: 76.00%

Table 2 Beam Angle Breakdown for the Lower Torus to Dollar Plate Weld Beam Direction 45 Shear 45 L Single 45 L Dual Weld Volume Weld Volume Weld Volume Weld Volume Perpendicular 73.30 73.30 73.30 73.30 73.30 73.30 Parallel 69.49 69.49 69.49 69.49 69.49 69.49 Scan 71.39 71.39 71.39 Average 71.39 71.39 71.39 _______

The scans are limited due to the Bottom Mounted Instrument tubing on the Bottom Head.

Combined Perpendicular. 73.30%

Combined Parallel: 69.49%

Combined Average: 71.39%

a

- U>

0) co (a0) 0P o Exam Limit R M

336.98 z Top Perp t

  • - 332.64 335.14 Top Parallel cn J 3.20, -a 340.07 I

342.53 - Lugs n 1.45 Exarm Limit I Bottom ParalLel I,'

75.0 Bottom Perp tA

0 P

R=88.16 to Clad R=88.16 to Clad In

- 6.38 ID A Tl 9:

W eD v-*

PNDEx SIZE Perp Scans a 0.33-Paraltet Scans - OS',

1-RV-101-141 (4)

SCAN LIHITS ARIJND LUGS Perp Scans 4/- 7.98 froaa Lug LC WOLF CREEK RVISI 2005-SAP Par.alel Scans +/- 11.0- from Lug £ WesDyne International Notes Perform scans between Lugs 7, LOWER SHELL TO TORUS first then expand scans below Lugs to maxlze coverage. EXAMINATION PROGRAM PLAN CalculAtion of Rotto. Positions s

AILDIMNSIOra . 1 8 OF 1SHEET 21

DMI Tube(*) Elavatlon Scan Sean Scan Scan SCan r o Wwnbor (Top of Start SUot stop Stop Lcngth CD Tube) (V I) (Tube) (Vasal (Tube).

CD 1 401.25 409.2 7.95 418.1? 16.92 8.97 -4 -

2, 3 400.76 406.59 7.63 417.0 17.04 9.21 _

4 .5 400.01 407.62 7.81 417.16 17.15 9.34 8, 7 399.6 407.39 7.79 4160.3 17.23 9.44 O a s98.35 408.05 7.7 415.68 1733 906 m 9,10 397.92 405.59 7.67 415.29 17.37 9.7 11,12 397.5 405.13 7.63 414.60 17.39 9.70 1S3 90.19 403.79 7.60 413.61 17.42 9.5 14, 15 394.92 402.46 7.56 412.5 17.58 10.02 le,17 394.44 401.99 7.55 412.06 17.64 10.09 0 u 8 Mm 21 394.0 401.55 7.55 411.68 17.68 10.13 O 22,23 393.12 400.66 7.54 410.87 17.75 10.21 24 tvu 27 300.82 396.36 7.54 408.72 17.9 10.36 O 26 390.37 397.82 7.45 406.3 17.93 10.46

29. 30 306.04 396.32 7.36 408.97 16.03 10.65 31 367.5 304.68 7.36 405.62 16.12 10.74 32.53 306.53 393.67 7.34 404.72 16.17 10.63
34. 35 3s5.57 392.88 7.31 403.74 18.19 10.86 V 36.37 385.06 392.35 7.29 403.35 16.29 11 30 MM 40 363.53 390.78 7.25 401.92 18.39 11.14 41.42 363.03 390.27 7.24 401.40 18.43 11.19 43,4.4 378.76 365.9 7.14 397.52 16.78 11.62 45 Phnu47 378.22 365.32 7.1 397.01 18.79 11.69 48.49 377.09 364.1 7.01 395.9 18.81 11.6 50s51 376.53 363.53 7.0 395.39 1o.86 11.05 (0 52 s 54 373.62 300.47 8.65 392.86 19.04 12.19 55 Uhnu58 371.81 378.68 8.87 391.06 19.25 12.38 180-WOLF CREEK RVISI 2005 - SAP

\WesDyne Internationat Bottor Head Dollar/HMI Tube Scans EXAMINATION PROGRAM PLAN

. tiILpDIsN

%Pfht Iccf nrnic lEfly tu I1EsTI FWr Pn _ v oP 21

-t _

-u D)

IDEAL SCAN INPUTS (0 0)

