ML20211Q738

From kanterella
Revision as of 19:57, 5 May 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-313/87-01 & 50-368/87-01 on 870119-23 & Notice of Violation
ML20211Q738
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/24/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
Shared Package
ML20211Q741 List:
References
NUDOCS 8703030173
Download: ML20211Q738 (2)


See also: IR 05000313/1987001

Text

-_ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

,: .

FEB 2 41987

In Reply Refer To:

Dockets: 50-313/87-01

50-368/87-01

Arkansas Power & Light Company-

ATTN: Mr. Gene Campbell

Vice President, Nuclear

Operations

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Dr. J. B. Nicholas of this office

during the period January 19-23, 1987, of activities authorized by NRC

Operating Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,

and to the discussion of'our findings with Mr. J. M. Levine and other members

of your staff at the conclusion of the inspection.

Areas examined during the inspection included liquid and gaseous radioactive

waste management programs and an investigation of an allegation involving the

qualifications for certain contract health physics technicians. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspector. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

these violations, in writing, in accordance with the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part'2, Title 10, Code of

Federal Regulations. Your response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

-

k[

O

DO 50 313

I'UR

ORIGINAL SIGNED BY:

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure (see next e)

RIV:FRPS C:FRPS C:R&SPB' C: C:RPBk' AC h

JBNicholas/tw BMurray WLFisher DRHunter JEGag1.1$do MEEmprson

p/g/87 fr/f/87 V/j)/87 1 6 40/87 %hg87 4 /()/87

</o

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ . _. _ _ _ _ _ _ _ _ _ _

-

.

Arkansas Power & Light Company -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-313/87-01

50-368/87-01

cc w/ enclosures:

J. M. Levine, Director

Site Nuclear Operations

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 72801

Arkansas Radiation Control Program Director

bec to DMB (IE06)

bec distrib. by RIV:

  • RPB *RRI R. D. Martin, RA
  • R&SPB. *Section Chief (RPB/B) *D. Weiss, RM/ALF
  • RIV DRSP *RSB
  • MIS System *RSTS Operator * Project Inspector
  • R. Hall *J. B. Nicholas *W. L. Fisher
  • B. Murray R. L. Bangart M. E. Emerson (2)
  • w/766

i

!

,

,