CD (AREAS OF NO OBSTRUCTION) -4

=r~

-4 3.

m

-I R 88.16 0

.3O CLAD 2

N

//

0 UV 56.1 382.2' to Top ft" 54.4' Top Perp of Flange 53.7' Top Paraltet VESSEL Ca' 02 c

f 14 INDEX SIZE 91 Perp and Parallet Scans = 0.325' (0.5') AF 46.1' Bottom Paratlel 45.4- Bottom Perp (A

I-RV-102-151 (5)

WOLF CREEK RVISI 2005 - SAP CALCULATION OF WesDyne Internationat BOTTOM and TOP POSITIONS LOWER TORUS TO DOLLAR PLATE EXAMINATION PROGRAM PLAN AILD sonw DINONSIN ICHESIM

~~

.L 1In LJ L II a .

fin.li.4Gu l U LI I S1 I- -

I. -

i (1PIs 1

- 10 CFR 50.55a Request No. 12R-36 Attachment 3 to ET 06-0011 Page 1 of 5 10 CFR 50.55a Request Number 12R-36 Relief Requested In Accordance with 10 CFR 50.55a(g)(5)(iii)

-Inservice Inspection Impracticality-

1. ASME Code Component(s) Affected Class 2 Pressure Vessel Pressure-retaining weld as listed.

PRESSURE VESSEL WELDS CODE CATEGORY C-A Code Description Weld No.

Item C1.10 Bonnet Flange to Channel Weld of the Residual EEJ01A-Heat Removal (RHR) Heat Exchanger SEAM-1-W

2. Applicable Code Edition and Addenda

The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the "Code")

edition and addenda is ASME Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda.

3. Applicable Code Requirement

ASME Section Xl, Figure IWC-2500-1 1989 Edition with no addenda requires volumetric examination of a minimum volume of base material on each side of the weld equal to a distance of Y4 inch for the shell circumferential weld (Code Item C1 .10).

The Wolf Creek Nuclear Operating Corporation (WCNOC) second ten-year interval inservice inspection program plan also implements Code Case N-460, which is endorsed by the NRC in Regulatory Guide 1.147, 'Inservice Inspection Code Case Acceptability ASME Section XI, Division 1." Code Case N-460 states in part, "when the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10 percent."

NRC Information Notice (IN) 98-42, 'Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements," termed a reduction in coverage of less than 10 percent to be "essentially 100 percent." IN 98-42 states in part, 'The NRC has adopted and further refined the definition of "essentially 100 percent" to mean "greater than 90 percent"... has been applied to all examinations of welds or other areas required by ASME Section Xl.'

4. Impracticality of Compliance The examination of the subject components is limited by the configuration of the flange design and the location of flange bolting. As shown on the attached figures, the proximity of the bolting to the bonnet flange to channel weld limits the scans from the flange side of the weld. Complete perpendicular coverage was achieved; however, the parallel coverage was limited on the flange side of the weld. Although a small amount of scanning was able to be performed on the flange side, parallel coverage was conservatively credited only to the channel side of the weld. This yields a composite coverage of the required examination volume of 75%.

to ET 06-0011 Page 2 of 5 10 CFR 50.55a Request Number 12R-36 Removal of the bolting to allow for complete coverage would be needed to meet the Code requirements. This would result in a considerable increase of radiological exposure to WCNOC personnel as, during refueling outages, this component is located in an area classified as a "high radiation area". The dose rates around this component generally range from 15 to 50 millirem per hour. It is estimated that it would take approximately 40 additional man-hours to remove the bolting, perform the additional examination and replace the bolting. The amount of dose received by personnel during this time would be a considerable burden to WCGS.

5. Burden Caused by Compliance The design configuration restrictions of the bonnet flange of the RHR heat exchanger at Wolf Creek Generating Station (WCGS) make the Code required examination coverage requirements impractical. The bolting is located so that circumferential scanning for axial flaws is limited on the flange side of the weld. To examine essentially 100% of the Code required volume would require removal and replacement of the bolting, causing Wolf Creek personnel to receive an additional amount of radiological dose, likely well in excess of one man-Rem.
6. Proposed Alternative and Basis for Use Proposed Alternative The following alternatives are proposed in lieu of the required examination coverage of essentially 100 percent:
1. Ultrasonic Testing (UT) of the subject weld was performed to the maximum extent practical during the second ten-year interval.
2. Pressure test VT-2 visual examinations were performed as required by Code Category C-H during the second ten-year interval. No evidence of leakage was identified for this component.

Basis for Use The basis for use of this alternative is that it provides the best examination coverage practical within the limitations of the current configuration. Based on the percentage of the examination volume completed, and the lack of any indications detected, there is a high level of confidence in the continued structural integrity of the weld. WCNOC does not believe that there is an increased level of safety or quality commensurate with the amount of increased dose required to complete this examination.

It should be noted that the Channel-to-Head weld of this RHR heat exchanger was examined with 100% coverage achieved, and no indications were detected.

7. Duration of Proposed Alternative The second ten year ISI interval which began September 3, 1995 and ended September 2, 2005.

to ET 06-0011 Page 3 of 5 10 CFR 50.55a Request Number 12R-36

8. Precedents a) Comanche Peak Steam Electric Station Letter, dated March 10, 2005, Docket No. 50-446, " Relief Requests B-12, B-13, B-14, and C-8 to the Unit 2 Inservice Inspection (ISI) from 1986 Edition of ASME Code,Section XI, No Addenda" and the associated NRC Safety Evaluation Report dated July 8, 2005 (TAC No. MC6405) [Only the B-12 portion of the request and the safety evaluation related to the B-12 portion is applicable to this document.]

to ET 06-0011 Page 4 of 5 10 CFR 50.55a Request Number 12R-36 Figure 1 Bonnet Flange to Channel Weld Configuration Weld EEJ01A-SEAM-1-W i

Flange Side I Channel Side II

.. ; z .

II C/L

. .7l = Unexamined

::::::: Volume with Parallel Scans to ET 06-0011 Page 5 of 5 10 CFR 50.55a Request Number 12R-36 Figure 2 Photograph of Bonnet Flange to Channel Weld

- 10 CFR 50.55a Request No. 12R-37 Attachment 4 to ET 06-0011 Page 1 of 6 10 CFR 50.55a Request Number 12R-37 Relief Requested In Accordance with 10 CFR 50.55a(g)(5)(iii)

--inservice Inspection Impracticality--

1. ASME Code Component(s) Affected Risk-informed Inservice Inspection (RI-ISI) Class 1 Pressure Retaining Piping Welds examined from the inside surface of Pressurized Water Reactors using procedures, personnel, and equipment qualified to ASME Section Xi, Appendix Vil, Supplement 2 or 10 criteria. This request is applicable to ISI selected welds identified by Note 2 in the following tables. However, similar conditions were encountered on other examined welds (Wolf Creek Nuclear Operating Corporation (WCNOC) augmented examinations) and those welds are also listed in the tables, as identified by Notes 3 and 4.

RI-ISI SAFE-END DISSIMILAR METAL WELDS (Formeriv CODE CATEGORY B-F)

Code Item Description Weld No.

(Note 1)

R1.20 Safe-end to Loop A RPV Inlet Nozzle RV-302-121-A (Note 2)

R1.20 Safe-end to Loop B RPV Inlet Nozzle RV-302-121-B (Note 3)

R1.20 Safe-end to Loop C RPV Inlet Nozzle RV-302-121-C (Note 3)

R1.20 Safe-end to Loop D RPV Inlet Nozzle RV-302-121-D (Note 2)

RI-ISI SAFE-END PIPING WELDS (Formerly CODE CATEGORY B14)

Code Item Description Weld No.

(Note 1)

R1.20 Elbow to Loop A RPV Inlet Safe-End Weld BB-01-F102 (Note 2)

R1.20 Pipe to Loop A RPV Outlet Safe-End Weld BB-01-F103 (Note 2)

R1.20 Elbow to Loop B RPV Inlet Safe-End Weld BB-01 -F202 (Note 4)

R1.20 Pipe to Loop B RPV Outlet Safe-End Weld BB-01-F203 (Note 4)

R1.20 Elbow to Loop C RPV Inlet Safe-End Weld BB-01-F302 (Note 4)

R1.20 Pipe to Loop C RPV Outlet Safe-End Weld BB-01-F303 (Note 4)

R1.20 Elbow to Loop D RPV Inlet Safe-End Weld BB-01-F402 (Note 4)

R1.20 Pipe to Loop D RPV Outlet Safe-End Weld BB-01-F403 (Note 4)

Note 1: As the methodology in EPRI TR- 12657 Rev. B-A does not provide item numbers, the format inASME Code Case N-578-1 is utilized for the assignment of these numbers.

Note 2: These welds are required to be examined per the ISI Program Plan.

Note 3: Due to V. C. Summer hot leg nozzle cracking, it was decided by WCNOC that all inlet and outlet nozzle-to-safe end dissimilar metal welds (listed above) were to be examined.

Note 4: These stainless steel Cat. B-J welds were examined due to the proximity to the dissimilar metal nozzle-to-safe end Cat. B-F welds being examined for reasons identified in Notes 2 and 3.

to ET 06-0011 Page 2 of 6 10 CFR 50.55a Request Number I2R-37

2. ApDplicable Code Edition and Addenda The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the "Code") edition and addenda is ASME Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda. In addition, as required by 10 CFR 50.55a, ASME Section Xl, 1995 Edition 1996 Addenda is used for Appendix VilI, Performance Demonstration for Ultrasonic Examination Systems.

3. Applicable Code Requirement

ASME Section Xl, Figure IWB-2500-8(c) 1989 Edition with no addenda requires volumetric examination of a minimum volume of the inner 1/3t (the inner 1/3 thickness of the piping) extending into the base material on each side of the weld equal to a distance of 1/4 inch on each side of the weld crown.

In a letter dated December 13, 2001, from the NRC to WCNOC, the NRC approved a relief request for WCNOC for the application of a risk-informed inservice inspection (RI-ISI) program for ASME Code Class I and 2 piping. As approved, the methodology in EPRI TR-1 12657 Rev. B-A is utilized for the method of examination of the subject welds, as well as the selection of welds to be examined.

The WCNOC second ten-year interval inservice inspection program plan also implements Code Case N-460, which is endorsed by the NRC in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section Xl, Division 1."

Code Case N-460 states in part, "when the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class I or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10 percent."

NRC Information Notice (IN) 98-42, "Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements," termed a reduction in coverage of less than 10 percent to be "essentially 100 percent." IN 98-42 states in part, 'The NRC has adopted and further refined the definition of "essentially 100 percent" to mean "greater than 90 percent"...

has been applied to all examinations of welds or other areas required by ASME Section Xl.'

4. Impracticality of Compliance The examination of the subject components is limited in examination coverage for the detection of axial flaws (circumferential scans) due to the ID configuration. The vendor who performed the subject weld examinations utilized surface geometry profiling software (profilometry) in conjunction with a focused immersion ultrasonic transducer positioned to permit accurate profile data across the examination volume to help the examiner confirm locations where the raw data indicates lack of transducer contact due to problematic surface geometry. There was roughness detected in the examination of the subject welds to the extent that the circumferential scan is not considered qualified to detect axial flaws. During the Cycle 14 refueling outage (RF14) the subject welds were examined by remote tool (automated examination) from the inside diameter (ID) of the piping. The vendor's procedure is not qualified to detect axial flaws in either austenitic or to ET 06-0011 Page 3 of 6 10 CFR 50.55a Request Number 12R-37 dissimilar metal welds that are not either ground or machined smooth. As shown on the attached figures 1 and 2, the amount of roughness present makes the scan for axial flaws unqualified. The final ultrasonic coverage is credited at 50% due to credit taken for axial scans only.

It should be noted that the four dissimilar metal welds on the outlet nozzles were smooth and thus able to be examined fully with both axial and circumferential scans.

5. Burden Caused by Compliance The configuration of the ID of the subject welds at Wolf Creek Generating Station (WCGS) make the Code required examination coverage requirements impractical. Plant modifications or the replacement of components designed to allow for complete coverage would be needed to meet the Code requirements. This would impose a considerable burden to WCNOC.
6. Proposed Alternative and Basis for Use Promosed Alternative The following alternatives are proposed in lieu of the required examination coverage of essentially 100 percent:
1. Ultrasonic testing (UT) of the subject welds was performed to the maximum extent practical due to configuration restrictions during the second ten-year interval.
2. Supplemental examination by Eddy Current techniques was performed. All areas of limitation were fully examined and no flaws were detected.
3. Pressure test VT-2 visual examinations were performed as required by Code Category B-P during the second ten-year interval. No evidence of leakage was identified for these components.

Basis for Use The basis for use of these alternatives is that they provide the best examination coverage practical within the limitations of the current configuration. The volumetric examination was performed using a system (procedures, personnel, and equipment) qualified in accordance with Appendix Vill, Supplements 2 and 10. The supplemental Eddy Current examination has been developed and demonstrated as stated below and would have detected any ID connected flaws that might have been present.

Due to the possibility that surface roughness would be detected during the examination of the subject welds, the vendor performed eddy current examination to augment the ultrasonic examination and to provide increased sensitivity at the near surface. This eddy current technique was first used in the VC Summer reactor vessel primary nozzle examinations of 2000. The procedure was refined after its first use in 2000 by applying it to the VC Summer hot leg dissimilar metal weld section removed from service. The to ET 06-0011 Page 4 of 6 10 CFR 50.55a Request Number 12R-37 removed section had a number of primary water stress corrosion cracking flaws along with non-relevant indications resulting from metallurgical interface and surface geometry.

Using these actual flaws and geometric conditions in the removed section to refine the technique, the vendor developed a reliable flaw-screening criteria which allowed for the successful use of the procedure in the VC Summer 2002 and 2003 examinations.

Since that time, the technique has been successfully blind tested for the Swedish authority SQC Kvalificeringscentrum AB (SQC NDT Qualification Center) under the program, Qualification of Equipment, Procedure and Personnel for Detection, Characterization and Sizing of Defects in Areas in Nozzle to Safe End Welds at Ringhals Unit 3 and 4," Hakan Soderstrand 7-10-03.

The technique has also been used to supplement examination of portions of the relevant near-surface volumes during the last several domestic pressurized water reactor nozzle-to-pipe examinations conducted by the vendor.

WCNOC believes that the performance of the partial volumetric examination combined with the supplemental eddy current examination and visual leakage examination provide a level of safety and quality at least equal, if not superior, to the Code required examination.

7. Duration of Proposed Alternative The second ten year ISI interval which began September 3, 1995 and ended September 2, 2005.
8. Precedents None to ET 06-0011 Page 5 of 6 10 CFR 50.55a Request Number 12R-37 Figure 1 Inlet Nozzle to Safe-end and Safe-end to Pipe I

to ET 06-0011 Page 6 of 6 10 CFR 50.55a Request Number I2R-37 Figure 2 Outlet Nozzle to Safe-end and Safe-end to Pipe

- 10 CFR 50.55a Request No. 12R-38 to ET 06-0011 Page 1 of 5 10 CFR 50.55a Request Number 12R-38 Relief Requested In Accordance with 10 CFR 50.55a(g)(5)(iii)

--Inservice Inspection Impracticality--

1. ASME Code Component(s) Affected Class 1 and 2 Risk-informed Inservice Inspection (RI-ISI) Piping welds as listed.

RI-ISI PIPING WELDS (Formerly CODE CATEGORY B-J. C-F-1)

Code Item Description Weld No.

(Note)

R1.11 6" 180 Degree Return to 6" Flange (Valve 3B-02-FW301 801 0A)

R1.11 3" Pipe to Valve 8378A G-21-FO13B R1.11 12" Pipe to Valve HV-8701A J-04-F048A R1.11 6" Pipe to Valve 8818A P-01-F009 R..11 6" Pipe to Valve 8818D P-01-F_21 R1.11 6" Pipe to Valve 8818C P-02-F022A R1.20 6" Pipe to Pressurizer Safety Nozzle Safe-End B-02-FO01A R1.20 Valve PCV-455C to 4" Pipe B-04-F014 Note: As the methodology in EPRI TR-1 12657 Rev. B-A does not provide item numbers, the format in ASME Code Case N-578-1 is utilized for the assignment of these numbers.

2. Applicable Code Edition and Addenda

The applicable ASME Boiler and Pressure Vessel Code (hereafter referred to as the

'Code") edition and addenda is ASME Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1989 Edition, with no Addenda. In addition, as required by 10 CFR 50.55a, ASME Section Xl, 1995 Edition 1996 Addenda is used for Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems.

3. Applicable Code Requirement

ASME Section Xl, Figure IWB-2500-8(c) 1989 Edition with no addenda requires volumetric examination of a minimum volume of the inner 1/3t (one third of the thickness) extending into the piping base metal for a distance of 1/4" past the edge of the weld crown. Figure IWC-2500-7(a) requires an identical examination volume.

In a letter dated December 13, 2001, from the NRC to Wolf Creek Nuclear Operating Corporation (WCNOC), the NRC approved a relief request for WCNOC for the application of a risk-informed inservice inspection (RI-ISI) program for ASME Code Class 1 and 2 piping. As approved, the methodology in EPRI TR-1 12657 Rev. B-A is utilized for the method of examination of the subject welds, as well as the selection of welds to be examined. The RI-ISI program requires volumetric examination of the subject welds and extends the Code required examination volume of the inner 1/3t to a distance 1/4" on either side of the weld counterbore or Y2W past the edge of the weld crown if no counterbore is present.

to ET 06-0011 Page 2 of 5 10 CFR 50.55a Request Number I2R-38 The WCNOC second ten-year interval inservice inspection program plan also implements Code Case N-460, which is endorsed by the NRC in Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability ASME Section Xi, Division 1."

Code Case N-460 states in part, "when the entire examination volume or area cannot be examined due to interference by another component or part geometry, a reduction in examination coverage on any Class 1 or Class 2 weld may be accepted provided the reduction in coverage for that weld is less than 10 percent."

NRC Information Notice (IN) 98-42, 'Implementation of 10 CFR 50.55a(g) Inservice Inspection Requirements," termed a reduction in coverage of less than 10 percent to be "essentially 100 percent." IN 98-42 states in part, 'The NRC has adopted and further refined the definition of "essentially 100 percent" to mean "greater than 90 percent"...

has been applied to all examinations of welds or other areas required by ASME Section Xl.'

4. Impracticalitv of Compliance The geometry of the subject components limits the examination to one side. Figures 1, 2, and 3 show the geometry of a pipe to nozzle-safe-end, an elbow to flange, and a pipe to valve weld, respectively.

When the examination area is limited to one side of an austenitic weld, the examination coverage does not comply with 10 CFR 50.55a(b)(2)(xv)(A) or the ASME Section Xl requirements and proficiency demonstrations do not comply with 10 CFR 50.55a(b)(2)(xvi) and full coverage may not be claimed. For austenitic piping, a procedure must be qualified with flaws on the inaccessible side of the weld.

Performance Demonstration Initiative (PDI) has not been able to qualify a single side examination procedure technique that is capable of demonstrating equivalency for a two-sided examination procedure technique on austenitic piping welds. Thus the coverage that may be claimed is limited to 50%.

5. Burden Caused by Compliance The geometry of the subject components make the Code required examination coverage requirements impractical. PDI has not been able to qualify a single side examination procedure technique that is capable of demonstrating equivalency for a two-sided examination procedure technique on austenitic piping welds.
6. Proposed Alternative and Basis for Use Proposed Alternative The following alternatives are proposed in lieu of the required examination coverage of essentially 100 percent:
1. Ultrasonic Testing (UT) of the subject welds was performed to the maximum extent practical due to design configuration restrictions during the second ten-year interval. This includes a best effort examination of the far side of each component to the extent possible utilizing a 60 degree refracted longitudinal to ET 06-0011 Page 3 of 5 10 CFR 50.55a Request Number 12R-38 search unit for components with thickness greater than 0.5 inch and utilizing a 70 degree shear wave search unit for components with thickness equal to or less than 0.5 inch.
2. Pressure test VT-2 visual examinations were performed as required by Code Category B-P during the second ten-year interval. No evidence of leakage was identified for these components.

Basis for Use The basis for use of these alternatives is that they provide the best examination coverage possible within the limitations of the current design configuration. The volumetric examination was performed using a system (procedures, personnel, and equipment) qualified in accordance with Appendix Vill, Supplement 2.

In addition, the thinner side of each component was fully examined (as shown by the attached figures). When degradation (i.e. cracking) occurs in a component with a configuration similar to these, it typically starts in the thinnest area. This thinnest area where degradation typically begins was fully examined in the subject welds.

7. Duration of Proposed Alternative The second ten year ISI interval which began September 3, 1995 and ended September 2, 2005.
8. Precedents None to ET 06-0011 Page 4 of 5 10 CFR 50.55a Request Number 12R-38 Figure 1 Pipe to Safety nozzle safe end configuration Figure 2 Elbow to Flange configuration to ET 06-0011 Page 5 of 5 10 CFR 50.55a Request Number 12R-38 Figure 3 Pipe to Valve configuration (Typical)